3850-PM-BCW0045d 4/2017 Sewer Extension Information Applicant Name: COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER WQG-02 WATER QUALITY MANAGEMENT GENERAL PERMIT FOR SEWER EXTENSIONS AND PUMP STATIONS SEWER EXTENSION INFORMATION APPLICANT NAME PROJECT INFORMATION If the project is associated with existing or proposed residential or industrial development, complete the following: Name of Development Type of Development Number of Units Project Acreage WQM Permit No. of Receiving Sewers BASIS OF DESIGN Design Year: Design Population: SEWER SYSTEM 1. INITIAL POPULATION DESIGN POPULATION 2. List the WQM Permit number of the sewer to which this system connects. 3. List the WQM Permit number of the treatment facility receiving flow from this system. 4. What is the reserve capacity of the most limiting component between this connection and the treatment facility? 5. LOCATION USGS Quadrangle Name Latitude/Longitude of Connection Point 6. 7. Latitude Degrees Minutes Longitude Seconds Degrees Minutes DESIGN FLOW DATA a. Submain Sewers (GPCD) b. Average Daily Flow (mgd) c. Infiltration/Inflow (I/I) (mgd) d. Industrial Waste Flow (mgd) e. Total Average Design Flow (mgd) f. Maximum Expected Flow Rate (Peak Instantaneous) (mgd) Describe measures taken to minimize I/l in the system including leakage test and reference applicable portion of the specifications. Seconds
© Copyright 2026 Paperzz