NATIONAL INSTITUTE FOR RESEARCH AND DEVELOPMENT OF ISOTOPIC AND MOLECULAR TECHNOLOGIES Donath St. 65-103, 400293, Cluj-Napoca, ROMANIA Tel.: +40-264-584037; Fax: +40-264-420042; GSM: +40-731-030060 e-mail: [email protected], web: http://www.itim-cj.ro Green technology used for ATLAS processing Dr. Ing. Fărcaş Felix [email protected] INCDTIM Why may we use “Green” Technology in a datacenter especially for Grid? 2 Green IT INCDTIM Green use. Reduce the energy consumption of computers and other information systems. Green disposal. Refurbish and reuse old computers Green manufacturing. Manufacture of electronic components and other subsystems with minimal or no impact on the environment Green design. Design energy efficient and environmentally sound computers, servers, and cooling equipment. 3 ITIM Datacenter dedicated to Grid INCDTIM Place for max 5 rack’s, total of 200 1U rack mountable computers To small for our expectation 5 years ago, but good for a start. No backup solution, no redundancy 4 We used some of the green IT concepts INCDTIM Green disposal – less space more computers – good management program, less people, – redundant system Green use – power economy – using virtual environment on 5 Years old rack mountable computers 5 Technology and Implementation INCDTIM 6 Blade technology INCDTIM IBM and HP Blade system, total of 46 Blades in only 29 U Processing power: 368 core Less space for 46 PC => core increase by 56% Less power consume reduced by 34% Management -> through web based interfaces MSA Storage capacity: 50 TB, Blade system and MSA storage 7 Network Layer 3 Switch Cisco 6509E INCDTIM A Layer 3 switch with routing capabilities -> decrease power consume Full redundant system -> increase reliability ITIM – RoEduNet 10 GB 2011 8 Backup and monitoring INCDTIM APC Netbotz Monitoring System Temperature Humidity Fluid detector Smoke detector Power generator 275kW Uninterruptible Power Source ~ APC Symetra of max 160 KVA full redundant U P S 9 Logical Schema of the Datacenter Network Configuration INCDTIM 10 INCDTIM RO-14ITIM Results for Atlas in Romania 11 17% of CPU time in Romania INCDTIM 12 What are the Green IT implementations results? INCDTIM Did we increase the number of Cores in the Datacenter? - Yes Did we Improve the management condition – Yes Do we have good redundancy? – Yes Did we Reduce the power consumption? … Maybe 13 Financial support 1. 2. 3. 4. 5. 6. 7. Fund through National Authority for Science Research (ANCS) SINDEGRID, closed project 12 EU – ConDeGrid / 2009 – present 15 EU / 2008 – present POS-CCE 192/2719, Sectorial Operational Program, “Increase of Economic Competitiveness”, contract 42/11.05.2009 Axis 2, Operation 2.2.3~ Improving the capacity and reliability of INCDTIM GRID center for integration in international networks (INGRID), Value: 2.345.800 lei ~ 500.000 Euro POS-CCE 536, Axis 2, operation 2.1.2, software acquisition. Cooperation program "HulubeiMeshcheryakov“ together with the Laboratory of Information Technologies at JINR –Dubna INCDTIM 14 Conference Invitation INCDTIM INCDTIM is organizing between the 25-27 October 2012 the Fifth Romania Tier 2 Federation "Grid, Cloud & High Performance Computing Science" - RO-LCG Conference http://www.itim-cj.ro/rolcg2012 Under the Regis of: IEEE Romania Section – Full paper submission: 25.07.2012 – Notification of acceptance: 1.09.2012 – Camera ready papers: 15.09.2012 15 ?Future idea? INCDTIM We are improving the storage capacity for analyzing ATLAS data in the near future Virtual implementation We are looking to improve the middleware. and changing gLite to EMI Improving the IPv6 link Working for obtaining new collaboration for the Grid site 16 Thank you for your time Your question please… 17
© Copyright 2025 Paperzz