2012/07/12 Msunduzi Municipality Improved Service Delivery through Non-Revenue Water Reduction Program Overview of Infrastructure • 52 Reservoirs (BPT’s, Reservoirs) – Outlets are metered • 170 District/Zone Meters • 200 Pressure Reducing Valves (PRV’s) • 1600 km of Pipeline – Various diameters • Purchase approximately 175 Mega Liters(Ml/d) per day from Umgeni Water . [ 38 Purchase/Sales meters - UW] •Total Infrastructure cost : R 2.6 Billion [CRC] 1 2012/07/12 Background to NRW Program • Non-Revenue Water is the difference in water volume between that bought from Umgeni Water and sold to all of Msunduzi Municipality’s customers • This difference is made up of both physical leaks from pipes as well as unmetered customers and illegal connections. • Non-Revenue Water in the Msunduzi Municipality (excluding Vulindlela) for 2009/10 FY was previously reported as 63% (corrected as 38.6%) and for the 2010/2011 FY was reported as 40.9% • The objective of this program is to improve both operational and financial efficiency of the Municipality in terms of water service delivery, and to meet a Presidential mandate of halving water losses by 2014 2 2012/07/12 IWA KPIs for last 5 Financial Years (Corrected) Msunduzi Municipality Trends Msunduzi Municipality Non-Revenue Water and Inefficiency of Water Trends 45.0% 42.4% 40.9% Non-Revenue water by Volume (%) 40.0% 38.6% 37.3% 35.0% 30.0% 28.0% 26.5% 25.0% 24.7% 24.6% 23.4% 20.0% 15.0% 13.1% 10.0% 5.0% 0.0% 2006/07 2007/08 NRW by Volume 2008/09 Financial Year 2009/10 2010/11 Inefficiency of Use 3 2012/07/12 Average Daily Purchases 200000 increase 180000 A v e 160000 r a g 140000 e Stability Increase p 120000 u r c 100000 h a s 80000 e s 60000 First Water Loss Project 40000 Daily… 20000 0 Jan-95 May-95 Sep-95 Jan-96 May-96 Sep-96 Jan-97 May-97 Sep-97 Jan-98 May-98 Sept-98 Jan-99 May-99 Sep-99 Jan-00 May-00 Sep-00 Jan-01 May-01 Sep-01 Jan-02 May-02 Sep-02 Jan-03 May-03 Sep-03 Jan-04 May-04 Sep-04 Jan-05 May-05 Sep-05 Jan-06 May-06 Sep-06 Jan-07 May-07 Sep-07 Jan-08 May-08 Sep-08 Jan-09 May-09 Sep-09 Jan-10 May-10 Sep-10 Jan-11 k l / d y Months NRW Reduction Program Details • Total approved program budget for Phase 1 is R22,1 million, of which the Department of Water Affairs is contributing R3 million • Awarded in December 2010, but practically started in January 2011. • Phase 1 targeted completion 30 June 2011 • Eight unique interventions targeting the reduction of water leaks and pipe bursts(real loss) • Eight unique interventions targeting billing improvement • 2010/11 FY Expenditure R14 858 046 (67%) 4 2012/07/12 Implementing Best Practice Through the Non-Revenue Water Reduction Program: • officials are being trained and mentored in best practice management. • existing policies are being refined and enforced • a comprehensive Operations and Maintenance Plan will be developed and implemented • a comprehensive Refurbishment Plan will be developed and implemented Reducing Water Leaks Replacement of Ageing Pipeline Infrastructure in the CBD: • JK Structures was awarded Phase 1A of the pipeline replacement initiative in June 2011 and began preparatory work in July 2011 • 3.4km of pipelines has been replaced via trenchless technology and open-trench replacement 5 2012/07/12 Reducing Water Leaks Reducing Water Leaks Leak Detection and Repair: • Munitech were awarded the Leak Detection and Repair Contract in February 2011 to carry out work on the reticulation network • The Contract was completed in September 2011 and 1 869km or reticulation has been surveyed in the east of the Municipality • 1 739 visible and non-visible leaks were located and have been repaired with an estimated 2.4 Ml/day being saved. 6 2012/07/12 Reducing Water Leaks Reducing Water Leaks New PRV Designs: • Reservoir zones were logged in an effort to quantify Minimum Night Flows (MNF) thereby helping prioritise zones with the highest Real Losses • New PRV designs have been completed on 6 focus areas taking into consideration the new pressure regime of 3bar minimum pressure and a maximum of 6bar • A conservative estimate on savings for installing 27 new PRVs is 10.1 Ml/day 7 2012/07/12 Reducing Water Leaks Reducing Water Leaks Existing PRV Maintenance and Optimisation: • 62 PRVs and BPTs were visited, inspected and maintenance on any problems found were fixed • Optimisation of existing PRVs has been completed for 2 reservoir zones thus far to reduce any excess pressure in a zone. Slow progress has been made due to line valves either not being maintained in the past or not being found • 2 advanced controllers have been installed on PRVs feeding the CBD. Commissioning and monitoring has commenced and current results indicate a saving of approximately R 2 million PA. 8 2012/07/12 Reducing Water Leaks Peak Flow @ 20.0 550 kl/hr Msunduzi Municipality Advanced Pressure Control on CBD PRV103 Peak Peak Flow Flow @ 480 480kl/hr kl/hr 600 18.0 500 16.0 14.0 10.0 8.0 300 Flowrate (kl/hr) Pressure (bar) 400 12.0 Pressure @ 4.5 bar Pressure @ 5.5 bar 200 6.0 4.0 100 2.0 0.0 2011/08/29 00:00 2011/09/03 00:00 2011/09/08 00:00 2011/09/13 00:00 Logging Period Downstream Pressure 2011/09/18 00:00 Critical Point Pressure 0 2011/09/23 00:00 Flowrate Reducing Water Leaks Reservoir Inspection and Repair: • 7 reservoirs were visited and prioritised for restoration. • Hathorns Reservoir is currently been advertised. • Hathorns by-pass system has been tested successfully to allow for the winning tenderer to start in earnest once the award has been made 9 2012/07/12 Reducing Water Leaks Improving Billing Meter Maintenance and Replacement of Damaged and Inaccessible meters: Exception reports gathered from meter readers from November 2010 till March 2011 were collated and all duplicates removed. Approximately 10 600 domestic consumer meters needed to be either replaced or maintained • 7 Plumbing Contractors from the Municipality’s database were contacted to tender on a rate’s based meter maintenance and replacement Contract from March 2011 to October 2011 • To date 6 061 meters have being maintained and 1 157 meters have been replaced • Another tender document is about to be advertised for a 24-month period to continue this initiative • 10 2012/07/12 Improving Billing Top Consumer Analysis and Meter Replacement: • Using past billing information, over a 24 month period, and 200 of the largest consumers in the Municipality were chosen and visited • New design drawings using correct specifications for above and below meter installations have been completed • 85 meters were prioritised for changeout and a tender document was prepared and will be going through the Bid-Specification Committee in the next few weeks. Public Awareness • Thus far 19 primary and secondary schools have been visited and presented the Water Awareness Programme. • A schools soccer tournament was also run very successfully in October 2011 with 18 schools participating and the Water Awareness Programme being the central theme using local businesses as sponsors. • A poetry contest for all schools is also in the planning phase and would be implemented towards the middle of this year. • A total of approximately 1650 posters where placed on street poles. 11 2012/07/12 Public Awareness • A schools soccer tournament was also run very successfully in October 2011 with 18 schools participating and the Water Awareness Programme being the central theme. • A poetry contest for primary schools is also in the planning phase and would be implemented towards the middle of this year. • Media articles and school visits are also currently been planned for water week in March. • A total of approximately 34 media articles where published which has as advertisement value of approximately R 1.2 million. Keeping the Public Informed …and on street poles... 12 2012/07/12 Keeping the Public Informed …in schools... Keeping the Public Informed 13 2012/07/12 Job Creation Opportunities …student learnership programs ... …and labour-intensive pipe replacment... Program Budget Requirements • The total required budget to implement the reduction of Non-Revenue Water within the Msunduzi Municipality area of jurisdiction over the 5-year period is R 205 276 940.70 excluding VAT. • Of this total R 182 738 638.82 (excl VAT) is capital budget requirements, and R 22 538 301.88(excl VAT) is operating budget requirements. • A total capital budget of R 57 020 837.44 (excl VAT) is required for meter installation and replacement purposes 14
© Copyright 2026 Paperzz