TRANSMISSION TESTING SERVICES POWER CABLE TEST RESULTS Report number Date of test Substation Feeder number/name Rated voltage Cable type Cable termination – End 1 Cable termination – End 2 Cable termination – End 3 Cable route length Atmospheric temp (°C) Humidity (%) Reason for test Summary of tests Relevant Standard 1. Phasing check MMI 0025 clause 5.2.1 or SDI 120 clause 5.7.4 2. Continuity MMI 0025 clause 5.2.1 or SDI 120 clause 5.7.1 3. Serving – insulation resistance MMI 0025 clause 5.2.1 or SDI 120 clause 5.7.6 4. Serving – HV withstand MMI 0025 clause 5.2.1 5. CCPU and link box tests MMI 0025 clause 5.2.1 6. Main conductor – insulation resistance MMI 0025 clause 5.2.1 or SDI 120 clause 5.7.6 7. Main conductor – HV Withstand (one of following options required) a) HV test supply b) 24hr soak (PM to arrange) 8. Main conductor – DC leakage current (Paper insulated cable only) 9. Main conductor – partial discharge (one of following options required) a) Off – line b) On – line 10. Main conductor – DDF (VLF) 11. Zero and positive sequence impedance Results MMI 0025 clause5.2.1 or SDI 120 clause 5.7.6 MMI 0025 clause 5.2.1 or SDI 120 clause 5.7.6.2 MMI 0025 clause 5.2.1 or SDI 120 clause 5.7.6 MMI 0025 clause 5.2.1 or SDI 120 clause 5.7.6.2 MMI 0025 clause 5.2.1 or SDI 120 clause 5.7.6.2 HVT 0001 section 14 – Report only (when VLF is used for test 7) MMI 0025 clause 5.2.1. Limit - Comparable to calculated results from protection design. Test data stored at G:\TIS\TESTSERV\TEST RESULTS…… Refer to Standards – SDI 535, MMI 0025 (transmission cables) and SDI 120 (distribution cables) for required tests, test voltages and acceptable limits. Refer to procedure – GNV 1094.7 for test methodology. Comments/conclusion Tested by FNV 1111 – July 2014 Service no. Reported by GNV 1094.7 Service no Page 1 of 7 Detail of Tests Results 1. Phasing check Limit – (Transmission and distribution) conforms to local network Phase Termination – End 1 Termination – End 2 Termination – End 3 A B C 2. Continuity Limit – (Transmission only) No main conductors open circuit Connection Continuity Result Instrument no. 3. Serving – insulation resistance Limit (Transmission) PVC sheath 1.5MΩ/km, HDPE 110MΩ/km, mixed 55MΩ/km (Distribution) new cable 55MΩ, old cable 10MΩ Connection Test voltage Test duration 1kV DC 1 minute Insulation resistance Result Instrument no. 4. Serving – high voltage withstand Limit (Transmission) – Always required. No disruptive discharge at 5kV DC (Distribution – only required on special request) No disruptive discharge at 5kV DC for new cables. 2.5kV DC for cables more than 20 years old. Connection Test voltage (kV DC) Test duration Leakage current Result 1 minute Instrument no. FNV 1111 – July 2014 GNV 1094.7 Page 2 of 7 5. Cable covering protection units (CCPU) sheath voltage limiters (SVL) and link boxes Note: Tests on CCPC/SVL may be best carried out prior to installation of link boxes Limit (Transmission only) Insulation resistance – Report only Ref V and I – Meets manufacturer’s specifications (project manager to supply specs) Location 1 – Manufacturers ratings Connection Rated voltage kV Reference voltage kV Test results Reference current mA Insulation resistance @ 1kV DC Measured current @ reference voltage mA DC Measured voltage @ reference current kV DC Result Instrument no. Location 2 – Manufacturers Ratings Connection Rated Voltage kV Reference Voltage kV Reference Current mA Test Results Insulation Resistance @ 1 kV DC Measured Current @ Reference Voltage mA DC Measured Voltage @ Reference Current kV DC Result Instrument no. Location 3 – Manufacturers ratings (Ref AS 1307) Connection Rated voltage kV Reference voltage kV Reference current mA Test results Insulation resistance @ 1kV DC Measured current @ reference voltage mA DC Measured voltage @ reference current kV DC Result Instrument no. FNV 1111 – July 2014 GNV 1094.7 Page 3 of 7 On completion of tests – All links confirmed sound and all boxes sealed Location 1 Checked by Location 2 Checked by Location 3 Checked by 6. Main conductor – isulation resistance Limit (Limit only applies to 60 secs reading. Report only for others) (Distribution) (Transmission) New HV XLPE 100GΩ New LV XLPE 200MΩ Old HV XLPE 200MΩ Old LV XLPE 50MΩ Old HV paper 100MΩ Old LV paper - report only Mixed HV 100MΩ Mixed LV 20MΩ Report only. Bring IR unbalance coefficients greater than 2.5 to the attention of Primary Systems As measured results Connection Test voltage (kV DC) 1kV – Dist 5kV – Trans 15 Secs 60 Secs N/A Insulation resistance at 180 600 R60 Secs Secs R15 N/A R600 R60 Result N/A Instrument no. 7. Main conductor – high voltage withstand Limits (Transmission) No disruptive discharge at appropriate test voltage. (Distribution – only required on special request) No disruptive discharge at appropriate test voltage. 7.1 (option a) Withstand using HV test supply (Maximum 1.25Uo when using AC or VLF for paper insulation) Connection Test voltage kV AC/DC/VLF Test duration Result Instrument no. FNV 1111 – July 2014 GNV 1094.7 Page 4 of 7 7.2 (Option b) Withstand using 24 hour soak from network supply This test performed when unable to perform 7.1 due to HV test supply limitation. Test is arranged by Project Manager and reported separately. 8. Main conductor – DC leakage current (Paper cables only) Limit (Transmission) Current stable and maximum unbalance of 2.0 (Distribution – only required on special request) current stable Percent of target withstand voltage Connection % Leakage current (once stable) µA / mA kV Leakage current unbalance co-efficient between phases Result @ 100% of withstand voltage 25 50 A-E 75 100 25 50 75 100 25 50 75 100 Instrument no. FNV 1111 – July 2014 GNV 1094.7 Page 5 of 7 9. Main conductor – partial discharge Option A – Off line test (AC or VLF) Limits Transmission XLPE - Less than background noise level @ 1.5Uo. Paper (or mixed paper and XLPE) – Balanced across phases (Max 1.25Uo) Distribution Per transmission (only required on special request) Connection Background noise level pC Discharge inception Discharge extinction Partial discharge level (pC) @ Result 1.0Uo kV Withstand voltage 1.5Uo pC ..…kV ..…kV ..…kV 1.0Uo kV ..…kV Notes PD detector frequency settings Centre frequency kHz Bandwidth kHz Calibrated at ..…kV 1.5Uo pC Instrument No. Notes: 1. All voltages phase to earth (Peak/√2) 2. Uo is nominal system voltage phase to earth Test procedure is as follows: 1. Raise test voltage toward withstand test level. 2. Record inception voltage and PD level. 3. Pause at 1.0Uo and 1.5Uo to record PD levels. 4. Perform withstand test. Record PD level during test period. 5. Reduce test voltage. Pause at 1.5Uo and 1.0Uo to record PD levels. Record PD extinction voltage Histogram of PD pattern (as required) Phase Test voltage Notes Paste image FNV 1111 – July 2014 GNV 1094.7 Page 6 of 7 Option B – On line test Limits (Transmission) No obvious discharge within cable circuit (Distribution – only required on special request) No obvious discharge within cable circuit Paste in histograms of results and make comments 10. Main conductor – DDF (only required when VLF withstand test is used) Limit report only Test supply frequency ……………….. Paste in image of DDF Vs voltage graph Limit Report only FNV 1111 – July 2014 GNV 1094.7 Page 7 of 7
© Copyright 2026 Paperzz