Wilston Grange Precinct Transport Study

Wilston Grange Precinct Study
Transport Engineering Studies
Wilston Grange Precinct Transport
Study
Technical Report
April 2015
Prepared for
Transport Network Operations Transport Planning & Strategy -
Prepared by
Transport Engineering Studies Group
Transport Planning & Strategy -
81917515
Final Draft
Page 1
Wilston Grange Precinct Study
Transport Engineering Studies
Transport Strategy & Planning
Level 6 Brisbane Square
266 George Street
Brisbane City QLD 4000
GPO Box 1434
Brisbane QLD 4001
Telephone
07 302 75550
Facsimile
07 333 40213
81917515
Final Draft
Page 2
Wilston Grange Precinct Study
Transport Engineering Studies
Document Control:
G:\BI\TPS\Transport Engineering\Proj14\140040 Wilston Grange Precinct Plan\Reports\Draft\Issue #1- SEP 2014
- Draft Report\140040 Wilston Grange Technical Report 150428.docx
Issue No.
Date of Issue
Amdt
Prepared By
(Author/s)
Edited and
Proofread
By
Reviewed
By
Approved
Issue
(Project
Director)
Initials
Initials
Initials
Initials
CS
1
September
2014
Draft
NG
ML
CS
2
April 2014
Final Draft
NG
CS
CS
81917515
Final Draft
Page 3
for
Wilston Grange Precinct Study
Transport Engineering Studies
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1
1.2
1.3
1.4
1
Study Area
Study Objectives
Study Methodology
Community Concerns
1
2
2
3
2.0 STRATEGIC PLANNING CONSIDERATIONS
8
2.1 Brisbane City Plan 2014
8
2.1.1 Strategic Framework
8
2.1.2 Ashgrove Grange Neighbourhood Plan
9
2.1.3 Bicycle Brisbane Infrastructure Plan : DRAFT ( Not Council Policy)
12
2.1.4 Draft CityShape 2031 Land Use Strategic Framework
12
2.2 Brisbane Long Term Infrastructure Plan 2012 – 2031
12
2.3 Translink Network Plan (Queensland Government) 2011
13
2.4 North Brisbane Area Study (NBAS)
13
2.5 South East Queensland Principal Cycle Network Plan
14
2.6 South East Queensland Infrastructure Plan and Program
14
2.7 Northern Busway
14
2.8 Brisbane City Council Road Planning Notes
15
2.9 Transport Plan for Brisbane
16
2.9.1 Public Transport
16
2.9.2 Road Network
16
2.9.3 Freight Route
16
2.10
Summary of Strategic Planning Considerations 18
3.0 LAND USE 19
3.1 Existing Situation
3.2 Proposed Future Land Use
19
19
4.0 STUDY AREA TRAVEL CHARACTERISTICS
22
4.1 Current Trends
22
5.0 PUBLIC TRANSPORT
32
5.1 Bus Routes
5.2 Train Services
32
33
6.0 ROAD NETWORK
35
6.1
6.2
6.3
6.4
Existing Traffic Volumes
Road Hierarchy
Speed Surveys
Traffic Crash History
6.4.1 Fatal & Hospitalisation Related Crashes
6.5 Road Safety Audit
6.5.1 Road Safety Audit Methodology
6.5.2 Limitations of Road Safety Audit
6.5.3 Road Safety Audit : Sub – Area 1
6.5.4 Road Safety Audit : Sub – Area 2
81917515
Final Draft
35
40
44
45
54
60
60
60
61
Error! Bookmark not defined.
Page 4
Wilston Grange Precinct Study
Transport Engineering Studies
6.5.5 Road Safety Audit : Sub – Area 3
6.6 Road Network Summary
6.7 Global Issues Summary
82
88
88
7.0 PEDESTRIAN NETWORK
91
7.1 Existing Pedestrian Network
7.1.1 Pedestrian Related Issues
7.1.2 Pedestrian Count Surveys
7.1.3 Pedestrian Related Crashes
7.2 Road Safety Audit – Pedestrian Related Issues
7.3 Pedestrian Network Summary
7.4 Pedestrian Network Recommendations
91
91
91
94
96
102
104
8.0 CYCLE NETWORK
108
8.1 Existing Cycle Network
8.1.1 Cycle Related Issues
8.1.2 Bicycle Count Surveys
8.1.3 Cycle Related Crashes
8.2 Road Safety Audit – Cycle Related Issues
8.3 Future Cycle Network
8.4 Cycle Network Summary
8.5 Cycle Network Recommendations
108
110
110
112
112
114
116
116
9.0 STRATEGIC MODEL DEVELOPMENT
121
9.1 Future Option Development
9.2 Future Infrastructure Projects
123
123
10.0 LOCAL AREA MODEL DEVELOPMENT
126
10.1
10.2
Base Year Network
Validation
11.0 OPTION DEVELOPMENT
129
11.1
11.2
11.3
Option 1 : Network Restrictions
Option 2 : Improving Accessibility
Option 3 : Major Upgrades
12.0 CURRENT TRAFFIC OPERATION 2013
13.0 FUTURE TRAFFIC OPERATION 2031
13.1
13.1.1 2031 Base Case – AM Peak
13.1.2 2031 Base Case – PM Peak
13.2
133
139
142
2031 Base Case
142
147
SIDRA Analysis – 2031 Base Case
14.0 CURRENT TRAFFIC OPERATION 2013
Final Draft
129
129
129
133
12.1
SATURN Analysis
12.1.1 AM Peak
133
12.1.2 PM Peak
137
12.1.3 Summary of Current Study Area Performance
139
12.2
SIDRA Analysis – 2013 Base Case
81917515
126
127
152
Page 5
142
152
Wilston Grange Precinct Study
Transport Engineering Studies
14.1
SATURN Analysis
14.1.1 AM Peak
152
14.1.2 PM Peak
155
14.1.3 Summary of Current Study Area Performance
157
14.2
SIDRA Analysis – 2013 Base Case
15.0 FUTURE TRAFFIC OPERATION 2031
15.1
15.1.1 2031 Base Case – AM Peak
15.1.2 2031 Base Case – PM Peak
15.2
15.32031
Error! Bookmark not defined.
15.3.1 2031 AM Peak – Option 1
15.3.2 2031 PM Peak – Option 1
15.42031
Error! Bookmark not defined.
15.4.1 2031 AM Peak – Option 2
15.4.2 2031 PM Peak – Option 2
15.52031
Error! Bookmark not defined.
15.5.1 2031 AM Peak – Option 3
15.5.2 2031 PM Peak – Option 3
15.6SATURN
Error! Bookmark not defined.
15.7Modelling
Error! Bookmark not defined.
152
157
159
2031 Base Case
159
163
SIDRA Analysis – 2031 Base Case
Option
159
167
1
Error! Bookmark not defined.
Error! Bookmark not defined.
Option
2
Error! Bookmark not defined.
Error! Bookmark not defined.
Option
3
Error! Bookmark not defined.
Error! Bookmark not defined.
Summary
Key
Table
Findings
16.0 SUMMARY OF RECOMMENDATIONS
ERROR! BOOKMARK NOT DEFINED.
17.0 CONCLUSIONS
ERROR! BOOKMARK NOT DEFINED.
APPENDIX A
– STRATEGIC PLANNING DOCUMENTSERROR! BOOKMARK NOT DEFINED.
APPENDIX B
– SATURN VALIDATION RESULTSERROR! BOOKMARK NOT DEFINED.
APPENDIX C
– SIDRA SUMMARIES
APPENDIX D
– SUMMARY OF RECOMMENDATIONSERROR! BOOKMARK NOT DEFINED.
81917515
Final Draft
ERROR! BOOKMARK NOT DEFINED.
Page 6
Wilston Grange Precinct Study
Transport Engineering Studies
List of Tables
Table 1.1 : Summary of Resident’s Concerns – Tabulated
Table 4.1: 2011 Census Travel Mode Summary – Wilston Grange Journey to Work Trips
Table 4.2: 1996-2011 Census Travel Mode Comparison – Wilston Grange Journey to Work
Trips
Table 4.3 : Detailed Travel Mode Share – Wilston Grange Work Based Trips (2011)
Table 5.1: Existing Bus Routes
Table 5.2: Existing Rail Service Frequencies
Table 6.1 : Daily Estimated Volumes
Table 6.2 : Traffic Survey Intersections
Table 6.3 : Existing Road Network
Table 6.4: Daily Estimated Speed Surveys
Table 6.5 : Average Crash Cost by DCA Group
Table 6.6 : Five Highest Intersection Crash Cost to Community by Crash Nature
Table 6.7 : Five Highest Road Section Crash Cost to Community by Crash Nature
Table 6.8: Crash Summary
Table 6.9 : Fatal Crashes
Table 6.10 : Hospitalisation Related Crashes Ordered by Cost to Community
Table 6.11 : Crashes Resulting in Hospitalisation
Table 6.13 : Sub-Area 1 RSA Summary of All Issues
Table 6.14 : Locations Identified with Very High Risk
Table 6.15 : Key Road Network Related Audit Concerns : Sub-Area 1
Table 6.16 : Sub-Area 2 RSA Summary of All Issues
Table 6.17 : Locations Identified with Very High Risk
Table 6.18 : Key Road Network Related Audit Concerns : Sub-Area 2
Table 6.19 : Sub-Area 3 RSA Summary of All Issues
Table 6.20 : Key Road Network Related Audit Concerns : Sub-Area 3
Table 6.21 : Locations with High Incident Rates (not listed in any particular order)
Table 7.1: Pedestrian Related Issues
Table 7.2: Pedestrian Related Crashes
Table 7.3 : Road Safety Audit – Pedestrian Related Issues with a High Risk
Table 7.4 : Pedestrian Related Issues identified in RSA & by Community
Table 7.5: Pedestrian Recommendations
Table 8.1 : Cycle Related Issues
Table 8.2: Cycle Related Crashes
Table 8.3 : Road Safety Audit – Cycle Related Issues with a High Risk
Table 8.4 : Road Safety Audit - Cycle Related Issues identified in RSA & by Community
Table 8.5: Cycle Network Recommendations
Table 9.1 : Model Development Process
Table 9.2: Future Infrastructure Development
Table 10.1 : GEH Values
Table 10.2: Model Flow Validation Results
Table 11.1 : Option Testing Spreadsheet
Table 12.1 : 2013 AM Peak Hour - Intersections with Oversaturated Turning Movements
Table 12.2: 2013 PM Peak Hour - Intersections with Oversaturated Turning Movements
Table 12.3: Intersection Performance Status Descriptions
81917515
Final Draft
Page 7
Wilston Grange Precinct Study
Transport Engineering Studies
Table 12.4 : SIDRA Summary Analysis Results – 2013
Table 13.1 : 2031 AM Peak Hour Base Case - Intersections with Oversaturated Turning
Movements
Table 13.2 : 2031 PM Peak Hour Base Case - Intersections with Oversaturated Turning
Movements
Table 13.3 : SIDRA Summary Analysis Results – 2031
Table 12.1 : 2013 AM Peak Hour - Intersections with Oversaturated Turning Movements
Table 12.2: 2013 PM Peak Hour - Intersections with Oversaturated Turning Movements
Table 12.3: Intersection Performance Status Descriptions
Table 12.4 : SIDRA Summary Analysis Results – 2013
Table 13.1 : 2031 AM Peak Hour Base Case - Intersections with Oversaturated Turning
Movements
Table 13.2 : 2031 PM Peak Hour Base Case - Intersections with Oversaturated Turning
Movements
Table 13.3 : SIDRA Summary Analysis Results – 2031
Table 13.4: 2031 AM Peak Hour Base Case - Intersections with Oversaturated Turning
Movements
Table 13.5 : 2031 PM Peak Hour Base Case - Intersections with Oversaturated Turning
Movements
Table 13.6 : 2031 AM Peak Hour Option 2 - Intersections with Oversaturated Turning
Movements
Table 13.7 : 2031 PM Peak Hour Option 2 - Intersections with Oversaturated Turning
Movements
Table 13.8 : 2031 AM Peak Hour Option 3 - Intersections with Oversaturated Turning
Movements
Table 13.9 : 2031 PM Peak Hour Option 3 - Intersections with Oversaturated Turning
Movements
Table 13.10: SATURN Summary Table
Table 13.11 : Summary of Findings
Table 13.12 : Summary Table of Number of Intersections Operating Above Capacity at Key
Intersections
Table 14.1 : Prioritisation Criteria
Table 14.2 : Overall Priority Ranking
81917515
Final Draft
Page 8
Wilston Grange Precinct Study
Transport Engineering Studies
List of Figures
Figure 1.1: Wilston Grange Study Area
Figure 1.2 : Summary Resident’s Concerns - Mapped
Figure 2.1:Ashgrove – Grange Neighbourhood Plan
Figure 2.2 : Lutwyche Road Corridor Neighbourhood Plan
Figure 2.3 : City Plan Freight Hierarchy Map
Figure 3.1: Study Area Land Uses (Brisbane City Plan 2000)
Figure 3.2 : Study Area Land Uses (Brisbane City Plan 2014)
Figure 4.1: Destinations of all Journey to Work Trips from Wilson Grange
Figure 4.2: Destination of Journey to Work Trips from Wilston Grange by Transport Mode
Figure 4.3: Origins of Journey to Work Trips to Wilston Grange
Figure 4.4: Origins of Journey to Work Trip to Wilston Grange by Transport Mode
Figure 5.1 : Public Transport Coverage - Source: Translink 2012
Figure 6.1: Traffic Survey Locations
Figure 6.2: 2013 Estimated Daily Volumes
Figure 6.3 : Road Hierarchy - Brisbane City Plan 2014
Figure 6.4 : Crashes Mapped by Crash Severity (DCA code)
Figure 6.5 : Crash Costs by DCA Code
Figure 6.6 : Fatal & Hospitalisation Related Crashes
Figure 6.7 : Road Safety Review Sub-Areas
Figure 6.8 : Sub-Area 1 : Audit Finding Locations
Figure 6.9 : Sub-Area 2 : Audit Finding Locations
Figure 6.10 : Sub-Area 3 : Audit Finding Locations
Figure 6.11 : Global Issues Summary Map
Figure 7.1 : Pedestrian Desire Lines
Figure 7.2: Pedestrian Related Crashes
Figure 7.3 : Pedestrian Network Recommendations
Figure 8.1 : Existing Bicycle Network
Figure 8.2 : Cycle Desire Lines
Figure 8.3 : Draft Brisbane Bicycle Infrastructure Plan - Hierarchy Plan
Figure 8.4 : Draft Brisbane Bicycle Infrastructure Plan - Bicycle Facility Plan
Figure 8.5: Cycle Network Recommendations
Figure 9.1 : Future Infrastructure Projects
Figure 10.1: Model Area and Location of Study Corridor
Figure 11.1 : Options
Figure 12.1 :Summary of Modelled Road Network Operation – 2013 AM Peak
Figure 12.2 : Summary of Modelled Road Network Operation - 2013 PM Peak
Figure 13.1 : Summary of Modelled Road Network Operation – 2031 AM Peak Base Case
Figure 13.2 : Comparison Plot between 2013 AM Peak Base Case and 2031 AM Peak Base
Case
Figure 13.3 : Summary of Modelled Road Network Operation – 2031 PM Peak Base Case
Figure 13.4 : Comparison Plot between 2013 PM Peak Base Case and 2031 PM Peak Base
Case
Figure 13.5 : Summary of Modelled Road Network Operation – 2031 AM Peak Option 1
Figure 13.6 : Comparison Plot between 2031 AM Base Case and 2031 AM Option 1
Figure 13.7 : Summary of Modelled Road Network Operation – 2031 PM Peak Option 1
81917515
Final Draft
Page 9
Wilston Grange Precinct Study
Transport Engineering Studies
Figure 13.8 : Comparison Plot between 2031 PM Base Case and 2031 PM Option 1
Figure 13.9 : Summary of Modelled Road Network Operation – 2031 AM Peak Option 2
Figure 13.10 : Comparison Plot between 2031 AM Base Case and 2031 AM Option 2
Figure 13.11: Summary of Modelled Road Network Operation – 2031 PM Peak Option 2
Figure 13.12 : Comparison Plot between 2031 PM Base Case and 2031 PM Option 2
Figure 13.13 : Summary of Modelled Road Network Operation – 2031 AM Peak Option 3
Figure 13.14 : Comparison Plot between 2031 AM Base Case and 2031 AM Option 3
Figure 13.15 : Summary of Modelled Road Network Operation – 2031 PM Peak Option 3
Figure 13.16 : Comparison Plot between 2031 PM Base Case and 2031 PM Option 3
Figure 14.1 : Overall Priority Ranking
81917515
Final Draft
Page 10
Wilston Grange Precinct Study
Engineering Studies
81917515
Transport
Final Draft
Page 11