Gaslight District: Proposed Southworks MixedUse Development 64 Grand Avenue South, Cambridge, Ontario, Functional Servicing Report Prepared for: HIP Developments Inc. 700 Rupert Street Waterloo, ON N2V 2B5 Prepared by: Stantec Consulting Ltd. 100-300 Hagey Boulevard Waterloo, ON N2L 0A4 161413366 Revised: April 21, 2017 Revision 1 2 Description final Updates to sections 2.1.1, 3.2.1, 3.2.3, 4.2 Author Dan Santos Dan Santos Quality Check Carrie Curtis Carrie Curtis Independent Review Matt Ninomiya Sign-off Sheet This document entitled Gaslight District: Proposed Southworks Mixed-Use Development 64 Grand Avenue South, Cambridge, Ontario, Functional Servicing Report was prepared by Stantec Consulting Ltd. (“Stantec”) for the account of HIP Developments Inc. (the “Client”). Any reliance on this document by any third party is strictly prohibited. The material in it reflects Stantec’s professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. In preparing the document, Stantec did not verify information supplied to it by others. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document. Prepared by (signature) Dan Santos, C.Tech. Project Coordinator, Community Development Reviewed by (signature) Carrie Curtis, P.Eng. Reurbanization Team Lead, Community Development GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT April 21, 2017 Table of Contents 1.0 INTRODUCTION ...........................................................................................................1.1 2.0 2.1 EXISTING CONDITIONS ...............................................................................................2.1 EXISTING SERVICING ...................................................................................................... 2.1 2.1.1 Water ............................................................................................................. 2.1 2.1.2 Sanitary ......................................................................................................... 2.1 2.1.3 Storm.............................................................................................................. 2.1 2.1.4 Floodplain and Source Water Protection ................................................ 2.2 3.0 3.1 3.2 PROPOSED GRADING AND SERVICING .....................................................................3.1 PROPOSED GRADING ................................................................................................... 3.1 PROPOSED SERVICING .................................................................................................. 3.1 3.2.1 Water ............................................................................................................. 3.1 3.2.2 Sanitary ......................................................................................................... 3.3 3.2.3 Storm.............................................................................................................. 3.3 3.2.4 Floodplain ..................................................................................................... 3.4 4.0 4.1 4.2 4.3 4.4 CONCEPTUAL STORMWATER MANAGEMENT DESIGN ...............................................4.1 STORMWATER MANAGEMENT CRITERIA ...................................................................... 4.1 WATER QUANTITY CONTROL ......................................................................................... 4.1 WATER QUALITY CONTROL ........................................................................................... 4.1 EROSION AND SEDIMENT CONTROL ............................................................................ 4.2 5.0 CONCLUSIONS ............................................................................................................5.1 LIST OF FIGURES Figure 1: Figure 2: Figure 3: Figure 4: Site Location Plan ..................................................................................................... 1.2 Floodplain Mapping ................................................................................................. 2.3 Source Water Protection Areas .............................................................................. 2.4 Conceptual Servicing .............................................................................................. 3.2 LIST OF APPENDICES APPENDIX A - Fire Flow Calculations APPENDIX B - Sanitary Flow Calculations APPENDIX C - Stormceptor Calculations GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Introduction April 21, 2017 1.0 INTRODUCTION Stantec Consulting Ltd. was retained by HIP Developments Inc. to complete a Functional Servicing Report in support of the Zoning By-Law/Official Plan Amendment for new high rise residential and commercial developments to be constructed at 64 Grand Avenue South in Cambridge, Ontario (further referred to as ‘the Site’). The site is located to the northwest of the intersection of Grand Avenue South and Fraser Street. The site is bounded to the north by the Dunfield Theatre Cambridge, to the east by Grand Avenue South, to the South by Fraser Street, and to the west by Glebe Street. For the exact location of the Site refer to Figure 1. The proposed development for the Site is the construction of two residential buildings with amenity spaces and alteration of two of the existing commercial buildings. The development is planned to include commercial, retail buildings, and apartment units in two 20 storey buildings where the first 5 storeys would contain an integrated parking structure. The purpose of this report is to identify the opportunities and any constrains for the subject site in respect to servicing, grading, and stormwater management in support of the Zoning ByLaw/Official Plan Amendment application. Pending the approval of the Zoning By-Law/Official Plan Amendment application, detailed design of the site will commence in support of Site Plan Approval. ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 1.1 V:\01614\active\161413366\design\drawing\civil\sheet_files\161413366_FIG-1.dwg 2017/04/21 9:42 AM By:Santos, Dan N August 2016 1614 13366 ORIGINAL SHEET - ANSI A Client/Project HIP DEVELOPMENTS INC. GASLIGHT DISTRICT 64 GRAND AVENUE SOUTH Figure No. 300 Hagey Blvd. Suite 100 Waterloo, ON, N2L 0A4 Tel. 519.579.4410 www.stantec.com Figure 1 Title SITE LOCATION PLAN GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Existing Conditions April 21, 2017 2.0 EXISTING CONDITIONS The Site is currently the location of the Southworks Outlet Mall and comprises an area of 2.08ha. The Southworks Outlet Mall is comprised of two existing commercial buildings, of two and three storeys in height complete with onsite parking. The Site generally drains from the northwest to the southeast through a combination of overland flows and some underground storm infrastructure towards Grand Avenue. There is an elevation difference nearing 6.0m from the northwest to the southeast of the Site. The existing site is currently 98% impervious. 2.1 EXISTING SERVICING 2.1.1 Water Based on the plan and profile drawings provided by the City of Cambridge there are various service connections to the Southworks building ranging from 150mm to 200mm. Based on this information there is a water service connection at the corner of Fraser Street and Grand Ave South to the south existing building and two service connections from Grand Ave South to the north existing building. There are various municipal hydrants located close to the Site. Three hydrants are located off Glebe Street (opposite the Site), and three on Grand Avenue South (two opposite the Site). There is a local 300mm watermain on Grand Avenue South, a 100mm diameter watermain on Fraser Street and a 150mm diameter watermain on Glebe Street. There is also a Regional 450mm diameter Ductile Iron watermain running parallel to the property. As per the Region of Waterloo’s Design Guidelines and Supplemental Specifications for Municipal Services (DGSSMS), no connection will be permissible to this watermain. 2.1.2 Sanitary Based on the plan and profile drawings provided by the City of Cambridge there are various service connections to the Southworks building. The majority of the connections appear on Fraser Street, however there is also a connection shown on Grand Avenue South at the location of the Site’s existing parking lot. Further investigation as to the size of the sanitary services should be undertaken during detailed design. There is an existing 1200mm diameter sanitary sewer on Grand Avenue South, a 250mm diameter on Fraser Street and a 200mm diameter on Glebe Street. 2.1.3 Storm The existing site currently drains toward Grand Avenue South via overland flows and through the existing underground storm infrastructure. The outlet for the site is a 250mm diameter storm pipe which outlets to a nearby catchbasin. This catchbasin discharges to a 600mm diameter storm ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 2.1 GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Existing Conditions April 21, 2017 sewer which crosses Grand Avenue South discharging to the Grand River. There is an existing 750mm diameter storm sewer on Fraser Street and a 200mm diameter storm sewer on Glebe Street. 2.1.4 Floodplain and Source Water Protection A portion of the existing site is located within the Grand River Conservation Authority (GRCA) regulated floodplain as shown on Figure 2. The site also resides within one of the Region of Waterloo’s Urban Area Source Water Protection Area’s (Figure 3), further consultation with the Grand River Conservation Authority regarding approvals will be required as part of detailed design. ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 2.2 Grand River Conservation Authority Map created: August 24, 2016 D RA FT LEGEND GRCA Disclaimer This map is for illustrative purposes only. Information contained hereon is not a substitute for professional review or a site survey and is subject to change without notice. The Grand River Conservation Authority takes no responsibility for, nor guarantees, the accuracy of the information contained on this map. Any interpretations or conclusions drawn from this map are the sole responsibility of the user. The source for each data layer is shown in parentheses in the map legend. For a complete listing of sources and citations go to: http://grims.grandriver.ca/docs/SourcesCitations2.htm 0 Copyright Grand River Conservation Authority, 2016 THIS MAP IS NOT TO BE USED FOR NAVIGATION 26 NAD 1983, UTM Zone 17 52 78 104 m. Scale 1:2,295 L PH EL U G Wellhead Protection Areas TO AR Y RD WPSA-2 G ID H E A!. R TO VIC GS T W ES RT ST ND S T AV . ! RD . ! HO . ! M K IN E R W S AT A TI O D N 40 1 BL VD A A A U N D A S Railway n d R iv e r Gr a D LY R A 2 Km ° Sources: Region of Waterloo 2010 S T RD Y RD S YE R RD D ST TO N IGL E M 24) N A M AIN Y (HW N.T.S. C N ST ES S IO V ER BE OL D NC H ST Township of North Dumfries Municipal Boundary E RD 0 0.5 1 BRA RD ND City of Cambridge Township of North Dumfries CLY D _ AA A BRANT FORD H W Y IES . ! AR A Regional Road Region of Waterloo International Airport A D D NA RA Provincial Highway River RD O ME B LV Y CED EK C RE RD NE R -A CA N . ! NL I R LEGEND IN N KL RD RL A City of Kitchener B L A I R CO OP TO H RD A A A A CO N M FR DU M BE Township of Wilmot City of Waterloo RO LE S EV IL HW T HU R ST BIS H ST ST NO R OXF O A A B US PIN E RD A RD ST . ! WATER ST Township of Woolwich GE HWY 401 T ON . ! FR A r BRID . ! HW A D L ER R ve A OO T ERL D-W A . ! A IN F O UN T KI NG A r ve . ! A A DE E d . ! E D UN NEW ee Sp Ri HES P E D RR S LE ST Ri Key Map D VE R A . ! D AN R N EE S TR U QU A RO LE G R TO TO 1 0 Y4 TOW A BL E A Township of Wellesley M AP AA VD BL A ST S A GL E L LM B RD . ! G Municipal Wellheads Groundwater Under Direct Influence (GUDI) A RD MS -HA ER CH S L EA M ON O . ! MAP 6a URBAN AREA SOURCE WATER PROTECTION AREAS Municipal Wellhead _ F IS HW T A A A AAA AA A AA __ . ! 8 Y 7/ AS AW TT R WAY FAIR RD _ __ . ! E VD BL AA A AA RD . ! A T R S ND LA S O WE B TH SS A RA LE H HIG IA LA LE AS AW TT KO R iv er A A AAA A D VE RI R ED of R TO VIC ST AR . ! ER U D T NE T MO U N CO CH T WPSA-8 D RD A IA S WPSA-7 nd N MA AA A A IR A K IN ST G ra LL RD T N T WPSA-6 Y A V BL HA R- E A A WPSA-5 FT EP . ! N ER CK LL VI A BS FO U LA DG T RD OR HE BS SC FI ER ER RD VE BR I _ ST D YA M RE NR S IT OO R LE DA YC N AI UN R IV E BL I NG EB DN IO AT ST . ! A AA A 85 TZ HW Y . ! AN LD WPSA-4 SH F IE ST TH . ! DR WPSA-3 7 WY PK KRESSL ER BR RD . ! R NO City of Guelph WPSA-1 H ER LINE CH LEGEND W IL L ST ST ES 7 WM LO BS ING A A SA ARTHUR ST A DR t Township of Woolwich A HW Y 8 TO HA M I LT Note: As of January 24, 2011, this Plan in its entirety, O is currently under N appeal before the Ontario Municipal Board (OMB). Before using this document, care should be taken to check the updated status of the appeal process on the Region of Waterloo's website. Note: This map forms part of the Official Plan of the Regional Municipality of Waterloo and must be read in conjunction with the policies of this Plan. GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Proposed Grading and Servicing April 21, 2017 3.0 PROPOSED GRADING AND SERVICING Preliminary grading and servicing strategies for the proposed development have been established based on available plan and profile drawing information for Grand Avenue South, Fraser Street and Glebe Street (dating back to 1914 through to the mid 1970’s ), and the conceptual site plan prepared by ABA Architects within the Design Brief dated April 7, 2017. It should be noted additional investigations to the servicing of the existing buildings may be required should internal upgrades in the existing buildings be proposed. Additionally, municipal By-law only permits one service connection to the property, and the existing plan and profiles detail multiple services connected to the existing building with stubs near the existing parking facility off Grand Avenue South. Further details on an overall servicing strategy will be developed during detailed design/SPA stages. Refer to Figure 4 for a conceptual servicing concept for the proposed development as well as Figure 2 for the GRCA regulated floodplain and Figure 3 for the Region of Waterloo’s Urban Area Source Water Protection Area’s. 3.1 PROPOSED GRADING The proposed development intends to preserve the existing Southworks buildings with alterations and proposes two new 20 storey buildings with integrated parking. The existing and proposed buildings would occupy approximately 50% of the Site. the proposed impervious coverage for the site is 92% which is less than the existing impervious cover. Grades will be maintained in a similar fashion to the existing conditions from the northwest towards the southeast. Grades will direct flows to localized catchbasins proposed onsite and to circumvent sheet flow of impervious areas from exiting the development. Maximum on site ponding for the purpose of stormwater management will be 0.3m per City requirements, if required. 3.2 PROPOSED SERVICING 3.2.1 Water The Site is located within Cambridge Pressure Zone 1 that currently operates on a target hydraulic grade line of 332.5m and is primarily supplied by the Middleton Water Treatment Plant (WTP). According to the Water Supply and Distribution Operations Master Plan Final Report (Stantec, February 2015) and the Water Supply Master Plan Update Final report (Stantec, March 2015) the Middleton WTP has the largest capacity in the Integrated Urban System. The existing site elevations range from 271.5m to 265.8m, which is lower than 276.3m requiring all water services to have pressure reducing valves installed as the pressures are higher than 550 kPa (80 psi). With respect to fire protection based on limited construction details for the proposed development, a conservative preliminary calculation using the Fire Underwriters Survey was completed; the proposed development for the Site requires a flow of approximately 133L/s. This would require a minimum diameter water service connection of 250m diameter (Appendix A). ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 3.1 FRASER STREET V:\01614\active\161413366\design\drawing\civil\sheet_files\161413366_FIG-4.dwg 2017/04/21 9:46 AM By:Santos, Dan N GRAND AVENUE SOUTH August, 2016 1614 13366 ORIGINAL SHEET - ANSI B Client/Project Legend HIP DEVELOPMENTS INC. GASLIGHT DISTRICT 64 GRAND AVENUE SOUTH Notes Figure No. 300 Hagey Blvd. Suite 100 Waterloo, ON, N2L 0A4 Tel. 519.579.4410 www.stantec.com Figure 4 Title CONCEPTUAL SERVICING GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Proposed Grading and Servicing April 21, 2017 It is anticipated that a connection off the existing 300mm watermain on Grand Avenue South right-of-way will be of sufficient size to service the proposed development; however these scenarios will need to be reviewed further during the detailed design stage for the development. Internal booster pumps for each high rise will likely be specified in the building to achieve appropriate flow and pressure on the upper floors given the proposed height of the buildings. Details regarding the existing services to the existing commercial buildings will be reviewed at the time of detailed design/SPA. It was identified through Region of Waterloo comments received February 28, 2017, that there are proposed future changes to the HGL for this area in Cambridge as noted in the “Implementation Plan for Cambridge Water System Upgrades Summary Report” completed by GM BluePlan in October 2015. During the detail design stage, this revised HGL will be taken into consideration. As previously identified, no connection will be permissible to the Regional 450mm diameter Ductile Iron watermain running parallel to the property. Should any upgrades to the municipal watermain be required, they will be proposed to the local watermain’s only with approval from the City. 3.2.2 Sanitary To determine the anticipated sanitary flows for the proposed development a sanitary flow design sheet has been prepared (Appendix B). Based on the Region of Waterloo’s Water and Wastewater Monitoring Report (2016) Development Data 1.77 people per unit (PPU) for the apartment buildings was used for the 396 units and the remaining half of the development site remaining as commercial and retail businesses; the proposed development has an anticipated peak sanitary flow rate of 12.773 L/s. Upon review of the plan and profile and other various documents available, there is an existing 250mm diameter sanitary sewer on the site that connects to the 1200mm via an existing manhole on Grand Avenue South. The slope of this existing pipe is not available, however at a 0.25% slope the 250mm diameter sanitary connection would have the capacity to service the development at 29.733 L/s while maintaining the City of Cambridge and the Region of Waterloo minimum velocity of 0.6 m/s. as the development is within the floodplain, all structures will be installed with waterproof lids. 3.2.3 Storm There is an existing storm sewer system installed on the development that outlets to a catchbasin on Grand Avenue South. Runoff collected in the proposed storm sewers are to be directed into an oil-grit separator (OGS) located on the eastern entrance off Grand Avenue South on the site before out-letting into the municipal storm system. Approval from the Region of Waterloo will be required to use this existing outlet that discharges directly to the Grand River. All storm sewers on site will be sized to convey the 5 year storm event, all flows greater than the 5 year storm event will be directed via overload flow towards Grand Avenue South. The OGS will be sized to control ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 3.3 GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Proposed Grading and Servicing April 21, 2017 an Enhanced Level of quality control (Level 1), removal of 80% of suspended solids, as required by the City of Cambridge. Region Staff have provided comments regarding the 5-year storm being controlled for the proposed development, with the capacity and condition of the existing storm infrastructure on Grand Avenue and overland flow routes for storm events above 5 years. As such, during the detailed design stage, discussions with the Region staff regarding possible controls for the site will be explored. 3.2.4 Floodplain The proposed development resides within the Galt City Centre Floodplain Special Policy Area (SPA) with Regulatory Floodplain Elevations (RFE) for Building A at 266.5m and Building B at 266.8m. As a result, based on the elevation information available, Building A would partially be within the Regulatory Floodplain at its southeast corner and Building B would have approximately the southern portion of the parking structure within the Regulatory Floodplain. The finished floor elevations therefore has been proposed to be increased to 266.82m for Building A and 266.88m for Building B as shown in the ABA Design Brief dated July 27, 2016. It should be noted that the development will be required to provide flood protection for all new structures within the RFE, require that no habitable room be provided below the RFE, and all new utilities be located higher than the RFE where practical and where not possible, such utilities shall be flood proofed. Further consultation with the GRCA will be required for approvals during detailed design. ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 3.4 GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Conceptual Stormwater Management Design April 21, 2017 4.0 CONCEPTUAL STORMWATER MANAGEMENT DESIGN 4.1 STORMWATER MANAGEMENT CRITERIA A portion of the site is located within the Grand River Conservation Authority’s floodplain regulated area and is part of the Galt City Centre Floodplain Special Policy Area. As part of the Development, Interference with Wetlands and Alterations to Shorelines and Watercourses Regulation (Ontario Regulation 150/06), the site will be required to ensure flood protection techniques be applied, no new habitable room be lower than the RFE, and that new utilities be located higher than the RFE where practical, or flood proofed. Additionally the City of Cambridge requires water quality control implementation of Enhanced Level of quality control (Level 1), as per the MOECC SWM practices Planning and Design Manual (2003). As the proposed site resides within one of the Region of Waterloo’s Urban Area Source Water Protection Area’s (Figure 3), further consultation with the Grand River Conservation Authority regarding approvals will be required as part of detailed design. 4.2 WATER QUANTITY CONTROL The sites existing impervious area is 98% and the proposed development plans to reduce the impervious area to 92%. As there is a proposed decrease of impervious area, quantity control for the 5 year storm event as required by the City of Cambridge will be achieved through development of the site as proposed. As such, it is not anticipated that further quantity control is required. This will be confirmed at the detailed design/SPA stage Region Staff have identified some concern with only the 5-year storm being controlled for the proposed development, with the capacity and condition of the existing storm infrastructure on Grand Avenue and overland flow routes for storm events above 5 years. As such, during the detailed design stage, discussions with the Region staff regarding possible controls for the site will be explored. 4.3 WATER QUALITY CONTROL As the site requires an Enhanced Level of quality control, requiring the removal of 80% of suspended solids, a Stormceptor Model STC 9000 or approved equivalent is proposed to be installed. Refer to Appendix C for the sizing of the Stormceptor, which was chosen to provide an Enhanced Level of quality control. The Stormceptor or approved equivalent will require regular annual maintenance to ensure its operability to the Enhanced Level control and the owner may be required to enter into a maintenance agreement with a suitable contractor for this maintenance. ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 4.1 GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Conceptual Stormwater Management Design April 21, 2017 4.4 EROSION AND SEDIMENT CONTROL Due to the existing sloping of the Site from northwest to the southeast at approximately 3.5%, erosion and sediment control is planned to be mitigated by the use of sediment control fencing surrounding the perimeter of the site. During construction all catchbasins will have filter cloth installed to mitigate sediment migration into the municipal storm system. The use of mud mats at all construction entrances will also be installed to lessen the tracking of sediments on the municipal roadway. Any sediment that is tracked onto the municipal roadway will be cleaned up by the contractor. These measures will be shown on the detailed design drawings. ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 4.2 GASLIGHT DISTRICT: PROPOSED SOUTHWORKS MIXED-USE DEVELOPMENT 64 GRAND AVENUE SOUTH, CAMBRIDGE, ONTARIO, FUNCTIONAL SERVICING REPORT Conclusions April 21, 2017 5.0 CONCLUSIONS Based on the foregoing analysis, it is concluded that: 1. Existing municipal infrastructure for water and sanitary are available along Grand Avenue South, Glebe Street, and Fraser Street. Grand Avenue South has a storm sewer operated by the Region of Waterloo that the site is currently connected to under existing conditions which discharges to the Grand River. Municipal storm infrastructure is also located on Fraser and Glebe Street. 2. The 250mm diameter water service on Grand Avenue South is of sufficient size to provide fire flows for the proposed development. It is anticipated that this connection off the existing 300mm watermain on Grand Avenue South right-of-way will be of sufficient size to service the proposed development. When the high rise construction materials and fire separates are known during the detailed design stage, a detailed fire flow analysis will be provided to determine if a smaller diameter water service will suffice for fire protection. It should be noted that no connection to the existing 450mm diameter Ductile Iron Watermain shall be permitted. 3. The existing 250mm diameter sanitary service on Grand Avenue South is of sufficient size to service the proposed buildings and existing commercial buildings. 4. The stormwater management quality control requirements of Enhanced Level of protection can be achieved using a Stormceptor STC 9000 or approved equivalent. The 5 year storm event will be conveyed in an onsite storm sewer system which is proposed to outlet into the Region of Waterloo’s existing 300mm storm infrastructure. 5. The proposed buildings are proposed to be higher than the Regional Floodplain Elevations of 266.5m and 266.8m. The development will be required to provide flood protection for all new structures within the Regional Floodplain Elevations, require that no habitable room be provided below the Regional Floodplain Elevations, and all new utilities be located higher than the Regional Floodplain Elevations where practical and where not possible, such utilities shall be flood proofed. Further consultation with the GRCA will be required for approvals during detailed design. 6. Additional grading, servicing, and stormwater management details will be provided during detailed design. ds v:\01614\active\161413366\planning\reports\final\rpt_161413366_gaslight_fsr_20170421_dms_draft.docx 5.1 APPENDIX A FIRE FLOW CALCULATIONS 161413366 - Southworks, Cambridge Fire Flow Demand Calculation Building A Fire Flow Calculations Reference: Water Supply for Public Fire Protection Part II Guide for Determination of Required Fire Flow Fire Underwriters Survey, 1999 1. Initial Estimate of Required Fire Flow Formula: F = 220 * C * SQRT (A) F C = = = = = = = * A the required fire flow in litres per minute coefficient related to the type of construction 1.5 for wood frame construction (structure essentially all combustible) 1.0 for ordinary construction (brick or other masonry walls, combustible floor and interior) 0.8 for non-combustible construction (unprotected metal structural components, masonry or metal walls) 0.6 for fire resistive construction (fully protected frame, floor, roof) the total floor area in square metres (incl all storeys but not basements at least 50% below grade) for fire resistive buildings, consider the two (2) largest adjoining floors plus 50% of each of any floors immediately above them up to eight (8), when the vertical openings are inadequately protected. If the vertical openings and exterior vertical communications are properly protected (one hour rating), consider only the area of the largest floor plus 25% of each of the two (2) immediately adjoining floors. Fire flow shall not exceed 30,000 L/min unless it is a one storey building which must not exceed 25,000 L/min or be less than 2,000 L/min Calculations for fire flow F: A = 2,325 C = 0.6 F = 6,365 L/min F L/min = 6,000 m2 2 Foot print area = 1,319 m Non-combustible construction = 106 L/s = 100 L/s No. Storeys 20 (rounded to the nearest 1,000 L/min.) 2. Charge to Required Fire Flow Based on Contents of Building (Occupancy) -25 -15 0 15 25 % % % % % = = = = = reduction due to non-combustible contents reduction due to limited combustible contents no charge due to combustible contents surcharge due to free burning contents surcharge due to rapid burning contents * Fire flow determined cannot be less than 2,000 L/min Calculation of Occupancy Surcharge or Reduction (OSR) OSR = 0 % (the contents of this building are considered limited combustible, see page's 18 & 21 FUS, 99) Calculations of revised fire flow F: F = 6,000 L/min = 100 L/s 3. Charge to Required Fire Flow Based on Presence of Automatic Sprinkler Protection 0 % -25 % -50 % = = = no reduction due to absence of automatic sprinkler system reduction without proper system supervision including water flow and control valve alarm service reduction with proper system supervision including water flow and control valve alarm service Calculation of Fire Flow Reduction Due to Presence of Automatic Sprinkler (AS) AS = -25 % (Assumed a sprinkler system installed) Reduction in Fire Flow (RF): RF = -1,500 L/min = -25 L/s 4. Charge to Required Fire Flow Based on Proximity to Other Buildings The charge for any one side generally should not exceed the following limits for the separations shown Separation to to to to to 0 3.1 10.1 20.1 30.1 Charge 25 20 15 10 5 3 10 20 30 45 Building Separation Wall Distance Left 17.17 Right 5 Front 15.54 Back 32 % % % % % Normally any unpierced party wall/firewall considered to form a boundary when determining floor areas may warrant up to a 10 % exposure charge. Calculation of Fire Flow Increase Due to Proximity to Other Buildings (PB) PB = PL+PR+PF+PRR = = = = proximity charge for left side of building proximity charge for right side of building proximity charge for front of building proximity charge for rear of building where, PL PR PF PRR PB PB = = 55 55 % % = = = = 15 20 15 5 % % % % The total percentage shall be the sum of the percentage of all sides, but shall not exceed 75%. Increase in Fire Flow (IF): IF = 3,300 L/min = 55 L/s 5. Final Fire Flow (F) Required F = F (From Section 2.0) - RF (From Section 3) + IF (From Section 4) = 6,000 L/min - 1,500 = 7,800 L/min = L/min + 3,300 L/min 130 L/s velocity = 8,000 L/min = 2,113 Gal /min = 133 L/s (rounded to the nearest 1,000 L/min.) 6. Additional Check List NOTES: Dia. 250 dia. 2.72 m/s Assumed that there are fire walls separating floors (reinforced conrete construction). 161413366 - Southworks, Cambridge Fire Flow Demand Calculation Building B Fire Flow Calculations Reference: Water Supply for Public Fire Protection Part II Guide for Determination of Required Fire Flow Fire Underwriters Survey, 1999 1. Initial Estimate of Required Fire Flow Formula: F = 220 * C * SQRT (A) F C = = = = = = = * A the required fire flow in litres per minute coefficient related to the type of construction 1.5 for wood frame construction (structure essentially all combustible) 1.0 for ordinary construction (brick or other masonry walls, combustible floor and interior) 0.8 for non-combustible construction (unprotected metal structural components, masonry or metal walls) 0.6 for fire resistive construction (fully protected frame, floor, roof) the total floor area in square metres (incl all storeys but not basements at least 50% below grade) for fire resistive buildings, consider the two (2) largest adjoining floors plus 50% of each of any floors immediately above them up to eight (8), when the vertical openings are inadequately protected. If the vertical openings and exterior vertical communications are properly protected (one hour rating), consider only the area of the largest floor plus 25% of each of the two (2) immediately adjoining floors. Fire flow shall not exceed 30,000 L/min unless it is a one storey building which must not exceed 25,000 L/min or be less than 2,000 L/min Calculations for fire flow F: A = 2,325 C = 0.6 F = 6,365 L/min F L/min = 6,000 m2 2 Foot print area = 1,319 m Non-combustible construction = 106 L/s = 100 L/s No. Storeys 20 (rounded to the nearest 1,000 L/min.) 2. Charge to Required Fire Flow Based on Contents of Building (Occupancy) -25 -15 0 15 25 % % % % % = = = = = reduction due to non-combustible contents reduction due to limited combustible contents no charge due to combustible contents surcharge due to free burning contents surcharge due to rapid burning contents * Fire flow determined cannot be less than 2,000 L/min Calculation of Occupancy Surcharge or Reduction (OSR) OSR = 0 % (the contents of this building are considered limited combustible, see page's 18 & 21 FUS, 99) Calculations of revised fire flow F: F = 6,000 L/min = 100 L/s 3. Charge to Required Fire Flow Based on Presence of Automatic Sprinkler Protection 0 % -25 % -50 % = = = no reduction due to absence of automatic sprinkler system reduction without proper system supervision including water flow and control valve alarm service reduction with proper system supervision including water flow and control valve alarm service Calculation of Fire Flow Reduction Due to Presence of Automatic Sprinkler (AS) AS = -25 % (Assumed a sprinkler system installed) Reduction in Fire Flow (RF): RF = -1,500 L/min = -25 L/s 4. Charge to Required Fire Flow Based on Proximity to Other Buildings The charge for any one side generally should not exceed the following limits for the separations shown Separation to to to to to 0 3.1 10.1 20.1 30.1 Charge 25 20 15 10 5 3 10 20 30 45 Building Separation Wall Distance Left 5 Right 14.5 Front 8.186 Back 28 % % % % % Normally any unpierced party wall/firewall considered to form a boundary when determining floor areas may warrant up to a 10 % exposure charge. Calculation of Fire Flow Increase Due to Proximity to Other Buildings (PB) PB = PL+PR+PF+PRR = = = = proximity charge for left side of building proximity charge for right side of building proximity charge for front of building proximity charge for rear of building where, PL PR PF PRR PB PB = = 65 65 % % = = = = 20 15 20 10 % % % % The total percentage shall be the sum of the percentage of all sides, but shall not exceed 75%. Increase in Fire Flow (IF): IF = 3,900 L/min = 65 L/s 5. Final Fire Flow (F) Required F = F (From Section 2.0) - RF (From Section 3) + IF (From Section 4) = 6,000 L/min - 1,500 = 8,400 L/min = L/min + 3,900 L/min 140 L/s velocity = 8,000 L/min = 2,113 Gal /min = 133 L/s (rounded to the nearest 1,000 L/min.) 6. Additional Check List NOTES: Dia. 250 dia. 2.72 m/s Assumed that there are fire walls separating floors (reinforced conrete construction). APPENDIX B SANITARY FLOW CALCULATIONS SUBDIVISION DESIGN PARAMETERS Southworks Development SANITARY SEWER AVERAGE DAILY FLOW PER PERSON = DESIGN SHEET DATE: DESIGNED BY: CHECKED BY: April 17, 2017 DMS CTC FILE NUMBERS: LOCATION STREET n/a RESIDENTIAL AREA AND POPULATION FROM TO AREA M.H. M.H. ID Units (Units) 231 30T- 264 396.00 POP. POP. CUMULATIVE DENSITY AREA (ppu) (ha) 1.77 701 POP. COMM PEAK PEAK AREA FACT. FLOW ID (L/s) 701 3.894 11.057 AREA (ha) 1 1.04 INDUST ACCU. AREA AREA ID (ha) 1.04 Page 1 of 1 AREA (ha) AREA AREA ID (ha) AREA (ha) l/p/day RESIDENTIAL: COMMERCIAL: 1.5000 L/s/Ha 0.004 L/s/person m/s MINIMUM VELOCITY = 0.600 INDUSTRIAL: 1.0000 L/s/Ha n= 0.013 INSTITUTIONAL: 2.5000 L/s/Ha MAX PEAK FAC.= 4.500 INFILTRATION: MIN PEAK FAC.= 1.500 INSTIT ACCU. 350 C+I+I 0.1500 L/s/Ha RESIDENTIAL HARMON PEAKING FACTOR INFILTRATION PEAK TOTAL ACCU. INFILT. AREA FLOW AREA AREA FLOW (ha) (L/s) (ha) (ha) (L/s) 1.56 397.04 1.04 PIPE TOTAL ACCU. 0.156 FLOW (L/s) 12.773 DIST (m) 6.0 DIA (mm) 250 SLOPE (%) 0.25 CAP. VEL. (FULL) (FULL) (ACT.) (L/s) (m/s) (m/s) 0.61 0.575 29.733 APPENDIX C STORMCEPTOR CALCULATIONS Brief Stormceptor Sizing Report - Southworks Project Information & Location Project Name Southworks City Country Project Number 1793 State/ Province Ontario Date 8/24/2016 Canada Designer Information EOR Information (optional) Name Dan Santos Name Company Stantec Company Phone # 519-585-7295 Phone # Email [email protected] Email Stormwater Treatment Recommendation The recommended Stormceptor Model(s) which achieve or exceed the user defined water quality objective for each site within the project are listed in the below Sizing Summary table. Site Name Southworks Target TSS Removal (%) 80 TSS Removal (%) Provided 83 Recommended Stormceptor Model STC 9000 The recommended Stormceptor Model achieves the water quality objectives based on the selected inputs, historical rainfall records and selected particle size distribution. Stormceptor Sizing Summary Stormceptor Model % TSS Removal Provided STC 300 47 STC 750 61 STC 1000 62 STC 1500 62 STC 2000 68 STC 3000 70 STC 4000 75 STC 5000 76 STC 6000 79 STC 9000 83 STC 10000 83 STC 14000 86 StormceptorMAX Custom Stormceptor Brief Sizing Report – Page 1 of 2 Sizing Details Water Quality Objective Drainage Area Total Area (ha) 2.08 TSS Removal (%) Imperviousness % 93.0 Runoff Volume Capture (%) 80.0 Oil Spill Capture Volume (L) Rainfall Peak Conveyed Flow Rate (L/s) Station Name WATERLOO WELLINGTON A State/Province Ontario Station ID # 9387 Years of Records 34 Storage (ha-m) Discharge (cms) Latitude 43°27'N 0.000 0.000 Longitude 80°23'W Water Quality Flow Rate (L/s) Up Stream Storage Up Stream Flow Diversion Max. Flow to Stormceptor (cms) Particle Size Distribution (PSD) The selected PSD defines TSS removal Fine Distribution Particle Diameter (microns) Distribution % Specific Gravity 20.0 20.0 1.30 60.0 20.0 1.80 150.0 20.0 2.20 400.0 20.0 2.65 2000.0 20.0 2.65 Notes • Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor, which uses the EPA Rainfall and Runoff modules. • Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal defined by the selected PSD, and based on stable site conditions only, after construction is completed. • For submerged applications or sites specific to spill control, please contact your local Stormceptor representative for further design assistance. For Stormceptor Specifications and Drawings Please Visit: http://www.imbriumsystems.com/technical-specifications Stormceptor Brief Sizing Report – Page 2 of 2
© Copyright 2026 Paperzz