EHN1 extension

EHN1 extension
Beam line procurement
Vacuum equipment - 1
Item
status
delivery
Production
Note
Flanges
Ordered
Dec 2016
External
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\Vacuum\Bride
s_DN219
Special tubes
Ordered
Dec 2016
External
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\Vacuum\Tube
_QPS_QPL
Collars
For tender
Apr 2017
External
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\Vacuum\Collie
r_219
Bellows
Received
Sep 2017
External
MBPL Magnet
chamber
For tender
Apr 2017
External /
welded
CERN
b. 867
folder
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\Vacuum\Souff
let_DN219
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\Vacuum\Cha
mbre_MBPL_H2
Vacuum equipment - 2
Item
status
delivery
Production
Note
folder
XBPF vacuum
tank
Waiting green
light, qty?
Jun 2017
External /
CERN
3d design ok,
drawings to be done
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\XBPF
Windows
Waiting material Apr 2017
CERN
Vacuum chamber
welded assembly
Waiting material Apr 2017
CERN
Pumps
On stock
Sep 2017
External
O_ring seals
Ordered
Mar 2017 External
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\Vacuum\Fenet
res
Beam line must be
frozen
(Al SPS type seals on
stock)
\\cern.ch\dfs\Workspaces\s\SBA
\NORTH\H4\Vacuum\Joints
Magnets supports
Item
status
delivery
Production
Note
folder
MBPL
Tilted
supports
Waiting frozen
tilted angle
Jun 2017
External
3d design ok,
drawings to be done
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\Supports_Aim
ant
QPS-QPL
tilted supports
tilted?
Angle?
Jun 2017
?
design to be done
-
Handling tool
for tilted
Magnets (x4)
Waiting frozen
tilted angle
Jun 2017
External
3d design ok,
drawings to be done
Polyurethane
Jacks x78
On stock
Mar 2017 CERN
Revision a faire
Tables
x18
planimetrique
On stock
Mar 2017 CERN
Revision a faire
Mechanical
Jacks x18
On stock
Mar 2017 CERN
Revision a faire
2 jaws collimators
Item
status
delivery
Production
Note
XCSV H2 x1
On stock
Sep 2017
CERN
Renovation a neuf a
faire
XCSV H4 x1
On stock
Sep 2017
CERN
Renovation a neuf a
faire
Tilted supports
x2
Waiting frozen Apr 2017
tilted angle
Design to be done
folder
XCON VLE target
Item
status
delivery
Production
Note
XCON H2
On stock
Sep 2017
CERN
Renovation a faire
N position: air + 2-3
target?
XCON H4
On stock
Sep 2017
CERN
Renovation a faire
N position: air + 2-3
target?
folder
Cherenkov XCET
Item
status
delivery
Production
Note
H2
2x XCET
On stock
Sep 2017
CERN
1x Freon (R12) 3.5 bars
1x CO2 15 bars
Renovation a faire
H4
2x XCET
On stock
Sep 2017
CERN
1x Freon (R12) 3.5 bars
1x CO2 15 bars
Renovation a faire
Windows 3.5 bars x4
Sep 2017
?
Design, codap
calculation to be done.
Windows 15 bars
x4
-
Sep 2017
?
Design, codap
calculation to be done.
Gas chamber
x4
-
Sep 2017
?
Design, codap
calculation to be done.
Gas piping EHN1
x4
-
Sep 2017
CERN
Gas ctrl system
x4
-
Sep 2017
CERN
New system, new
design to be done
folder
XBPF Beam profile Fibers
Item
status
delivery
Production
Note
folder
vacuum tank
Qty?
Tilt?
Jun 2017
External / CERN
3d design ok,
drawings to be done
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Beam_line\XBPF
Support
Qty?
Tilt?
Jun 2017
External / CERN
3d design ok,
drawings to be done
XDWC support
Item
status
delivery
Production
Note
XDWC H2 x1
On stock
Sep 1017
CERN
Renovation a faire
XDWC H4 x1
On stock
Sep 1017
CERN
Renovation a faire
folder
Shielding blocks
Item
status
delivery
Production
Note
folder
Be 24-16-8
ordered
Feb 2017
External
x70
\\cern.ch\dfs\Workspaces\s\SBA
\CENF\Shielding_blocks
Be 23-16-8
ordered
Feb 2017
External
x6
Poutre 4088
ordered
Jun 2017
External
x8
Poutre 4888
ordered
Jun 2017
External
x23
Dalle beton
6x2x0.6m²
ordered
Mar 2017
External
x7
Shielding
upstream NP02
Not yet
defined
Mar 2017
?
`