QES Management System Issue Date: 18/12/2014 Application to Access/Enter Confined Spaces Permit Number (Office Use only) CWW Contact Person: File/Project No.: Location Address: Melways Ref: Manhole Numbers: Application for: (please circle) Non Entry Works Only Confined Space Entry Type of Works: (Please circle) Date of Access – From To: Time of Access – From To: Company Name: Postal Address: Site Contact Name: Contact Phone: Office Contact Name: Contact Phone: Office email address: Office Fax: MH Alteration Plug Insertion Plug Removal CCTV New Branch Other Inspection Name(s) of Person(s) Entering/Accessing Confined Space: ALL CONTRACTORS MUST COMPLY WITH CWW’S CONDITIONS AS HIGHLIGHTED BELOW AND THOSE CONTAINED IN CWW’S RESPONSE TO THIS APPLICATION: All parties entering manholes are to be familiar with and carry out works in accordance with the OH&S Regulations 2007, AS2865 “Confined Spaces” and City West Water’s ‘PRO-69 Confined Space Entry and Associated Works’ Procedure. If manholes to be accessed are located within private property, you the contractor must notify property owners 3 days in advance and gain permission to access their property. All your safety equipment and machinery must be well maintained and a service history kept as proof of service intervals. The following information/documentation must be submitted along with this application: Copies of each of your employees / sub-contractors current Confined Space Entry Tickets. Copy of proposed Safe Work Method Statement. Copy of submitted ‘Notification of Intention to Commence Excavation Operations in Trenches, Shafts and Tunnels (if applicable)’. A site map indicating the location of the proposed works. During inspection of this sewer / manhole(s) the contractor must : Check prior to entering any manhole that entry is safe and complete checklist. Wear and use correct safety gear and work in a responsible safe manner. Keep disruption to residents to a minimum. Reinstate all manhole covers and leave site clean and safe. As the contractor, l understand that it is my responsibility to ensure that all parties engaged in entering/accessing City West Water’s assets strictly comply with all the above conditions. SIGNED ___________________________________________ DATE _____ / _____ / ______ Access Notification is to be made at least five (5) days prior to entry of any manholes. Send this sheet to the – Operational Control Centre via Email: [email protected] Enquiries & Call In/Out Telephone No. 1800 057 981 Document FOR-159 Rev 3 Page 1/1
© Copyright 2026 Paperzz