Dubuque County Annual Review 2015 Eric Schmechel Urban Conservationist Dubuque SWCD S Erosion & Sediment Control Permits S 93 Minor Permits Issued (93 in 2014) S 11 Major Permits Issued (12 in 2014) Major Permits S Dubuque Airport Utility Extension (50 acres disturbed) S John Deere (2) - Foundry Pond, Parking lot, S Germaine Electric S Derby Grange S SW Arterial (English Road Bridge 20 acres) S Stecker Storage Building S Scott Brimeyer S Jerry Behnke S Charlie Glab (Streambank Stabilization) S Northern Natural Gas Fee’s Collected S 93 Permits at $100 = $9300.00 S 11 Major Permits = $9395 S $18,895.00 28e Agreement S Headed into year 2 on 28e agreement (6 year agreement) with City of Dubuque (2014) S FY 2017 Dubuque County and City of Dubuque payment is $44, 532.45 2016…Online Reporting S Move to Online Permitting process? S ESC and Stormwater Permits would be emailed to me BEFORE approval – S All Major ESC and Stormwater Permits still need Pre-Con or Pre Plat Meeting Violations S Cedar Crest Subdivision (Meetings 2016) S TimberHyst Subdivision (J Arsendorf) S Katra Subdivision S Inspections Bi-weekly / Complaints S Cliff Pfab Drainage 2015 Projects S J Aresendorf Over-Detention Basin Built S Streambank Stabilization - Private Landowners S Airport Utility Expansion/Granger Creek Stabilization S Thunder Ridge Soil Quality Restoration (SQR) S Airport Bio-Retention Cells S SW Arterial (new bridge/wetland) S Brimeyer Electric S Germaine Electric S Derby Grange Basins & SQR S Contractor Workshops (Feb and March 2015) NRCS Structures 2015 S 6 Grade Stabilization Structures Built (Ponds, Wet Basins) S 13 Sediment Control Structures (Dry Basins) TimberHyst Basin Catfish Creek Streambank Bio-Retention Cell Thunder Hills SQR Iowa Flood Center Monitoring S 2 Real Time Monitors in Catfish Creek S Nitrogen, Turbidity, Chloride, D.O.) S Velocity and Flow Models S Watershed Kiosks (Swiss Valley and Mines of Spain) IRVM Program S Working with Dubuque County Conservation Board and Dubuque County Engineer S All Dubuque County Roadways and Culverts being Assessed (2015 and 2016 Interns) (Funded by Grant) S Hydroseeder has been purchased via Grant S 10 acres Native Grass Seed seeded in right of way 2015 (DCCB) S Ordered 10 acres Native Seed for 2016 S Must complete new Dubuque County IRVM Plan (Work with Secondary Roads)? Catfish Creek Watershed Management Plan Catfish Creek Watershed Authority Board 3186 Hughes Ct Dubuque, IA 52003 S 120 W. Main St West Dundee, IL 60118 State Revolving Fund (SRF) Sponsorship Project – Catfish Creek Bee Branch Stormwater SRF Loan (15 Million) 1.4 Million Available for Catfish Creek (2015-2019) Stream Restoration- South Fork Catfish Creek (Approx. $800,000) Cost-Share Programs for Agricultural and Urban Landowners ($300,000) – Sediment Control Structure and Ponds (April 30th Application Deadline) 2016-2017 Projects Wetland Restoration – Swiss Valley - $30,000 Bio-Retention Cells – Private Landowners - $50,000 Soil Quality Restoration – RFP Landscapers - $100,000 Streambank Stab – Private landowners - $100,000 Permeable Pavement Systems – Swiss Valley - $20,000 South Fork Project S MSA Awarded Contract ($99,500) S Assessment and Survey work April 2016 S Bid October 2016 S Construction Winter/Spring 2016-2017
© Copyright 2026 Paperzz