BioSling, part of a biogas plant Gas station Digestion Storage Digester Up grading BioSling container Raw gas composition Methane Carbon dioxide Back to nature Pure methane Reason for up grading Industry Heat & Power Vehicle Solubilty methane and carbon dioxide Absorption column Pump Compressor Scrubber tower at Laholm Coil pump,”slingpump”, an invention from Jukkasjärvi in Lappland Kostnad för uppgradering Cost for up grading Our estimation for BioSling and 1000 cow is 0,18 €/nm3 Raw gas from 1000 cows ≈70nm3/h Workshop in Vittangi Biogas upgrading by absorption in a coil pump Carbon dioxide to atmosphere ”Flashtank” for release of carbon dioxide e) V2 Accumulator for methane CH4 c) Methane to consumers d) Atmosphere of raw gas, methane and carbon dioxide f) Bubbles of carbon dioxide b) Coil pump Main components and functions g) a) Closed cistern for anaerobic digestion F1 V1 Bubbles of methane Hose swivel Coil pump drive a) b) Coil pump, circulates a liquid for gas absorption.The pump is partially submerged in a trough filled with absorption liquid. The mouth of the coil is alternating in the atmosphere or in the liquid by rotation. Rotation creates alternating scoops of liquid and gas, which are screwed to the right. The gas is compressed and absorbed accordance to Henry´s law. The liquid is selected to selectively absorb carbon dioxide, the basic principle for gas separation. c) Vessel accumulating methane and diverting liquid with absorbed carbon dioxide. The pump generates a gas pressure of a few Bars. d) V1, a throttle valve depressurizes the liquid . Bubbles of methane and carbon dioxide e) "flashtank" is an atmospheric vessel for releasing the carbon dioxide . The vessel is also buffer volume for the absorbent . f) V2, a control valve for the liquid level in the trough. Manure + urine + organic substrate + bacteria for anaerobic digestion g) F1, this float controls the liquid level and stops gas from escaping . 10 okt 2005, idékoncept och ritning av Göran Grönhammar, GGs Process & Energiteknik AB, org. nr 556229-5351, rev 29/11-08 First prototype Second prototype test in Boden Complet BioSling container ent g room h Area wit quipm e g n i s s oce pr steerin r o l o r t n o C BioSling, container, its compartments Hose coil, 8 coil in parallell Two components Principle flow diagram Vehicle gas Carbon dioxide Pressure 10 Bars Gas and water separator Coil pump Stripper tower Air Water scrubber Pumps Switch valve Supply water Compressor Anaerobic digester BioSling process flow diagram
© Copyright 2026 Paperzz