Solar Initiatives - Ratings for major sites

Attachment B
Ratings for Major Sites Investigated
Site
Specific Areas
Rating
Primary Issues
701 Ocean Street
Roof, main building
A
Roof, fl eet building
B
Carports 1-10
B
Some potential shading, roof was determined to be adequate for installation,
though this should be confi rmed by a structural engineer.
Roof was not examined and would need more detailed structural analysis,
some potential shading
Removal of trees and/or removal or relocation of light poles
Emeline Campus
Roof, 1400 building
A&B
Roof, 1080 building
A&B
Roof, 1060 building
B
The entire roof was not examined and would need more detailed structural
analysis
The entire roof was not examined and would need more detailed structural
analysis
Roof was not examined and would need more detailed structural analysis.
Roof, 1040 building
B
Roof was not examined and would need more detailed structural analysis.
Roof, 1020 building
B
Roof was not examined and would need more detailed structural analysis.
Roof, warehouse building
B
Roof was not examined and would need more detailed structural analysis
Roof, outbuilding
B
Roof was not examined and would need more detailed structural analysis.
Roof, 415 Brookside
B
Roof was not examined and would need more detailed structural analysis.
Carports 7, 13, 14
A
Some potential evening shading, removal or relocation of light poles
Carports 1-6, 9-12, 15-17
B
Removal of trees and/or removal or relocation of light poles
Carport 8
C
Shading, telephone poles and light poles make this a problematic site
Animal Shelter
Roof, western section
B
Roof, eastern section
B
Roof, southeastern section
B
Carport, western section
B
Carport, central section
A
Roof was not examined and would need more detailed structural analysis.
Some small roof obstacles.
Roof was not examined and would need more detailed structural analysis.
Some small roof obstacles.
Roof was not examined and would need more detailed structural analysis.
Potential evening shade from building, removal of trees and/or removal or
relocation of light poles
Removal of trees and/or removal or relocation of light poles
Carport, eastern section
A
Removal of trees and/or removal or relocation of light poles
Roof, western section
B
Roof was not examined and would need more detailed structural analysis.
Roof, central section
B
Roof was not examined and would need more detailed structural analysis.
Roof, eastern section
B
Roof was not examined and would need more detailed structural analysis.
Carports 1-7
B
Removal of trees and/or removal or relocation of light poles
Roof, offices & fl eet area
C
Roof would need replacement to support solar panel weight.
Roof, offices
C
Roof would need replacement to support solar panel weight.
Roof, large vehicle parking
C
Roof would need replacement to support solar panel weight.
Roof, outbuilding
A
Only viable rooftop on site.
Roof, sign shop
C
Roof would need replacement to support solar panel weight.
A&B
Removal of trees and/or removal or relocation of light poles
Si mpkins Swim Center
Brommer Yard
Carports 1-4
Rountree Detention Center
Roof, outbuilding
B
Roof was not examined and would need more detailed structural analysis.
Roof, "X" building (partial)
B
Roof was not examined and would need more detailed structural analysis.
Due to the new planned construction, solar should be included for the roof at
the design/build bid process.
Roof, main building
B
Roof was not examined and would need more detailed structural analysis.
Roof, jail area
B
Roof was not examined and would need more detailed structural analysis.
Carports 1-2
B
Removal of trees and/or removal or relocation of light poles
Roof, Sciences building
B
Roof was not examined and would need more detailed structural analysis.
Some roof obstacles.
Roof, Investig. Building
B
Roof was not examined, however, a solar panels are already on this roof, but
not functioning, which could reduce the size of the needed array.
Roof, Admin. building
B
Carports 1-4
B
Center for Public Safety
Building was inadvertently left out of the investigation.
Removal of trees and/or removal or relocation of light poles, carport 4 has the
potential to add solar panels to existing structures in place.
Ben Lomond Transfer Station
Ground mounts 1-4
B
Steepness of slopes will require soils and geotechnical assessments.