318-GM RAs proposal - GMSC Feedback Form (1/02/10) 1 Final Risk Class: ____________ 1 GM Committee Ref: ____________ 1 Biol. Services Ref: ____________ HSE Ref (if appropriate): 1___________ 1 = all to be allocated by GM-BSO GMSC FEEDBACK FORM Title of Proposal: Sub-title: Name of Principal Investigator (PI): Contact details for PI (‘phone/e-mail): Name of Assessors: Reasons for recommendation or declining of proposal/amendment: Final assignment of containment measures and risk class: Signed: ………………………………………. Printed: …………………………………….. On behalf of GMSC-318 Dated On completion, this form should be sent to the Centre GM-BSO where he/she is not the sole assessor for distribution to the project PI. For Class 2, Notifiable and above: Date HSE notified: Date approved by HSE: Comments from HSE attached on a separate sheet (yes / no): Acknowledgements: Dr. John Coote, Feb. 2009 1 318-GM RAs - Project Amendment Form ((1/02/10) 1 Final Risk Class: ____________ 1 GM Committee Ref: ____________ 1 Biol. Services. Ref: ____________ HSE Ref (if appropriate): 1___________ 1 = all to be allocated by GM-BSO PROJECT AMENDMENT FORM Please indicate below changes to the current proposal. Project reference number to which amendment relates: ________________ Name of Proposer (required field): Project title (required field): Location of Laboratory work: No change required Location of Animal work (if applicable): No change required General description of procedures involved in the project: No change required Host system(s): No change required Add Delete Vector system(s): No change required Add Delete Inserts: No change required Add Delete Staff involved: No change required Add Delete Changes affecting the answers to the questions on the original proposal: Do these changes affect the classification of the GMM? Yes | No Do these changes affect the risk assessment for human health? Yes | No Do these changes affect the environmental risk assessment? Yes | No If the answer is yes to any of these questions, the GMSC must be consulted before proceeding. If the project has now ceased, please tick ______ and sign and date this form Signature of proposer: ............................................................... Date ………………… If you have any questions about filling in or submitting this form, please contact the Centre GM-BSO Acknowledgements: Dr. John Coote, Feb. 2009 1
© Copyright 2026 Paperzz