Pre Start Monitor - Summary of Current Significant Actions, Issues and Risks: By Who By When Key Contacts Key Personnel Potton Self Build Consultant Project Manager Quantity Surveyor Architect Structural Engineer Finance Contact Code Assessor Building Inspector Warranty Inspector Planning Officer Planning & Programming Date of Possession Start Date on Site Lead in Period Construction Period (wks) Target Completion Date Move in Date Financial Summary Build Budget Contingency Allowance Finance Stage payments (list) Contact Details 1.0 Pre Commencement Check List Information Specification Bill of Quantities Detailed Budget Build Programme Construction Issue Drawings; (See schedule) Planning Conditions Schedule Resolution of Pre start Conditions Building Regs submission and approval Site Investigations & Reports Demolitions Asbestos Type 3 Survey Notices & Permits Waste management plan Code Registration Appointment of Assessor Design Stage Assessment SAP,s Air Pressure Testing Targets Warranty Quotation Registration Technical / Legals Party Wall Agreements Party Wall Schedules of Work Drainage connection approvals Highway connection approvals Required? Y/N Date Required By Date Provided Responsibility / Action Setting Out Information Site Survey Utility Services (See Schedule) Planning / Programming Prestart Programme Build Programme Surveying Retained Features / Boundary Treatments. Existing Photos of boundaries and footpaths etc 2.0 Key Design Information required Element Levels Setting out Information Full Foundation Design Drainage Design Dimensional Floor Plans Dimensioned Sections Elevations (planning approved standard) Comments Roof Plan Structures (sufficient detail for s/c enquiries) Detailed Construction Information Retaining Structures Details Superstructure Details Roof Construction Details Structural Steelwork Details Kitchen Layouts Window Schedule Lintel Schedule Ironmongery Schedule Door Schedule Electrical Installations Mechanical Installations Second Fixing Finishing’s External Works (Hard) External Works (Soft 3.0 Statutory Services Authorities Monitor (Dates) Main Services Gas Electric Water BT Temp Services Electric Water Telephone Diversion Electric Water Gas Cable Disconne ctions Electric Water Gas Cable 4.0 Subcontract Procurement S/C Package Demolitions Groundwork’s Roof Tiling Timber frame Joinery Brickwork Glazing Plastering Rendering Screeding Plumbing Heating Electrical Ceramic Tiling Decorations Tarmacadam Fencing Flooring Scaffolding Structural Steelwork Landscaping Timber Fencing Metal Fencing Insulation Mastic Kitchen First fix Second fix 5.0 Material Procurement (Significant Materials) Material Date required on Site DPC Meter boxes Bricks & Blocks ( Inc. Specials) Wall ties Art Stone Lintels Loose Steelwork Cavity Closers Joists Trusses 1st Fix J 2nd Fix J 3rd Fix J Kitchens Stairs Doors Linings Doors external Ironmongery Internal doors Windows Supplier Lead Time Current Status (Dates) Supplier Design Approval Period Period Order to be placed by Order Placed
© Copyright 2026 Paperzz