HPC and Grid Computing in INCDTIM

NATIONAL INSTITUTE FOR RESEARCH AND DEVELOPMENT OF ISOTOPIC
AND MOLECULAR TECHNOLOGIES
Donath St. 65-103, 400293, Cluj-Napoca, ROMANIA
Tel.: +40-264-584037; Fax: +40-264-420042; GSM: +40-731-030060
e-mail: [email protected], web: http://www.itim-cj.ro
Green technology used for
ATLAS processing
Dr. Ing. Fărcaş Felix
[email protected]
INCDTIM
Why may we use “Green”
Technology in a datacenter
especially for Grid?
2
Green IT
INCDTIM
Green use. Reduce the energy consumption of
computers and other information systems.
Green disposal. Refurbish and reuse old
computers
Green manufacturing. Manufacture of electronic
components and other subsystems with minimal or no
impact on the environment
Green design. Design energy efficient and
environmentally sound computers, servers, and
cooling equipment.
3
ITIM Datacenter dedicated to Grid
INCDTIM
Place for max 5 rack’s, total of 200 1U
rack mountable computers
To small for our expectation 5 years ago,
but good for a start.
No backup solution, no redundancy
4
We used some of the green IT
concepts
INCDTIM
Green disposal
– less space more computers
– good management program, less
people,
– redundant system
Green use
– power economy
– using virtual environment on 5
Years old rack mountable
computers
5
Technology and Implementation
INCDTIM
6
Blade technology
INCDTIM
IBM and HP Blade system, total of 46
Blades in only 29 U
Processing power: 368 core
Less space for 46 PC => core increase
by 56%
Less power consume reduced by 34%
Management -> through web based
interfaces
MSA Storage capacity: 50 TB,
Blade system and
MSA storage
7
Network Layer 3 Switch Cisco
6509E
INCDTIM
A Layer 3 switch with routing capabilities ->
decrease power consume
Full redundant system -> increase reliability
ITIM – RoEduNet 10 GB 2011
8
Backup and monitoring
INCDTIM
APC Netbotz
Monitoring System
Temperature
Humidity
Fluid detector
Smoke detector
Power generator
275kW
Uninterruptible
Power Source ~
APC Symetra of
max 160 KVA full
redundant
U
P
S
9
Logical Schema of the Datacenter
Network Configuration
INCDTIM
10
INCDTIM
RO-14ITIM
Results
for Atlas
in
Romania
11
17% of CPU time in Romania
INCDTIM
12
What are the Green IT
implementations results?
INCDTIM
Did we increase the number of Cores in
the Datacenter? - Yes
Did we Improve the management condition
– Yes
Do we have good redundancy? – Yes
Did we Reduce the power consumption?
… Maybe 
13
Financial support
1.
2.
3.
4.
5.
6.
7.
Fund through National Authority for Science
Research (ANCS)
SINDEGRID, closed project
12 EU – ConDeGrid / 2009 – present
15 EU / 2008 – present
POS-CCE 192/2719, Sectorial Operational
Program,
“Increase
of
Economic
Competitiveness”, contract 42/11.05.2009
Axis 2, Operation 2.2.3~ Improving the
capacity and reliability of INCDTIM GRID
center for integration in international
networks (INGRID), Value: 2.345.800 lei ~
500.000 Euro
POS-CCE 536, Axis 2, operation 2.1.2,
software acquisition.
Cooperation
program
"HulubeiMeshcheryakov“ together with the Laboratory
of Information Technologies at JINR –Dubna
INCDTIM
14
Conference Invitation
INCDTIM
INCDTIM is organizing between the 25-27
October 2012 the Fifth Romania Tier 2
Federation "Grid, Cloud & High Performance
Computing Science" - RO-LCG Conference
http://www.itim-cj.ro/rolcg2012
Under the Regis of: IEEE Romania
Section
– Full paper submission: 25.07.2012
– Notification of acceptance: 1.09.2012
– Camera ready papers: 15.09.2012
15
?Future idea?
INCDTIM
We are improving the storage capacity for
analyzing ATLAS data in the near future
Virtual implementation
We are looking to improve the middleware.
and changing gLite to EMI
Improving the IPv6 link
Working for obtaining new collaboration for
the Grid site
16
Thank you for your time




Your question please…
17