2016 – 2025 TIP TIP Amendments for Consideration in February, 2017 FUNDING ADTAP APD BA BOND R CMAQ DP ER FBUS FED FEPD FF FMOD FMPL FNF FNS FNU FSGR FSPR FUZ HFB HP HRRR HSIP JARC FUNDING DESCRIPTION Appalachian Development Transportation Assistance Program Appalachian Development Bonus Allocation Revenue Bond Congestion Mitigation Discretionary or Demonstration Emergency Relief Capital Program - Bus Earmark (5309) Unidentified Federal Funding Elderly and Persons with Disability (5310) Federal Ferry Fixed Guideway Modifications Metropolitan Planning (5303) New Freedom Program New Starts - Capital (5309) Non Urbanized Area Formula Program (5311) State of Good Repair State Planning and Research Capital Program - Bus Earmark (5309) Highway Fund Bridge Replacement Program High Priority High Risk Rural Roads Highway Safety Improvement Program Job Assistance and Reverse Commute (3037) FUNDING L FUNDING DESCRIPTION Local NHP NHPB NHPBA NHPIM O RR RTAP S S(M) SMAP SRTS STHSR STP STPDA STPE National Highway Performance Program National Highway Performance Program(Bridge) National Highway Performance Program(Bonus Allocation) National Highway Performance Program (Interstate Maintenance) Local, Non Federal or State Funds Rail-Highway Safety Rural Transit Assistance Program State State Match for STP-DA or Garvee Projects Operating Assistance and State Maintenance Safe Roads to School Stimulus High Speed Rail Surface Transportation Program Surface Transportation Program (Direct Attributable) Surface Transportation Program (Enhancement) STPEB STPOFF STPON T Surface Transportation Program (Enhancement) Surface Transportation Program (Off System) Surface Transportation Program (On System) Highway Trust Funds TAP TAPDA TAPDA TIGER Transportation Alternatives Program Transportation Alternatives Program (Direct Attributable) Transportation Alternatives Program (Direct Attributable) TIGER Discretionary Grants PROPOSED AMENDMENTS TO THE TIP PROJECT ROUTES Riverwalk EB‐5547 Greenway Phase II Lexington EB‐5830 Avenue EB‐5831 Coxe Avenue US 19 @ NC U‐5971 63 NC 63 (New U‐5972 Leicester Highway) US 19 Business U‐5973 (Weavervill e Highway) DIVISIONS 13 13 13 COUNTIES DESCRIPTION TOTAL TIP Amendment COST (in Detail thousands) ACTIVITY FUNDING CONSTRUCT NEW MULTI‐USE PATH FROM INCREASE STBG‐ EXISTING FLAT CREEK GREENWAY DA FUNDING TRAILHEAD NEAR STATE STREET AND Buncombe CHARLOTTE STREET TO EXISTING RIVERSIDE FOR PE IN FY 2017 GREENWAY NEAR RIVERSIDE PARK AND EXTENSION WEST OF NC 9 NEAR EXISTING 2,156 Asheville, Lexington Avenue, Patton Avenue Project Added to Buncombe to Southside Avenue. Improve Bicycle and the TIP Pedestrian Infrastructure. 675 Asheville, Coxe Avenue, Patton Avenue to Project Added to Short Coxe Avenue. Improve Bicycle and the TIP Pedestrian Infrastructure. 525 Buncombe US 19 (Patton Avenue), US 19 (Patton Avenue) and NC 63 (New Leicester Highway). Construct Intersection Improvements. Programmed for Planning and Environmental Study Only to Expedite Delivery of New STI Project 13 Buncombe 13 Programmed for Planning and NC 63 (New Leicester Highway) from US Environmental 19/23 (Patton Avenue) to Newfound Road. Study Only to Buncombe Construct Access Management Expedite Improvements. Delivery of New STI Project 13 Programmed for Planning and US 19 Business (Weaverville Highway) and Environmental Buncombe New Stock Road (SR 1740). Construct Study Only to Intersection Improvements. Expedite Delivery of New STI Project PE ROW CST PE PE STBGDA Local STBGDA Local STBGDA Local Cost in Thousands 2016 2017 120 30 142 36 2018 2019 80 20 1,385 346 STBGDA 540 Local 135 STBGDA 420 Local 105 2020 2021 2022 2023 2024 2025 POST YEARS PROJECT ROUTES NC 81 (Swannano U‐6046 a River Road) NC 112 (Sardis U‐6047 Road/Sand hill Road) U‐6053 New Access Road U‐4712 US 23 Business (South Main Street) U‐6048 US 19, US 23 DIVISIONS COUNTIES DESCRIPTION TOTAL TIP Amendment COST (in Detail thousands) ACTIVITY FUNDING 13 Programmed for Planning and NC 81 (Swannanoa River Road) from US 70 Environmental Buncombe (Tunnel Road) to US 74 (South Tunnel Study Only to Road). Upgrade Roadway. Expedite Delivery of New STI Project 13 Programmed for Planning and NC 112 (Sardis Road/Sandhill Road), NC 191 Environmental Buncombe (Brevard Road) to US 19/23 (Smokey Park Study Only to Hghway). Widen Roadway. Expedite Delivery of New STI Project 13 New Route, Construct Access Road to Add Economic Development Avadim Technologies Facility Near the Buncombe Intersection of I‐40 and SR 2500 (Blue Ridge Project to the TIP Road). 14 13 & 14 Haywood Programmed for Planning and US 23 Business (South Main Street) from Environmental Hyatt Creek Road (SR 1164) to US 276 Study Only to (Pigeon Street). Widen to Multi‐Lanes. Expedite Delivery of New STI Project Programmed for Planning and US 19, US 23 from Chestnut Mountain Road Environmental Buncombe, (SR 1836) to Wiggins Road (SR 1200). Study Only to Haywood Upgrade Roadway. Expedite Delivery of New STI Project 1,000 CST APD Cost in Thousands 2016 2017 1,000 2018 2019 2020 2021 2022 2023 2024 2025 POST YEARS PROJECT U‐6049 I‐5834 ROUTES NC 225 (South Main Street) I‐40 DIVISIONS COUNTIES DESCRIPTION TOTAL TIP Amendment COST (in Detail thousands) ACTIVITY FUNDING 14 Programmed for Planning and NC 225 (South Main Street) at South King Environmental Henderson Street to US 176. Widen Bridge 143 to Five‐ Study Only to Lanes. Expedite Delivery of New STI Project 14 Project Added at the Request of Division. Project was I‐40 from Mile Marker 27 to Mile Marker Inadvertently 34. Pavement Rehabilitation. Deleted from STIP in November, 2016. Haywood 7,400 CST NHPIM Cost in Thousands 2016 2017 2018 2019 7,400 2020 2021 2022 2023 2024 2025 POST YEARS
© Copyright 2026 Paperzz