Public Private partnership in the Baltics and Europe Alternative means of financing Energy and Infrastructure projects Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period 2007 - 2013 Marijus Franckevičius Director Energy Agency, Lithuania 23 November 2006, Reval Hotel Lietuva, Vilnius ENERGY AGENCY LITHUANIA Selected Key Messages from Operational Programs (1) • The Lithuanian national energy supply networks and systems substantially meet current customers needs, however, majority of equipment are outdated in all respects and do not meet modern standards of security and reliability of supply • Natural gas is supplied from a single source (Russia), therefore, projects aimed at increasing reliability and safety of energy supply must be implemented • Energy supply networks and systems must be modernised by applying state-ofthe-art technological solutions aimed at increasing the security and reliability of energy supply and by improving opportunities for fuel diversification and power generation at co-generation plants • Non-decreasing social, economic, and territorial inequalities between different Lithuanian regions as well as between the cities and rural areas, determine unequal possibilities to support, properly maintain, and renew the available housing, thus, physical degradation of residential environment and buildings as well as lack of social housing is observed in separate areas of the country (especially in problematic territories) ENERGY AGENCY LITHUANIA Selected Key Messages from Operational Programs (2) • The system for collection of recyclable and dangerous waste as well as management of biodegradable waste is underdeveloped • Major energy plants using traditional energy sources have no treatment equipment for air emissions and, therefore, fail to meet EU requirements • Energy consumption is inefficient in Lithuania because of poor energy characteristics of most public buildings • Low level of performance of boiler houses and of electricity generated by CHP plants • Underused energy potential of renewable energy resources ENERGY AGENCY LITHUANIA Provisional allocation of resources to Energy Related Projects Fund OP Economic Growth (2) ERDF Promotion of Cohesion (3) Cohesion Priority Action group Budget, MLt Basic Economic Infrastructure (4) Energy Supply Networks (1) 489.350 Local and urban development, conservation of cultural heritage and nature, adaptation for tourism development (1) Housing development in identified problem areas (1) 200.000 Water supply and waste water treatment systems (1) Modern waste management Environment and sustainable systems (2) development (3) Improvement of air quality (3) Increase of energy efficiency and use of RES (4) ENERGY AGENCY LITHUANIA 2,697.000 996.610 Energy supply networks (Possible projects) • Electricity (150 million Lt): – Construction of new electricity transmission lines – Construction / modernization of electricity distribution network – Construction / modernization of transformer sub-stations • Natural gas (90 million Lt): – Construction of new natural gas transmission pipelines – Construction of new natural gas distribution network, connection of new consumers • District heating (249 million Lt): – Replacement of outdated DH pipes with new modern ones Total ERDF allocation – 489 million Lt (142 MEuro) ENERGY AGENCY LITHUANIA Energy supply networks - electricity (Project example) Length, km. 82 Cost, mln. Lt 92 Construction duration, years 4 ENERGY AGENCY LITHUANIA Energy supply networks – natural gas (Project example) Length, km. 160 Cost (incl. distribution), mln. Lt 242 Construction duration, years ENERGY AGENCY LITHUANIA 3 Energy supply networks – District Heating (Project example) Renovated pipes (agreed 100 mm diameter), km. 1800 Duration, m. till 2015 Cost, mln. Lt 400 Fuel saved, ktoe 30 Reduced CO2 emission, kt. 70,4 ENERGY AGENCY LITHUANIA Increase of energy generation and consumption efficiency and use of renewable energy resources (Possible projects) • Increase efficiency of energy production (94 million Lt): – Modernization of CHP plants – Modernization of boilers operating in DH systems – Construction of high-efficiency CHP plants • Utilization of RES for energy production (111 million Lt): – Fuel conversion to RES at boiler houses or CHP plants – Construction of new boilers or CHP plants fueled by RES • Renovation of public buildings (792 million Lt): – Reconstruction / upgrading of building envelope and energy systems, reducing energy consumption Total Cohesion Fund allocation – 997 million Lt (289 MEuro) ENERGY AGENCY LITHUANIA FUELS USED FOR DH 1997 - 2005 90,0 83,6 82,3 80,1 80,0 81,7 75,5 72,0 70,0 68,5 59,1 60,0 % 52,5 50,0 44,1 38,1 40,0 30,0 27,3 22,7 18,7 17,2 20,0 10,0 1,2 3,0 2,0 1,5 2,0 0,8 2,0 0,6 4,0 1,3 5,0 0,8 9,7 7,2 5,6 10,0 0,8 4,2 12,0 2,1 0,8 0,0 1997 1998 Natural Gas 1999 2000 Fuel oil 2001 2002 Wood 2003 2004 2005 Other fuel It is foreseen that production of heat using local, renewable and waste resources would make 17% in general heat balance in 2010 and 23% - in 2020 ENERGY AGENCY LITHUANIA INSTALLED WOOD PROJECTS IN LITHUANIA (~400 MW) Possible increase of RES based generating capacities due to Structural Funds support ~ 200 MW Installed capacity 0.2 – 1 MW Installed capacity 1 - 10 MW Installed capacity more than 10 MW ENERGY AGENCY LITHUANIA http://www.avei.lt Energy saving possibilities in public buildings (Source – National Energy Efficiency Program) Type of buildings Area, mill. m2 Investments, mill. Lt Maximal Optimal Expected savings, MWh/year Maximal Optimal Buildings of administrative mission 7.9 1738 1264 1043 1010 Tertiary sector 5.9 885 590 620 531 Buildings of educational, cultural and sport mission 8.7 1305 785 653 509 Healthcare sector 2.5 425 300 213 182 Religious and other special mission 5.1 459 357 274 268 30.1 4812 3294 2803 2500 TOTAL ENERGY AGENCY LITHUANIA
© Copyright 2025 Paperzz