eSTORAGE WP 2 Progress & Results 28/10/2013 Jean-Christophe Passelergue Olivier De l’Hermuzière A consortium of energy-industry leaders and academic researchers Algoé, a management consultancy. Alstom, a leading power generation and grid equipment and solutions company. DNV KEMA, the global expert in energy and sustainability consultancy. EDF, the world’s largest producer of electricity. Elia, one of Europe’s leading electricity transmission system operators. Imperial College, a provider of worldclass education and research. 28/10/2013 © 2013 eStorage 2 Agenda 1. 2. 3. 4. 5. Objectives & Organization Results and Progress Next Year Actions Critical Success Factors Q&A Session 28/10/2013 © 2013 eStorage 3 3 WP2 Objectives Existing limitations • Classic Pumped Storage Hydro Plants (PSP) not flexible enough to – contribute to portfolio energy balance management – provide Ancillary Services such as secondary regulation when in pumping mode – participate efficiently in Balancing Mechanism when in pumping mode WP Objectives • Implement new market rules and associated incentives schemes related to storage in a context of large renewable resources integration • Demonstrate the criticality of IT tools in enabling the deployment and efficient use of storage systems in the framework of Smart Energy Networks On/Off Pumping mode Flexible Generation mode Year 1 Objectives • Review and demonstrate the existing tools to the WP partners • Identification of current operational process and constraints • Prepare a flexible framework for WP2 development WP2 28/10/2013 © 2013 eStorage 4 DEMO DEMO RTD T3.1 Performance and Service Targets T2.1 System Specifications Development Scenarios and Role of Storage for the Future EU Electricity System T1.2 T2.2 IT tools for more continuous energy trading markets Economic and Environmental Value of Storage in the Future EU electricity Systems T2.3 Obstacles for the integration of Storage in Current EU Regulatory and Market framework Unit design & Model Test T3.2 T3.3 T1.3 Conversion to Variable Speed of Hydro Plant Unit Smart Dispatch Storage PSP T3.4 T1.4 Hydro Plant unit monitoring WP6 Management T1.1 WP3 Benefits of Storage and Regulatory Framework & Market Design MGT WP2 Smart Energy Networks & IT Tools WP5 Communication WP1 Pumped Hydro Storage Upgrade in Variable Speed OTHER Work Packages Organization Regulatory Recommendations for Storage in European Market Rules T4.1 Feasibility and technical cost benchmark PSP sites in EU WP4 Exploitation 28/10/2013 © 2013 eStorage OTHER 5 WP2 Organization Smart Energy Networks & IT Tools T2.1 System Specifications Functionnal Specification Identification of Needs T2.2 IT Tools for more continuous trading market T2.3 Smart Dispatch Storage PSP System Architecture & Interoperability Detailed Specification System Architecture & Interoperability Standard Interface & Protocol Data Model Standard Interface & Protocol Data Model Development Integration Development Integration Detailed Specification Test & Validation Test & Validation EDF, AHF, AGR ICL, ELIA, AGR 28/10/2013 © 2013 eStorage 6 Results & Progress Review and demonstrate the existing tools to the WP partners • WP2.1 & WP2.2 : extension of e-terramarket entso-e suite, focusing on the Market Clearing Engine • WP2.3 : extension of the IPO (Intra-day Plant Optimization) module (from e-terrageneration product) • WP2 KOM : demo of e-terramarket entso-e and e-terrageneration to the partners Business operations and constraints analysis • WP2.3 : Meeting with EDF « DOAAT » in St Denis in Feb 7th • WP2.3 : Meeting with EDF « conduite » in Lyon in July 5th • WP2.1 & WP2.2 : Coordination with WP3&4: – Participation at the WP3 KOM in March 26th – Redefinition of WP2 schedule in coordination with WP3 milestones and deliverables Preparation of a flexible framework for WP2 development • Purchase of third-party development licenses for the optimization modules : AIMMS (mathematical modeling software) & CPLEX (solver) • On-going set-up of the optimization module framework that will facilitate the development and integration of var-speed PSP models and market models 28/10/2013 © 2013 eStorage 7 Next Year Actions General • • Project Management (internal & consortium) Actively participate to the other Working Group WP2.1 & WP 2.2 – IT tools for more continuous trading market • • • Follow-up WP3 development in view of the interim WP3 report expected in M24 Start to work on first specification “Market Model and associated clearing rules” Completing the framework setup and build base balancing market models (offers and bids, ancillary services requirement, power balance clearing and congestion management) WP2.3 – Smart Dispatch Storage PSP • • • 28/10/2013 Get varspeed PSP data and characteristics to build and implement a var-speed PSP mathematical model in the IPO module (technical part only) Produce a high level project note specification to describe the scope, proposed optimization tool and expected results Deliver a first version of adapted eSTORAGE IPO in 2014 (not an official deliverable) © 2013 eStorage 8 Critical Success Factors • Availability of physical and commercial model data to get meaningful and representative results • Availability of adapted market rules for implementation on market management system • Identify the place and role of the optimization tool within the actual EDF business process • Get acceptance and support from EDF exploitation team to implement meaningful demonstrator 28/10/2013 © 2013 eStorage 9 28/10/2013 © 2013 eStorage 10
© Copyright 2026 Paperzz