file - eStorage project

eSTORAGE
WP 2 Progress & Results
28/10/2013
Jean-Christophe Passelergue
Olivier De l’Hermuzière
A consortium of energy-industry
leaders and academic researchers
Algoé, a management consultancy.
Alstom, a leading power generation
and grid equipment and solutions
company.
DNV KEMA, the global expert in
energy and sustainability consultancy.
EDF, the world’s largest producer of
electricity.
Elia, one of Europe’s leading electricity
transmission system operators.
Imperial College, a provider of worldclass education and research.
28/10/2013
© 2013 eStorage
2
Agenda
1.
2.
3.
4.
5.
Objectives & Organization
Results and Progress
Next Year Actions
Critical Success Factors
Q&A Session
28/10/2013
© 2013 eStorage
3
3
WP2 Objectives
Existing limitations
•
Classic Pumped Storage Hydro Plants (PSP) not flexible enough to
– contribute to portfolio energy balance management
– provide Ancillary Services such as secondary regulation when in
pumping mode
– participate efficiently in Balancing Mechanism when in pumping mode
WP Objectives
•
Implement new market rules and associated incentives schemes related
to storage in a context of large renewable resources integration
•
Demonstrate the criticality of IT tools in enabling the deployment and
efficient use of storage systems in the framework of Smart Energy
Networks
On/Off
Pumping mode
Flexible Generation
mode
Year 1 Objectives
•
Review and demonstrate the existing tools to the WP partners
•
Identification of current operational process and constraints
•
Prepare a flexible framework for WP2 development WP2
28/10/2013
© 2013 eStorage
4
DEMO
DEMO
RTD
T3.1
Performance and
Service Targets
T2.1
System Specifications
Development Scenarios and Role of
Storage for the Future EU Electricity
System
T1.2
T2.2
IT tools for more continuous
energy trading markets
Economic and Environmental Value of
Storage in the Future EU electricity
Systems
T2.3
Obstacles for the integration of Storage in
Current EU Regulatory and Market
framework
Unit design & Model
Test
T3.2
T3.3
T1.3
Conversion to Variable
Speed of Hydro Plant Unit
Smart Dispatch Storage PSP
T3.4
T1.4
Hydro Plant unit
monitoring
WP6 Management
T1.1
WP3
Benefits of Storage and Regulatory
Framework & Market Design
MGT
WP2
Smart Energy Networks
& IT Tools
WP5 Communication
WP1
Pumped Hydro
Storage Upgrade in
Variable Speed
OTHER
Work Packages Organization
Regulatory Recommendations for Storage
in European Market Rules
T4.1
Feasibility and technical cost benchmark PSP sites in EU
WP4
Exploitation
28/10/2013
© 2013 eStorage
OTHER
5
WP2 Organization
Smart Energy
Networks & IT
Tools
T2.1 System
Specifications
Functionnal
Specification
Identification of
Needs
T2.2 IT Tools for
more continuous
trading market
T2.3 Smart
Dispatch Storage
PSP
System
Architecture &
Interoperability
Detailed
Specification
System
Architecture &
Interoperability
Standard
Interface &
Protocol
Data Model
Standard
Interface &
Protocol
Data Model
Development
Integration
Development
Integration
Detailed
Specification
Test & Validation
Test & Validation
EDF, AHF, AGR
ICL, ELIA, AGR
28/10/2013
© 2013 eStorage
6
Results & Progress
Review and demonstrate the existing tools to the WP partners
•
WP2.1 & WP2.2 : extension of e-terramarket entso-e suite, focusing on the Market Clearing Engine
•
WP2.3 : extension of the IPO (Intra-day Plant Optimization) module (from e-terrageneration product)
•
WP2 KOM : demo of e-terramarket entso-e and e-terrageneration to the partners
Business operations and constraints analysis
•
WP2.3 : Meeting with EDF « DOAAT » in St Denis in Feb 7th
•
WP2.3 : Meeting with EDF « conduite » in Lyon in July 5th
•
WP2.1 & WP2.2 : Coordination with WP3&4:
– Participation at the WP3 KOM in March 26th
– Redefinition of WP2 schedule in coordination with WP3 milestones and deliverables
Preparation of a flexible framework for WP2 development
•
Purchase of third-party development licenses for the optimization modules : AIMMS (mathematical
modeling software) & CPLEX (solver)
•
On-going set-up of the optimization module framework that will facilitate the development and
integration of var-speed PSP models and market models
28/10/2013
© 2013 eStorage
7
Next Year Actions
General
•
•
Project Management (internal & consortium)
Actively participate to the other Working Group
WP2.1 & WP 2.2 – IT tools for more continuous trading market
•
•
•
Follow-up WP3 development in view of the interim WP3 report expected in M24
Start to work on first specification “Market Model and associated clearing rules”
Completing the framework setup and build base balancing market models (offers and
bids, ancillary services requirement, power balance clearing and congestion
management)
WP2.3 – Smart Dispatch Storage PSP
•
•
•
28/10/2013
Get varspeed PSP data and characteristics to build and implement a var-speed PSP
mathematical model in the IPO module (technical part only)
Produce a high level project note specification to describe the scope, proposed
optimization tool and expected results
Deliver a first version of adapted eSTORAGE IPO in 2014 (not an official deliverable)
© 2013 eStorage
8
Critical Success Factors
•
Availability of physical and commercial model data to get meaningful and representative results
•
Availability of adapted market rules for implementation on market management system
•
Identify the place and role of the optimization tool within the actual EDF business process
•
Get acceptance and support from EDF exploitation team to implement meaningful demonstrator
28/10/2013
© 2013 eStorage
9
28/10/2013
© 2013 eStorage
10