< Reference > Transportation of a Dry Storage Cask from the Common Pool Building to the Temporary Dry Cask Storage Facility in Fukushima Daiichi Nuclear Power Station April 4, 2013 Tokyo Electric Power Company 1 Transportation of a Dry Storage Cask to the Temporary Dry Cask Storage Facility Today (April 4), a dry storage cask inspected in the Common Pool Building has been transported to the Temporary Cask Storage Facility in Fukushima Daiichi Nuclear Power Station. Temporary Cask Storage Facility Common Pool (in the east side of the ground) Carry in/out of the pool pit Carry in/out of the cask decontamination pit Transportation dolly (carry in/out) N Monitoring shack Arch-shaped crane Overhead traveling crane on the third floor (Lift up/down) Protection fence Overhead traveling crane on the first floor (Reload) Concrete module Exhaust Exhaust Air supply Air supply Cask Transportation via a special vehicle 2 Cask Transportation via a Trailer Cask being carried out of the Common Pool Building Cask being transported Photos taken on April 4, 2013 by TEPCO 3 Dry Storage Cask Installation in the Concrete Module Concrete module コンクリートモジュール Horizontal 水平吊具 hanger Support frame 支持架台 Support 支持架台frame Transportation vehicle 輸送車両 Fixture 固定具 固定具 Fixture (Plan view) (図は平面図を示す) 1. Installation of walls on three sides (Already completed) 支持架台 Support frame 支持架台 Support frame fixing bolt 固定ボルト 2. Cask transportation (Done today) Concrete module (for the edge) 屋根部コンクリートモジュール(端部用) 3. Cask installation (Done today) 圧力センサ Pressure sensor Surface temperature sensor 表面温度センサ Junction box ジャンクションボックス 乾式貯蔵 Dry storage cask キャスク 外部配線 Wiring outside Concrete module (longitudinal direction) コンクリートモジュール(長手方向) (Plan view) (図は平面図を示す) 4. Wall installation (Done today) Air supply給気口 opening (Plan view) (図は平面図を示す) 5. Roof installation (Done today) 外部に引き出した Sensor cable drawn outside センサのケーブル 6. Installation of instruments (to be done) 4 Dry Storage Cask Transported to the Temporary Cask Storage Facility Today Trunk (γray shield) Neutron ray shield material (Resin) External cylinder Primary lid Bottom plate The cask transported today is a medium-sized cask. Secondary lid Support structure Basket Medium size casks (4) Large size casks (5) Outer diameter 2.2m 2.4m Total length 5.6m 5.6m 96 tons 115 tons 37 52 Total weight (including fuels) Number of stored fuels 5 Outer Shape of the Concrete Module Outer shape of the concrete module Lower side Upper side Approx. 4,000 Support frame Approx. 7,300 Cask installation (Dry storage cask) 6 Overview of the Temporary Dry Cask Storage Facility - Number of casks stored: 50 (Space secured for additional 15 casks) - Each cask is covered by a concrete module which functions as a storage cover. - Basic structure: The foundation has been built on an improved ground. - The support frame is fixed by fixing bolts (similarly to the existing cask storage). - An arch-shaped crane is installed to allow for handling casks, etc. Crane Monitoring shack Protection fence N Gate Concrete module Exhaust Exhaust Air supply Air supply Cask 7 Start of Operation of the Temporary Dry Cask Storage Facility A thermometer (surface temperature sensor) and a pressure sensor will be installed on the cask to perform calibration. The operation of the facility will be started once the monitoring of the pressure between lids and surface temperature utilizing the thermometer and the pressure sensor is started. An announcement will be made after the operation starts. End 8
© Copyright 2026 Paperzz