CALDERDALE MBC WARDS AFFECTED: ALL 7 CABINET 13 JULY 2009 NEW AFFORDABLE ZERO CARBON HOMES FOR CALDERDALE REPORT OF THE GROUP DIRECTOR, COMMUNITY SERVICES 1. ISSUE 1.1 The purpose of this report is to decide how to proceed following receipt of tender submissions for affordable zero carbon homes in Calderdale. 2. NEED FOR A DECISION 2.1 In October 2007 Cabinet approved the principle of using up to £300,000 of commuted sums money to stimulate and add value to the development of affordable homes in Calderdale, built to zero-carbon standards. Cabinet also requested that a further report be submitted following the assessment of submissions received. 3. RECOMMENDATION 3.1 It is recommended that Cabinet authorise the Head of Housing and Community Support to accept the tender submitted by Pennine Housing 2000. D:\81896908.doc 4. BACKGROUND Commuted sums 4.1 Calderdale Council normally seeks provision of affordable housing ‘on site’ as part of larger planning applications. However, in specific circumstances, ‘commuted sums’ are agreed as an alternative. Cabinet received a report on a proposal to support the construction of zero carbon homes in Calderdale on 29 th October 2007. Cabinet resolved that the principle of using commuted sums to stimulate and add value to the development of affordable homes in Calderdale, built to zero carbon standards, be supported and up to £300,000 be allocated for this purpose. It also resolved that Registered Social Landlords and developers be invited to submit expressions of interest on the basis of the brief presented to Cabinet and that a further report be submitted to Cabinet following the assessment of submissions received. 4.2 Cabinet approved a report on 10th April 2006 on ways such commuted sums can be deployed to secure additional affordable housing. This included providing additional subsidy to secure the delivery of a scheme funded through Social Housing Grant, in addition to funding provision of housing for special or specific needs as identified in Housing Strategy 2005-2010. Climate change and sustainable homes 4.3 It is widely recognised that climate change, caused by the build up in greenhouse gases, and maintaining a stable and affordable energy supply in an increasingly unstable world are the greatest environmental challenges we face today. In the UK, the energy we use in our homes and for personal transport is responsible for almost half of the country’s carbon dioxide emissions. Clearly housing design has an important role to play as part of a comprehensive local response to tackling global warming. 4.4 Government responses to the climate change challenge have included a progressive tightening of Building Regulations, the introduction of a new Planning Policy Statement on Climate Change and the launching of a new ‘Code for Sustainable Homes’, which is designed to enable a step change in sustainable building practice for new homes. Government has also recently published a new Green Paper on housing, “Homes for the Future: more affordable, more sustainable”. This reaffirms the Government’s commitment to all new homes being zero carbon rated from 2016. Zero carbon homes 4.5 The Code for Sustainable Homes measures the sustainability of a home against nine design categories, rating the ‘whole home’ as a complete package. The design categories are: Energy and CO2 Emissions Surface Water Run-off Health and Wellbeing Water Waste Ecology Materials Pollution 4.6 Each of the above categories includes a number of environmental issues which have a potential impact on the environment. The issues can be assessed against a performance target and awarded one or more credits. Minimum standards exist for a number of categories, but apart from these the Code is very flexible, allowing developers to choose which and how many standards they implement to obtain ‘credits’ under the Code in order to achieve a higher sustainability rating. Examples of completed Zero Carbon Homes at BRE Innovation Park – Insite 2009* 4.7 The Code for Sustainable Homes uses a sustainability rating system, indicated by ‘stars’, to communicate the overall sustainability performance of a home. A home can achieve a sustainability rating from one to six stars depending on the extent to which it has achieved Code standards. One star is the entry level – above the level of the current Building Regulations; and six stars is the highest level – reflecting exemplar development in sustainability terms. A ‘Zero Carbon’ home uses less energy than it generates over time. A carbon footprint is calculated for the full life of the home, including the carbon dioxide emissions created during the build process and daily energy needs. This figure is offset by the property’s ability to produce the energy it needs itself through renewable sources of energy. 4.8 As the development of zero carbon homes is still cutting edge there is little definite information on the likely additional costs. For future development they currently have been quoted from £15,000 for code level 5 and £45,000 for code level 6. There have only been a total of 2 level 5 zero carbon homes and no level 6 built to date. The latest figures below highlights the number of post-construction code of sustainable homes certificates issued by end of March 2009 : Source – Parliamentary Official Report (Hansard) Total number of code certificates issued in the UK by end March 2009 Post construction (by code level) Registration March 2009 >170,000 Design 1 2 3 4 5 6 1,082 0 1 32 4 2 0 Note - 2 of these completed level 4 homes are within Calderdale *photo’s by Peter White – BRE Ltd 4.9 The above table clearly shows that using commuted sums to stimulate and add value to the development of affordable zero carbon homes would showcase Calderdale as a progressive and forward thinking leader on the key housing issues of affordability and climate change. Construction would also act as an exemplar to promote and encourage the embracing of code 5 and 6 construction in the Borough. Affordable homes and affordability 4.10 The Calderdale Housing Requirements Study was published in 2005 and its headline finding was that there was a shortfall of 720 units of affordable housing across the district, with a high proportion (around two-thirds) of people wanting to move unable to afford to purchase on the open market. Based upon these findings the Calderdale Housing Strategy identifies the need for additional affordable housing in the district and sets a target of 20% of all completions to be affordable homes. 4.11 It is widely accepted that households should not be required to devote more than 30% of their net household income to rent and/or mortgage payments in order to have a realistic chance of sustaining tenancy/ownership. It is thus suggested that the properties must be affordable with reference to average local incomes. 4.12 All tenderers are Registered Social Landlords (RSLs) or have identified key RSL partners whose rents would be set by the Homes and Communities Agency (HCA) at an affordable level. Shared ownership units would need to be based on local income levels to ensure affordability. 5. TENDER PROCESS 5.1 The Procurement strategy for this project was to give a wide range of potential providers the opportunity to tender. Background information on affordable zero carbon homes and a Pre-Qualification Questionnaire (PQQ) were sent to all Registered Social Landlords (RSLs) and developers operating within the borough, in addition to developers with prior experience of developing EcoHomes and local sustainability-interest groups. Further awareness of the project was generated through the advertisement within the Official Journal of the European Union (OJEU) 5.2 Through the PQQ stage of the procurement process a total of 14 responses were received. Following the scoring, audit and financial evaluations, 7 potential providers were identified and formally invited to tender. Discussions were held with all seven developers to confirm their interest in the project following the onset of the ‘credit-crunch’. 5.3 From the 7 developers invited to tender, 3 withdrew due to issues with land availability, the inability to secure RSL involvement and 2 of the developers invited to tender made the decision to submit a joint tender proposal. 5.4 In total 3 tender submissions were received from Southdale Homes, Pennine Housing 2000 and a joint bid from St.Vincent’s/Rok Group. These were scored in a fair and equitable way by the tender panel based on pre-determined scoring criteria: Number of Units, Level of the Code for Sustainable Homes achieved, Development Time, Strategic Fit with the aims of Calderdale Council, Added Value, Partnering and Monitoring. 5.5 The tender panel evaluated on a ‘Most Economically Advantageous Tender’. The tender panel individually scored Pennine Housing 2000 the highest on both the Price and Quality aspects and it is recommended that Cabinet approve the tender submitted by Pennine Housing 2000. 6. OPTIONS CONSIDERED A Do nothing B Choose recommended developer C Choose different developer A Do Nothing 6.1 The ‘do nothing’ option is not realistic as the commuted sums need to be used in a creative and cost-effective manner to support the objectives within the Calderdale Housing Strategy. B Choose Recommended Developer 6.2 The tender panel individually scored Pennine Housing 2000 the highest on both the Price and Quality aspects. As such the tender submission from Pennine Housing 2000 was found to be the most economically advantageous tender and preferred option. Key features of the Pennine Housing scheme are mixed tenure family houses built to Code level 5 and 6 which could make a start on site immediately with the first zero carbon homes in the Borough predicted to be completed by January 2010 with monitoring and great publicity opportunities. 6.3 The submission for Pennine Housing 2000 included some flexible options within the tender and it is recommended that option 2 be approved. This option would provide a total of 12 mixed-tenure units all built to zero carbon standards over 3 identified sites, including 10 units built to level 5 of the code for sustainable homes and 2 units built to level 6, the highest level possible. There are additional costs for publicity, monitoring and management of the scheme giving a total cost of £290,000, which was also the least expensive of the submissions received. The submission proposes the employment of a Project manager to engage with local schools and facilitate site visits for young people to learn and complete project work, in addition to supporting new residents and assisting with monitoring. An apprenticeship scheme was also proposed in conjunction with construction partners Bramall and Lovell. 6.4 In terms of deliverability, on the Cornholme site, the Zero Carbon project can commence immediately upon receipt of a successful decision from Cabinet. The other two sites in Hebden Bridge and Luddendenfoot are vacant and will require planning permission to be sought, but would provide continuity subject to receipt of complimentary financial support from the Homes and Communities Agency, as they can be constructed straight after completion of the Cornholme site. If Cabinet approves this proposal, the first zero carbon homes could be completed in the borough as early as January 2010, as the units at Mount Pleasant benefit from full planning permission to code level 4 and the site is already cleared ready to begin construction and only minor planning amendments would be required, although planning permission still needs to be sought for the other proposed sites. 6.5 Pennine Housing 2000 are already a key partner, Calderdale’s largest locally based RSL and an active member of Calderdale Forward Local Strategic Partnership. Pennine Housing 2000 and development partners also have a wealth of experience developing eco-homes and recently completed two units in Illingworth, which were the first in the country to achieve level 4 of the Code for Sustainable Homes. 6.6 There is a tremendous potential for publicity for an affordable zero carbon scheme for both Calderdale Council and development partners. Pennine Housing 2000 are proposing a strategic marketing plan involving publicity opportunities with local media and specialist housing and building publications. Lettings would take place through Calderdale’s established Choice Based Lettings system, ‘Keychoice’ and liaison between with key partners. C Choose Different Developer 6.7 Although all the submissions were of a high standard, choosing a different developer is not recommended on the basis of the tenders received. The tenders have been scored on a fair and equitable basis with all five members of the tender panel individually scoring Pennine Housing 2000 the highest on both the Price and Quality aspects. As such the tender submission from Pennine Housing 2000 was found to be both the most economically advantageous tender and preferred option for quality. 7. CONSULTATION 7.1 The proposed uses of commuted sums set out in this report are consistent with the objectives set out in the Calderdale Housing Strategy 2005 - 2010 which, in turn, incorporate the findings of the Calderdale Housing Requirements Study 2005. Both of these documents were based upon extensive consultation and research with the public, Councillors and stakeholders. 8. FINANCIAL IMPLICATIONS 8.1 An amount of £300,000 has been allocated to this project through commuted sums obtained through planning obligations for affordable housing. These financial receipts available from the Section 106 agreements can only be used for affordable housing provision, and must be spent in accordance with the specific terms of each agreement. There is no extra cost to the Council, other than the staff resource required to secure commuted sums and develop proposals for their use, which is only a small part of the housing enabling role. 8.2 The project will drive forward the Council’s commitment to both affordable housing and sustainability agendas. It will also secure additional local investment from RSLs as they will be utilising their own resources and finances in addition to Council funding and over £500,000 social housing grant via the Homes and Communities Agency (HCA), contributing to the regeneration of the Borough. 9. CORPORATE IMPLICATIONS 9.1 The Calderdale Local Area Agreement (LAA) contains actions and targets aimed at addressing housing needs, including the securing of affordable housing through the planning system and meeting the particular needs of the rural parts of the Borough. Similarly, the Calderdale Community Strategy (Futures Plan) acknowledges the importance of increasing access to good quality affordable and sustainable housing in the Borough. 9.2 The provision of affordable housing helps to create mixed and sustainable communities, and homes that meet zero carbon standards are in line with the Council’s Environmental Policy, in addition to contribution towards the LAA indicator NI186 which aims to tackle climate change through reduced carbon emissions. 9.3 The Calderdale Housing Strategy seeks to address the housing requirements of all members of the community, and recognises that some individuals and communities will have different needs. The Housing Strategy’s objectives are organized to support broader Council priorities including regeneration, supporting vulnerable people and improving community safety. 9.4 In terms of equality implications, no adverse impacts have been identified from the proposed initiative and it will have positive effects in terms of increasing access to affordable housing for people with lower incomes and ensuring the design will incorporate accessibility to Lifetime Homes standards. 10. CONCLUSION 10.1 On the basis of the tenders received it is recommended that Cabinet approve acceptance of the tender submitted by Pennine Housing 2000. By using commuted sums to stimulate and add value to the development of affordable homes in Calderdale, the Council would encourage the early construction of ‘zero carbon’ homes in the area, and take a lead in acting locally to tackle a global issue, whilst addressing the key housing issues of affordability and climate change. Ref: MD Date: 31 July 2017 KERSTEN ENGLAND GROUP DIRECTOR, COMMUNITY SERVICES FOR FURTHER INFORMATION ON THIS REPORT CONTACT: Mark Dowson, Affordable Rural Housing Officer – 01422 393266. [email protected] DOCUMENTS USED IN THE PREPARATION OF THE REPORT: Calderdale Housing Strategy 2005 - 2010 Cabinet report 10th April 2006 : “Use of S106 commuted sums for affordable housing” Cabinet Report 29th October 2007 : “New affordable zero carbon homes for Calderdale” The Code for Sustainable Homes, Communities and Local Government, February 2008 Tender Documents DOCUMENTS ARE AVAILABLE FOR INSPECTION AT: Northgate House, Halifax.
© Copyright 2026 Paperzz