“VB Beles” Limited Liability Partnership Radiographic Testing (Gamma / X-Ray) Ultrasonic Inspection Visual Inspection Dye Penetrant Inspection Positive Material Identification Magnetic Particle Inspection Hardness Testing Thickness check Pre-Heat and Post-Weld Heat Treatment DIRECTOR TECHNICAL CONSULTANT DEPUTY DIRECTOR PROCESS MANAGER QUALITY ENGINEER ADMINISTRATIVE DEPARTMENT HR DEPARTMENT ACCOUNT DEPARTMENT RS & HSE SPECIALIST LOGISTIC AND MATERIAL DEPARTMENT PROJECT SUPERVISOR PROJECT SUPERVISOR PROJECT SUPERVISOR PROJECT SUPERVISOR NDT TEAMS NDT TEAMS PWHT TEAMS PWHT TEAMS LAWYER S/N Description Quantity 1 Gamma Source Projectors with Iridium 192 & Accessories 8/35 2 X-Ray Crawlers 4 3 Panoranic / Directional X-ray tubes Site-X 5/5 4 UT Machines 7 5 Thickness Check gauges 4 6 Magnets with Test blocks 10/5 7 Hardness Testing equipment 7 8 Dosimeters and bleepers 72/34 9 Film viewers and densitometers 12/10 10 Emergency storage kits 10 11 Developing facilities 10 12 NDT Accessories -- 13 PWHT Equipment's (6 / 12 channel) 10 14 Flexible heating ceramic pads and heating elements 1500 15 Warning signs and lamps 150 16 Ferritemeter 1 17 Insulation Material 3000 18 Mobile Laboratories 8 19 Mobile Isotope storage pits 6 The Company has Head office in Uralsk city with equipped Process Base near to it. Atyrau Branch office was opened and developed actively from 2012. “VB Beles” LLP has 1 permanent and 6 mobile certified Isotope storage pits, 3 permanent stocks, 8 mobile laboratories and 7 equipped and sanitary certified vehicles. Main Project Experience S.N Project Client Year 1 “Uralsk-Karachaganak Gas Pipeline” Karachaganak Petroleum Operating b.v. 2010 2 “Chinarevo Gas Plant” ZhaikMunai LLP 2010 3 “Alibekmola & Kozhasai” Gas field Kazakh Oil Aktobe LLP 2010-2012 4 “Kazakhstan-China” Pipeline 156km + 98km Kazakhstan-China Pipeline LLP 2010-2012 5 “Beineu-Bozoi-Shymkent” Gas Pipeline JSC OGCC KazStroyService 2012-2013 6 “Kashagan site - Karabatan field” Petroleum & Facilities E&C Limited, ISGEC, GMMOS LLP 2012 7 Shutdown works at Karachaganak field IGS Corporation 2012-2013 8 “Pump Station #8” Kazakhstan-China Pipeline LLP 2013 9 Replacement of Oil Pipeline 88km Caspian Pipeline Consortium 2011-2012 10 Pressure Vessels and Piping NDT Inspection at ANPZ Plant Atyrau Refinery LLP 2012-2016 11 “Asia Gas Pipeline” Section 100km+54km AGP LLP 2013-2014 12 Extension of Caspian Pipeline Consortium Project CPC 2013-2016 NDT & PWHT Vendor Qualification S.N. Client 1 North Caspian Operating Company 2 Karachaganak Petroleum Operating 3 Kazakhstan – China Pipeline LLP 4 Atyrau Refinery LLP 5 JSC OGCC KazStroyService 6 Asia Gas Pipeline LLP 7 Saipem S.p.A. 8 Bureau Veritas Kazakhstan Post Address Building 10H1, micro-district “Zhana Orda”, Uralsk city, West Kazakhstan region, the Republic of Kazakhstan Telephone / Fax +7 (7112) 27-86-95 E-mail [email protected] Web-site www.vb-beles.kz
© Copyright 2026 Paperzz