SS105 StoTherm Vario on MasterWall ® Insulation

Sto Specification Australia
SS105 StoTherm Vario on MasterWall® Insulation Panel
StoTherm Vario Mineral Render System over
MasterWall® insulation Panel System
On timber/steel frame construction
Based on BRANZ Appraisal No 478
Refer to MasterWall for installation details
Sto Registration: For StoWarranty the
completed specification must be registered with
Stoanz Australia Ltd. Email to [email protected]
1. PROJECT DETAILS
Specifier:
Project & Address:
Project Owner:
Sto Warranty:
Sto 15 Year with StoService Assurance
StoTherm Vario Render over
MasterWall® Insulation Panel
System on timber/steel frame
construction
This specification details the application of the StoTherm Vario Render System
consisting of, StoLevell Novo meshed basecoat render, Stoplex W primer,
selected Stolit coloured finishing render coated in selected StoColor facade paint
on MasterWall® Insulation Panel System over timber or steel framed construction
in accordance with Australian Building Code National Construction Code (NCC).
Select Finishing Render:
--Click to select--
Select Facade Coating:
--Click to select--
Specification Number:
Office Use Only
i.e. 16.01_StoReg tec_sales_SS105_project address
Project Notes:
The StoWarranty requires the completed specification to be registered with Stoanz Australia Ltd. Email [email protected]
Stoanz Australia Ltd | Authorised Partner of Sto | 7 Mitchell Street, Marrickville, Sydney, NSW, Australia
Ph: +61 2 9560 9589 Fax: +61 2 9572 6003 Email: [email protected]
Rev No: 7 pa-16.04 Copyrights© Stoanz Australia Limited
1
Sto Specification Australia
SS105 StoTherm Vario on Masterwall® Insulation Panel
2. CONSTRUCTION & DETAILING
Responsibility
All work in this section shall be the responsibility of the Main Contractor, unless
previously agreed in writing. Stoanz Australia Limited accepts no responsibility for
defective workmanship in relationship to the application of the Sto system, or for
defects in the design, construction, or condition of the building, either as built or in
relation to the works.
The Main Contractor is to ensure that they are fully conversant with exterior
legislation requirements, the project specifications and details, MasterWall®
Insulated Panel System Installation & Construction Details Manual and any
specific installation requirements relating to the Main Contractor’s responsibilities
before any works commence. The Main Contractor is also responsible for the
various subcontractors to ensure that all items relating to weathert lightness,
penetrations and dissimilar material junctions affecting the construction system are
strictly in accordance with project specific details, manufacturer’s instructions and
details i.e. items such as roofs, soffits, openings, lights & security fittings, electrical
wiring, flashings, deck membranes dissimilar junctions etc. that abut, flash or
penetrate the system. The Main Contractor shall also ensure that the window and
door joinery is installed in accordance with the project drawings and MasterWall®
joinery details.
A Masterwal®l cladding QA and StoService Quality Assurance Document is to be
filled out as a record of the work undertaken by the Sto Contracting Company.
Timber Frame
Timber framing must comply with the National Construction Code (NCC) for
buildings or parts of a building within the scope limitations. All framing shall be true
in vertical and horizontal planes with particular attention to intersections between
top plate, floor joists and bottom plate in multi-storey construction. Adequate timber
framing including noggins and blocking shall be provided by the Main Contractor to
facilitate cladding fixings for the designated wind zone, membrane upstands,
dissimilar materials and exterior fixtures on the cladding.
The timber grade and level of treatment shall be in accordance with the AS/NZS
1604 current requirements.
Note: Any areas to be supported by blocking are required to be designated /
assigned prior to installation and the timber framing blocked as necessary.
Steel Frame
Steel framing must be to a specific design meeting the requirements of the National
Construction Code (NCC) and NASH Au.
Wall insulation
Wall insulation must meet the group climatic zone insulation requirements in
accordance with the ASINZS 4859.1 and the BCA
Framing Wrap
A vapour permeable wrap meeting the requirements of the National Construction
Code (NCC).shall be installed in accordance with the building wrap manufacturer’s
instructions. The wall wrap should be returned into the recesses of all openings and
double lapped and flashing taped as required.
The StoWarranty requires the completed specification to be registered with Stoanz Australia Ltd. Email [email protected]
Stoanz Australia Ltd | Authorised Partner of Sto | 7 Mitchell Street, Marrickville, Sydney, NSW, Australia
Ph: +61 2 9560 9589 Fax: +61 2 9572 6003 Email: [email protected]
Rev No: 7 pa-16.04 Copyrights© Stoanz Australia Limited
2
Sto Specification Australia
SS105 StoTherm Vario on Masterwall® Insulation Panel
Soffits
Soffits are installed with a 6/8mm bead of MS Sealant installed after the cladding
work is completed and before rendering commences. Inclined soffits require a metal
flashing.
Penetrations and Fittings
Penetrations and fittings such as waste pipes, vents etc should slope to the exterior,
be adequately supported by blocking and be taped onto the sarking with a square
sized flexible flashing tape. Blocking must also be installed for taps, door stops
hooks, lights, gas fittings, security alarms with all exterior electrical wiring encased
in PVC conduit at a downwards rake of 5 degrees that is sealed with MS Sealant.
Aluminium Joinery
All windows and doors shall be fitted prior to installation of the cladding by the
appointed window installer positioned to sit and be sealed / flashed in accordance
with the MasterWall® joinery details.
MAIN CONTRACTOR & ALL TRADES INVOLVED IN ANY EXTERIOR WORK
All details must be in accordance with the Project drawings and details
3. MASTERWALL® PANEL INSTALLATION
Responsibility
All work in this section shall be the responsibility of the Cladding Contractor who
shall check that the timber or steel frame construction is acceptable before
proceeding with the installation of the MasterWall® Insulated Panel System. The
Cladding Installer is to ensure adequate protection apparel and equipment is
supplied to meet their responsibilities in regards to the Health and Safety
regulations and that all dissimilar and adjacent surfaces are masked off and
protected.
MasterWall® Insulation Panel
System
Shall be installed in accordance with the MasterWall® System Installation &
Construction Detail Manual, specifications and details using MasterWall fixings,
tapes, adhesives, uPVC etc. Before commencing check the framing is straight
adequate studs, blocking and noggins have been installed to securely fix the panel
system and fitting or fixtures detailed in the project drawings. All panel joins must be
adhesively foamed and the selected joinery must be installed to sit over the
MasterWall® opening reveals that have been waterproofed in accordance with the
MasterWall® details. On completion of the MasterWall® installation rasp back all
joints to remove any adhesive foam residue and check all openings are correctly
detailed before commencing any rendering.
Note refer to Masterwall® details and specifications before commencing for fixing
centres, instillation details and complete a Masterwall® QA as a record of work.
Control & Interstorey Joints
Vertical control joints are required on walls over 20 metres long, where the system
abuts dissimilar material or overlays different construction material. Horizontal
interstorey joints are required at all mid floor junctions in accordance with the
MasterWall® System & Construction Detail Manual and specifications.
The StoWarranty requires the completed specification to be registered with Stoanz Australia Ltd. Email [email protected]
Stoanz Australia Ltd | Authorised Partner of Sto | 7 Mitchell Street, Marrickville, Sydney, NSW, Australia
Ph: +61 2 9560 9589 Fax: +61 2 9572 6003 Email: [email protected]
Rev No: 7 pa-16.04 Copyrights© Stoanz Australia Limited
3
Sto Specification Australia
SS105 StoTherm Vario on Masterwall® Insulation Panel
Sealant
Shall be paintable MS Sealant used strictly in accordance with the Manufacturers
Technical Data Sheet.
Rendered Parapets and
Balustrade Caps
For rendered parapet and balustrade caps refer to the MasterWall® Skyline
System to provide a waterproof membrane system.
Architectural Profiles
& Shapes
Architectural shapes used to create decorative detailing shall be correctly cut to size
and fitted using StoFlexyl mortar notch towelled to the back of the shape prior to
placing. As required construction fixings are used to mechanically fix large or heavy
shapes but care is required to avoid distortion. Joins are butted together using Sto
Crack filler and any control joints must be mirrored through the profile. Profiles
shall be pre-meshed or receive a StoArmat mesh coat and are placed after the
mesh coat with top edges meshed to the wall.
4. STOTHERM VARIO RENDER INSTALLATION
Responsibility
All work in this section shall be the responsibility of the Sto Contractor who must
assure themselves that the surfaces to be rendered are dry, free of contamination
and satisfactory before work commences. Adequate protection of all adjacent
surfaces shall be undertaken prior to commencing.
General
Rendering shall be carried out in stages over the Masterwall® cladding
incorporating; StoLevell Novo meshed basecoat render over the panels sealed
with Stoplex W sealer, selected Stolit coloured finishing render coated in selected
StoColor facade paint.
Materials
Stoanz Austrlai Ltd supplies all the following materials
StoLevell Novo meshed basecoat
Sto Stoplex W sealer
Selected Stolit K coloured finishing
renders
Sto uPVC pre meshed corner angles,
finishing edges and drip edges.
Selected StoColor facade paint
StoFlexyl waterproofing
Detailing:
Sto uPVC pre meshed finishing edges, drip edges and corner angles are available
as required.
StoLevell Novo meshed
basecoat render
To clean dry secure insulation panels apply a base coat of StoLevell Novo render
by hawk and trowel at approximate thickness of 5.0mm. While the render is still wet,
lightly embed the Sto reinforcing mesh ensuring adjacent drops of mesh are
overlapped by a minimum 75mm and float the surface to ensure the mesh has been
embedded before reinforcing all openings with mesh butterflies on top of the mesh
coat and apply a second coat of StoLevell Novo to ensure the mesh is fully
covered. Once dry remove any slight ridging etc. of the rendered surface with a Sto
rasp to achieve a flat plane surface.
The StoWarranty requires the completed specification to be registered with Stoanz Australia Ltd. Email [email protected]
Stoanz Australia Ltd | Authorised Partner of Sto | 7 Mitchell Street, Marrickville, Sydney, NSW, Australia
Ph: +61 2 9560 9589 Fax: +61 2 9572 6003 Email: [email protected]
Rev No: 7 pa-16.04 Copyrights© Stoanz Australia Limited
4
Sto Specification Australia
SS105 StoTherm Vario on Masterwall® Insulation Panel
Sto Stoplex W primer
To clean dry StoLevell Novo surface apply one coat of Stoplex W primer by brush
and roller to seal the surface at approximately 10m² per litre.
Sealant Installation
After the sealer has dried, all render junctions between joinery and adjacent
dissimilar surfaces and around penetrations shall be sealed with MS Sealant.
Float Finished Renders
Note: refer to header for
selected finish
Stolit K texture is available in 1.0, 1.5, 2.0 or 3.0mm aggregate as selected
Stolit K coloured finishing render as selected
To all exterior rendered surfaces apply the selected Stolit K coloured finishing
render with a stainless steel trowel gauging to the thickness of the aggregate size
and finished with a plastic float to the requisite pattern and allow to dry normally
overnight. The spreading rate shall be approximately 12sqm/1.0mm, 9sqm/1.5mm,
7sqm/2.0mm and 4sqm/3.0mm -/per pail.
StoColor facade paint selected
All Stolit K surfaces shall receive one (1) full coat of StoColor façade paint tinted to
the selected colour and applied by brush and roller at approximately 6/7 m² per litre.
Note: Always maintain wet edges between cutting in and roll in tight to ensure an
even film build is maintained.
5. GENERAL NOTES
Colour
As selected by the client or specifier Stoanz Limited recommends that the selected
colour must have a minimum Light Reflectance Value of 35%. Where a colour less
than 35% LRV but not less than 25% is selected two coats of StoColor X-black
heat reflective facade are required. Colours selected below the recommended
values will affect the warranty.
6. STOSERVICE ASSURANCE
Refer; StoService Assurance
for comprehensive guide
The Sto Render System should be cleaned annually by low pressure washing or
hosing down to remove surface contaminants with special attention to non-rain
washed areas (as required use a proprietary house wash sprayed on first with a low
pressure garden spray). When recoating is required at the 9 - 10 year period to
maintain long-term integrity this is carried out using StoColor façade paint over a
cleaned surface. Where a colour change is required Stoanz Limited should be
consulted for a specific specification.
An annual visual inspection is to be undertaken by the owner or their agent to check
for any physical damage or defects in the cladding or exterior building elements to
ensure any obvious faults are identified and repaired. Every two and half years the
building occupier will be notified to contact the Sto Contractor to carry out a
StoService inspection. On completion the Sto Contractor will issue a current
StoService certificate that will be recorded in the Sto warranty information so a longterm record of the service history is maintained.
The StoWarranty requires the completed specification to be registered with Stoanz Australia Ltd. Email [email protected]
Stoanz Australia Ltd | Authorised Partner of Sto | 7 Mitchell Street, Marrickville, Sydney, NSW, Australia
Ph: +61 2 9560 9589 Fax: +61 2 9572 6003 Email: [email protected]
Rev No: 7 pa-16.04 Copyrights© Stoanz Australia Limited
5
Sto Specification Australia
SS105 StoTherm Vario on Masterwall® Insulation Panel
7. WARRANTY
Sto 15 Year Warranty
The StoTherm Vario Insulation System described in this specification is
warranted for a period of fifteen (15) years from the date of practical completion.
This is to comply with the relevant clauses in the Australian Building Code; for this
type of building element provided maintenance requirements as set out in the
StoService documents are followed.
The warranty is supplied by the Sto Contractor on completion with a five (5) year
workmanship warranty signed off on completion of the work. The warranty
document and the material warranty is issued by Stoanz Australia Limited provided
that;
(a)
All specified work is carried out by the approved Sto Contractor who must
complete and sign the Sto Quality assurance and the PS3 Workmanship
Warranty
(b)
All work is carried out in accordance with this Specification or any written
amendments issued by the Manufacturers.
(c)
The warranty does not cover situations where the render system is subjected
to physical disturbance, chemical spillage or interference.
8. DISCLAIMER
The information contained in this specification is based on our findings, experience,
testing and certification at the revision date. End users are still responsible for
establishing the suitability of the specified products in regards to their intended use.
No liability is undertaken for use of this information outside of Stoanz Australia
Limited control or for the substrates and site conditions that are outside of Stoanz
Australia Limited’s parameters. Where a Sto registered contractor applies Stoanz
purchased products in accordance with a the specifications, TDS sheets and details
a Sto Warranty document is available but must be serviced in accordance with the
StoService documentation. Stoanz reserve the right to alter or update information
and formulations at any time without prior notice.
The StoWarranty requires the completed specification to be registered with Stoanz Australia Ltd. Email [email protected]
Stoanz Australia Ltd | Authorised Partner of Sto | 7 Mitchell Street, Marrickville, Sydney, NSW, Australia
Ph: +61 2 9560 9589 Fax: +61 2 9572 6003 Email: [email protected]
Rev No: 7 pa-16.04 Copyrights© Stoanz Australia Limited
6