*VB Beles* Limited Liability Partnership

“VB Beles”
Limited Liability Partnership









Radiographic Testing (Gamma / X-Ray)
Ultrasonic Inspection
Visual Inspection
Dye Penetrant Inspection
Positive Material Identification
Magnetic Particle Inspection
Hardness Testing
Thickness check
Pre-Heat and Post-Weld Heat Treatment
DIRECTOR
TECHNICAL CONSULTANT
DEPUTY DIRECTOR
PROCESS
MANAGER
QUALITY
ENGINEER
ADMINISTRATIVE
DEPARTMENT
HR
DEPARTMENT
ACCOUNT
DEPARTMENT
RS & HSE
SPECIALIST
LOGISTIC AND
MATERIAL
DEPARTMENT
PROJECT
SUPERVISOR
PROJECT
SUPERVISOR
PROJECT
SUPERVISOR
PROJECT
SUPERVISOR
NDT TEAMS
NDT TEAMS
PWHT TEAMS
PWHT TEAMS
LAWYER
S/N
Description
Quantity
1
Gamma Source Projectors with Iridium 192 & Accessories
8/35
2
X-Ray Crawlers
4
3
Panoranic / Directional X-ray tubes Site-X
5/5
4
UT Machines
7
5
Thickness Check gauges
4
6
Magnets with Test blocks
10/5
7
Hardness Testing equipment
7
8
Dosimeters and bleepers
72/34
9
Film viewers and densitometers
12/10
10
Emergency storage kits
10
11
Developing facilities
10
12
NDT Accessories
--
13
PWHT Equipment's (6 / 12 channel)
10
14
Flexible heating ceramic pads and heating elements
1500
15
Warning signs and lamps
150
16
Ferritemeter
1
17
Insulation Material
3000
18
Mobile Laboratories
8
19
Mobile Isotope storage pits
6
The Company has Head office in Uralsk city with equipped Process Base near to it.
Atyrau Branch office was opened and developed actively from 2012.
“VB Beles” LLP has 1 permanent and 6 mobile certified Isotope storage pits, 3 permanent stocks, 8 mobile laboratories and 7
equipped and sanitary certified vehicles.
Main Project Experience
S.N
Project
Client
Year
1
“Uralsk-Karachaganak Gas Pipeline”
Karachaganak Petroleum Operating
b.v.
2010
2
“Chinarevo Gas Plant”
ZhaikMunai LLP
2010
3
“Alibekmola & Kozhasai” Gas field
Kazakh Oil Aktobe LLP
2010-2012
4
“Kazakhstan-China” Pipeline 156km +
98km
Kazakhstan-China Pipeline LLP
2010-2012
5
“Beineu-Bozoi-Shymkent” Gas Pipeline
JSC OGCC KazStroyService
2012-2013
6
“Kashagan site - Karabatan field”
Petroleum & Facilities E&C Limited,
ISGEC, GMMOS LLP
2012
7
Shutdown works at Karachaganak field
IGS Corporation
2012-2013
8
“Pump Station #8”
Kazakhstan-China Pipeline LLP
2013
9
Replacement of Oil Pipeline 88km
Caspian Pipeline Consortium
2011-2012
10
Pressure Vessels and Piping NDT
Inspection at ANPZ Plant
Atyrau Refinery LLP
2012-2016
11
“Asia Gas Pipeline” Section
100km+54km
AGP LLP
2013-2014
12
Extension of Caspian Pipeline
Consortium Project
CPC
2013-2016
NDT & PWHT Vendor Qualification
S.N.
Client
1
North Caspian Operating Company
2
Karachaganak Petroleum Operating
3
Kazakhstan – China Pipeline LLP
4
Atyrau Refinery LLP
5
JSC OGCC KazStroyService
6
Asia Gas Pipeline LLP
7
Saipem S.p.A.
8
Bureau Veritas Kazakhstan
Post Address
Building 10H1, micro-district “Zhana Orda”, Uralsk city, West
Kazakhstan region, the Republic of Kazakhstan
Telephone / Fax +7 (7112) 27-86-95
E-mail
[email protected]
Web-site
www.vb-beles.kz