IMPORTANT SAFETY PROCEDURES RULES ARE IN PLACE TO KEEP YOU SAFE. DON'T TAKE CHANCES! FIRE & SAFETY Ethanol is ammable and Grain or DDGS dust are combustible. The following are strictly enforced: • No smoking inside plant fenced area • No open ames • Turn off all electronic equipment inside fenced area • No mechanical or maintenance work on plant site. Vehicles that will not start are towed at owner's expense • Keep cell phones off (incl hands-free) at all times • If a re breaks out notify Husky ops & remain a safe distance away • In event of a spill notify Security/Husky Ops IN EVENT OF PLANT EMERGENCY • Pull over to the side of the road and turn off truck • Unless in immediate danger remain in your vehicle until instructed to leave. ACTIONS OF DISCIPLINE FOR DRIVERS WHO CHOOSE NOT TO COMPLY WITH RULES • Drivers will face penalties from re-orientation at security to up to 3 months (or more) banned from site • Anyone found smoking inside plant fence will be banned for at least 3 months • Anyone using a cell phone / electronic device on site will be banned for at least a month Drivers who ask for help or clari cation (before acting) will not be penalized EVERY YEAR HUSKY ENERGY'S MINNEDOSA ETHANOL PLANT: • Purchases about 390,000 T of grain • Produces over 150,000,000L of ethanol • Produces 115,000 Tonnes of DDGS (Dried distiller's grain with solubles) for livestock feed PROOF OF ORIENTATION OTHER RULES • No ethanol loading during lightning storms (Call control room for more information) • Any spills (e.g. fuel) from trucks, or, grain spills from hoppers are cleaned up at owner's expense • No backing up on site without a Husky spotter • Site is under 24h video surveillance Name:_______________________________ Company:____________________________ Orientation Date:______________________ Orientation Complete Second Load DDGS GRAIN Show to security each visit. Third Load w w w.husk ygrain.com FACILITY MAP ARRIVAL & CHECK-IN (ALL LOADS) 1. Report to Security for entry & staging instructions (Bulk Chemical and Ethanol drivers will be referred to control room) 2. Grain & DDGS Provide the following information: • TAN # (Truck Authorization Number) / Truck Order # • Scheduled time • Person / company hauling for • Product (Wheat / Corn / DDGS) • Proof of orientation pamphlet (see other side) 3. Remove or unroll your tarp. On rainy/windy days this can be done on site if approved by security 4. Turn CB to channel 19; wait for instructions PROCEDURES FOR DELIVERING GRAIN 1. Drive to grain probe when called. Obey traffic lights 2. Drive into the receiving bay when clear PLANT RULES (READ THIS!!!) • No smoking or open ames of any kind • Turn OFF cell phones (incl. hands-free devices) • Driver supplied hard hat & eye protection required • No children under 12 years • No climbing into trailers • Speed Limit 15 km/hr • Stay in your cab unless unloading in grain receiving bay or loading ethanol • Basic traffic rules apply and are strictly enforced • Bullying, intimidation and discrimination of any sort will not be tolerated We want your visit to be as smooth and efficient as possible. If you aren't sure what to do or run into problems ask – Security guards and plant operators are happy to help. UNLOADING: 1. SHUT OFF engine. 2. Follow dumping lights(located on south wall, mid-bay) Red: Wait to Unload Yellow: Begin Unload Green: truck has been tared empty – clear to exit bay 3. No Trailer clean-out unless speci cally authorized by operations 4. Exit the bay, park just outside and get paperwork from Grain Receiving Building (E) (enter man door on south side) PROCEDURES FOR LOADING DDGS 1. Drive to DDGS Loading Site (G) when instructed 2. Wait until contacted by Husky Operator 3. Instruct the load-out operator as to how you would like the load distributed in your trailer 4. Level and tarp the load from the walkway/platform after loading is complete PROCEDURES FOR LOADING ETHANOL 1. One truck at loading area at a time. (One truck may stage inside gate during security hours – stay in your truck) 2. All drivers perform 3 training loads with operations 3. Obey all posted PPE requirements; don PPE prior to entry 4. If your are having problems or have questions contact control room (instructions posted inside loading shack) EXITING PROCEDURES (GRAIN/DDGS LOADS) 1. Drive to exit gate (F) once all paperwork is complete 2. Push “Grain” button on the keypad or channel 19 on your CB radio to request exit (ETHANOL or BULK CHEMICAL LOADS) 1. Drive to exit gate (F) 2. Push “Control Room” button on the keypad to request exit CONTACT US Grain Scheduler 204-867-8108 Lead Grain Purchaser 204-867-8146 Grain Buyer 204-867-8142 Grain Office Toll Free 877-217-7425 DDGS Marketer 204-867-8163 Grain Elevator receiving office 204-867-8112 Control room (Ethanol loads) 204-867-8107 We want to be your rst choice for delivery locations. Feedback – good or bad? Let us know.
© Copyright 2026 Paperzz