EHN1 extension Beam line procurement Vacuum equipment - 1 Item status delivery Production Note Flanges Ordered Dec 2016 External \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\Vacuum\Bride s_DN219 Special tubes Ordered Dec 2016 External \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\Vacuum\Tube _QPS_QPL Collars For tender Apr 2017 External \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\Vacuum\Collie r_219 Bellows Received Sep 2017 External MBPL Magnet chamber For tender Apr 2017 External / welded CERN b. 867 folder \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\Vacuum\Souff let_DN219 \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\Vacuum\Cha mbre_MBPL_H2 Vacuum equipment - 2 Item status delivery Production Note folder XBPF vacuum tank Waiting green light, qty? Jun 2017 External / CERN 3d design ok, drawings to be done \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\XBPF Windows Waiting material Apr 2017 CERN Vacuum chamber welded assembly Waiting material Apr 2017 CERN Pumps On stock Sep 2017 External O_ring seals Ordered Mar 2017 External \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\Vacuum\Fenet res Beam line must be frozen (Al SPS type seals on stock) \\cern.ch\dfs\Workspaces\s\SBA \NORTH\H4\Vacuum\Joints Magnets supports Item status delivery Production Note folder MBPL Tilted supports Waiting frozen tilted angle Jun 2017 External 3d design ok, drawings to be done \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\Supports_Aim ant QPS-QPL tilted supports tilted? Angle? Jun 2017 ? design to be done - Handling tool for tilted Magnets (x4) Waiting frozen tilted angle Jun 2017 External 3d design ok, drawings to be done Polyurethane Jacks x78 On stock Mar 2017 CERN Revision a faire Tables x18 planimetrique On stock Mar 2017 CERN Revision a faire Mechanical Jacks x18 On stock Mar 2017 CERN Revision a faire 2 jaws collimators Item status delivery Production Note XCSV H2 x1 On stock Sep 2017 CERN Renovation a neuf a faire XCSV H4 x1 On stock Sep 2017 CERN Renovation a neuf a faire Tilted supports x2 Waiting frozen Apr 2017 tilted angle Design to be done folder XCON VLE target Item status delivery Production Note XCON H2 On stock Sep 2017 CERN Renovation a faire N position: air + 2-3 target? XCON H4 On stock Sep 2017 CERN Renovation a faire N position: air + 2-3 target? folder Cherenkov XCET Item status delivery Production Note H2 2x XCET On stock Sep 2017 CERN 1x Freon (R12) 3.5 bars 1x CO2 15 bars Renovation a faire H4 2x XCET On stock Sep 2017 CERN 1x Freon (R12) 3.5 bars 1x CO2 15 bars Renovation a faire Windows 3.5 bars x4 Sep 2017 ? Design, codap calculation to be done. Windows 15 bars x4 - Sep 2017 ? Design, codap calculation to be done. Gas chamber x4 - Sep 2017 ? Design, codap calculation to be done. Gas piping EHN1 x4 - Sep 2017 CERN Gas ctrl system x4 - Sep 2017 CERN New system, new design to be done folder XBPF Beam profile Fibers Item status delivery Production Note folder vacuum tank Qty? Tilt? Jun 2017 External / CERN 3d design ok, drawings to be done \\cern.ch\dfs\Workspaces\s\SBA \CENF\Beam_line\XBPF Support Qty? Tilt? Jun 2017 External / CERN 3d design ok, drawings to be done XDWC support Item status delivery Production Note XDWC H2 x1 On stock Sep 1017 CERN Renovation a faire XDWC H4 x1 On stock Sep 1017 CERN Renovation a faire folder Shielding blocks Item status delivery Production Note folder Be 24-16-8 ordered Feb 2017 External x70 \\cern.ch\dfs\Workspaces\s\SBA \CENF\Shielding_blocks Be 23-16-8 ordered Feb 2017 External x6 Poutre 4088 ordered Jun 2017 External x8 Poutre 4888 ordered Jun 2017 External x23 Dalle beton 6x2x0.6m² ordered Mar 2017 External x7 Shielding upstream NP02 Not yet defined Mar 2017 ? `
© Copyright 2026 Paperzz