Lab 10 (28/11/2016) - Low Functionality Protoype

Smart House
Group 4:
Gonçalo Espadeiro and Paulo Ferreira
CCU 2016/2017
LAB 10 – Low Functionality
Protoype
Critical Tasks

Turn off the “Wall light 1” and turn on the “Cell Phone charger” of the
“Kitchen”. (Easy)

Turn all the light switchs and power plugs off in “John’s Bedroom” and
check if power consumption is 0. Turn it all on and check if power
consumption increased. (Medium)

Add a home division named “Anna’s bedroom” with 2 light switches and 2
power plugs. (Hard)
Secondary Tasks

Check how much was spended in the last 5 days (statistics menu).

Check the last 3 operations (history menu).

Check if are any problems to solve (notifications menu).
Home Screen
Critical Task 1

Turn off the “Wall light 1” and turn on the “Cell Phone charger” of the
kitchen. (Easy)
Critical Task 2

Turn all the light switchs and power plugs off in the “Living Room” and check if power
consumption is 0. Turn it all on and check if power consumption increased. (Medium)
Critical Task 3

Add a home division named “Anna’s bedroom” with 2 light switches and 2
power plugs. (Hard)
Questions?