Biogas Tallin (kopia) 2

BioSling, part of a biogas plant
Gas station
Digestion
Storage
Digester
Up grading
BioSling container
Raw gas composition
Methane
Carbon
dioxide
Back to nature
Pure
methane
Reason for up grading
Industry
Heat & Power
Vehicle
Solubilty methane
and carbon dioxide
Absorption
column
Pump
Compressor
Scrubber tower at Laholm
Coil pump,”slingpump”, an invention
from Jukkasjärvi in Lappland
Kostnad för uppgradering
Cost for up grading
Our estimation for BioSling and
1000 cow is 0,18 €/nm3
Raw gas from
1000 cows ≈70nm3/h
Workshop in Vittangi
Biogas upgrading by absorption in a coil pump
Carbon dioxide to
atmosphere
”Flashtank”
for release
of carbon
dioxide
e)
V2
Accumulator for methane CH4
c)
Methane to consumers
d)
Atmosphere of raw gas,
methane and carbon
dioxide
f)
Bubbles of
carbon dioxide
b)
Coil pump
Main components and functions
g)
a) Closed cistern for anaerobic digestion
F1
V1
Bubbles of
methane
Hose swivel
Coil pump drive
a)
b) Coil pump, circulates a liquid for gas absorption.The
pump is partially submerged in a trough filled with
absorption liquid. The mouth of the coil is
alternating in the atmosphere or in the liquid by
rotation. Rotation creates alternating scoops of liquid
and gas, which are screwed to the right. The gas is
compressed and absorbed accordance to Henry´s law.
The liquid is selected to selectively absorb carbon
dioxide, the basic principle for gas separation.
c) Vessel accumulating methane and diverting liquid
with absorbed carbon dioxide. The pump generates a
gas pressure of a few Bars.
d) V1, a throttle valve depressurizes the liquid .
Bubbles of methane
and carbon dioxide
e) "flashtank" is an atmospheric vessel for releasing the
carbon dioxide . The vessel is also buffer volume for
the absorbent .
f) V2, a control valve for the liquid level in the trough.
Manure + urine + organic substrate +
bacteria for anaerobic digestion
g) F1, this float controls the liquid level and stops gas
from escaping .
10 okt 2005, idékoncept och ritning av Göran Grönhammar, GGs Process & Energiteknik AB, org. nr 556229-5351, rev 29/11-08
First prototype
Second
prototype
test in
Boden
Complet BioSling container
ent
g room
h
Area wit
quipm
e
g
n
i
s
s
oce
pr
steerin
r
o
l
o
r
t
n
o
C
BioSling, container, its
compartments
Hose coil, 8 coil in parallell
Two components
Principle flow diagram
Vehicle gas
Carbon dioxide
Pressure 10 Bars
Gas
and
water
separator
Coil
pump
Stripper
tower
Air
Water
scrubber
Pumps
Switch
valve
Supply water
Compressor
Anaerobic
digester
BioSling process flow diagram