and must not be used on this project A10 20 Silv erto wn Wa y d olwich Roa th Wo A1020 Nor Royal Wharf Unit 9.01 Market Square | Shops / Retail 1426 2384 WEST S I LV E R TOW N P O N TO O N DOCK 17109 N 6916 7174 Note level does not take into account thickness of thermal insulation applied to ceiling LYLE PARK Thames Barrier and Park Block Location Plan 17109 Key 150mm LV duct 96mm Virgin Media duct 90mm BT duct 50mm FA duct First Floor Plan 96mm HYP duct 1 : 100 2485 Note level does not take into account thickness of thermal insulation applied to ceiling 1803 1803 1425 110mm Drainage pop up 4025 75/150mm RWP from above to drain Heating Pipework Direct Heating Pipework (if energy center used) Electricity (Low Voltage Safety) 2485 1636 1636 Electricity (High Voltage)1653 1653 1653 West Elevation - Commercial Unit 01 - Curtain Walling 328 5.7m 1 : 50 4960 110mm Stub Stack Area m2 1803 North Elevation - Commercial Unit 01 - Curtain Walling 3726 Electricity (High Voltage Export) 1 : 50 50mm CCTV duct 1425 Water Pipework Floorplan Gas Pipework 90min Fire Rated lining to highlevel ductwork into AOV West Elevation - Commercial Unit 01 North Elevation - Commercial Unit 01 6525 Note level does not take into account thickness of thermal insulation applied to ceiling Ceiling height 9900 203 m2 FFL +6000 SSL +5975 U/s of Structure + 11700 3,530 5450 9.01 3375 20555 Area ft 2 1425 Unit number Entrance 5450 Entrance 50mm Spare duct 110/150mm SVP from above to drain 3273 Entrance 4025 Entrance 1 : 200 1 : 200 17224 17151 VENTILATION FREE AREA REQUIRED @ 50% = 10m2 Note: Window and Door frames UNIT 9.01 5450 5450 Entrance Entrance 14339 In the locations shown on drawings, the tenants shall provide Insulating glass units cur Type: Comar 6EFT Structurally Glazed Curtain Walling System. No Spec: All ground floor inner panes to be min 6.8mm laminated Extra Clear Float to com Date by Design' and toDescription By Minimum Ckd U value 1 'Secured comply with required BREEAM ratings. - Outer pane: Toughened SN70/37 on Extra Clear Float., coating applied to surface. 4025 Spectrophotometric Data Light Transmission 70% G value 37 U value 1.0 7251 Ground Floor Plan 1 : 200 Please refer to NBS clause 110A CURTAIN WALLING: [STRUCTURAL - SHOP AND FRONTAGE REFER TO WCEC DETAILED DRAWINGS] The frames are to be Aluminium, PPC finish, through colour internal and external wind frames , PPC colour ref : RAL 7006 30% gloss. Comar Architectural Aluminium System approved) PROJECT Royal Wharf, © WCEC ARCHITECTS - DISCLAIMER Development Phase 2 This drawing is copyright and shall not be reproduced or used for any other purpose without the written permission of the Architects. This drawing must be read in conjunction with all other related TITLE and documentation. drawings It is the contractors responsibility to ensure full compliance with the Building Regulations. Do not scale from this drawing, use figured dimensions only. It is the contractors responsibility to check and verify all dimensions on site. Any discrepancies to be reported immediately. DRAWING STATUS IF IN DOUBT ASK. Materials not in conformity with relevant British or European Standards/Codes of practice or materials known to be deleterious to health & safety must not be used or specified on this project. DRAWN knownDB Materials to contain asbestosCHECKED contaminated MD materials (ACM's) in the manufacture or installation process have not been specified and must not be on this project SCALE Asused indicated @ A1 UNIT 9.01 Plot 09.01 - Commercial Unit 01 Plan First Floor Plan 1803 Ground Floor Plan 1 : 200 1803 1803 1 : 100 Information • • • • • • • • North Elevation - Commercial Unit 01 - Curtain Walling Tenant to restrict waste to within store until collection. No external cage. Tenant to issue design intent layout for internal drainage. Tenant Riser to have access at each floor level. Tenant to issue roof plan details. Landlord to confirm vent strategy (louvres over - shop front) Tenant requires satellite dish to roof. WCEC to issue Revit model to indicate high level services & routes through tenant demise. Delivery Lay-by within 50m of unit entrance 1 : 50 Unit 9.01 - North Elevation wcec architects February 2016 DATE 4th Floor, South Building, Staple Inn Buildings, High Holborn, London, WC1V 7PZ Carrwood Court, Carrwood Road, Sheepbridge, Chesterfield, S41 9QB t: 020 3388 0019, e: [email protected], www.wcec.co.uk 2384 1426 JOB NO. DRAWING NO. 14-019 A_00_09.01_300 UNIT 9.01 6916 7174 17109 125 m2 SSL +8875 U/s of Structure + 11700 Note level does not take into account thickness of thermal insulation applied to ceiling Note level does not take into account thickness of thermal insulation applied to ceiling North Elevation - Commercial Unit 01 17109 1 : 200 Block Location Plan Key 150mm LV duct 96mm Virgin Media duct 90mm BT duct First Floor Plan i) Elevations shown are as per current planning permission, but may be subject to change. ii) Shop fonts/glazing to be installed by Tenant unless otherwise agreed with the Entrance Landlord. 1 : 100 50mm FA duct 96mm HYP duct 50mm Spare duct 110/150mm SVP from above to drain Entrance 110mm Stub Stack 110mm Drainage pop up 75/150mm RWP from above to drain Heating Pipework Direct Heating Pipework (if energy center used) Electricity (Low Voltage REV
© Copyright 2026 Paperzz