checksix.com Case Study: Rig Move ExcellenceTM Check-6’s Rig Move Excellence program greatly accelerates oil & gas company’s efficiency by enhancing the collaborative relationship between production operations and mobile maintenance. Region: Marcellus Shale area Challenge: An independent oil and gas exploration and production company requested assistance in reducing their rig mobilization time in the Marcellus Shale area. Client moves averaged approximately 8.7 days and client desired to significantly reduce this non-productive time to improve overall financial and operational efficiency while also improving safety. Assessment and Solution Implementation: After assessing a move and following extensive discussions with the client, alignment was achieved involving program objectives, support for program obtained from drilling contractors and clear performance expectations were communicated with the trucking companies. With the full support of the client, Check-6 Consultants implemented a number of process changes including: • A comprehensive and collaborative planning process facilitated before every move • Development of detailed rig down, trucking, and rig up plans • Use of roustabouts, trained over time and paired with drilling contractor hands to augment crews during labor intensive rig down and rig up work phases • Detailed planning to minimize effects of weekend and holiday trucking curfews restricting movement of permit loads • Use of a structured communication process involving a morning operations and safety meeting, mid-day refocus meetings, and end of day after-action-review meeting to gather lessons learned and plan for the evening and next day’s operations • Facilitated JSA briefings to ensure all aspects of every safety critical task are understood before commencing operations • Gradually introduced night operations to make better use of this normally non-productive time (to include setting in items, some trucking, and light crane operations) • Gathering and use of lessons learned from previous moves to continuously improve operations Rig Move Success Lessons Learned Case Study: Rig Move ExcellenceTM Results: Brief Client achieved an average 40% reduction in move times involving three different drilling contractors executing over 20 moves. Approximately 25% of moves achieved in 4.1 days or less without a recordable injury. The client’s return on investment has exceeded 400% and the added predictability resulting from a more consistent mobilization process has eased planning for the next stage in the completions process. Debrief Previous Average Rig Execute Marcellus Shale Area 9 8.5 8.5 5 ce rief Rig 1 Previous Average le Area 8.5 checksix.com Rig 2 Rig 3 Rig Move Excellence 1st Move Rig Move Excellence 2nd Move Check-6 International delivers tailored solutions to high hazard, high consequence industries (oil and gas, mining, refineries, manufacturing, and construction) to reduce risk, lower costs, and improve efficiency and safety. Check-6 has taken the best practices and lessons learned from military and commercial6.3 aviation, and developed a suite of products and services that improve leadership and team performance, enhance training and competency, and ensure procedural discipline & compliance. Mid-Continent Area 5.04 4.84 © Check-6 2015. All rights reserved. Reproduction for commercial use is strictly prohibited. 4.06
© Copyright 2026 Paperzz