EMME/2 Model Application End Gridlock Now Commissioned By Kemper Freeman, Jr. Lead By Dr. Bill Eager, TDA Inc. Presented To 17th International EMME/2 Users’ Group Conference Calgary, Alberta, Canada October 2003 By Clyde Scott, Parametrix Presentation 1. EGN (What It Would Take To Reduce Congestion 25%) – 2. Study Parameters • Demand /Supply • Congestion • Identify Projects • Measure Effectiveness • Rank Projects EMME/2 Application – – All-or-Nothing Assignments Equilibrium Assignments • – Additional Demand Options Scalar Exports to Excel EGN • Scenario 2020 MTP – Demand Fixed • Delay - Unconstrained minus Constrained VHT • Project Definition – Freeflow Demand > Capacity = (Excess Demand) – Excess Demand/(Lane Capacity) = (Lane Needs) – Project Definition (MTP Plus Additional Lanes) • Travel Characteristics – System-Wide VMT, VHT, & Average Trip Length – Project-Using Subset of Trip Table • Assigned to EGN Network (Travel Characteristics) • Compared to 1998 Travel Characteristics Model Flow 2020 MTP Travel Demand Model 1998 Travel Demand Model 2020 Daily Non-Carpool & Carpool Vehicles Enif All-or-Nothing Assignments 2020 MTP Roadway Network Project Definition Excess Demand Lanes EGN Network Slave Assignment Select Project Assignments Project Trip Tables Project Vehicles on Paths 1998 Conditions Measures of Effectiveness Project Vehicles on Paths 2020 EGN Conditions Project List EMME/2 Model Application Enif • Measure The Effectiveness of Individual Projects – Within A Framework of A Comprehensive Package of Projects – Consistent Comparison To Scenario Alternatives • • • • Existing Conditions No-Build Efficient EMME/2 Macro Linkage to Excel Spreadsheets Typical Measures of VMT & VHT • System Wide – Network Skims • By Link Type or VDF • By Link Attribute • For All Auto Modes (EMME/2 defaults) – Matrix Calculations • • Sub-Area Summaries Select Paths – Additional Demand Options – Network Skims • • Select Link Select Segments – Matrix Calculations • Sub-Set of Trip Table (From Select Link) SYSTEMWIDE Vehicle Hours Traveled Unconstrained Constrained Seattle HighCap Seattle RAN Seattle Other Seattle Non Seattle HighCap Non Seattle RAN Non Seattle Other Non Seattle Tot HighCap Tot RAN Tot Other Total Minutes per Trip Miles per Trip Trips 19,239 7,804 25,652 52,695 91,055 38,168 108,916 238,139 110,294 45,972 134,568 290,834 11.3 25,161 9,515 28,716 63,392 118,256 47,243 126,541 292,040 143,417 56,758 155,257 355,432 13.8 1998 Network 1998 Demand AM Peak Period Vehicle Speed Veh Hours Miles Unconstrained Constrained Lane Miles Delay 1,113,915 58 44 280 5,922 312,361 40 33 168 1,711 733,569 29 26 1,184 3,064 2,159,845 41 34 1,632 10,697 5,392,433 59 46 1,708 27,201 1,570,772 41 33 1,358 9,075 3,660,499 34 29 6,588 17,625 10,623,704 45 36 9,654 53,901 6,506,348 59 45 1,988 33,123 1,883,133 41 33 1,526 10,786 4,394,068 33 28 7,772 20,689 12,783,549 44 36 11,286 64,598 2.5 8.3 1,547,450 2020 EGN Network 2020 3+ Adjusted Demand AM Peak Period Vehicle Hours Traveled Vehicle Speed Veh Hours Unconstrained Constrained Miles Unconstrained Constrained Lane Miles Delay Seattle HighCap 22,851 24,672 1,327,104 58 54 292 1,821 Seattle RAN 7,384 8,447 295,050 40 35 170 1,063 Seattle Other 25,364 28,835 732,136 29 25 1,186 3,471 Seattle 55,599 61,954 2,354,290 42 38 1,648 6,355 Non Seattle HighCap 128,873 153,210 7,720,627 60 50 2,355 24,337 Non Seattle RAN 45,311 54,167 1,916,583 42 35 1,659 8,856 Non Seattle Other 135,985 161,065 4,575,512 34 28 7,305 25,080 Non Seattle 310,169 368,442 14,212,722 46 39 11,319 58,273 Tot HighCap 151,724 177,882 9,047,731 60 51 2,647 26,158 Tot RAN 52,695 62,614 2,211,633 42 35 1,829 9,919 Tot Other 161,349 189,900 5,307,648 33 28 8,491 28,551 Total 365,768 430,396 16,567,012 45 38 12,967 64,628 Minutes per Trip 11.0 12.9 1.9 Miles per Trip 8.3 Trips 1,996,223 Scale = 6000 I-5 Shift To & Shift From SR-605 Shift To & Shift From s=%1% ~x=-1 ~y=0 ~z=40 ~:loop Additional Options Assignment ~x+1 ~y+1 Select Individual Project ~z+1 2.41 ~+|1|y|@sl|n|0||*|4 Select Project Assignment ~+|1|y|@sl|n|ul3||ul3=%x%.5,%y%.5||4 q 5.11 ~+|1|~?q=2|2|3|h|5|mf34||||7|@sl||.max.|%x%.5,%y%.5|mf%z%|y|sph%y%|sel proj %y% pmhov|n|4 ~+|c|mf33|||30|.2|.2 5.21 2 Store Project Trip Table 2.41 ~+|1|y|@p%y%h|n|volad||*|4|q ~?y<27 ~$loop Store Path s=%1% ~x=30 ~y=0 2.41 Path VMT - VHT ~:loop ~x+1 ~y+1 ~+|1|n|@p%y%s*timau/60||ci=0|&cj=0||5 ~+|4|ms%y%|p%y%svh|p%y%svht %1%|1 ~+|1|n|@p%y%s*len||?||5| ~+|4|ms%x%|p%y%svm|p%y%svmt %1%|1 ~?y<27 ~$loop q ~!del %s%smoe.rpt reports=%s%smoe.rpt 3.14 2 ms 2 q reports=reports Calculate VHT Store In ms Calculate VMT EMME/2 Module: 3.14 Project: Date: 02-09-08 06:03 User: E287/TRANSPO..Scot END CONGESTION NOW ADDED CAPACITY SEACBD --------------------------------------------------------------------------------------------------Matrix Directory ---------------Matrix: Flags: Modified: Description: Value: ms01: p1svh 02-09-08 06:03 p1svht 973 123647.609 ms02: p2svh 02-09-08 06:03 p2svht 973 21731.6171 ms03: p3svh 02-09-08 06:03 p3svht 973 72048.0781 ms04: p4svh 02-09-08 06:03 p4svht 973 10888.4501 ms05: p5svh 02-09-08 06:03 p5svht 973 143211.187 ms06: p6svh 02-09-08 06:03 p6svht 973 16861.6015 ms07: p7svh 02-09-08 06:03 p7svht 973 80906.7812 ms08: p8svh 02-09-08 06:03 p8svht 973 78559.625 ms09: p9svh 02-09-08 06:03 p9svht 973 61850.4882 ms10: p10svh 02-09-08 06:03 p10svht 973 27399.3574 ms11: p11svh 02-09-08 06:03 p11svht 973 28466.0898 ms12: p12svh 02-09-08 06:03 p12svht 973 17014.998 ms13: p13svh 02-09-08 06:03 p13svht 973 29333.6757 ms14: p14svh 02-09-08 06:03 p14svht 973 16514.9023 ms15: p15svh 02-09-08 06:03 p15svht 973 30287.6328 ms16: p16svh 02-09-08 06:03 p16svht 973 36206.0273 Page: 5793 Table IIa - EGN+ Project Trips Under 1998 Travel Conditions HOV VHT I-5 (SR512-SR509) SR167 (SR509-SR512) SR167(SR512-I405) SR509 (Trm-I5) I-405 (I5s-I5n) SR509 (Trm-1st B HOV) I-5 (N.Gate-I405) I-5 (I405-SR2) I-5 (SR2-Marysville) I-605 (I90-SR9) SR512 (SR167-Meridian Exit) SR518 (I5- SeaTac Exit) SR18 (SR169-I90) SR161 (Meridian Ave SR512-178th) SR520 (I5-I405) SR520 (I405-SR202) SR202 (Wdnvl-Sahalee) SR908 (Redmond-I405) SR525 (I405-SR526) SR522 (Wdnvle-Monroe) SR9 (SR522-SNO_CO line) SR92 (SR9-Granite Fls23) Novelty Hill Rd (Avndl-SR203) Spokane viaduct I-90 (Estgt-Sunset Intrch) US-2 ( SR9- Sultan) I5 (188thSo-Northgate) VMT 7662 1126 3330 66 8827 1361 4563 3488 1030 232 1256 571 68 678 3455 1667 395 283 605 947 1361 484 215 733 1060 474 13086 Trips 238993 37645 108660 2198 292477 39874 148453 128417 40744 8441 42538 18871 2478 22935 101907 52164 12689 9215 19673 36251 51971 18171 7131 19954 40707 19057 398496 7018 1200 4030 133 13353 2157 5912 4136 1134 345 1054 1149 72 593 4696 2542 611 588 895 1110 1363 409 339 890 1886 470 14725 VHT 123648 21732 72048 10888 143211 16862 80907 78560 61850 27399 28466 17015 29334 16515 30288 36206 17078 11987 16206 27522 43795 8182 5137 12875 23597 15379 168348 SOV ALL Vehicles VMT Trips VHT VMT Trips 4471745 150870 131309 4710738 157888 751578 35876 22858 789223 37076 2369403 100502 75378 2478063 104532 342172 17924 10954 344370 18057 4489458 257022 152039 4781935 270374 528817 37286 18223 568692 39442 2832467 95632 85469 2980920 101545 2907450 82280 82047 3035867 86416 2462042 59228 62880 2502785 60362 1122728 22177 27632 1131169 22522 1007085 34860 29722 1049622 35913 551817 38062 17586 570688 39211 1176456 20250 29402 1178934 20321 565455 34585 17192 588390 35178 862373 54930 33743 964279 59626 1099488 84212 37874 1151652 86754 528073 50056 17473 540762 50667 369711 33422 12270 378926 34010 487811 31340 16811 507483 32234 994683 35829 28469 1030934 36939 1681060 62746 45157 1733031 64109 293039 6302 8666 311210 6711 174705 10220 5352 181836 10559 366751 21166 13607 386705 22056 847726 43075 24657 888432 44960 610941 15262 15853 629998 15732 5519684 236882 181434 5918179 251607 (1 88 th S oNo rth I-5 ga (S te R5 ) 12 -S R5 09 I-4 ) 05 ( SR I5 s16 I5 7( n) SR 51 2I4 I-5 05 (N ) .G at eSR I4 05 51 I -5 ) 2 (S (I4 R 05 16 -S 7R2 M er ) id ia n Ex SR it) 52 SR 0 ( I5 16 -I4 7 05 (S R ) 50 9SR SR 51 18 2) (S R I-5 16 9(S I9 R2 0) -M ar ys vi lle SR I-6 ) 05 9 (S ( I9 R5 SR 022 SR 16 SN 9) 1 (M O _ er CO id ia lin n e) S SR R5 12 50 -1 9 78 (T th rm ) -1 st B HO V) I5 Hours of Delay Reduction, PM period Top 15 in Regional Delay Reduction with Seattle I-5 Widened 25,000 10,000 Graph – Excel 20,000 Pierce County 15,000 Snohomish Cnty King County 5,000 - 17th International EMME/2 Users’ Group Conference Calgary, Alberta, Canada October 2003
© Copyright 2026 Paperzz