EYETS LHC 2016/2017 Works EN/EL/CF A. Gonzalez & G. Girardot 11 octobre 2016 Agenda 1. Copper cabling 2. Optical fibers 3. Support needed 4. Conclusion 20/10/2015 Coordination meeting 1. Cabling campaigns Intervention overview 1. LHC1G-YEB1 2. LHC1D-YEB1 3. LHC1S-YEB1 4. LHC2G-YEB1 5. LHC2D-YEB1 6. LHC3P-YEB1 7. LHC3S-YEB1 8. LHC4S-YEB1 9. LHC5G-YEB1 18 cabling campaigns 275 cables / 21 km 10. LHC5D-YEB1 11. LHC5S-YEB1 12. LHC6S-YEB1 13. LHC7G-YEB1 14. LHC7D-YEB1 15. LHC7P-YEB1 16. LHC7S-YEB1 17. LHC8G-YEB1 18. LHC8D-YEB1 11/10/2016 EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt1 (Underground) • Constraints: • • • • • Liquid Helium in QRL => authorization for the access to the cable trays needed Electrical lockout Installation of scaffolding over the magnets in UJ14 Opening cable passages in UJ14 / UJ16 Pulling fragile cables for AFP activity Affaire Code Building N° PLAN Title Group User Nb. cables Length (m) Cabling campaign C213AHA173001 UL16 ?? EYETS - SEISMIC NETWORK EN-MME M. CABON 4 120 LHC1D-YEB1 C213AHA176001 UJ14 ?? EYETS - CABLAGE BPM AFP.6L1 BE-BI C. BOCCARD 4 220 LHC1G-YEB1 Works Under ground 11/10/2016 • Length of cables ≈ 350m • Estimated duration: • Pulling =3d + 3d • Connecting + tests =2d + 2d EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt1 (Surface) • Constraints: • Electrical lockout Affaire Code Building N° PLAN Title C213AHA163001 SR1 10357 EYETS - CABLAGE NOUVEAU RPADO SR1 C213AHA168001 SR1 10357 EYETS - FGC-ETHER FOR LHC - SR1 Works Surface 11/10/2016 Group User TE-EPC H. THIESEN TE-EPC • Length of cables ≈ 330m • Estimated duration: • Pulling =1.5w • Connecting + tests =1.5w J. GOMEZ COSTA Nb. cables Length (m) Cabling campaign 11 300 LHC1S-YEB1 1 30 LHC1S-YEB1 EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt2 (Underground) • Constraints: • • • • Liquid Helium in QRL => authorization for the access to the cable trays needed Electrical lockout Opening cable passages between UA and RA Pulled cable through all the arc 1-2 Affaire Code Building N° PLAN Title Group User Nb. cables Length (m) Cabling campaign C213AHA174001 UA27 10890 EYETS - CABLAGE VACUUM – TE-VSC JP. BOIVIN 1 70 LHC2D-YEB1 C213AHA165001 UA23 11241 EYETS - TDI INTERFEROMETER RESET - EN-STI J. LENDARO 1 47 LHC2G-YEB1 C213AHA172001 ARC1-2 ?? EYETS - REMPLACEMENT LIAISONS SAREP THERMOSWI TE-MSC P. DENIS 1 5500 LHC2G-YEB1 Works Under ground 11/10/2016 • Length of cables ≈ 5617m • Estimated duration: • Pulling =1d + 1.5w • Connecting + tests =2d + 3d EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt3 (Underground) • Constraints: • Electrical lockout Affaire Code Building N° PLAN C213AHA UJ33 ?? Title Group User Nb. cables Length (m) Cabling campaign EYETS - MODIFICATION CABLAGE COLLIMATION UJ33 EN-STI J. LENDARO 54 850 LHC3P-YEB1 Works Under ground 11/10/2016 • Length of cables ≈ 850m • Estimated duration: • Pulling =1w • Connecting + tests = 2w EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt3 (Surface) • Constraints: • Electrical lockout Affaire Code Building N° PLAN Title C213AHA163002 SR3 10357 EYETS - CABLAGE NOUVEAU RPADO SR3 C213AHA168002 SR3 10357 EYETS - FGC-ETHER FOR LHC - SR3 Works Surface 11/10/2016 Group User TE-EPC H. THIESEN TE-EPC • Length of cables ≈ 330m • Estimated duration: J. GOMEZ COSTA • Pulling =1.5w • Connecting + tests =1.5w Nb. cables Length (m) Cabling campaign 11 300 LHC3S-YEB1 1 30 LHC3S-YEB1 EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt4 (Surface) Affaire Code Building N° PLAN C213AHA167001 SH4 ?? Title Group User Nb. cables Length (m) Cabling campaign EYETS - CABLAGE 24VDC REDONDANT P4 - TE-CRG B. IVENS 4 205 LHC4S-YEB1 Works Surface 11/10/2016 • Length of cables ≈ 205m • Estimated duration: • Pulling =3d • Connecting + tests =4d EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt5 (Underground) • Constraints: • • • Liquid Helium in QRL => authorization for the access to the cable trays needed Electrical lockout Opening cable passages between UL56 et USC55 Affaire Code Building N° PLAN Title Group User C213AHA161003 R571 C213AHA161001 10906 EYETS - DEPLACEMENT CABLE DC TCTW.A4R5 BE-BI C. BOCCARD R532 10906 EYETS - BPM POUR TCTW.4L5.B2 BE-BI C. BOCCARD C213AHA161002 R532 10906 EYETS - DEPLACEMENT CABLE DC TCTW.A4L5 BE-BI C. BOCCARD C213AHA166001 USC55 10906 EYETS - SIGNAUX TENSION TCTW P5 EN-STI J. LENDARO 3 60 LHC5G-YEB1 C213AHA173002 UP53 ?? EYETS - SEISMIC NETWORK - EN-MME M. CABON 4 120 LHC5G-YEB1 Works Under ground 11/10/2016 • Length of cables ≈ 1170m • Estimated duration: • Pulling =1w + 1.5w • Connecting + tests = 4d + 1w Nb. cables Length (m) Cabling campaign LHC5D-YEB1 6 990 LHC5G-YEB1 LHC5G-YEB1 EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt5 (Surface) • Constraints: • Electrical lockout Affaire Code Building N° PLAN Title Group User Nb. cables Length (m) Cabling campaign C213AHA163003 SE5 10357 EYETS - CABLAGE NOUVEAU RPADO SE5 TE-EPC H. THIESEN 11 300 LHC5S-YEB1 C213AHA168003 SE5 10357 EYETS - FGC-ETHER FOR LHC - SE5 TE-EPC J. GOMEZ COSTA 1 30 LHC5S-YEB1 Works Surface 11/10/2016 • Length of cables ≈ 330m • Estimated duration: • Pulling =1.5w • Connecting + tests =1.5w EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt6 (Surface) Affaire Code Building N° PLAN C213AHA167002 SH6 ?? Title Group User Nb. cables Length (m) Cabling campaign EYETS - CABLAGE 24VDC REDONDANT P6 - TE-CRG B. IVENS 4 205 LHC6S-YEB1 Works Surface 11/10/2016 • Length of cables ≈ 205m • Estimated duration: • Pulling =3d • Connecting + tests =4d EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt7 (Underground) • Constraints: • • • Works RP area Electrical lockout Opening cable passages in UJ76 • Length of cables ≈ 8171m • Estimated duration: Under ground • Pulling =1w + 3d + 4d • Connecting + tests = 1w + 1w +1w Affaire Code Building N° PLAN Title Group User Nb. cables Length (m) Cabling campaign C213AHA169001 RR77 10538 EYETS - BPM COLLIMATEURS PT7 BE-BI C. BOCCARD 3 900 LHC7D-YEB1 C213AHA164002 R771 10541 EYETS - CABLAGE UA9 EN-STI J. LENDARO 24 1590 LHC7D-YEB1 C213AHA174004 R771 10890 EYETS - CABLAGE VACUUM TE-VSC JP. BOIVIN 14 1208 LHC7D-YEB1 C213AHA169002 UJ76 10538 EYETS - BPM COLLIMATEURS PT7 BE-BI C. BOCCARD 1 250 LHC7G-YEB1 C213AHA174003 R74 10890 EYETS - CABLAGE VACUUM TE-VSC JP. BOIVIN 9 1150 LHC7G-YEB1 C213AHA164001 TZ76 10541 EYETS - CABLAGE UA9 EN-STI J. LENDARO 15 830 LHC7P-YEB1 C213AHA174002 TZ76 10890 EYETS - CABLAGE VACUUM TE-VSC JP. BOIVIN 12 2220 LHC7P-YEB1 C213AHA187001 TZ76 ?? EYETS - BIC COLLIMATEUR CRYSTAL TE-MPE C. MARTIN 1 23 LHC7P-YEB1 11/10/2016 EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt7 (Surface) • Constraints: • Electrical lockout Affaire Code Building N° PLAN Title Group User Nb. cables Length (m) Cabling campaign C213AHA163004 SR7 10357 EYETS - CABLAGE NOUVEAU RPADO SR7 TE-EPC H. THIESEN 11 300 LHC7S-YEB1 C213AHA168004 SR7 10357 EYETS - FGC-ETHER FOR LHC - SR7 TE-EPC J. GOMEZ COSTA 1 30 LHC7S-YEB1 Works Surface 11/10/2016 • Length of cables ≈ 330m • Estimated duration: • Pulling =1.5w • Connecting + tests =1.5w EYETS 2016-2017 – Works EN-EL-FC 1. Cabling campaigns – Pt8 • Constraints: • • • Liquid Helium in QRL => authorization for the access to the cable trays needed Electrical lockout Opening cable passages between UA and RA Affaire Code Building N° PLAN Title Group User Nb. cables Length (m) Cabling campaign C213AHA165002 UA87 11241 EYETS - TDI INTERFEROMETER RESET EN-STI J. LENDARO 1 158 LHC8D-YEB1 C213AHA174004 UA87 10890 EYETS - CABLAGE VACUUM TE-VSC JP. BOIVIN 1 70 LHC8D-YEB1 C213AHA186002 UL86 ?? EYETS - CABLAGE P8 QURCA/B TE-CRG B. IVENS 26 1230 LHC8D-YEB1 C213AHA186001 UL84 ?? EYETS - CABLAGE P8 QURCA/B TE-CRG B. IVENS 34 1155 LHC8G-YEB1 Works Under ground 11/10/2016 • Length of cables ≈ 2613m • Estimated duration: • Pulling =1w + 3d • Connecting + tests = 1w + 1w EYETS 2016-2017 – Works EN-EL-FC 2. Optical Fibre – LHC activities Location • Works • LHC Survey BIS fibres (5 weeks) US’s, UJ's, UA’s, TZ76, USC55 • Blowing O.F. cables over existing duct infrastructure US’s and UJ’s to UA’s • Local distribution (Patchcables installation) UA’s + patching and measurements • LHC Cryo redundancy LSS and QUI fibres (5 weeks) • Local distribution + Blowing O.F. cables US’s and UJ’s to UA’s, UL’s • Patching and measurements • Fibres for LUA9 P7R (1 week) • TZ76, UJ76, R771 Blowing O.F. cables over existing duct infrastructure TZ76-UJ76-R771 + patching and measurements • HL-LHC Relocation fibre cables P1-P1.8 (2.5 weeks ) • SR1, SM18 Systems disconnection and relocation over the new O.F. cables • Replacement of RSF cables (3.5 weeks) (acces by LHC) Constraints: • • • US’s, UJ's, UA’s, UL’s,TZ76 Electrical lockout in UA’s Limited working coactivity near blowing activities (2, 3 hours interventions) No more than 2 works at the same time, draft planning will be proposed to EN-ACE 11/10/2016 EYETS 2016-2017 – Works EN-EL-FC TI2, TI8 2. Optical Fibre – LHC activities Location • Registration and inspections • Optical Fibre Database UA27, US's ,UJ's • Registration /verification labeling of Cable Hardware • Duct/microduct registration • Verification radiation induced attenuation progression • Optical fibre measurements • O.F. monitoring system • US’s, UJ's UA27, US's ,UJ's, Surface Patching and Optical fibre measurements Constraints: • No working constraints (inspections in front of the racks, visual inspection of cable trays) 11/10/2016 EYETS 2016-2017 – Works EN-EL-FC 3. Support needed • Departmental Safety Officer (DSO): • Authorization for access to cable tray • EN/ACE • Detail schedule => the 2 cable campaigns of the same point in parallel (if possible) • VIC • Electrical lockout • EN/EA • Scaffolding, … • EN/HE • 50/60 drums to transport and handle • HSE/RP • TE/CRG • Cryo lockout • TE/EPC • Electrical lockout 20/10/2015 Coordination meeting G. Girardot 4. Conclusion • Activities on all LHC sites. • The presence of liquid helium in the QRL increase the constraints and risks for cable works. • Access constraints during cabling. • Many fireproof closure will be open. • Many other groups will be involved in our interventions. • All new requests will be subject to the approval of the coordination EN/ACE and EN/EL (resources) 20/10/2015 Coordination meeting G. Girardot Thank you for your attention !
© Copyright 2026 Paperzz