Code Level of Progress Green Project already delivered. Amber

Cumbria Climate Change Action Plan
2009-14 Monitoring Report
Name of CSP Member Organisation:
Code
Level of Progress
EXAMPLE COPY ONLY
Green
Project already delivered.
Public Organisation A.
Amber
Project in progress or not due to be delivered until a later
date but no significant concerns about meeting targets in
the timetable.
Red
Likelihood of non-delivery of some or all elements of the
project or no awareness of an action plan in place,
therefore urgent action needed.
Lead Officer for Report: e.g. Michael Matthews (Policy and Performance)
Report Date: 14th December 2009
Energy Objectives: To reduce CO2 emissions by 10% by 31.3.11 and by 25% by 31.3.14 while stimulating renewable installations and environmental
technologies sector growth locally.
Overall commentary by Lead Organisation on progress made on Energy Objectives and next steps:
With a baseline now established of 1,250 tonnes per annum (2007), the Board has agreed to a budget in 2010/11 of £15,000 to invest in energy
reduction and energy efficiency measures. This should lower emissions by 8% by 01/03/11 with a potential financial saving of £3,500 per annum
This capital investment is being augmented by staff training, bringing about a wider awareness and understanding of our corporate aim of reducing
CO2 emissions from our buildings. A staff incentive scheme has begun (Oct 2009) whereby staff are rewarded a proportion of the cost of energy
they save each quarter. Through this staff scheme, we expect to make a further 6% reduction in energy use by 2011 – thereby reaching the CSP
target of 10% by 31/3/11. A scoping study for appropriate renewables for our estate is scheduled for February 2010, after which a review of the
options will be presented to the Board in March 2010. We have had difficulties in signing up to a green tariff as we are contracted to our current
energy provider until 1/3/12.
Actions and Targets
Key
Blue: Specific Action for all CSP members
Clear: Specific Action for relevant lead org.
Lead
Organisation
Red
Amber
Green
Report comments with revised target
date
& Officer
Responsible
Reduce CO2 emissions from 2007 baseline
by 10% by 31/3/11 and by 25% by 2014.
All CSP
Set up invest to save energy budget of
10% of current energy costs by 31/03/10.
All CSP
e.g. Mike
Matthews
Exception (red or amber)
G
A
Evidence available
to auditor
See Overall Commentary
Energy Use / Utility
Bill information.
Baseline recently established. Board have
rejected budget for 2010 but currently aware
and under review. £15,000 represents 8%.
Accounts and
budgets
Initiate energy efficiency projects within
estates and premises to cut energy use by
10% by 31/03/10 and CO2 emissions by
10% by 31/03/11.
All CSP
A
8% reduction forecast. Carbon Plan agreed.
‘Hard to heat’ main office requires large
investment for small CO2 return. Carbon Officer
employed p/t.
e.g. Mike
Matthews
Carbon Plan.
Quarterly reports submitted to Board.
Establish carbon emissions baseline for
2007 by 31/12/09
All CSP e.g.
Clare Shaw
Procure 100% green tariff electricity supplies by
31/03/10
All CSP e.g. Tim
Smith
G
R
See Overall Commentary (1,250 tonnes CO2
pa)
Energy Use / Utility
Bill information.
Cannot achieve this target date as currently in
contract until 2012. Expected transfer 2012.
Procurement Contract