The Space Congress® Proceedings 2015 (43rd) A Showcase of Space, Aviation, Technology, Logistics, and Manufacturing Apr 28th, 8:00 AM Ground Systems Development and Operations: Return of Human Spaceflight Shawn Quinn Ground Systems Development & Operations (GSDO) Follow this and additional works at: http://commons.erau.edu/space-congress-proceedings Scholarly Commons Citation Shawn Quinn, "Ground Systems Development and Operations: Return of Human Spaceflight" (April 28, 2015). The Space Congress® Proceedings. Paper 7. http://commons.erau.edu/space-congress-proceedings/proceedings-2015-43rd/proceedings-2015-43rd/7 This Event is brought to you for free and open access by the Conferences at ERAU Scholarly Commons. It has been accepted for inclusion in The Space Congress® Proceedings by an authorized administrator of ERAU Scholarly Commons. For more information, please contact [email protected]. GROUND SYSTEMS DEVELOPMENT AND OPERATIONS Exploration Begins Here 1 4 SLS, Orion, and GSDO Orion Crew Capsule Building the capability to pioneer deep space. Space Launch System Ground Systems Development & Operations Exploration Mission 1 EM-1 Uncrewed Distant Retrograde Orbit 9 Return Lunar Gravity Assist CM/SM Separation El-20 min Inbound: ~9 days 10 11 Entry & Landing 12 DRO Arrival Burn 6 1 LAUNCH 2 Perigee Raise Maneuver ICPS – 100x975 nmi Distant Retrograde Orbit 70,000 KM (Not strictly circular) Trajectory Correction Maneuvers Orion 7 3 Trans Lunar Injection ICPS 4 Outbound: ~10 days 8 Outbound Lunar Gravity Assist Objectives: DRM - Uncrewed MPCV • • • • Demonstrate spacecraft systems performance prior to crewed flight • Demonstrate high speed entry (~11 km/s) and TPS performance prior to crewed flight Lunar capable heat shield 4 tank SM with full prop load EM-2 systems not included: ECLSS, Crew Systems, LAS Abort Motors (Inert) 5 DRO Departure Burn Interim Cryogenic Propulsion Stage (ICPS) used to provide TLI burn 44 Orion Production Operations and Exploration Flight Test 1 Making Progress at KSC Designed and fabricated Orion ammonia ground support equipment; performed EFT-1 flight load Multi-Purpose Processing Facility upgrades wrapping up this summer followed by ground support equipment installation and testing Firing Room 1 outfitted and Spaceport Command and Control Software validated Rotation, Processing and Surge Facility platform modifications complete Successful EFT-1 recovery of the crew module Speakers Bureau 7 7 Making Progress at KSC Launch Pad 39B largely complete, only flame trench work and IOP/SS water routing remains Vehicle Assembly Building shuttle platform demo complete, new SLS platforms in fabrication Mobile Launcher structural modifications progressing, fabrication of umbilicals and other equipment in work Speakers Bureau Crawler-transporter modifications and 8 upgrade to ~18 million lbs capacity 8 GSDO: EXPLORATION BEGINS HERE 9 Path to EM-1 Launch - Every Milestone Counts Comm. Firing Room 1 Activation Comm. Command Module Power Up Dec 2012 May 2013 C&C– Firing Room 1 Power up Jun 2013 MPPF – CMAS Ready for EFT-1 Servicing L&R Underway Recovery Test Complete L&R Stationary Recovery Test Complete ML -Pad V&V Complete Sept 2014 Jan 2014 Aug 2013 Sep2017 EFT-1 Recovery Complete Dec 2014 EFT-1 C&C – Operational Spaceport C&C System Oct 2016 1. 2. 3. 4. 5. 6. 7. Top Priorities GSDO PDR ✓ EFT-1 Launch ✓ GSDO CDR EM-1 ORD EM-1 Launch EM-2 ORD EM-2 Launch Legend: C&C – “Basic Command and Control” VAB HB 3 Platform Demolition Complete Oct 2012 Mar 2013 Mobile Launcher Heritage GSE Removal Complete ML Mod Contract Start - 2013 LC-39 Pad B Flame Trench/Flame Deflector Demo Complete Mar - 2013 Range Autonomous Flight Safety System MPPF GSE Installation Complete Dec 2015 Apr 2015 L&R Underway Recovery Exercise Complete ML-VAB V&V Complete ML GSE Installation Complete Aug 2016 VIL Apr 2017 Sep 2016 C3R OPI EM-1 LC-39 Pad B VAB HB 3 VAB Door Referb Low Bay Ceiling Platform Concepts Started 2012 EM-2 EES/Multi-Use Study Complete HGLDS Cabling at LH2/LOX LOX/LH2 Valve Qual Started - 2012 MPPF Construction Restart Feb 2013 C&C – Hazardous Operations C&C Mar 2015 Range 50MHz Doppler Radar Capability Sep 2015 MPPF Construction Complete Oct 2015 VAB HB 3 Construction Complete Aug 2016 Crawler Transporter Pad B Const. Complete VAB V&V Complete Nov 2016 Mar 2017 Jul 2018 MPPF V&V Complete 40 + Modification Projects Completed Dec 2013 Feb 2017 LC-39Pad B LC-39 Pad B Emergency Egress Design Start 2016 2012 EM-1 Recovery Complete 2013 2014 2015 2016 Emergency Egress/ V&V Complete 2018 2017 2018-2021 10 SLS / ORION / GSDO … LAUNCHING EM-1 2018! 10 Connect with us www.nasa.gov/kennedy http://go.nasa.gov/groundsystems twitter.com/NASAKennedy twitter.com//NASA_go4launch facebook.com/NASAKennedy flickr.com/photos/NASAKennedy instagram.com/NASAKennedy 11 GSDO-TEMPL-018, Rev. Basic, 02/01/13
© Copyright 2026 Paperzz