LHC-EYETS 2016/17 Coordination meeting #23 21st March, 2017 EYETS follow up – EN-ACE-OSS EYETS 2016-2017: General infos • LHC-EYETS completed on Sunday 30th April. All the activities must be completed by Friday 14th April • IMPACT: intervention period EYETS-LHC-2016/17 • Phone ‘piquet’: 161669 • OSS website (planning, constraints, …): https://espace.cern.ch/en-dep-mef-lpc/EYETS2016-2017/Global%20Schedules/Forms/AllItems.aspx • INDICO: https://indico.cern.ch/category/7198/ • Unlock out W14 (3rd April - 7th April) • LHC back to BE-OP on Friday 14th April • The cryogenics filling started from mid March only LIMITED cryogenics lock out authorisations can be delivered • Tests started in the Machine FENCES are in place DO NOT CROSS!!!! LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 2 No Access in the Surface & Underground Areas DSO Test DSO TEST All points 7th & 8th April If the PZ85 lift replacement is not completed: - NO access to LHCb from the LHC machine from 6th April afternoon, to Monday 10th April in the morning; - Access on 10th, 11th and 12th from 8am to 4pm The patrol of Point 8 (including LHCb) is foreseen on 6th April in the afternoon) All the openings LHC Machine / Experiments must be closed at latest on 31st March All the openings inside the LHC machine must be closed by the 31st March From 3rd April the patrols will start The Experiments must be patrolled for the DSO test LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 3 TETRA procedure when degraded network After the discussion in the CSAP and in a dedicated meeting held with the A&T DSOs, the following procedure is proposed: • Access is not generally forbidden to the underground when TETRA is not available. • The evident corollary is that the undergrounds must not be evacuated when TETRA is not working. • In case of TETRA malfunctioning a warning should be sent to "active" activity leaders (people who declared an IMPACT, and these IMPACTs are "active"), warning them that communication capabilities are reduced (no TETRA, or even no TETRA and no GSM), and that they should consider to postpone their activities. • If the risk analysis of the activity concluded that TETRA is mandatory as safety measure (lone worker...), the activity must be postponed. LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 4 PM85 intervention Schindler would like to verify the status of PM85 pit this Friday 24 mars at 12h45. No access to P8 during 10 minutes. Two people will be in place (-1 and 0 floor) to advise everyone. LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 5 Filling of Inner Triplets: NO ACCESS IT in LSS1 and 5 filling will start on Wednesday 22nd March, morning IT in LSS2 and LSS5 filling will start on Friday 24th March, morning Access in the IT area, when ITs are filled with Liquid Helium: - Authorization of the complex manager; - Max duration of the intervention 10 min; - Access only in the transport area; - Intervention well justified. LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 6 TETRA measurement campaign in the LHC IT/CS wants to carry out in LHC: • Deep measurements campaign in the LHC to check if the TETRA coverage can be improved (e.g. few meters with no TETRA coverage at the centre of some arcs, FB atex radios performing worse than standard radios) • Validate the radio infrastructure against PIM (interference phenomenon caused when several high-power networks are transmitted together) After the discussion in the CSAP and in a dedicated meeting held with the A&T DSOs, the following procedure is proposed: • • • • Access is not generally forbidden to the underground when TETRA is not available. The evident corollary is that the undergrounds must not be evacuated when TETRA is not working. In case of TETRA malfunctioning a warning should be sent to "active" activity leaders (people who declared an IMPACT, and these IMPACTs are "active"), warning them that communication capabilities are reduced (no TETRA, or even no TETRA and no GSM), and that they should consider to postpone their activities. If the risk analysis of the activity concluded that TETRA is mandatory as safety measure (lone worker...), the activity must be postponed. LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 7 UX45 – NO access No access on the “overhead” area LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 8 Work authorizations (Helium spill risk) Document Id 1738609 1738911 1739823 1742339 1742554 1743236 1745101 Document Version 1 1 2 1.1 1 1 1 1745139 1746508 1749199 1752496 1752734 1752794 1753084 1753427 1754991 1754996 1756958 1758697 1761122 1761124 1761270 1762938 1764526 1764976 1 1 1 1 1 1.1 1 1 1 1 1 1 1 1 1 1.01 1 1 1767698 1767516 1 0.5 1769055 1769057 1767952 0.5 0.5 0.1 updated on 21st March 2017 Title Status Exceptional Authorisation: HSE-RP-AS Survey in IT areas (EYETS 2016) Released Exceptional Authorisation: EN-ACE-SU: Maintenance in IT Areas (EYETS 2016/17) Released Work Frame Authorisation: EP-UAT-AFP installation, Phase 2 Cancelled Exceptional Authorisation: EN-MEF-MM Radiographie Industrielle EYETS 2016/17 Released Exceptional Authorisation: TE-VSC activities in IT areas during EYETS 2016-17 Released Exceptional Authorisation: Installation of LHCb Forward Shower Counters - EYETS 2016-17 Released Exceptional Authorisation: Campagne de cablage Zone Triplet LSS2R - EYETS 2016/17 Released Exceptional Authorisation: EP-ADO, EN-EA-EC Installation of shielding for the ALFA experiment EYETS 2016/17 Released Exceptional Authorisation: EN-ACE-SU: Radial measurement in IR1 and IR5 (EYETS 2016/17) Released Exceptional Authorisation (IT): BE-ICS-AS etalonnage ODH EYETS 16/17 Released Exceptional Authorisation: EN-ACE-CL: Verification de plans en zones IT (EYETS 2016/17) Released Exceptional authorisation: SMB-SE-FAS :Installation of Crack Meters in RB 26, EYETS 2016/17 Released Exceptional Authorisation: EN-ACE-SU: Campagne de mesure sans ventilation en arc 78 (EYETS 2016/17) Released Exceptional Authorisation: HSE-RP-AS Etalonnage dans zones IT (EYETS 2016/17) Released Exceptional Authorisation: EN-MEF-MM Radiographie Point 5 EYETS 2016/17 Released Exceptional Authorisation: EP-UHC, Removal/Installation of ECAL in RP84 (IT 8L) EYETS2016-17 Released Exceptional Authorisation: BE-ASR-SU Inspection of Sealing (All ITs) EYETS2016-17 Released Exceptional Authorisation: EN-MEF-MM Radio-Tomographie Sector 8-1 YETS 2016/17 Released Exceptional Authorisation: EN-ACE-SU: Travaux de Maintenance dans les ITs 1,2,5 et 8 (EYETS 2016/17) Released Exceptional Authorisation: EN-EL Fibre optique RA 47 EYETS2016/17 Released Exceptional Authorisation: BE-ICS réparation détection incendie RA67 EYETS2016/17 Released Exceptional Authorisation: HSE cartographie RP pour ITs point 5 EYETS2016/17 Released Exceptional Authorisation: EN-ACE-SU: Remplacement fil IR1L (EYETS 2016/17) Released Exceptional Authorisation: HSE cartographie RP pour ITs point 1L EYETS2016/17 Released Work Frame Authorisation: EN-EL-CF Pose de cables dans Arc Released Exceptional Authorisation: BE-ICS-AS Replacement of ODH flash. Request for Activities in the Inner Triplet Areas at T < 80 K Released Exceptional Authorisation: EN-ACE-CL Photographies for layout database Under Approval Exceptional Authorisation: SMB Request for Activities in the Inner Triplet Areas at T < 80 K for cleaning activities Under Approval Exceptional Authorisation: EN-ACE-SU Photographies in the Inner Triplet Under Approval machine Schedule Exceptional Authorisation: EN-STI-ECELHC Test of Robot in IT1 at T < 80 Kfor LHC EYETS EDMS 1768162; Under Approval INDICO 624874 9 LHC-EYETS: electrical constraints AUG TEST Point Day Point Day LHC1 + ATLAS 6th January BA1 13th February LHC18 + SM18 10th January BA2 15th February LHC2 + ALICE 16th March BA3 16th February LHC3 + PM32 16th January BA4 + CNGS 28th February LHC4 8th March BA5 1st March LHC5 + CMS 5th January BA6 20th January LHC6 9th March BA7 10th January LHC7 7th March LHC8 27th February PS + PSB 14th & 15th January Prevessin 4th March BA80 4th April Meyrin + Adm. 4th January BA81 5th April Meyrin W. + ISR 28th January BA82 + 85 6th April COMPLETED for LHC LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 10 LHC-EYETS: Maintenance CV Maintenance Point Weeks Start Finish LHC1 50 – 51 – 1 – 2 15th December 11th January LHC2 9-10-11 27th February 19th March LHC3 8 10 12 & 14 20th March 24th March + 4th April LHC4 2–3–4 10th January 27th January LHC5 49 – 50 – 51 – 1 5th December 6th January LHC6 6–7–8 6th February 24th February LHC7 9 27th February 3rd March LHC8 3–4–5 16th January 3rd February Cryo Maintenance Point Weeks Start Finish LHC1 2–3–4 11th January 24th January LHC2 11-12 13th March 24th March LHC4 9 – 10 27th February 10th March LHC6 6–7–8–9 6th February 3rd March LHC8 7–8 13th February 24th February LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 11 LHC-EYETS: constraints W12 and W13 LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 12 LHC-EYETS: constraints W12 and W13 LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 13 LHC-EYETS: constraints W12 and W13 LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 14 Safety aspects: VIC follow up Activity Group Location Status @ 20th February Cabling & Fibre EN-EL-FC Gael Girardot Antonio Gonzales Adrian Grinand LSS8 LSS5R LSS2R LSS6 LSS7 UJ33 Arc 6-7 (for TE-MSC thermoswitch) P4 (UA/RA) UL557 + TZ76 VIC Approved VIC Approved VIC Approved VIC Approved VIC not needed VIC Approved VIC Approved VIC Approved VIC Approved ALFA shielding installation EP- Alfa Mickael Lazzaroni LSS1 VIC Approved UD62 and UD68 activities EN-STI UD62 & UD68 DIMR completed ODH flash in UJ14 BE-ICS UJ14 (ITs) VIC not needed RE42 water cleaning SMB-SE RE42 VIC Approved Cabling for Radmon EN-EL RR73 / 77 VIC Approved Curage des réseaux de drainage SMB UJ33 VIC Approved Cleaning SMB UA23 VIC to be organised LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 15 Lineal schedule Co-activity P1 - LSS1L o W11-12-13 AFP activities o W14 ALFA shielding installation NO co-activity (3-4th April) - LSS1R o W 12 à AFP activities o W13 ALFA shielding installation NO co-activity (27-28th Mars) o W13-until the end of EYETS NO ACCESS ElQA test 12 - Arc12 o W13-14 NO ACCESS ELQA test sector 12 dates TBC o From W15 NO ACCESS Powering tests LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 16 LSS1L Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 17 P1 – LSS1R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 18 Point 18 – Arc 1.2 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 19 LSS2L – P2 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 20 LSS2R - Arc 2.3 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 21 Point 3 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 22 Arc 3.4 - LSS4L Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 23 Point 4 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 24 LSS4R – Arc 4.5 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 25 LSS5L Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 26 P5 – LSS5R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 27 Arc 5.6 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 28 LSS6L – P6 - LSS6R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 29 LSS7L – P7 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 30 LSS7R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 31 Arc 7.8 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 32 LSS8L Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 33 P8 - LSS8R Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 34 Arc 8.1 Personal ODH MANDATORY in the arc LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 35 Next Coordination meetings Week 13 28th March @9h00, room 30-7-010 Week 14 4th April @9h00, room 30-7-010 LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 36 LHC-EYETS: linear schedule Baseline 38 LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 LHC-EYETS: Constraints 39 LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 IT intervention on analogic phones • The intervention is scheduled 5th April. • The intervention starts at 20h00 and should finish by midnight. • Upgrade the 4 nodes sequentially, so not all sites are down at the same time. However, all analogue and IP phones will be affected at a particular time during the intervention (red phones and lifts included). • The mobile phones, the fire brigade and the CCC are redundant so they will be able to call/receive calls at anytime. LHC machine Schedule for LHC EYETS EDMS 1768162; INDICO 624874 40
© Copyright 2026 Paperzz