Barcelona 12-15 May 2003 GAMAD Project (Distribution Assets Maintenance Activities Management System) Olarreaga_SP_Author_Alpha 5_ Block 1.1 1 Barcelona 12-15 May 2003 Goals of GAMAD • Tool for: – Minimize Maintenance costs – Guarantee internal and external safety and quality requirements • Useful information for: – Prioritize investments – Materials and subcontractors standardization – Maintenance activities scheduling – Controlling and audit trails Olarreaga_SP_Author_Alpha 5_ Block 1.1 2 Barcelona 12-15 May 2003 How to reach the goals Real benefits depends on Functionality and effective use level Olarreaga_SP_Author_Alpha 5_ Block 1.1 3 Barcelona 12-15 May 2003 Functionalities of GAMAD • Developed on SAP R/3 PM module. Many specific functions required custom development • Global scope • From low to very high voltage facilities • Standardization, Planning, Programming, Executión, Analysis • Preventive, corrective, small improvements, ... • Work orders linked to each asset affected • Technic, economic and inventory information Olarreaga_SP_Author_Alpha 5_ Block 1.1 4 Barcelona 12-15 May 2003 Functionalities of GAMAD • CICO model (Risks and Opportunities management) RISK = Probability x Consequence FACILITY Condition Condition Circumstance Circumstance Importance Number and kind of anomalies Olarreaga_SP_Author_Alpha 5_ Block 1.1 Number and kind of anomalies Preventive Maintenance x Importance Inspections x Importance Correction of Anomalies 5 Barcelona 12-15 May 2003 Functionalities of GAMAD • Materials reliability module MATERIAL FALLO DE FAILURE MATERIAL FAILURE INCIDENCIA OPERATION ANOMALY ANOMALÍA Entry of Alta de incidencia the incidence Anomaly Anomalíain en GAMAD GAMAD GAMAD Local operation Operación Local It Exige request to link the asociar la incidence Incidenciato ItExige request to link the asociar la incidence Incidenciaof Material Registro de Reliability Fiablidad de Registry Materiales OT WO Corrective mantenimiento Maintenance correctivo WO notification Notificación OT (Record/Certification) (Registrar/Certificación) Material Registro de Reliability Fiabilidad de Registry Materiales WO Anomaly OT corrección correction anomalías WO Investment OT solicitud de application inversión Notificación OT WO notification (Record/Certification) (Registrar/Certificación) closure of anomalías anomalies cierre de Material Registro de Reliability Fiabilidad de Registry Materiales Material Reliability Olarreaga_SP_Author_Alpha 5_ Block 1.1 6 Barcelona 12-15 May 2003 Functionalities of GAMAD GAMAD SYSTEM STANDARDIZATION Definition of processes, criteria, ranges, anomalies, standard timeframes, risk assessments, priorities, ... MAINTENANDE of facilities and equipment PLANNING DEFINITION OF MAINTENANCE POLICIES “What to do on each element and how often” STANDARDIZATION INVENTORY of facilities and equipments of facilities and equipments RENEWAL PROGRAMMING of facilities and equipments ANNUAL PROGRAM WO to WO ANALYSIS PREPARATIÓN/ EXECUTIÓN WO’s MANAGEMENT MATERIAL RELIABILITY FOLLOW UP FOLLOW-UP REPORTS Service Quality Regulation Operating experience Manufacturers recommendations New technologies Methods (CICO, RCM, TPM, Total Quality Olarreaga_SP_Author_Alpha 5_ Block 1.1 7 Barcelona 12-15 May 2003 Functionalities of GAMAD • Integrated with: • Inventory • Investment system • Purchasing, warehousing and controlling • Future functionalities • Documental management (maps, technic documentation, digital photos, ...) • Local operation support • Improving performance using portable mobile computers Olarreaga_SP_Author_Alpha 5_ Block 1.1 8 Barcelona 12-15 May 2003 Effective use level of GAMAD • System and process indicators • Current implementation level (18 months after), 41% – Operative implementation, 70% – Monitoring and follow-up implementation, 50% – Profitable use of information, 20% • Main handicaps and barriers: – New system and new operating procedures and criteria – Geografic distribution of users – Organizational changes Olarreaga_SP_Author_Alpha 5_ Block 1.1 9 Barcelona 12-15 May 2003 Benefits obtained •Goals obtained, directly book-keeping reflected: •Personal costs •External costs •Investments optimization •Other potential benefits not obtained yet, they will be reached depending on the evolution of implementation status Olarreaga_SP_Author_Alpha 5_ Block 1.1 10 Barcelona 12-15 May 2003 Lessons learnt •Requirements to make a profitable potential system: •Leadership •Organization (size and components) •Deep and detailed functional analysis •Requirements to obtained a profitable use: •Leadership •Continuous training and recycling •Centralized support •Continuous actions according users experiences Olarreaga_SP_Author_Alpha 5_ Block 1.1 11
© Copyright 2026 Paperzz