PROPOSED Programs, Services and Facilities Needed COS Strategic Master Planning Process: February 2005 Documents Used:1 There have been numerous processes conducted to collect information on what is needed at COS with respect to programs, services and facilities. The following documents have been reviewed and summarized into the attached tables: Summary of November 11, 2004 Planning Day Information On November 11, 2004, all COS staff met to provide input into the development of the college’s strategic master plan. Twelve groups spent about two hours discussing two key questions: “What should be the mission of COS?” and “What projects/activities should we be conducting?” The responses were summarized and are used as the basis for the strategic master planning documents. Community Forums – Fall 2004 A series of eight community meetings were conducted in fall 2004. The communities included Dunsmuir, Scott Valley, Weed, and Yreka. Additional communities are being visited in Spring 2005. List of 2004-05 Priority Projects for COS (developed through Level 1-2-3 planning) Each year, groups on campus prepare “level 1” plans which include objectives for the upcoming year as well as the resources required. The facilities, equipment and staff requests are reviewed and prioritized by “level 2” and then submitted to the President’s Advisory Council (“level 3”). 2006-2010 Five Year Construction Plan (prepared for Chancellor’s Office) The college prepares a Five Year Construction Plan annually for the Chancellor’s Office in reference to the Community College Construction Act of 1980. The plan includes descriptions of the new construction we would like the state to fund. District Scheduled Maintenance Five Year Plan (prepared for Chancellor’s Office) The scheduled maintenance plan is updated annually and includes the types of regular activities the college staff feels is necessary to maintain facilities (e.g. roofs, utilities, mechanical). Facilities Status Report – September 2003 (prepared by Mark Healy) In September 2003, the college’s Director of Maintenance & Operations completed a report on all buildings on campus which included a listing of 1) Major projects completed in the last ten years, 2) Current facility needs, and 3) Long-range needs. Enrollment Management: Short- & Long-Term Enrollment and Retention Strategies (prepared by Academic Senate Subcommittee- 2005) For the 2004-05, the Academic Senate has as its high priority goal: “Develop short- and longterm strategies to improve enrollment and retention.” A committee has been meeting throughout the year to develop ideas and has prepared a draft report. Information from this draft report was included. 1 Some of the documents used are in the process of being updated. The most current ones available in February 2005 were used to prepare the attached list. Draft February 2005 1 SWACC Property & Liability Inspection – January 2003 (prepared for COS by Keenan & Associates) About every two years, a representative from Keenan & Associates inspects the facilities to determine if there are items which might increase our “liability”. This report was prepared based on an inspection conducted on June 21, 2002. An updated report is expected in the near future. Special Request to Campus (email from Superintendent/President on 1/27/05) In order to make certain a particular program or project is not “forgotten”, the Superintendent/President made a request to all campus staff to submit any additional information to his office on programs, services or facilities that might need to be included in the strategic master plan. Organization of Results The list of programs, services and facilities is organized into the following categories: o Academic Programs – New o Academic Programs – Remodeling o Services for Students o Collaboration o Staff o Facilities - New o Facilities – Remodeling/Improvement o Facilities - Maintenance o Equipment Draft February 2005 2 ACADEMIC PROGRAMS – NEW Title of Project Outdoor Recreation Ski/Snowboard (team) Wilderness SearchRescue-First Response Medical Imaging Source 2004 Planning Day Senate Enrollment Mgmt. 2004 Planning Day 2004 Planning Day 2004 Planning Day Dental Hygiene 2004 Planning Day Medical Terminology Medical Transcription Wellness 2004 Planning Day Forestry 2004 Planning Day Culinary Arts 2004 Planning Day Animal Science 2004 Planning Day Agriculture Hospitality/Tourism Community Forums 2004 Planning Day Mechanics 2004 Planning Day Paralegal 2004 Planning Day Electrician 2004 Planning Day Plumbing 2004 Planning Day Construction 2004 Planning Day Computer Network Computer Hardware Process Tech 2004 Planning Day Real Estate 2004 Planning Day Home Health Aid Community forums Automotive Fiber Processing/Spinning and Weaving Bachelor’s Degrees Community forums Community forums Landscape studies Community forums RN Program Community forums Commercial Driver Community forums Draft February 2005 Description/Comments 2004 Planning Day 2004 Planning Day Community forums 3 ACADEMIC PROGRAMS – REMODELING/IMPROVEMENT Title of Project Expand cultural and performing arts center Vacation-Education packages in summer Elder Hostel-type programs ECE Lab School Source 2004 Planning Day Outreach to Home School Students Increase capacity for distance education Entire summer school on-line Entire degree program on-line Implement compressed calendar COS Classes at the high schools 2004 Planning Day More late start, weekend and evening Special summer programs Lifelong Learning (senior college) GED Program 2004 Planning Day 2004 Planning Day 2004 Planning Day Community forums 2004 Planning Day 2004 Planning Day 2004 Planning Day 2004 Planning Day Senate Enrollment Mgmt. Community forums 2004 Planning Day 2004 Planning Day Basic Skills Program Senate Enrollment Mgmt. Analyze trade tech school offerings & provide (at lower cost) Continuing Education for Health Professionals Expand work experience Senate Enrollment Mgmt. Expand/enrich summer program Incorporate new technology into classroom Increase library hours Senate Enrollment Mgmt. Draft February 2005 Partner with national youth sports program; Writer’s conference; specialty programs 2004 Planning Day Senate Enrollment Mgmt Community forums Senate Enrollment Mgmt. Senate Enrollment Mgmt. Analyze alternatives to scheduling Ski weekend; white water rafting 2004 Planning Day Teacher Aide Training Use COS 8am-10pm Monday-Saturday Description/Comments 2004 Planning Day Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. 2004 Planning Day 2004 Planning Day Senate Enrollment Mgmt. 4 Offer late start college Senate Enrollment Mgmt. Improve web presence 2004 Planning Day Senate Enrollment Mgmt. Senate Enrollment Mgmt. Continue T3 projects focusing on diversity Create marketing strategies for the mix of students we want; use student testimonials “Siskiyou Scholars” program for local students Explore new ways to report FTES Be recruitment-friendly; involve all COS employees in recruitment Alumni/Reunion Program Program to assist new employees “Soft Skills” courses Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Community forums Community forums Community forums Business-friendly courses Community forums More classes in outlying areas Adult computer/internet courses Athletic/Performing Arts programs MCTV Regular Show Community forums Expand internet courses Community forums Connect with OSF Community forums Italian Language courses Community forums Non-smoking classes Community forums Men’s/Women’s Soccer teams Expand Yreka offerings Community forums Local teacher continuing education Academic classes in Yreka; e.g political science, government, history Community forums Community forums Community forums Community forums Community forums Community forums Draft February 2005 5 SERVICES FOR STUDENTS Title of Project Job Placement Services in career center Mandatory study hall for at-risk students Create sense of belonging Source 2004 Planning Day Follow EOPS/SSS model for success Use San Diego Mesa College materials for outreach Make student retention a high priority & evaluate regularly Develop student services strategic plan focusing on retention Promote financial aid Senate Enrollment Mgmt. Open residence halls all year Develop early warning for probationary students Determine why students “don’t enroll” Create friendly campus environment (eg.1st week) Build program for EACH employee to take ownership of retention Sponsor political events Senate Enrollment Mgmt. Outreach to high schools Community forums Speaker’s Bureau (for service clubs) Public relations – increase Community forums Circle K club Community forums Draft February 2005 Description/Comments Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Senate Enrollment Mgmt. Community forums Provide COS update once per year Community forums 6 COLLABORATION Title of Project Be strong partners in Weed Comm. Ctr Increase faculty interaction with K-12 Create college town atmosphere in Weed Promote shopping opportunities for students Transportation system – bringing students to campus & for outside field trips/special events Promote economic development by serving as catalyst for new businesses Create partnerships on campus, regionally, nationally Create relations with county employers (nursing, fire, theater, athletics) Use local talent of retired individuals Put “community” into community college – MCTV, Weed Comm. Ctr., Speaker’s Bureau, COS Alumni Assn. Source 2004 Planning Day Description/Comments 2004 Planning Day 2004 Planning Day 2004 Planning Day 2004 Planning Day 2004 Planning Day 2004 Planning Day Senate Enrollment Mgmt. 2004 Planning Day Senate Enrollment Mgmt. 2004 Planning Day Senate Enrollment Mgmt. Draft February 2005 7 STAFF Title of Project Provide competitive compensation Provide on-going staff development FLEX/professional growth opportunities Provide adequate staff to support programs Faculty/staff mentoring Source 2004 Planning Day Description/Comments 2004 Planning Day 2004 Planning Day 2004 Planning Day Shared governance Senate Enrollment Mgmt. Customer service training Senate Enrollment Mgmt. Involve all staff in recruitment & retention Senate Enrollment Mgmt. Draft February 2005 8 FACILITIES - NEW Title of Project Athletic Field House Tutoring Center Source 2004 Planning Day 5 Year Construction Plan 2004 Planning Day Smoking Kiosks 2004 Planning Day New Library 2004 Planning Day New Gym 2004 Planning Day Amphitheater Indoor Arena: “Siskiyou Dome” Recital Hall Residence Halls Regional Health Care Training Facility Relocation of Maintenance Facility Physical Science Building Yreka Campus Expansion Student Union New Classroom Building Description/Comments Pool, dance areas, rock climbing, racquetball, indoor practice – softball, baseball, track 2004 Planning Day 5 Year Construction Plan 2004 Planning Day 2004 Planning Day 2004 Planning Day Apartment-style 2004 Planning Day 5 Year Construction Plan 5 Year Construction Plan 5 Year Construction Plan NAS Area 5 year Construction Plan Student Services Council Community forums NAS Student gathering center and student services Replace Abner Weed and Greenshields Draft February 2005 9 FACILITIES - REMODELING Title of Project Residence Halls Classrooms Source 2004 Planning Day Community forums 2004 Planning Day Student Center 2004 Planning Day Signage Labs Theater Study Nooks 2004 Planning Day Community forums 2004 Planning Day PAC Priority List 2004 Planning Day PAC Priority List PAC Priority List Art Patio PAC Priority List Gym Locker Rooms PAC Priority List Life Science Study Area PAC Priority List Life Science HVAC PAC Priority List Life Science Modernization PAC Priority List Eddy Hall-Learning Services HVAC/Remodel Gym Head Coaches Office PAC Priority List Gym Lighting PAC Priority List Inside Hitting Area PAC Priority List Child Development Center Description/Comments Bathrooms, etc. Modernized to meet needs; smart classrooms Coffee cart, study space, comfy furniture On-campus directions; off-campus locator signs (e.g. near SVB) Modernize/upgrade Painting, bathrooms, larger atrium, coat check-in Around campus PAC Priority List Career & Tech Draft February 2005 10 FACILITIES - MAINTENANCE Title of Project Heating & Cooling Source 2004 Planning Day Beautify Grounds 2004 Planning Day Paint Offices/classrooms 2004 Planning Day Replace all windows on campus Roofs: I-Tech Maintenance Shop Physical Assessment Gym Theater Utility: Campus Switchgear LRC Electrical Panel Recondition Backup Generator Replace portions of main sewer line HVAC Physical Science, Theater, Tech services Revamp energy management system campus-wide 2004 Planning Day Replace gym floor Replace interior gym bleachers Abner Weed: Roof, Paint, HVAC, Remove unused wiring Eddy Hall: HVAC, Roof, Paint, Interior remodel (Learning Serv) Greenshields: Roof, Pain Physical Science: Roof, Paint, remodel interior McCloud: HVAC, Paint, Roof Life Science: Roof, Abate Asbestos, Paint, HVAC Theater: Renovate restrooms, lobby Draft February 2005 Description/Comments 5 Year Scheduled Maintenance Plan 5 Year Scheduled Maintenance Plan 5 Year Scheduled Maintenance Plan 5 Year Scheduled Maintenance Plan Facility Status Report 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 11 LRC: Electrical panels, HVAC, Studio remodel, floor covering Ponderosa Hall: Electrical panels, fireplace, bathrooms, phone wiring, carpet, fire alarm, fire sprinklers, drinking fountains, exterior concrete, HVAC controls (individual for rooms); AC Juniper Hall: Same as Ponderosa (except bathrooms) Industrial Tech: Conversion of welding lighting, roof Athletic Training Ctr: Remodel bathrooms, roof replace drinking fountain, Student Center: Roof, underground waste lines, replace windows, replace plants & revise sprinkler system, paint, fireplace, door openers replace exterior doors Gym: HVAC repair, remodel laundry room paint inside, replace lighting, replace flooring in weight room, replace gym floor, replace basketball goals Rain Gutters throughout campus Discovery Children’s Center: Automatic irrigation, paint, roof Foundation/Resource Building: Ramp replacement, sidewalk, roof, paint Fields: Baseball – irrigation system, seeding, south dugout Track – recoat surface, long jump, pole vault Football – redo field, restroom, snack bar, paving to bleachers, cable for scoreboard, play clocks Draft February 2005 Facility Status Report 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report – 2003 Facility Status Report 2003 12 Campuswide: Parking lots, electrical switchwear, signage, forest management Parking lot surface near ITech & Weight room – repair or resurface Outside Basketball courts Sidewalk near theater Yreka Campus: Use of extension cords Main Walkway Steps Men’s & Women’s Locker Rooms: shower floor Draft February 2005 Facility Status Report – 2003 Priority Recommendations: SWACC Property/Liability Report – January 2003 Priority Recommendations: SWACC Property/Liability Report – January 2003 Priority Recommendations: SWACC Property/Liability Report – January 2003 Priority Recommendations: SWACC Property/Liability Report – January 2003 SWACC Property/Liability Report – January 2003 13 EQUIPMENT Title of Project Replace broken desks; add special desks for disabled; provide open seating Benches around campus Source 2004 Planning Day Campus-wide PA system 2004 Planning Day Closed caption for all lectures State of the art projection, sounds recording in T2 Upgrade T3 with new computers and mini-pianos Computer workstations with internet in every classroom Mini-Kinkos with printshop, FAX, internet café for students Booklet Maker 2004 Planning Day Student Center Redo Description/Comments 2004 Planning Day 2004 Planning Day 2004 Planning Day 2004 Planning Day 2004 Planning Day PAC 2004 Priority List PAC 2004 Priority List Draft February 2005 14
© Copyright 2026 Paperzz