Royal Wharf Unit 9.01 Market Square | Shops / Retail

and must not be used on this project
A10
20
Silv
erto
wn
Wa
y
d
olwich Roa
th Wo
A1020 Nor
Royal Wharf
Unit 9.01
Market Square | Shops / Retail
1426
2384
WEST
S I LV E R TOW N
P O N TO O N
DOCK
17109
N
6916
7174




Note level does not take into
account thickness of thermal
insulation applied to ceiling
LYLE
PARK
Thames Barrier
and Park
Block Location Plan
17109
Key
150mm LV duct
96mm Virgin Media duct
90mm BT duct
50mm FA duct
First Floor Plan
96mm HYP duct
1 : 100
2485
Note level does not take into
account thickness of thermal
insulation applied to ceiling
1803
1803
1425
110mm Drainage pop up
4025
75/150mm RWP from
above to drain
Heating Pipework
Direct Heating Pipework
(if energy center used)
Electricity (Low Voltage
Safety)
2485
1636
1636
Electricity
(High
Voltage)1653
1653
1653
West Elevation - Commercial Unit 01 - Curtain Walling
328
5.7m
1 : 50
4960
110mm Stub Stack
Area m2
1803
North Elevation - Commercial Unit 01 - Curtain Walling
3726
Electricity (High Voltage Export)
1 : 50
50mm CCTV duct
1425
Water Pipework
Floorplan
Gas Pipework
90min Fire Rated lining to
highlevel ductwork into AOV


West Elevation - Commercial Unit 01
North Elevation - Commercial Unit 01
6525
Note level does not take into
account thickness of thermal
insulation applied to ceiling
Ceiling height
9900
203 
m2
FFL 
+6000
SSL 
+5975


U/s of
Structure + 11700
3,530
5450
9.01
3375
20555
Area ft
2
1425
Unit number
Entrance
5450
Entrance
50mm Spare duct
110/150mm SVP from
above to drain
3273
Entrance
4025
Entrance
1 : 200
1 : 200
17224

17151
VENTILATION FREE AREA
REQUIRED @ 50% = 10m2
Note:
Window and Door frames

UNIT
9.01

5450
5450
Entrance
Entrance
14339
In the locations shown on drawings, the tenants shall provide Insulating glass units cur
Type: Comar 6EFT Structurally Glazed Curtain Walling System.
No
Spec: All ground floor inner panes to be min 6.8mm laminated Extra Clear Float to com
Date by Design' and toDescription
By Minimum
Ckd U value 1
'Secured
comply with required BREEAM ratings.
- Outer pane: Toughened SN70/37 on Extra Clear Float., coating applied to surface.
4025
Spectrophotometric Data Light Transmission 70% G value 37 U value 1.0
7251
Ground Floor Plan
1 : 200
Please refer to NBS clause 110A CURTAIN WALLING: [STRUCTURAL - SHOP AND
FRONTAGE REFER TO WCEC DETAILED DRAWINGS]
The frames are to be Aluminium, PPC finish, through colour internal and external wind
frames , PPC colour ref : RAL 7006 30% gloss. Comar Architectural Aluminium System
approved)


PROJECT
Royal Wharf,
© WCEC ARCHITECTS - DISCLAIMER
Development Phase 2
This drawing is copyright and shall not be reproduced or used for any
other purpose without the written permission of the Architects.
This drawing must be read in conjunction with all other related
TITLE and documentation.
drawings
It is the contractors responsibility to ensure full compliance with the
Building Regulations.
Do not scale from this drawing, use figured dimensions only.
It is the contractors responsibility to check and verify all dimensions
on site.
Any discrepancies to be reported immediately.
DRAWING STATUS
IF IN DOUBT ASK.
Materials not in conformity with relevant British or European
Standards/Codes of practice or materials known to be deleterious to
health & safety must not be used or specified on this project.
DRAWN knownDB
Materials
to contain asbestosCHECKED
contaminated MD
materials (ACM's)
in the manufacture or installation process have not been specified
and
must not be
on this project
SCALE
Asused
indicated
@ A1

UNIT 9.01
Plot 09.01 - Commercial Unit 01 Plan
First Floor Plan
1803
Ground Floor Plan
1 : 200
1803
1803
1 : 100
Information
•
•
•
•
•
•
•
•
North Elevation - Commercial Unit 01 - Curtain Walling
Tenant to restrict waste to within store until collection. No external cage.
Tenant to issue design intent layout for internal drainage.
Tenant Riser to have access at each floor level.
Tenant to issue roof plan details.
Landlord to confirm vent strategy (louvres over - shop front)
Tenant requires satellite dish to roof.
WCEC to issue Revit model to indicate high level services & routes through tenant demise.
Delivery Lay-by within 50m of unit entrance
1 : 50
Unit 9.01 - North Elevation
wcec architects
February 2016
DATE
4th Floor, South Building, Staple Inn Buildings,
High Holborn, London, WC1V 7PZ
Carrwood Court, Carrwood Road,
Sheepbridge, Chesterfield, S41 9QB
t: 020 3388 0019, e: [email protected], www.wcec.co.uk
2384
1426
JOB NO.
DRAWING NO.
14-019
A_00_09.01_300

UNIT
9.01
6916
7174
17109

125 m2

SSL +8875


U/s of Structure +
11700
Note level does not take into
account thickness of thermal
insulation
applied
to ceiling
Note level does not take
into
account
thickness
of thermal insulation applied to ceiling
North Elevation - Commercial Unit 01
17109
1 : 200
Block Location Plan
Key
150mm LV duct
96mm Virgin Media duct
90mm BT duct

First Floor Plan
i) Elevations shown are as per current planning permission, but may be subject to change.
ii) Shop fonts/glazing to be installed by Tenant unless otherwise agreed with the Entrance
Landlord.
1 : 100
50mm FA duct
96mm HYP duct
50mm Spare duct
110/150mm SVP from
above to drain
Entrance
110mm Stub Stack
110mm Drainage pop up

75/150mm RWP from
above to drain
Heating Pipework

Direct Heating Pipework
(if energy center used)
Electricity (Low Voltage
REV