Building standards Summary of standards and expectations Version 1.0 Resources Directorate Building standards Summary of standards and expectations Introduction Background Overview Enforcement procedure Description of standards and expectations Accessibility Air conditioning Best value Building methods Building Research Establishment Environmental Assessment Method (BREEAM) Carbon Trust Car parking and travel planning Cost profile strategies Demographics Design Ecological assessment Energy management Facilities management Fire Guidance and regulations Handover Health and safety Internal environment Lifts Option appraisal Planning guidance Procurement Schedule of accommodation Scoping property/acquisition Sustainability Waste management Water hygiene Whole life costing Appendices Table of acronyms Reference documents Roles of the professional advisor in Cornwall Council Technical advisors/consultees Building standards Summary of standards and expectations Version 1.0 1 1 1 2 3 3 3 3 3 5 6 6 7 7 8 9 10 11 11 11 12 12 13 14 14 14 15 15 15 16 16 17 17 19 19 20 24 26 i Introduction “Good design isn’t only concerned with how beautiful a product is; it’s about how effectively it performs. Good design makes life better for everyone who comes into contact with it. A well designed building costs less to run and maintain. A well designed building should be sustainable and that means getting it right for the next generation”, John Sorrell, 2006. Background 1. Since the early 1990’s, a more relaxed and decentralised attitude for the commissioning and undertaking of building work has resulted in the potential for clients to exploit a wide range of avenues through which outcomes can be achieved. In encouraging a flexible approach to the procurement of professional services and building contracts, together with the opportunity to create unique solutions to answer specific user group problems, it has become increasingly difficult to maintain a consistent standard of service and delivery that fulfils the aspirations of the corporate estate of Cornwall Council. These corporate aspirations and standards are managed by property services on behalf of the Council. Overview 2. Minimum building standards and expectations are set out below in alphabetical and not priority order. They shall be applied to all projects, irrespective of the funding stream or client base and it is imperative that the latest version of all documents, regulations or guidance is referred to. It should be remembered that some commissions may also have other standards applicable to them which may be laid down by funding bodies, (e.g. lottery funding or South West Regional Development Association), or specialist regulatory bodies, (e.g. adult care or hostel accommodation). These additional standards are not covered in this document and clients will instruct their consultants and service providers independently where there is the potential for parallel or additional standards to exist. 3. One or more standards will apply to all projects, whether creating new buildings, extending existing buildings, undertaking refurbishment/alterations or external works. Service providers will need to ensure that applicable standards are applied in a responsible and reasonable manner, so that the resultant output will benefit the Council’s corporate estate. The continual improvement of the estate is the core criteria of property services, ensuring that a legacy of poor or inappropriate design, specification and construction is not a future burden on energy, capital and maintenance budgets in years to come. Ultimately, this is an ever increasing penalty for the population of Cornwall, the main contributors to these budgets. Building standards Summary of standards and expectations Version 1.0 1 4. Unless there are overriding requirements, it will be assumed that the lifespan of building work, especially core education based buildings, is sixty years. In that respect, the selection of construction methods and finishes will reflect the anticipated lifespan. Similarly, the selection and installation of mechanical and electrical services will reflect the need to reduce energy demand and carbon emissions and take implications of global warming into account. The selection of an appropriate site for the project, together with an assessment of the environmental impact of that location shall be carefully considered. Location and orientation will have a significant effect on the success of a project and it is essential that clients and service providers assess the options available and the impact of preferred solutions. Enforcement procedure 5. The Council implements a landlord’s approval process which is required where any building (whether shared, owned, leased or simply occupied by the Council) is subject to development, alteration or acquisition. This process includes the required notification to external third party landlords. 6. The process has been designed and developed to ensure protection of the Council and its employees who are engaged in premises development, in their requirement to meet statutory obligations relating to health and safety, planning and building regulations and to ensure that construction works are delivered in accordance with the Council’s rules and guidance. 7. Compliance with the process is obligatory for all developments. Where contravention occurs, the corporate landlord reserves the right to charge the project sponsor (who may be the service or building occupier) the full cost of remedial work in ensuring that the new development complies with the Council’s standards. This may, in extreme cases, include returning the property to its original state. 8. In the case of school properties, disciplinary measures may include the application of a local authority direction order. Generally, all council employees are required to adhere to the landlord’s approval process and other adopted processes and failure to do so would represent a breach of the responsible officers’ contract of employment. In extreme cases and/or subject to external enforcement action, criminal or other proceedings may be taken against both the Council and/or individuals. 9. The landlord’s approval process is administered by the asset management team, who represent the interests of the corporate landlord. Guidance on meeting the requirements of the process is available from them. Building standards Summary of standards and expectations Version 1.0 2 Description of standards and expectations Accessibility 10. Full consideration will be given to all categories of disability as defined by current legislation. In addition to implementing appropriate building solutions, it will be necessary for the site access and approach arrangements to be assessed and modified, as well as considering improvement of circulation to key features of the existing or proposed facilities. The choice of building locations, where not determined by existing factors, will take full account of the infrastructure in terms of transport, community, sustainability and other factors. Air conditioning 11. The provision of air conditioning will be avoided wherever possible, due to its detrimental impact on energy efficiency and carbon emissions. The provision of a well designed layout that makes use of natural ventilation through opening windows, louvres, ducts and chimneys will be the expected solution. Should it prove impossible to provide natural ventilation, then mechanical air movement will be considered to create the required number of air changes expected by the applicable regulation or guidance. Air conditioning will be the last resort in order to provide the appropriate internal environment conditions. Should air handling or conditioning be required, the installation of heat recovery will be expected in order to ensure a more energy efficient solution is created. More detailed guidance is given in the Council’s mechanical ventilation and cooling equipment (air conditioning) policy. Best value 12. Best value will apply to all aspects of the procurement, design, construction and long term running of the project. Clients will be expected to recognise that the selection process of a preferred consultant and/or contractor to work on a project will reflect the expectations of best value. In addition to the underlying cost; qualifications, experience, recommendations, references and the ability to undertake tasks in a safe and skilled manner will form an integral part of the decision making process in selecting a team to provide the required level of service. Once the team has been recruited, clients will measure the outputs and products from that team against similar best value principles, including whole life costing. Construction techniques, material selections, services installations and finishes will all represent the need to offer a solution that creates an outcome with good life expectancy, low maintenance and minimal financial and environmental costs. Building methods 13. Modern construction methods offer a wide range of materials and methods to create a building solution. Many are suitable and work well to provide an appropriate environment and envelope for the lifespan of Building standards Summary of standards and expectations Version 1.0 3 the project and their efficacy can only be judged on a project by project basis at design review or during the landlord’s approval process. However, there are some fundamental issues which will be addressed by the client or service provider to ensure that the preferred solution offers compliance to the Council’s expectations. 14. All works will be expected to meet the requirements of the Construction (Design and Management) Regulations 2007, as well as applicable heath and safety legislation to execute the building on site. The installation of a compatible energy management system, allowing connection to core monitoring will be required. The provision of information technology systems shall comply with the existing policies of the Council. • Materials – The choice of materials for construction work will be selected with particular reference to their ease of use, frequency of maintenance, upgrading or renewal and their ability to offer future flexibility and adaptability. Production of appropriate documentation identifying and measuring the works to be undertaken are essential to ensure that the client and the service provider clearly consider and identify all materials, components and services involved in the project before the works are undertaken; typically these documents would be based on current versions of the national building specification or the standard method of measurement for building works. – All materials will be as described in the specification and under the quality standards and controls, materials and articles section in the standard forms of contract. All materials will comply with the relevant British standards where applicable and for materials not of UK manufacture, the relevant certificates of compliance will be required. Maximum use will be made of re-used, re-useable, recycled and recyclable materials or renewable materials from sustainably managed sources in order that environmental impacts are kept to a minimum, with low carbon footprint materials used where practical. Please note that the Council has a preference for the use of timber from sustainably managed sources (Forest Stewardship Council or similar). • Specifications – The consultant must include, as part of the tender documentation for all projects, the latest version of the following specifications or a similar and equal document Fabric specification – the Council’s standard (NBS) specification relates to the structure, fabric and finishing of buildings and is based on the NBS standard work and the Council’s material and workmanship standards • Electrical specification - standard technical specification for electrical services • Building standards Summary of standards and expectations Version 1.0 4 Mechanical specification - standard technical specification for mechanical services – With regard to demolition works, the consultant is to ensure that the NBS specification document adequately deals with and fully describes all aspects of the works, the sequence of works and the legislation relating to such works • • Pre approved specifications – The Council operates a term contract for highway maintenance and small works to roads, car parks and other external areas. The documentation includes specification details which meet the design standards of the Council. Works of this type can be procured direct with the term contractor under the terms and conditions of this contract, without the need to undergo an alternative tender process. • Standard method of measurement (SMM) – The rules and procedures of the latest version of SMM are to be followed in their entirety. SMM provides the basis for the provision of a minimum standard of information for bills of quantities and additional information will be included to provide clarity of purpose where necessary. The consultant is expected to adopt a pragmatic approach in the interpretation of SMM rules and procedures. – The consultant will examine the options with regards to the need for bills of quantities for each project with the employer and prepare a report setting out the recommendations. Where the need is identified, provisional sums are only to be included in bills of quantities when the works identified cannot be properly measured and described because of their unforeseen nature. An elemental version of the tendered, priced bills of quantities will be required for all projects. The items within the bills of quantities are, without exception, to be measured as groups of elements. The elemental groups and their contents are to be as defined by the Building Cost Information Service. The preliminaries bill will be arranged in SMM order and must specifically describe and encompass all heath and safety and environmental issues. Building Research Establishment Environmental Assessment Method (BREEAM) 15. BREEAM is the benchmark assessment process required by the Department for Education (DfE) on education projects and by the Council on all non education projects. For education projects, this assessment will apply to all projects in the primary sector in excess of £500,000 and in excess of £2m in the secondary sector. In addition, the assessment will be considered on projects where the phasing of work will result in a combined or aggregated value in excess of these figures. Building standards Summary of standards and expectations Version 1.0 5 16. BREEAM attempts to measure the environmental suitability of a proposal, measuring both the physical outcomes as well as the management and processing of the project and the organisation sponsoring the project. A BREEAM rating will be established for the project (pass/good/very good/excellent). The DfE require that qualifying projects meet the very good or excellent rating. The Council will expect a very good rating as a minimum on all qualifying projects, but on new projects, or those which offer the opportunity of a comprehensive replacement or renewal of a facility, (rather than extension and adaptation) an excellent rating will be assumed to be the benchmark requirement. 17. In order to complete the BREEAM rating it is essential to employ the services of a qualified assessor. Projects are assessed across a range of individual topics grouped under eight main headings. To achieve credits for individual topics in some areas is straightforward and relatively undemanding. The Council has identified key credits which will be targeted and achieved as a priority. These have been selected in order to make best use of the BREEAM rating, as these credits offer the best outcomes to reduce carbon emissions and climate change implications. Carbon Trust 18. The Council is actively pursuing the policy and practice of reducing carbon emissions throughout all elements of its operations. This undertaking has been reinforced by its membership of the Carbon Trust sponsored Local Authority Carbon Management Programme in 2006. The core aims of the initiative are to identify and implement actions, policies and procedures which reduce the carbon footprint and emissions of any of the Council’s undertakings. This broad requirement will be applied to all aspects of a building project. Car parking and travel planning 19. In order to establish the appropriate amount of car parking required for a specific site, it is essential to consult the Council’s highways development control team. The requirement for a transport assessment and travel plan will need to be established, as this will inform the designers about actual on and off site requirements that a proposal will generate. Reference should be made to the Council publication ‘Travel plans – advice for developers in Cornwall’, as this contains information about thresholds for transport assessments/travel plans as well as maximum parking guidelines. 20. Transport assessments will include an accessibility assessment/non motorised user audit as well as access and approach roads analyses; should a proposal increase the numbers of staff, pupils, visitors or residents on a site, clients should not assume that a simple increase in parking spaces will be acceptable as the actual parking requirements (including secure and covered cycle and motor cycle parking) will result from satisfactory travel assessment/travel plan submissions. Building standards Summary of standards and expectations Version 1.0 6 21. Safe pedestrian routes to and from the property, together with carefully designed parking and drop off areas are essential to ensure the safety of building users. Where possible, a design will attempt to make best use of the existing car park areas. In some cases, facilities such as hard play areas should be positioned to act as overflow parking for special events. Cost profile strategies 22. Consultants and project managers need to have ownership of schemes and it is important that the proposals at the commit to invest stage (the point at which the client decides in principle to invest in a project) have clear remits with regards to status, budgets, time scales and sustainability investments which will be measured by the use of specific performance indicators. 23. Consultants must understand fully the client’s brief and aspirations and the extent and composition of the capital and revenue budget allocations for individual schemes. They must recommend a contract procurement strategy which will be the most beneficial as far as the Council is concerned, identify and manage the risk of items which have cost uncertainty, advise on the whole life cost benefits of alternative sustainable and energy efficient solutions, identify and cost sustainability works within existing buildings which can be offset against consequential improvement requirements, manage anticipated capital and revenue expenditure to ensure that predicted cost goals are achieved and ensure that final capital expenditure is within +/- 5% of the commit to invest stage budget. 24. Consultants must prepare documents to use as cost information and cost management tools. These documents will include the following: procurement strategy justification reports, stage approval estimates and cost plans, critical analyses reports of design proposals, analyses of alternative design solutions, risk logs, analyses of sustainable construction options, statements of commit to invest remits, cash flow forecasts and option appraisal reports where appropriate. Demographics 25. The need for a development at any site must be underpinned by a good understanding of the demand. The Council tries to ensure, funding permitted, that the provision of facilities at any one site is in direct response to the current and projected need of that community. This need is established by studying the current and future trends of population growth in the county and in specific areas. 26. For education projects, the children, schools and families’ capital team will be able to assist in establishing the profile of growth within any specific catchment area. 27. The Council’s strategy is to reduce excessive numbers of surplus places and address basic need where demand exceeds current school capacity. Building standards Summary of standards and expectations Version 1.0 7 The Council’s policy is to convert surplus permanent accommodation in schools, where it is needed, to meet new curriculum demands and to provide facilities for staff, resources, SEN and accommodation for extended services. 28. All projects shall be considered by the asset management team within the context of the overall development needs of the property. Project sponsors shall ensure that designers and other consultants are aware of all future development needs and that any proposal is delivered to compliment a fully considered improvement plan for the premises. Design 29. The quality of the design of the built environment is seen as a key driver in establishing high standards of output from building users (staff, pupils, visitors and members of the community), as well as higher staff morale, reduced absenteeism, better health and wellbeing and a greater sense of belonging. Careful development of a briefing document is an essential pre requisite to a successful design solution. The Government has identified good design as an essential element of public spending, and in ‘Better public building’ they outline the essentials for developing appropriate responses to the need for new or expanded public facilities. In many cases the public building in a community (library, school etc) will be a focus for that community and offer the only facility where collective activities can take place. This aspect will be promoted within the design aspirations. 30. In the education sector, the DfE have published a range of guidance documents and design exemplars under the heading schools for the future. These documents are fully supported by property services and are seen as aspirational documents available to inform all clients and designers of the expectations of modern educational facilities. Key principles can be found in a wide range of documents and design guides, however the fundamental issues can be summarised into the following key areas: Flexibility and adaptability of the design, construction and services installation will be essential to ensure that change of service delivery can be accommodated with simple and minimal future alteration Minimisation of future maintenance costs by the use of quality materials is expected, together with a clear understanding of the environmental implications of those material choices Minimisation of the impact of any development is crucial - the site options must be carefully considered, as the obvious and cheapest may not be the best in the longer term The proposals must adopt best practice for long term sustainability and offer a significant improvement in terms of energy demand and usage Building standards Summary of standards and expectations Version 1.0 8 Energy sourcing will also be a key area of concern, as a clear move towards the provision of renewable energy sources will be expected Adequate security and lighting measures which generate minimum disturbance to the environment are expected • Design brief – The design brief is an essential element of the project and is a key document prepared by the client to inform the designers of the essential elements and outputs of the project. A design brief will be a flexible document that can be reviewed, enhanced and modified (with the assistance of the design team) as the project progresses. However all projects will not progress without this key document in place. – The brief will embody the aspirations of the client. These will reflect corporate needs and the needs of the senior management of the facility, as well as reflecting the needs and aspirations of the users of the building (where necessary, it will also reflect the needs of the community associated with the project) and full consideration will be given to all users of the building at all times of day. Funding streams will be highlighted, together with the relationship of timescales. Any information gleaned from previous work on the site, together with site details, surveys, existing building data, health and safety files and previous planning concerns or conditions shall be included. The brief shall also look to establish a schedule of accommodation and essential timescales for the project shall be highlighted, so that appropriate procurement strategies and construction techniques can be employed to respond to the delivery timetable. Ecological assessment 31. Early pre-application discussions with environment and heritage officers are essential as they will inform feasibility work and guide the need for specific surveys. Ecological assessments will take place at the start of a project and include a desk study, initial assessment and specialist surveys as appropriate, covering all areas of the site potentially affected by the project, including access, service routes, contractors’ compounds, storage areas etc. A post project ecological assessment will take place after the first growing season. 32. All site features (e.g. semi natural habitats, hedges, trees, invasive species and wet areas as well as nesting, roosting and feeding areas for legally protected species) must be assessed and the hierarchy of planning policy statement nine followed; avoid damage, mitigate for damage, compensate for unavoidable damage and always seek enhancement. Best practice advice can be found within the Institute of Ecology and Environmental Management guidelines and the Council’s biodiversity planning guidance. Full consideration should be given to the health, safety and long term maintenance of any landscaping works. Building standards Summary of standards and expectations Version 1.0 9 • Coastal and marine issues – Schemes that may impact upon the marine and coastal environment will seek specialist advice from the marine officer • Drainage – Drainage will be assessed to ensure that the project does not conflict with flood risk areas and an assessment of the potential for encountering contaminated land will be undertaken. Consideration of drainage management, i.e. grey water recycling, SUDS, minimising additional hard area, petrol interceptors etc, will form part of the drainage assessment • Landscape issues – The landscape impact assessment will be informed by the county landscape character assessment, historic landscape characterisation and a visual impact assessment – The landscaping scheme will be informed by the landscape, tree and ecological assessments to provide mitigation and enhancement • Trees – Where there are trees on or surrounding the site, a tree assessment to BS 5837 must be undertaken to inform the design - existing trees (including those under tree protection orders), whether singly or in groups, shall be retained and protected, or replaced as mitigation for damage or loss Energy management 33. The building regulations in force at the time of the work will be considered to be the minimum acceptable standard for building energy performance. A local south west consultation looking at improving building performances, has made policy recommendations that will, in the near future, become the compliant policy. 34. All heating and hot water services will be controlled through an on site building management system, which will allow remote monitoring of all its functions by the Council. Only one manufacturer of the building management system will be permitted for the whole site. 35. Electrical equipment and circuits will be time controlled and artificial lighting levels related to the available natural light. 36. The energy and water services to new build (including extensions) and refurbished buildings will be adequately metered to allow the building and any contained processes to be independently monitored and evaluated. 37. To ensure a proper strategic approach and the correct technical advice; any energy management installations must be referred to the energy manager. Building standards Summary of standards and expectations Version 1.0 10 Facilities management 38. To ensure that the occupier of the building gets the most out of the accommodation, the whole operation of the facility will be carefully considered. To help to achieve this, facilities management must be involved at the early planning stages. They will then liaise with suppliers, provide the necessary advice and suggest enhancements that, if incorporated into the project at the appropriate time, will build in significant benefits at minimal cost to the project, for example; finishings (and how they affect the operation of the cleaning service), fire, CCTV, security and access control systems, maintenance of the travel plan, how the parking is managed and even the layout of the furniture as this will allow the circulation space and the heating and ventilation systems to work as designed). Early, careful consideration will build in flexibility and durability and hopefully reduce the associated revenue costs in the longer term. Fire 39. All public buildings shall respond to the exacting requirements of the Regulatory Reform (Fire Safety) Order 2005 and building regulations. The current trend is to move towards developing risk assessments to inform the design and longer term use of the building. The design will respond to the needs for fire compartmentation, separation, fire fighting appliances, escape routes and signage. Where necessary, emergency lighting shall be installed. A fire alarm will need to be installed, modified and/or suitably extended, with additional sounders provided to ensure audibility. The location of high risk elements of the design, such as boiler rooms, workshops, heat emitters etc, shall be carefully considered and sited so as to minimise the risk to the building users. In some cases it may be necessary to consider sprinkler systems to ensure that the building meets with the requirements of the insurance policies of the Council. In addition, the provision of on site water storage for fire fighting purposes may be needed where the local water supply has poor pressure. Guidance and regulations 40. This document will be considered as the building standard which is underpinned by a variety of documents and references which fall into the categories of national legislation, national guidance, codes of practice, British standards and statements of best practice. Council officers and consultants will use these underpinning documents as their base design data unless there is an overriding council document (which will rarely be the case). Decisions to work outside approved guidance will be the exception and will be recorded as part of deliberate design or policy decisions. Appendix b lists only the key documents to be used as resource materials for each particular design area, the list is not exhaustive and gives only guide direction to the key areas. Building standards Summary of standards and expectations Version 1.0 11 Handover 41. The completion of the building works requires final certification (a signed certificate of acceptance for practical completion) from a competent person. This shall include the construction elements, including all the fittings included in the contract, as well as the services provided to the project. Completion and testing certificates will be required and these need to be available before the building is occupied. Testing certificates can only be issued by a competent person, usually someone with appropriate responsibility from the sub-contractor. Specific systems, such as boilers, specialist electrical installations, lifts and IT/communications systems etc will require the installer to provide on site training and advice to inform the building user of correct operational procedures prior to handover. 42. Prior to handover all rubbish will be removed from site, protective casings will be in place where required and the occupied areas will be cleaned by the contractor. The contractor will ensure the master keys to fitted locks are registered with the lock supplier in the name of the end user as nominated by the contract administrator and that this information has been recorded in the health and safety file. 43. The completed health and safety file will be left with the building occupier for future reference at the handover, along with copies of as installed drawings, plant operating instructions, guarantees required by the mechanical and electrical specification and any other documents reasonably required by the CDM co-ordinator and listed in the health and safety file. The employers commissioning period will be as the standard forms of contract. 44. Soft landscaping areas will be handed over after successful establishment; in good order with all weeds, stakes and ties removed (formal acceptance by a competent person will be required). As it can take up to three years to achieve satisfactory establishment, (depending upon the size and type of plants used), contracts will include the appropriate maintenance period. Those responsible for on going maintenance will be involved in this process and agree the timetable. Health and safety 45. The Council is committed to maintaining high standards for the provisions made for the health, safety and welfare of its employees, visitors and members of the public who may be affected by its undertakings. Clients and consultants are duty bound to ensure that appropriate steps are taken to remove or reduce the risk to the health and safety of all users of the buildings they manage or develop. Breaches of health and safety are regarded as a criminal offence, with individuals as well as corporate bodies liable for prosecution. Clients shall ensure that their appointed consultant has suitable experience and training to develop proposals which address the implications of health and safety to the property. Building standards Summary of standards and expectations Version 1.0 12 46. The Council expects all consultants and contractors to abide by the following: • Embrace the duties placed on them under health and safety legislation for all work carried out on behalf of the Council • Keep up to date with all new health and safety legislation affecting both its own employees and those undertakings accepted on behalf of the Council - where council policies place a higher duty than recognised standards, then these shall be adopted from the outset • Any designer employed by them will fully embrace the Construction (Design and Management) Regulations 2007 • The designer shall also take into consideration any impacts the project might make on the environment • Any contractor or sub contractor used shall be vetted for health and safety compliance and ideally be a member of the Contractors Health and Safety Assessment Scheme • Keep the Council informed of any change of circumstances such as issues of improvement/prohibition notices or prosecutions made against them by the Health and Safety Executive • Report any RIDDOR reportable incidents or dangerous occurrences which occur on the build project to the Council, including those incidents involving contractors and subcontractors • The Council reserves the right to request its safety officers to inspect construction projects during the construction phase and on completion and to keep inspection records on file - copies of safety inspections will be left on site for inclusion in the project safety file and copies of F10 notifications will be forwarded to the Council’s health, safety and wellbeing team • Understand that frequent or gross failures made under health and safety legislation whilst managing undertakings accepted on behalf of the Council may result in suspension or elimination from the Council’s pre-accredited contractor list Internal environment 47. An element of building design that is crucial to its success and sustainability is the quality of the internal environment: • Acoustics - part e of the building regulations will be met by following building bulletin 93’s performance standards for indoor ambient noise levels, sound insulation and reverberation • Lighting - lighting will be designed following the guidance in building bulletin 90 and the CIBSE code for lighting whilst minimising energy consumption (for schools, less than 10 W/m2 in classrooms) Building standards Summary of standards and expectations Version 1.0 13 • Daylight - maximum use will be made of daylight, whilst avoiding glare and excessive solar gains; an average daylight factor of 2% is a reasonable minimum • View out – an external view should be available from workspaces - this could be achieved by ensuring that all desks are within seven metres of a window with a view of the sky and landscape or other buildings • Ventilation – part F and criterion three of part l of the building regulations will be met by achieving building bulletin 101’s performance standards for fresh air supply and overheating • Ceiling heights – the height of a space can have a profound impact on occupants’ feelings of comfort - for schools, ceilings will be no lower than 2.4m in primary school classrooms and 2.7m in secondary school classrooms Lifts 48. The provision of passenger lifts, stair lifts and platform lifts will meet the requirements of the existing policies of the Council. Lifts and lifting equipment are covered by legislation with specific requirements for design, construction, installation and maintenance. The mechanical and electrical section is to be informed of any proposed lift installation and will advise on the protocol for design specification and installation. Option appraisal 49. Formal and documented option appraisal is required for all schemes costing over £500,000 and is to be carried out on a whole life costing basis as stipulated in the corporate asset management plan and capital strategy 2004. Option appraisal is carried out informally as part of all design processes and where significant issues are addressed or departure from this standard is adopted the considered options will be documented in an auditable manner. Planning guidance 50. New builds or refurbishments can have a significant role to play in the wider community and the economy. It is therefore important to consult widely on plans and to look at opportunities for integrating development with other plans and policies, the planning team can help develop this approach. 51. Housing schemes can generate planning gain which can be used to support education and other public facilities and services (such as green space and transportation). It is important that this is done in a planned way to ensure a holistic approach to the development of communities. 52. Full commitment will be given to any listed building or landscaping on sites. • Playing fields and outdoor play spaces Building standards Summary of standards and expectations Version 1.0 14 – For educational development, it is essential for early assessment of the impact of potential proposals on playing fields and play spaces to be considered and evaluated. The DCSF has significant guidance available on the requirements for the provision of outdoor playing facilities for both formal and informal uses. There are statutory requirements for these facilities based on the numbers of pupils and their ages. Schemes will not proceed unless there is indisputable evidence that the proposal meets the minimum requirements expected by DCSF, as well as offering a practical layout for curriculum delivery. The client or consultant will also demonstrate that any future needs will not be inhibited by undertaking the proposal. Procurement 53. The Council’s contract procedure rules, constitution and the landlord’s approval process set out statutory and corporate requirements that will be complied with in regards to the selection of contractors, the obtaining of quotes and tenders, the submission, opening and evaluation of tenders, the awarding of contracts and the selection of consultants. Schedule of accommodation 54. The brief shall look to establish a schedule of accommodation which helps to identify the minimum requirements of rooms within the anticipated development. The schedule will indicate the ideal floor area of a particular space and how many are required. It will also identify the target net and gross areas of the property following development. The schedule will encompass all spaces, including the provision of office space, specialist rooms, staff areas, storage, toilets, disabled facilities, reception/waiting areas, plant rooms and circulation. In addition, the schedule will also identify the room adjacencies needed to ensure the appropriate relationships of spaces within the whole development. Finally the schedule will attempt to set a target gross internal floor area which early budget costing and future designs or estimates can be compared against. 55. In school accommodation, reference to room data sheets produced by property services will be needed which respond to the space requirements anticipated by DfE through its guidance embodied in building bulletins 98 and 99. An assessment of the existing accommodation will be made to ensure that, when combined with any projected additional accommodation, the total floor area does not exceed the thresholds advised by the DfE. Scoping property/acquisition 56. Investment in property carries a long term implication, the responsibility for which forms a substantial resource requirement and implication for the future. Implications are individual property Building standards Summary of standards and expectations Version 1.0 15 dependant but will be considered as part of the asset management process. The project manager will take due consideration of all the statutory issues that affect the holding of property by the Council. Key issues currently cover sustainability, energy management, accessibility, legionella and water hygiene, noxious and dangerous substances, maintenance liabilities and procedures and third party liabilities. Whilst many of these issues are covered elsewhere in this standard the final handover process will check that the aspects and documentations required under the Council’s disposals and acquisitions policy are considered. Sustainability 57. Building projects shall demonstrate and adopt an integrated approach to the design, planning and specification of materials and systems and to building location and orientation. Embodied within this approach will be the need to demonstrate the use of techniques that develop energy and resource efficient buildings, bringing significant environmental improvements to the building user and to the local and national energy consumption. Preference must be given to those materials from sustainable and renewable sources, or materials that offer low embodied energy during their production and distribution. This may well mean that materials are sourced locally from certified supply chains, or use local employment to create the material or product. The use of micro generation of energy must be evaluated in order to offset the projects energy demand profile. 58. Sustainability of the project over its lifetime must also be considered. The client base use of the scheme, long term affordability and maintenance profile, potential income generation and the benefits to the community over a longer period must be consider as essential elements of establishing the sustainable profile of the project. Waste management 59. Reduction of waste in the process of constructing and managing buildings will be a key target. Designers will consider the use of materials that embody an inherently low wastage and high flexibility and constrain designs to ensure that wasteful processes in construction are minimised. 60. The design and planning of projects will encourage the use of recycled materials, whilst providing the potential for re-use of materials in the future. Off site production will be considered where practical. 61. Specification of materials will follow good practice with reference to sustainability and carbon use, i.e. selecting materials with reduced carbon footprint, which have a low impact on the environment and are from renewable resources. Building standards Summary of standards and expectations Version 1.0 16 62. Site management will take full consideration of the environmental impacts of operational methods, e.g. dust control, waste containment, site water management etc. 63. Contractors will follow good material management and handling to ensure that damage and over ordering are reduced to minimum levels on site. They will be required to satisfy checks on their disposal, recycling and environmental management policies as part of the Council’s vetting procedure. Water hygiene 64. The Council recognises the danger of legionnaire’s disease arising from water systems within its buildings and takes the necessary inspection and monitoring steps to ensure water systems are controlled, including taking remedial action on systems where necessary. The Health and Safety Executive have produced an approved code of practice and guidance which the Council has adopted as a defining document. All new system designs shall be installed in accordance with the requirements of this code. Whole life costing 65. The consultant will provide advice and consult with others to prepare reports for the following: • Alternative construction strategies and options and their affordability • Cost comparisons with similar projects by others • Risk of the buildings not achieving anticipated user satisfaction, occupancy rates and financial viability goals • Use of sustainable materials and locally sourced or recycled products • Maximising use of building space and facilities • Possible income from lettings • Comfort level of building users and the buildings ability to satisfy intellectual needs • Addressing the social aspirations of the user groups • Possible joint venture development options • Future site development • Existing infrastructure • Environmental and habitat issues • Measures to protect buildings and building users • Future vertical or horizontal extensions to the buildings Building standards Summary of standards and expectations Version 1.0 17 • Flexibility of design with regard to anticipated future accommodation needs • Flexibility of design with regard to anticipated future energy needs • Options for changing the use of the buildings • Life expectancy of buildings structure and envelope • Issues associated with the future replacement of the building envelope • Issues associated with all future hard and soft facilities management costs including particular reference to the design and quality of mechanical and electrical installations • Issues regarding the future demolition of the buildings • Issues relating to changing climate and weather conditions • Issues relating to site location and future commercial and personal transportation needs Building standards Summary of standards and expectations Version 1.0 18 Appendix A Table of acronyms The following table gives definitions of the acronyms mentioned within the document: Table of acronyms Acronym Full title BREEAM Building Research Establishment Environmental Assessment Method BS British standard CDM Construction (Design and Management) Regulations 2007 DfE Department for Education NBS National building specification RIDDOR Reporting of injuries, diseases and dangerous occurrences SMM Standard method of measurement Building standards Summary of standards and expectations Version 1.0 19 Appendix B Reference documents This list summarises relevant reference documents in alphabetical order; it is not exhaustive and is appended as a guide only. A Sporting Future for the Playing Fields of England (Sport England) – http://www.sportengland.org/facilities__planning/putting_policy_into_pr actice/determining_applications.aspx Accessible Sports Facilities (Sport England) – http://www.sportengland.org/facilities__planning/design_guidance_note s.aspx Better Public Building (HM Government) http://webarchive.nationalarchives.gov.uk/20110118095356/http:/www .cabe.org.uk/publications/better-public-building British Standards – http://www.bsi-global.com Building Bulletins (DfE) – http://www.education.gov.uk/search/results?q=building+bulletin Building Regulations – http://www.planningportal.gov.uk/buildingregulations/approveddocume nts/ Building Research Establishment Environmental Assessment Method – http://www.breeam.org/ Car Park and Landscape Design (Sport England) – http://www.sportengland.org/search.aspx?query=car+parking City Academies (DCSF) – (superseded, archive DCSF site) http://webarchive.nationalarchives.gov.uk/20100612050234/education. gov.uk/ City Learning Centres Design Guide (DfE) – http://products.ihs.com/cis/Doc.aspx?AuthCode=&DocNum=255094 Code for Lighting (CIBSE) – http://www.cibse.org/index.cfm?go=publications.view&item=183 Common Arrangement of Work Sections for Building Works (Second Edition) 1998 http://www.cibse.org/index.cfm?go=publications.view&item=123 Building standards Summary of standards and expectations Version 1.0 20 Construction (Design and Management) Regulations 2007 – http://www.hse.gov.uk/construction/cdm.htm Cornwall Council (publications available on request) http://www.cornwall.gov.uk/ A Design Statement for Cornwall – http://www.cornwall.gov.uk/default.aspx?page=15742 Biodiversity Planning Guidance - http://www.cornwall.gov.uk/default.aspx?page=12898 Capital Strategy 2011 - http://www.cornwall.gov.uk/default.aspx?page=17743 Constitution of the Council – http://www.cornwall.gov.uk/default.aspx?page=1747 Contract Procedure Rules – http://www.cornwall.gov.uk/idoc.ashx?docid=23d1f033-c27e-471ebb28-6b39f221b8b7&version=-1 Corporate Asset Management Plans – http://www.cornwall.gov.uk/default.aspx?page=9885 Acquisitions and Disposals Policy http://www.cornwall.gov.uk/default.aspx?page=28127 Landlord’s Approval’ Process (available on request) Lifts and Lifting Equipment Policy and Best Practice Note http://www.cornwall.gov.uk/default.aspx?page=28127 Material and Workmanship Standards – (available on request) Mechanical Ventilation and Cooling Equipment (Air Conditioning) Policy http://www.cornwall.gov.uk/default.aspx?page=28127 Room Data Sheets – http://www.cornwall.gov.uk/default.aspx?page=28127 Standard National Building Specification – http://www.cornwall.gov.uk/default.aspx?page=21667 Standard Technical Specification for Electrical Services – http://www.cornwall.gov.uk/default.aspx?page=21667 Standard Technical Specification for Mechanical Services – http://www.cornwall.gov.uk/default.aspx?page=21667 Building standards Summary of standards and expectations Version 1.0 21 Travel Plans: Advice for Developers in Cornwall http://www.cornwall.gov.uk/default.aspx?page=14893 Designing Schools for Extended Services Extended Schools Guidance: Community Use (DfE) http://www.partnershipsforschools.org.uk/documents/library/BSFarchive/ExtendedServices.pdf Designing Space for Sports and Arts (DfE) – http://products.ihs.com/cis/Doc.aspx?AuthCode=&DocNum=255085 Disability Discrimination Act 1995 – http://www.opsi.gov.uk/acts/acts1995/ukpga_19950050_en_1 Disability Discrimination Act 2005 http://www.opsi.gov.uk/acts/acts2005/ukpga_20050013_en_1 Educational Facilities – Design for Community Use (Sport England) – http://www.thenbs.com/PublicationIndex/DocumentSummary.aspx?Pub ID=503&DocID=248642 Exemplar Designs: Concepts and Ideas (DfE) – http://www.partnershipsforschools.org.uk/documents/library/BSFarchive/compendium.pdf Floors for Indoor Sports (Sport England) http://www.sportengland.org/facilities__planning/idoc.ashx?docid=2d9f 4431-562d-4efd-af4d-6f052c9c305b&version=2 Handbook of Sustainable Building – An Environmental Preference Method for Selection of Materials for use in Construction and Refurbishment (Anink, Booonstra and Mak) http://www.cplbookshop.com/contents/C1282.htm Health and Safety at Work Regulations (various) – http://www.hse.gov.uk/ Institute of Ecology and Environmental Management (IEEM) Guidelines http://www.ieem.org.uk/ National Building Specification – http://www.thenbs.com/products/nbsBuilding/index.asp National Building Specification Standard Work – http://www.thenbs.com/products/nbsBuilding/index.asp Natural Turf for Sport (Sport England) – http://www.sportengland.org/facilities__planning/design_and_cost_guid ance/natural_turf.aspx Building standards Summary of standards and expectations Version 1.0 22 Planning Policy Statement 9 – Biodiversity and Geological Conservation http://www.communities.gov.uk/publications/planningandbuilding/pps9 Schools for the Future: Designing School Grounds (DfE) – http://www.partnershipsforschools.org.uk/library/BSF-archive/designguidance/BSF-DfE-publications.html Sports Halls: Design (Sport England) – http://www.sportengland.org/facilities__planning/design_and_cost_guid ance/sports_halls.aspx Sports Halls: Sizes and Layouts (Sport England) – http://www.sportengland.org/facilities__planning/design_and_cost_guid ance/sports_halls.aspx Standard Method of Measurement for Building Works – http://www.ricsbooks.com/productInfo.asp?product_id=4202 Supporting and Delivering Zero Carbon Development in the South West (final policy report by Faber Maunsell and Peter Capener, prepared for South West Regional Assembly, SWERDA and GOSW, January 2007) – http://www.southwestra.gov.uk/media/SWRA/RSS%20Documents/Technical%20Documents/T echnical%20Work/final_technical_report_v23.PDF The Control of Legionella Bacteria in Water Systems - Approved Code of Practice and Guidance (Health and Safety Executive) – http://www.hse.gov.uk/legionnaires/index.htm The Education (School Premises) Regulations 1999 – http://www.legislation.gov.uk/uksi/1999/2/contents/made The Green Guide to Specification (BRE) – http://www.brebookshop.com/details.jsp?id=321573 The Regulatory Reform (Fire Safety) Order 2005 – http://www.legislation.gov.uk/uksi/2005/1541/contents/made The School Premises Regulations - DfE Circular – http://www.education.gov.uk/schools/adminandfinance/schoolscapital/a 0058285/school-building-legislation Transforming Schools: An Inspirational Guide to Remodelling Secondary Schools (DfE) – http://www.partnershipsforschools.org.uk/library/BSF-archive/designguidance/BSF-DfE-publications.html Building standards Summary of standards and expectations Version 1.0 23 Appendix C Roles of the professional advisor in Cornwall Council Any scheme will require a professional advisor to lead on the project as a first point of contact for the client service. In practice this leadership may change as the project evolves but they will all share one key set of attributes, they will be experienced in the construction process and be able to advise on how to proceed with the particular project required. Each of the following roles has a different set of skills, some of which will be very broad (like those of a project manager) and some very specialised (like an acoustic engineer). The main roles are considered below: Architect - the lead designer on any substantial or complex new build or refurbishment project where a full design team is engaged to deliver their specialist areas of design, cost management or specialist advice. The architect leads and co-ordinates the activities of that design team. In some instances the architect may lead the project as the first point of contact with the client co-ordinating all aspects of the project. In other instances a project manager may be appointed allowing the architect to focus on their role as lead designer. Asset manager - works with clients to ensure that they are professionally guided, briefs are fully considered, the options generated encompass the widest development perspectives, clients are fully engaged and top quality developments are commissioned to provide maximum versatility and value for money, creating an excellent product and contributing to the enhancement of the overall property portfolio of the Council. Building surveyor - able to design and procure most repair work and modest new build/refurbishments. The smaller, less complex nature of the work allows them to work independently, bringing in other designers or specialists to complete specifics aspects of design or specification. They will also advise on a wide range of property maintenance issues including building condition surveys. CDM co-ordinator - formerly known as the planning supervisor, this role is engaged by the client to ensure that the requirements of the Construction (Design and Management) Regulations 2007 are complied with by all parties. Project manager - employed to lead on the procurement of the design and building work and advise client services on other agents to be appointed. The depth of their involvement will vary on the method of procurement and the experience of the client service but always with the key objectives of delivering projects on time, within budget and to the required standards. Quantity surveyor - advises on and manages the building construction cost (including whole life cost), the procurement method and choice of contract (may also take a lead role as project manager). Building standards Summary of standards and expectations Version 1.0 24 Services engineer - provides specialist advice on the modelling, design and procurement of the electrical, heating, ventilation and communications services around sites of buildings. They may take the lead role where existing systems are to be replaced. Structural engineer - provides advice on the design and procurement of the structural elements to buildings or other structures to lead designers. They may also advise on structural issues on existing buildings and structures. Acoustic engineer – they are increasingly important in the design of school buildings as they help to create the right acoustic environment for teaching and learning, guiding other designers on their design input to the scheme. Asbestos surveyors - asbestos surveys are required for all buildings where alterations are required. Energy manager – employed by the Council to maintain a strategic overview of the Council’s energy management strategy and ensure a consistent approach to the design of energy management systems and controls in buildings. Land surveyor - provides accurate surveys of the topography and existing features, buildings or infrastructure for a site as an essential component of commissioning a new project. Landscape architect - designs the external landscape around buildings, described as soft (planting etc) and hard (courtyards, paving etc). Tree (arboriculture) specialist - provides specialist knowledge on tree assessment, protection and safety. They can advise on tree planting and management as well as risks to buildings and occupants from trees. Ecologist - provides detailed advice about nature and conservation issues including legally protected species and habitats, surveys and site assessments. They can advise on ecological enhancement of sites as well as protection. Building control officer - employed by the Council to ensure all construction work meets with building regulation requirements. Clerk of works - responsible for ensuring the project is undertaken in accordance with the drawings and specifications. Employed by the client to check the quality of work through the project leader. Health and safety advisor - able to advise in detail on a wide range of building related health and safety compliance or risk assessments. Planning officer - employed by the Council to advise on the application of town and country planning matters including works on listed buildings and manage the planning application process. Planning officers take a more strategic view of land use across the county and are outside of the scope of these standards. Building standards Summary of standards and expectations Version 1.0 25 Appendix D Technical advisers Anthony Weight - Sustainable Development Officer Colin Edwards - Service Asset Manager Colin Hawke - Natural Environment Officer (Advice) David Bunney - Facilities Services Manager Denis Mattos - Principal Building Services Engineer Ken Allen - Deputy Head of Capital Strategy Mike Lawton - Principal Health & Safety Officer Mike Shilston - Energy Manager Mike White – Policy Project Officer Peter Kniveton - Team Leader (Building Surveys) Peter Woodford – Group Architect Tony Bane – Group Quantity Surveyor Consultees Arthur Hooper - Operations Director (CORMAC) Bob Perry - Chief Valuer and Estate Manager Bryan Skinner - Corporate Property Asset Manager Chris Ramsey - Assistant Chief Executive (Communications and Libraries) Dave Richards - Senior Assistant Director (Performance and Service) David Hayhoe - Assistant Director (Property) Jonny Alford - Chief Land Agent Mark Jones - Deputy Director (PT&E) Mark Stephenson - Assistant Director (Highway Management) Michael Bennett - Corporate Property Standards Manager Mike Hawkey - Head of Environment & Heritage Nick Cox - Asset Manager Patrick Keeble - Service Asset Manager Richard Williams - Head of Family Services Robin Stephenson - General Manager (Adult Social Care) Steve Colwill - Assistant Director (Individual Needs) Teresa Frost - Business Improvement Manager (Maintenance Consultancy) Tim Foster - Office Manager (Maintenance Consultancy) Trevor Cooper - Assistant Director (Access Information & Infrastructure) Prepared by: Chris Jackson Policy and Training Manager Property Services 31 July 2017 Building standards Summary of standards and expectations Version 1.0 26 If you would like this information in another format please contact: Cornwall Council County Hall Treyew Road Truro TR1 3AY Telephone: 0300 1234 100 Email: [email protected] www.cornwall.gov.uk Building standards Summary of standards and expectations Version 1.0 27
© Copyright 2026 Paperzz