Solar PV Battery Energy Storage Systems Smart Microgrids EPC

NIDEC INDUSTRIAL SOLUTIONS
Solar PV
Battery Energy Storage Systems
Smart Microgrids
EPC Solutions
Green Energy Ohio Second Policy Conference
Wednesday, May 04 2017
About Nidec Corporation
Workforce: 140,000
Market capitalization: $25B USD
1/28
Nidec Industrial Solutions – Solar PV & BESS
2/28
Our Newest Addition:
$1.7B in Growth Through Aquisition
3/28
Control Techniques & Leroy-Somer
At a glance 2015
10,000
EMPLOYEES
WORLDWIDE
$1.7
BILLION IN
SALES
32
MANUFACTURING
LOCATIONS
WORLDWIDE
Drives & Motors:

Leader in Variable Speed Solutions
Electric Power Generation:

No 1 in alternators <25 MW
Global Presence

4
Confidential
Operations and E&D Teams in Europe,
China, India & USA
Confidential
World Leader in Battery Energy Storage
& Smart Microgrid Solutions
Mexico
238 MW
Germany
140 MWh
*
Hybrid/electric propulsion
PV Plant
*
1 GWp of PV, BESS & Smart Microgrid Solutions
400MWh of Battery Energy Storage Solutions in Operation
* under construction
5/28
Nidec Industrial Solutions
Your One-Stop-Shop
Based on our proprietary technology in LV/MV Drives, PMS, EMS
6/28
Vertical Integration - 1500V Outdoor Inverter
Up to 5 MW - CONVERSION UNIT WITH OUTDOOR INVERTERS
- Improved 1500Vdc
for PV
- Next Generation for
BESS
DC Range
900 – 1400Vdc
Max dc input Voltage
1500Vdc
Output Frequency / THDi
50 (60) Hz / ≤ 3% (at P > 25%)
Power Factor
Adjustable 0÷1 (lagging – leading)
Nominal Ambient
Conditions
40°C &50°C - up to 2000m asl
Degree of Protection
IP54
Cooling Method
Air Cooled/Water cooled
Efficiency MAX (EU)
Grid Forming Inverter (for BESS)
98.9
7/28
Vertical Integration ARTICS Smart Energy
Energy Management
System
Power Management
System
+
ARTICS Smart Energy
=
•
Fully Integrated
Power and Energy Management in one single platform
•
Reliable
Industrial automation suite used in more than 900 plants worldwide
•
Custom
Configurable and open platform
8/28
BESS for PFR
Germany: Steag project
The challenge
Primary frequency regulation to the grid
to ensure stability
Scope of supply
• EPC for 6 BESS for 15 MW/ 23MWh
• Net Voltage: 10 KV
• Total Peak Power: 90 MW
• Total Capacity: 138 MWh
• EPC for 90MW/138MWh
SOLUTION
• Battery: Li-Ion
• Optimized configuration: 1.5MW /2.3MWh
in 40’
9/28
Smart Microgrid with BESS
Hybrid Smart Microgrid: grid stability and
green power generation
Scope of supply
30Kwp Wind
68Kwp PV
250KVA Diesel gen
250Kw/520kwh BESS
•
•
•
•
•
•
Generation from PV and Wind. Diesel generator for
emergency only
PMS
Air cooling PCS
Battery: Sodium Nickel Chloride
Challenging environment: isolated mining village at 3660mt in
Chilean andes
Main purpose: reduce the dependence from diesel fuel and
provide 24h electrical power to the village.
10/28
Our Value
Nidec Delivers
Mini Hydro
Industrial
Users
•
We solve power problems:
• Motor, Alternator/Generator experts
• In-house Power Conversion Systems
• Power Managament & Energy Management
•
We Deliver Solutions
• Components to full EPC
• Customized and Standard
• Large and Small Projects
•
We Support You
• 250 people in Cleveland and Growing
• Nearly 40 Field Service Engineers
• 24/7 hot line
•
We are Competitive
• Performance Guarantees
Wind
PV
Grid substation /
Main grid
Producers & Users
Electric Energy
Storage
Users
Vertically Integrated Turn-Key Solutions
11/28