Oxygen System - Global Nitrogen Services

Hydrotesting & Pigging Requirements - Customer Inquiry Form
Date:
Company:
Name:
Address:
Tel:
Mobile:
Fax:
Email:
Mobilization / Demobilization
Mobilization Date:
Demobilization Date:
Mobilization Location:
Project POC:
POC Phone Number:
Pipeline Details
Type of Pipeline (NGL, Oil, etc.):
Pipeline location (Land or Offshore):
Pipeline Length:
Pipeline OD & Wall Thickness:
ANSI/ASME:
Pipeline Min/Max Elevation Changes:
Maximum Water Depth:
Riser Water Depth:
Pipeline MAOP:
Please send completed form to Ryan W. Smith or to Anthony Hall
Email: [email protected]
Email: [email protected]
Fax: 713-937-5236
Scope of Work (Check One)
Pre- Cleaning:
Yes
No
Filling:
Provide Pig Speed:
Inhibitor, O2 Scavenger, Biocide:
Provide Type and PPM:
Hydrostatic Testing:
Minimum Test Pressure:
Maximum Test Pressure:
Dewatering:
Drying:
Provide Dew Point:
Cleaning:
Provide Penetration:
Caliper Inspection:
Provide Pig Speed:
MFL Inspection:
Provide Pig Speed:
Nitrogen Packing:
Provide Pack Pressure:
Launcher/Receiver Provided:
Other Information:
Please send completed form to Ryan W. Smith or to Anthony Hall
Email: [email protected]
Email: [email protected]
Fax: 713-937-5236