Work Report Refurbishing Claim Boundary Lines

Work Report
Refurbishing Claim Boundary Lines
Currie-Bowman (South) Property
Currie Township, Ontario
524700E, 5370900N
Prepared for:
Kinross Gold Corporation
Prepared by:
The Claim Group Inc.
June 12, 2013
Table of Contents
Summary .............................................................................................................................. 1
Introduction ........................................................................................................................ 2
Location and Access ........................................................................................................... 2
History of Claim ................................................................................................................. 2
Current Work ...................................................................................................................... 2
List of Figures
Figure 1 ................................................................................................................................. 3
Figure 2 ................................................................................................................................. 4
Appendices
Appendix I: Summary of Work
Summary
Claims L1193806, L1201418 and L1201419 are located in Currie Township, and form
part of the Currie-Bowman Property held by Kinross Gold Corporation. In order to
accurately locate the claim boundaries, the boundary lines were refurbished as allowed
under Section 10(1)(g) of Ontario Regulation 6/96 (Assessment Work). The work was
completed between 03June2013 and 11June2013 by BZ Environmental Consulting out of
Timmins, Ontario.
Introduction
Between 03June2013 and 11June2013, the claim boundary lines on claims L1193806,
L1201418 and L1201419 were refurbished. This was done to accurately determine the
location of the claim boundaries in the field.
Location and Access
The property is located in Currie Township, approximately 60km east of the City of
Timmins, Ontario (Figure 1). The property can be accessed from Timmins by vehicle
via Highway 101 to Grindstone Road. The claims identified in this report are shown
with red asterisks on Figure 2.
History of Claims
Claim L1193806 was recorded 14December1993 by George Michel Caron in the name of
Cross Lake Minerals Ltd. and claims L1201418 and L1201419 were recorded
11January1994 by George Michel Caron in the name of Cross Lake Minerals Ltd. The
claims were transferred to Falconbridge Limited in 1995. Minor prospecting and
mapping/sampling was carried out in the summer of 1995, and geophysical surveys
were completed in 2001 and 2008. The claims were transferred to Echo Bay Mines Ltd.
in 2002; Echo Bay Mines Ltd. subsequently amalgamated with Kinross Gold
Corporation in 2006. The claims are currently held 100% by Kinross Gold Corporation.
In order to accurately determine the claim boundary location, Kinross elected to
refurbish the boundary lines in 2013.
Current Work
Claim boundary lines for claims L1193806, L1201418 and L1201419 were refurbished
from 03June2013 to 11June2013. A summary of the claim boundary refurbishment is
provided in Appendix I.
Currie-Bowman
Property Location
Figure 1: General location map of the Currie-Bowman Property.
1201424
12
20
22
1201085
52
5372500N
1228643
1
4
01
537500E
535000E
532500E
530000E
527500E
525000E
1201076
12
1201077
1193806
1201248
1198869
6
53
93
1
1
1201417
1201419
1201080
21
22
36
37
67
67
83
83
6
6
3
3
8
8
8
8
23
38
24
7
3
67
8
6
86
83
86
1201084
9
3
1201418
83
83
1201081
1201082
1201083
Cool
Water
Lake
1164140
5370000N
1201249
1201250
Kinross Gold Corporation
Currie-Bowman Project
Property Location Map
COMPILED: SWD SCALE:
DATUM: NAD 83, Zone 17
DRAFTED: SWD
PLAN: Currie-Bowman
REVISED BY:
DATE: 15 JAN 04 DATE:
Figure 2: Location map of Currie-Bowman Property showing location of boundary refurbishment claims.
MAP No.:
Appendix I
Summary of Work
Work Report for Various Claims in Currie-Bowman Townships
Date: June 11th, 2013
Currie-Bowman
1201418
1201419
1193806
Information for work completed while refurbishing claim boundaries on the following
claims in Currie-Bowman Township between June 3rd and 11th, 2013.
Persons who performed the work: Mark Bednarz, Norm Collins, Chad Gloucester and
Tyler Jakubiak.
The crew travelled from Timmins via Highway 101 approximately 80 kilometers east to
Black Bear Road, turning south on Black Bear Road approximately 2 km. At that point we
split up and each took a claim to refurbish. We re‐blazed and flagged the property lines.
We used coordinates from the Ministry Claim Map which was provided to us by our client.
The field work was performed between June 7th – 10th, 2013.
June 3rd – 5th – completed various communications with client, ministry and crews.
Researched claim on the Ministry Claim map system.
Jun 7th – travelled from Timmins to claim. Start to re‐blaze and re-furbish claim
boundary.
Jun 10th – travelled from Timmins to claim. Continue to re‐blaze and re-furbish claim
boundary.
Jun 11th - Complete report.