2016 – 2025 TIP

2016 – 2025 TIP
TIP Amendments for Consideration in February, 2017
FUNDING
ADTAP
APD
BA
BOND R
CMAQ
DP
ER
FBUS
FED
FEPD
FF
FMOD
FMPL
FNF
FNS
FNU
FSGR
FSPR
FUZ
HFB
HP
HRRR
HSIP
JARC
FUNDING DESCRIPTION
Appalachian Development
Transportation Assistance Program
Appalachian Development
Bonus Allocation
Revenue Bond
Congestion Mitigation
Discretionary or Demonstration
Emergency Relief
Capital Program - Bus Earmark (5309)
Unidentified Federal Funding
Elderly and Persons with Disability (5310)
Federal Ferry
Fixed Guideway Modifications
Metropolitan Planning (5303)
New Freedom Program
New Starts - Capital (5309)
Non Urbanized Area Formula Program
(5311)
State of Good Repair
State Planning and Research
Capital Program - Bus Earmark (5309)
Highway Fund Bridge Replacement
Program
High Priority
High Risk Rural Roads
Highway Safety Improvement Program
Job Assistance and Reverse Commute
(3037)
FUNDING
L
FUNDING DESCRIPTION
Local
NHP
NHPB
NHPBA
NHPIM
O
RR
RTAP
S
S(M)
SMAP
SRTS
STHSR
STP
STPDA
STPE
National Highway Performance Program
National Highway Performance Program(Bridge)
National Highway Performance Program(Bonus Allocation)
National Highway Performance Program (Interstate Maintenance)
Local, Non Federal or State Funds
Rail-Highway Safety
Rural Transit Assistance Program
State
State Match for STP-DA or Garvee Projects
Operating Assistance and State Maintenance
Safe Roads to School
Stimulus High Speed Rail
Surface Transportation Program
Surface Transportation Program (Direct Attributable)
Surface Transportation Program (Enhancement)
STPEB
STPOFF
STPON
T
Surface Transportation Program (Enhancement)
Surface Transportation Program (Off System)
Surface Transportation Program (On System)
Highway Trust Funds
TAP
TAPDA
TAPDA
TIGER
Transportation Alternatives Program
Transportation Alternatives Program (Direct Attributable)
Transportation Alternatives Program (Direct Attributable)
TIGER Discretionary Grants
PROPOSED AMENDMENTS TO THE TIP
PROJECT
ROUTES
Riverwalk EB‐5547 Greenway Phase II
Lexington EB‐5830
Avenue
EB‐5831
Coxe Avenue
US 19 @ NC U‐5971
63
NC 63 (New U‐5972 Leicester Highway)
US 19 Business U‐5973
(Weavervill
e Highway)
DIVISIONS
13
13
13
COUNTIES
DESCRIPTION
TOTAL TIP Amendment COST (in Detail
thousands) ACTIVITY FUNDING
CONSTRUCT NEW MULTI‐USE PATH FROM INCREASE STBG‐
EXISTING FLAT CREEK GREENWAY DA FUNDING TRAILHEAD NEAR STATE STREET AND Buncombe
CHARLOTTE STREET TO EXISTING RIVERSIDE FOR PE IN FY 2017
GREENWAY NEAR RIVERSIDE PARK AND EXTENSION WEST OF NC 9 NEAR EXISTING 2,156
Asheville, Lexington Avenue, Patton Avenue Project Added to Buncombe to Southside Avenue. Improve Bicycle and the TIP
Pedestrian Infrastructure.
675
Asheville, Coxe Avenue, Patton Avenue to Project Added to Short Coxe Avenue. Improve Bicycle and the TIP
Pedestrian Infrastructure.
525
Buncombe
US 19 (Patton Avenue), US 19 (Patton Avenue) and NC 63 (New Leicester Highway). Construct Intersection Improvements.
Programmed for Planning and Environmental Study Only to Expedite Delivery of New STI Project
13
Buncombe
13
Programmed for Planning and NC 63 (New Leicester Highway) from US Environmental 19/23 (Patton Avenue) to Newfound Road. Study Only to Buncombe
Construct Access Management Expedite Improvements.
Delivery of New STI Project
13
Programmed for Planning and US 19 Business (Weaverville Highway) and Environmental Buncombe
New Stock Road (SR 1740). Construct Study Only to Intersection Improvements. Expedite Delivery of New STI Project
PE
ROW
CST
PE
PE
STBGDA
Local
STBGDA
Local
STBGDA
Local
Cost in Thousands
2016
2017
120
30
142
36
2018
2019
80
20
1,385
346
STBGDA
540
Local
135
STBGDA
420
Local
105
2020
2021
2022
2023
2024
2025
POST YEARS
PROJECT
ROUTES
NC 81 (Swannano
U‐6046
a River Road)
NC 112 (Sardis U‐6047
Road/Sand
hill Road)
U‐6053
New Access Road
U‐4712
US 23 Business (South Main Street)
U‐6048
US 19, US 23
DIVISIONS
COUNTIES
DESCRIPTION
TOTAL TIP Amendment COST (in Detail
thousands) ACTIVITY FUNDING
13
Programmed for Planning and NC 81 (Swannanoa River Road) from US 70 Environmental Buncombe
(Tunnel Road) to US 74 (South Tunnel Study Only to Road). Upgrade Roadway.
Expedite Delivery of New STI Project
13
Programmed for Planning and NC 112 (Sardis Road/Sandhill Road), NC 191 Environmental Buncombe (Brevard Road) to US 19/23 (Smokey Park Study Only to Hghway). Widen Roadway.
Expedite Delivery of New STI Project
13
New Route, Construct Access Road to Add Economic Development Avadim Technologies Facility Near the Buncombe
Intersection of I‐40 and SR 2500 (Blue Ridge Project to the TIP
Road).
14
13 & 14
Haywood
Programmed for Planning and US 23 Business (South Main Street) from Environmental Hyatt Creek Road (SR 1164) to US 276 Study Only to (Pigeon Street). Widen to Multi‐Lanes.
Expedite Delivery of New STI Project
Programmed for Planning and US 19, US 23 from Chestnut Mountain Road Environmental Buncombe, (SR 1836) to Wiggins Road (SR 1200). Study Only to Haywood
Upgrade Roadway.
Expedite Delivery of New STI Project
1,000
CST
APD
Cost in Thousands
2016
2017
1,000
2018
2019
2020
2021
2022
2023
2024
2025
POST YEARS
PROJECT
U‐6049
I‐5834
ROUTES
NC 225 (South Main Street)
I‐40
DIVISIONS
COUNTIES
DESCRIPTION
TOTAL TIP Amendment COST (in Detail
thousands) ACTIVITY FUNDING
14
Programmed for Planning and NC 225 (South Main Street) at South King Environmental Henderson Street to US 176. Widen Bridge 143 to Five‐ Study Only to Lanes.
Expedite Delivery of New STI Project
14
Project Added at the Request of Division. Project was I‐40 from Mile Marker 27 to Mile Marker Inadvertently 34. Pavement Rehabilitation. Deleted from STIP in November, 2016.
Haywood
7,400
CST
NHPIM
Cost in Thousands
2016
2017
2018
2019
7,400
2020
2021
2022
2023
2024
2025
POST YEARS