[email protected] www.bennett.ie (053) 9388651 Ballinakill Ballycarney Enniscorthy Co. Wexford Madeira Oaks Affordable Passive Housing Project Cost Analysis (a case study) Seamus Mullins Quantity Surveyor Michael Bennett Group Case Study – Cost Definition • Establish the additional construction cost of building a Certified Passive House of similar design to an already constructed BER A3 rated House on our site at Madeira Oaks, Enniscorthy, Co. Wexford. • Establish affordability for the house purchaser. 3 Case Study – Cost Definition • No building elements other than those containing a passive aspect have been examined. • No overheads or profit margin have been included in the analysis. • VAT has not been added on to the final figure. • All costs figures quoted are at current values. 4 Case Study -Exclusions • Land Cost • Site Preliminaries (site overheads) • Finishes and Fitments • Personal Choice Items 5 Building Description Comparison • • • • • Both houses are traditional semi-detached design Both are typical 3 bedroom two storey houses The thermal envelope of both is timber frame The floor area is 102m2 (1,100sq.ft. approx.) Triple glazed windows are proposed for the new Passive House, and were also installed in the as build A3 house. However, the Passive House windows are Certified Passive. 6 Building Description Comparison • Space heat demand, and heat load values are much lower in the Passive House. • Structural air tightness of less than 0.60 hˉ ¹ will be achieved in the Passive House. An air leakage of 1.66 hˉ ¹ was achieved in the A3 house. • U-values ; A3 Ground Floor - 0.16W/m2K (Passive -0.09W/m2K) A3 External Walls - 0.23W/m2K (Passive – 0.17W/m2K) A3 Roof Space – 0.14W/m2 K (Passive – 0.08W/m2K) 7 Existing A3 House 8 9 10 11 Case Study Cost Analysis Building Cost Affordability 12 1. Substructure • Additional insulation detailing at the junction of the external wall and the floor slab. • Increased insulation thickness under the general area of the floor slab. Extra Over Cost €315.00 €787.00 13 2. External Wall • Wider and heavier wall structure. • Greater insulation thickness. • Improved cold bridging. • Increased measures to deal with interstitial condensation, air tightness, and wind tightness. Extra Over Cost €2,150.00 14 3. Roof Structure • Structural design changes. • Greater insulation thickness. • Increased measures to deal with interstitial condensation, air tightness, and wind tightness. Extra Over Cost €680.00 15 4. Windows and External Doors Extra Over Cost • Supply and installation. €304.00 16 5. Space Heating System, and Renewable Technologies • Omit the following ; a) Oil fired heating system (boiler and radiators). b) Solar Panel Installation c) MHRV d) Wood burning Stove. e) Chimney Stack 17 5. Space Heating System, and Renewable Technologies Extra Over Cost • Add back the following ; a) Nilan Unit b) Photovoltaic Panels €1,035.00 cr. Note; Secondary Heating is provided – 1.35Kwatts(max.) 18 6. Passive House Certification Extra Over Cost • Irish Passive House Academy Certification Fee. • Technical support on site in supervising the works. €540.00 19 7. Door Blower Test • Passive House door blower test requires a different methodology, and the air tightness requirement is far greater than our current building standards. • BER testing is also required for compliance purposes. Extra Over Cost €340.00 20 Cost Analysis Summary 1. 2. 3. 4. 5. 6. 7. Substructure External Wall Roof Structure Windows and External Doors Space Heating System, and Renewable Technologies Certification & Technical Door Blower Test €1,102.00 €2,150.00 €680.00 €304.00 €1,035.00 €540.00 €340.00 €4,081.00 21 22 23 Madeira Oaks Affordable Passive Housing Project Case Study Thanks for your attention! Seamus Mullins Quantity Surveyor Michael Bennett Group [email protected] www.bennett.ie (053) 9388651 Ballinakill Ballycarney Enniscorthy Co. Wexford
© Copyright 2026 Paperzz