Wilston Grange Precinct Study Transport Engineering Studies Wilston Grange Precinct Transport Study Technical Report April 2015 Prepared for Transport Network Operations Transport Planning & Strategy - Prepared by Transport Engineering Studies Group Transport Planning & Strategy - 81917515 Final Draft Page 1 Wilston Grange Precinct Study Transport Engineering Studies Transport Strategy & Planning Level 6 Brisbane Square 266 George Street Brisbane City QLD 4000 GPO Box 1434 Brisbane QLD 4001 Telephone 07 302 75550 Facsimile 07 333 40213 81917515 Final Draft Page 2 Wilston Grange Precinct Study Transport Engineering Studies Document Control: G:\BI\TPS\Transport Engineering\Proj14\140040 Wilston Grange Precinct Plan\Reports\Draft\Issue #1- SEP 2014 - Draft Report\140040 Wilston Grange Technical Report 150428.docx Issue No. Date of Issue Amdt Prepared By (Author/s) Edited and Proofread By Reviewed By Approved Issue (Project Director) Initials Initials Initials Initials CS 1 September 2014 Draft NG ML CS 2 April 2014 Final Draft NG CS CS 81917515 Final Draft Page 3 for Wilston Grange Precinct Study Transport Engineering Studies TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 1.2 1.3 1.4 1 Study Area Study Objectives Study Methodology Community Concerns 1 2 2 3 2.0 STRATEGIC PLANNING CONSIDERATIONS 8 2.1 Brisbane City Plan 2014 8 2.1.1 Strategic Framework 8 2.1.2 Ashgrove Grange Neighbourhood Plan 9 2.1.3 Bicycle Brisbane Infrastructure Plan : DRAFT ( Not Council Policy) 12 2.1.4 Draft CityShape 2031 Land Use Strategic Framework 12 2.2 Brisbane Long Term Infrastructure Plan 2012 – 2031 12 2.3 Translink Network Plan (Queensland Government) 2011 13 2.4 North Brisbane Area Study (NBAS) 13 2.5 South East Queensland Principal Cycle Network Plan 14 2.6 South East Queensland Infrastructure Plan and Program 14 2.7 Northern Busway 14 2.8 Brisbane City Council Road Planning Notes 15 2.9 Transport Plan for Brisbane 16 2.9.1 Public Transport 16 2.9.2 Road Network 16 2.9.3 Freight Route 16 2.10 Summary of Strategic Planning Considerations 18 3.0 LAND USE 19 3.1 Existing Situation 3.2 Proposed Future Land Use 19 19 4.0 STUDY AREA TRAVEL CHARACTERISTICS 22 4.1 Current Trends 22 5.0 PUBLIC TRANSPORT 32 5.1 Bus Routes 5.2 Train Services 32 33 6.0 ROAD NETWORK 35 6.1 6.2 6.3 6.4 Existing Traffic Volumes Road Hierarchy Speed Surveys Traffic Crash History 6.4.1 Fatal & Hospitalisation Related Crashes 6.5 Road Safety Audit 6.5.1 Road Safety Audit Methodology 6.5.2 Limitations of Road Safety Audit 6.5.3 Road Safety Audit : Sub – Area 1 6.5.4 Road Safety Audit : Sub – Area 2 81917515 Final Draft 35 40 44 45 54 60 60 60 61 Error! Bookmark not defined. Page 4 Wilston Grange Precinct Study Transport Engineering Studies 6.5.5 Road Safety Audit : Sub – Area 3 6.6 Road Network Summary 6.7 Global Issues Summary 82 88 88 7.0 PEDESTRIAN NETWORK 91 7.1 Existing Pedestrian Network 7.1.1 Pedestrian Related Issues 7.1.2 Pedestrian Count Surveys 7.1.3 Pedestrian Related Crashes 7.2 Road Safety Audit – Pedestrian Related Issues 7.3 Pedestrian Network Summary 7.4 Pedestrian Network Recommendations 91 91 91 94 96 102 104 8.0 CYCLE NETWORK 108 8.1 Existing Cycle Network 8.1.1 Cycle Related Issues 8.1.2 Bicycle Count Surveys 8.1.3 Cycle Related Crashes 8.2 Road Safety Audit – Cycle Related Issues 8.3 Future Cycle Network 8.4 Cycle Network Summary 8.5 Cycle Network Recommendations 108 110 110 112 112 114 116 116 9.0 STRATEGIC MODEL DEVELOPMENT 121 9.1 Future Option Development 9.2 Future Infrastructure Projects 123 123 10.0 LOCAL AREA MODEL DEVELOPMENT 126 10.1 10.2 Base Year Network Validation 11.0 OPTION DEVELOPMENT 129 11.1 11.2 11.3 Option 1 : Network Restrictions Option 2 : Improving Accessibility Option 3 : Major Upgrades 12.0 CURRENT TRAFFIC OPERATION 2013 13.0 FUTURE TRAFFIC OPERATION 2031 13.1 13.1.1 2031 Base Case – AM Peak 13.1.2 2031 Base Case – PM Peak 13.2 133 139 142 2031 Base Case 142 147 SIDRA Analysis – 2031 Base Case 14.0 CURRENT TRAFFIC OPERATION 2013 Final Draft 129 129 129 133 12.1 SATURN Analysis 12.1.1 AM Peak 133 12.1.2 PM Peak 137 12.1.3 Summary of Current Study Area Performance 139 12.2 SIDRA Analysis – 2013 Base Case 81917515 126 127 152 Page 5 142 152 Wilston Grange Precinct Study Transport Engineering Studies 14.1 SATURN Analysis 14.1.1 AM Peak 152 14.1.2 PM Peak 155 14.1.3 Summary of Current Study Area Performance 157 14.2 SIDRA Analysis – 2013 Base Case 15.0 FUTURE TRAFFIC OPERATION 2031 15.1 15.1.1 2031 Base Case – AM Peak 15.1.2 2031 Base Case – PM Peak 15.2 15.32031 Error! Bookmark not defined. 15.3.1 2031 AM Peak – Option 1 15.3.2 2031 PM Peak – Option 1 15.42031 Error! Bookmark not defined. 15.4.1 2031 AM Peak – Option 2 15.4.2 2031 PM Peak – Option 2 15.52031 Error! Bookmark not defined. 15.5.1 2031 AM Peak – Option 3 15.5.2 2031 PM Peak – Option 3 15.6SATURN Error! Bookmark not defined. 15.7Modelling Error! Bookmark not defined. 152 157 159 2031 Base Case 159 163 SIDRA Analysis – 2031 Base Case Option 159 167 1 Error! Bookmark not defined. Error! Bookmark not defined. Option 2 Error! Bookmark not defined. Error! Bookmark not defined. Option 3 Error! Bookmark not defined. Error! Bookmark not defined. Summary Key Table Findings 16.0 SUMMARY OF RECOMMENDATIONS ERROR! BOOKMARK NOT DEFINED. 17.0 CONCLUSIONS ERROR! BOOKMARK NOT DEFINED. APPENDIX A – STRATEGIC PLANNING DOCUMENTSERROR! BOOKMARK NOT DEFINED. APPENDIX B – SATURN VALIDATION RESULTSERROR! BOOKMARK NOT DEFINED. APPENDIX C – SIDRA SUMMARIES APPENDIX D – SUMMARY OF RECOMMENDATIONSERROR! BOOKMARK NOT DEFINED. 81917515 Final Draft ERROR! BOOKMARK NOT DEFINED. Page 6 Wilston Grange Precinct Study Transport Engineering Studies List of Tables Table 1.1 : Summary of Resident’s Concerns – Tabulated Table 4.1: 2011 Census Travel Mode Summary – Wilston Grange Journey to Work Trips Table 4.2: 1996-2011 Census Travel Mode Comparison – Wilston Grange Journey to Work Trips Table 4.3 : Detailed Travel Mode Share – Wilston Grange Work Based Trips (2011) Table 5.1: Existing Bus Routes Table 5.2: Existing Rail Service Frequencies Table 6.1 : Daily Estimated Volumes Table 6.2 : Traffic Survey Intersections Table 6.3 : Existing Road Network Table 6.4: Daily Estimated Speed Surveys Table 6.5 : Average Crash Cost by DCA Group Table 6.6 : Five Highest Intersection Crash Cost to Community by Crash Nature Table 6.7 : Five Highest Road Section Crash Cost to Community by Crash Nature Table 6.8: Crash Summary Table 6.9 : Fatal Crashes Table 6.10 : Hospitalisation Related Crashes Ordered by Cost to Community Table 6.11 : Crashes Resulting in Hospitalisation Table 6.13 : Sub-Area 1 RSA Summary of All Issues Table 6.14 : Locations Identified with Very High Risk Table 6.15 : Key Road Network Related Audit Concerns : Sub-Area 1 Table 6.16 : Sub-Area 2 RSA Summary of All Issues Table 6.17 : Locations Identified with Very High Risk Table 6.18 : Key Road Network Related Audit Concerns : Sub-Area 2 Table 6.19 : Sub-Area 3 RSA Summary of All Issues Table 6.20 : Key Road Network Related Audit Concerns : Sub-Area 3 Table 6.21 : Locations with High Incident Rates (not listed in any particular order) Table 7.1: Pedestrian Related Issues Table 7.2: Pedestrian Related Crashes Table 7.3 : Road Safety Audit – Pedestrian Related Issues with a High Risk Table 7.4 : Pedestrian Related Issues identified in RSA & by Community Table 7.5: Pedestrian Recommendations Table 8.1 : Cycle Related Issues Table 8.2: Cycle Related Crashes Table 8.3 : Road Safety Audit – Cycle Related Issues with a High Risk Table 8.4 : Road Safety Audit - Cycle Related Issues identified in RSA & by Community Table 8.5: Cycle Network Recommendations Table 9.1 : Model Development Process Table 9.2: Future Infrastructure Development Table 10.1 : GEH Values Table 10.2: Model Flow Validation Results Table 11.1 : Option Testing Spreadsheet Table 12.1 : 2013 AM Peak Hour - Intersections with Oversaturated Turning Movements Table 12.2: 2013 PM Peak Hour - Intersections with Oversaturated Turning Movements Table 12.3: Intersection Performance Status Descriptions 81917515 Final Draft Page 7 Wilston Grange Precinct Study Transport Engineering Studies Table 12.4 : SIDRA Summary Analysis Results – 2013 Table 13.1 : 2031 AM Peak Hour Base Case - Intersections with Oversaturated Turning Movements Table 13.2 : 2031 PM Peak Hour Base Case - Intersections with Oversaturated Turning Movements Table 13.3 : SIDRA Summary Analysis Results – 2031 Table 12.1 : 2013 AM Peak Hour - Intersections with Oversaturated Turning Movements Table 12.2: 2013 PM Peak Hour - Intersections with Oversaturated Turning Movements Table 12.3: Intersection Performance Status Descriptions Table 12.4 : SIDRA Summary Analysis Results – 2013 Table 13.1 : 2031 AM Peak Hour Base Case - Intersections with Oversaturated Turning Movements Table 13.2 : 2031 PM Peak Hour Base Case - Intersections with Oversaturated Turning Movements Table 13.3 : SIDRA Summary Analysis Results – 2031 Table 13.4: 2031 AM Peak Hour Base Case - Intersections with Oversaturated Turning Movements Table 13.5 : 2031 PM Peak Hour Base Case - Intersections with Oversaturated Turning Movements Table 13.6 : 2031 AM Peak Hour Option 2 - Intersections with Oversaturated Turning Movements Table 13.7 : 2031 PM Peak Hour Option 2 - Intersections with Oversaturated Turning Movements Table 13.8 : 2031 AM Peak Hour Option 3 - Intersections with Oversaturated Turning Movements Table 13.9 : 2031 PM Peak Hour Option 3 - Intersections with Oversaturated Turning Movements Table 13.10: SATURN Summary Table Table 13.11 : Summary of Findings Table 13.12 : Summary Table of Number of Intersections Operating Above Capacity at Key Intersections Table 14.1 : Prioritisation Criteria Table 14.2 : Overall Priority Ranking 81917515 Final Draft Page 8 Wilston Grange Precinct Study Transport Engineering Studies List of Figures Figure 1.1: Wilston Grange Study Area Figure 1.2 : Summary Resident’s Concerns - Mapped Figure 2.1:Ashgrove – Grange Neighbourhood Plan Figure 2.2 : Lutwyche Road Corridor Neighbourhood Plan Figure 2.3 : City Plan Freight Hierarchy Map Figure 3.1: Study Area Land Uses (Brisbane City Plan 2000) Figure 3.2 : Study Area Land Uses (Brisbane City Plan 2014) Figure 4.1: Destinations of all Journey to Work Trips from Wilson Grange Figure 4.2: Destination of Journey to Work Trips from Wilston Grange by Transport Mode Figure 4.3: Origins of Journey to Work Trips to Wilston Grange Figure 4.4: Origins of Journey to Work Trip to Wilston Grange by Transport Mode Figure 5.1 : Public Transport Coverage - Source: Translink 2012 Figure 6.1: Traffic Survey Locations Figure 6.2: 2013 Estimated Daily Volumes Figure 6.3 : Road Hierarchy - Brisbane City Plan 2014 Figure 6.4 : Crashes Mapped by Crash Severity (DCA code) Figure 6.5 : Crash Costs by DCA Code Figure 6.6 : Fatal & Hospitalisation Related Crashes Figure 6.7 : Road Safety Review Sub-Areas Figure 6.8 : Sub-Area 1 : Audit Finding Locations Figure 6.9 : Sub-Area 2 : Audit Finding Locations Figure 6.10 : Sub-Area 3 : Audit Finding Locations Figure 6.11 : Global Issues Summary Map Figure 7.1 : Pedestrian Desire Lines Figure 7.2: Pedestrian Related Crashes Figure 7.3 : Pedestrian Network Recommendations Figure 8.1 : Existing Bicycle Network Figure 8.2 : Cycle Desire Lines Figure 8.3 : Draft Brisbane Bicycle Infrastructure Plan - Hierarchy Plan Figure 8.4 : Draft Brisbane Bicycle Infrastructure Plan - Bicycle Facility Plan Figure 8.5: Cycle Network Recommendations Figure 9.1 : Future Infrastructure Projects Figure 10.1: Model Area and Location of Study Corridor Figure 11.1 : Options Figure 12.1 :Summary of Modelled Road Network Operation – 2013 AM Peak Figure 12.2 : Summary of Modelled Road Network Operation - 2013 PM Peak Figure 13.1 : Summary of Modelled Road Network Operation – 2031 AM Peak Base Case Figure 13.2 : Comparison Plot between 2013 AM Peak Base Case and 2031 AM Peak Base Case Figure 13.3 : Summary of Modelled Road Network Operation – 2031 PM Peak Base Case Figure 13.4 : Comparison Plot between 2013 PM Peak Base Case and 2031 PM Peak Base Case Figure 13.5 : Summary of Modelled Road Network Operation – 2031 AM Peak Option 1 Figure 13.6 : Comparison Plot between 2031 AM Base Case and 2031 AM Option 1 Figure 13.7 : Summary of Modelled Road Network Operation – 2031 PM Peak Option 1 81917515 Final Draft Page 9 Wilston Grange Precinct Study Transport Engineering Studies Figure 13.8 : Comparison Plot between 2031 PM Base Case and 2031 PM Option 1 Figure 13.9 : Summary of Modelled Road Network Operation – 2031 AM Peak Option 2 Figure 13.10 : Comparison Plot between 2031 AM Base Case and 2031 AM Option 2 Figure 13.11: Summary of Modelled Road Network Operation – 2031 PM Peak Option 2 Figure 13.12 : Comparison Plot between 2031 PM Base Case and 2031 PM Option 2 Figure 13.13 : Summary of Modelled Road Network Operation – 2031 AM Peak Option 3 Figure 13.14 : Comparison Plot between 2031 AM Base Case and 2031 AM Option 3 Figure 13.15 : Summary of Modelled Road Network Operation – 2031 PM Peak Option 3 Figure 13.16 : Comparison Plot between 2031 PM Base Case and 2031 PM Option 3 Figure 14.1 : Overall Priority Ranking 81917515 Final Draft Page 10 Wilston Grange Precinct Study Engineering Studies 81917515 Transport Final Draft Page 11
© Copyright 2026 Paperzz