Work Report Refurbishing Claim Boundary Lines Currie-Bowman (South) Property Currie Township, Ontario 524700E, 5370900N Prepared for: Kinross Gold Corporation Prepared by: The Claim Group Inc. June 12, 2013 Table of Contents Summary .............................................................................................................................. 1 Introduction ........................................................................................................................ 2 Location and Access ........................................................................................................... 2 History of Claim ................................................................................................................. 2 Current Work ...................................................................................................................... 2 List of Figures Figure 1 ................................................................................................................................. 3 Figure 2 ................................................................................................................................. 4 Appendices Appendix I: Summary of Work Summary Claims L1193806, L1201418 and L1201419 are located in Currie Township, and form part of the Currie-Bowman Property held by Kinross Gold Corporation. In order to accurately locate the claim boundaries, the boundary lines were refurbished as allowed under Section 10(1)(g) of Ontario Regulation 6/96 (Assessment Work). The work was completed between 03June2013 and 11June2013 by BZ Environmental Consulting out of Timmins, Ontario. Introduction Between 03June2013 and 11June2013, the claim boundary lines on claims L1193806, L1201418 and L1201419 were refurbished. This was done to accurately determine the location of the claim boundaries in the field. Location and Access The property is located in Currie Township, approximately 60km east of the City of Timmins, Ontario (Figure 1). The property can be accessed from Timmins by vehicle via Highway 101 to Grindstone Road. The claims identified in this report are shown with red asterisks on Figure 2. History of Claims Claim L1193806 was recorded 14December1993 by George Michel Caron in the name of Cross Lake Minerals Ltd. and claims L1201418 and L1201419 were recorded 11January1994 by George Michel Caron in the name of Cross Lake Minerals Ltd. The claims were transferred to Falconbridge Limited in 1995. Minor prospecting and mapping/sampling was carried out in the summer of 1995, and geophysical surveys were completed in 2001 and 2008. The claims were transferred to Echo Bay Mines Ltd. in 2002; Echo Bay Mines Ltd. subsequently amalgamated with Kinross Gold Corporation in 2006. The claims are currently held 100% by Kinross Gold Corporation. In order to accurately determine the claim boundary location, Kinross elected to refurbish the boundary lines in 2013. Current Work Claim boundary lines for claims L1193806, L1201418 and L1201419 were refurbished from 03June2013 to 11June2013. A summary of the claim boundary refurbishment is provided in Appendix I. Currie-Bowman Property Location Figure 1: General location map of the Currie-Bowman Property. 1201424 12 20 22 1201085 52 5372500N 1228643 1 4 01 537500E 535000E 532500E 530000E 527500E 525000E 1201076 12 1201077 1193806 1201248 1198869 6 53 93 1 1 1201417 1201419 1201080 21 22 36 37 67 67 83 83 6 6 3 3 8 8 8 8 23 38 24 7 3 67 8 6 86 83 86 1201084 9 3 1201418 83 83 1201081 1201082 1201083 Cool Water Lake 1164140 5370000N 1201249 1201250 Kinross Gold Corporation Currie-Bowman Project Property Location Map COMPILED: SWD SCALE: DATUM: NAD 83, Zone 17 DRAFTED: SWD PLAN: Currie-Bowman REVISED BY: DATE: 15 JAN 04 DATE: Figure 2: Location map of Currie-Bowman Property showing location of boundary refurbishment claims. MAP No.: Appendix I Summary of Work Work Report for Various Claims in Currie-Bowman Townships Date: June 11th, 2013 Currie-Bowman 1201418 1201419 1193806 Information for work completed while refurbishing claim boundaries on the following claims in Currie-Bowman Township between June 3rd and 11th, 2013. Persons who performed the work: Mark Bednarz, Norm Collins, Chad Gloucester and Tyler Jakubiak. The crew travelled from Timmins via Highway 101 approximately 80 kilometers east to Black Bear Road, turning south on Black Bear Road approximately 2 km. At that point we split up and each took a claim to refurbish. We re‐blazed and flagged the property lines. We used coordinates from the Ministry Claim Map which was provided to us by our client. The field work was performed between June 7th – 10th, 2013. June 3rd – 5th – completed various communications with client, ministry and crews. Researched claim on the Ministry Claim map system. Jun 7th – travelled from Timmins to claim. Start to re‐blaze and re-furbish claim boundary. Jun 10th – travelled from Timmins to claim. Continue to re‐blaze and re-furbish claim boundary. Jun 11th - Complete report.
© Copyright 2026 Paperzz