RESET & Technology Insertion BG Roger A. Nadeau DCG, Systems of Systems Integration RDECOM 9 September 2004 RESET • Return Systems to Pre-deployment Condition – Inspect and Repair to 10/20 Standards – Eliminate Desert Induced Damage – Repair Crash / Battle Damage Systems – Replace Attrited Systems • Apply Approved MWOs • Apply Enhancements to Address Critical, Safety, Readiness and Warfighting Deficiencies Done in Theater of Operations RECAP • Return Systems to Near Zero Hours / Zero Miles Condition • Technology Insertion Where Appropriate Done at Depot/Industry Location Lethal Survivable Dominates the Battlefield Agile Survivable Heavy Task Force, Force Multiplier Not Invincible Needs Survivability Enhancement Options Agility Better Suited to Army Transformation Survivability through Agility SASO/MOUT Survivability Enhancements Critical Non-Linear Battlefield Puts Thin Skinned Assets at High Risk Must Have Survivability Options for Tactical Truck Fleet Reliability Enhancements Also a Critical Need Technology Insertion What is needed? Expected? When? With how much risk? S&T Organizations Army S&T Other DOD S&T Other Govt S&T U.S. Industry S&T Current Transition Processes For S&T Projects X X X What is coming? From who? When? Does it work? With how much risk? My investment? PEO Programs FY1 FY2 FY3 FY4 FY5 FY6 FY7 FY8 FY9 X Program 1 FOG X OF TECHNOLOGY X TRANSITIONS Program 2 X Program 3 Products for the Warfighter International S&T User Needs, Requirements, Experiments, Assessments BACKUP Operational Readiness Impacts Enablers Funding – Long Lead Time Parts – Induction Seed Assets – Backfill / Swap-out with Return of Assets for Theater – Reduces Lead-time of Return to Units – Buy At Least 90 days of Readiness End State – Supports DA G3 Priorities Must Have for Next Fight AMC Reset Summary APS Non - APS • 995 Aircraft to be Reset • 789 Aircraft Available for Reset, (Worldwide) Aviation • 210 Aircraft Currently Inducted • • • • 206 of 218 Unit Sets Turned in. Currently Supporting CONOPS. Scheduled to Support OEF-5 / OIF-3. Tasked to Prepare 1215 Trks ISO CMATT. Total Issued 263 ARF (Guam) • • • • • 1X1 Bde ( Watson) On-Station SEP 03 1 CL V ( Page) On-Station Jul 04 1 CS1(TBD):Apr 05 Sustainment Cargo Ship: TBD HA/DR Ship: TBD ARF (Diego) • • • • • 1X1 Bde ( Soderman), May 04 CS2: (TBD) 1 CL V ( Carter), Mar 04 Sustainment Cargo Ship: TBD HA/DR Ship: TBD SWA Returns • 281 Aircraft Completed • 9 Battalions Scheduled for Reset Patriot • 3 Battalions Inducted (Bliss, Germany, Qatar) • 6 Battalion Completed (Bliss, Germany) • 3 ID on Target to meet July Reset. Ground Systems • Equip f/ 82d & 101st Moving to Depots. • Selected Seeds Approved for Depots. (Tanks, Bradleys, HETS, HMMWVs, etc.) 13 Redeployment Equipment Flow THEATER UNITS Redeployment Assembly Area Equipment Requiring Depot Level Maint CONUS DEPOT AMC AC Units Serviceable & Reparable Equipment Home Station RC DEMOB CELLS Chain of Cmd Responsible for TM 10/20 Inspections and maintenance THEATER: • 10/20 TI & ORDER, APPLY PARTS • PROPERTY BOOK INVENTORY, ADJUSTMENT DOCUMENTS POSTED, REQUISITIONS PREPARED • REDEPLOY PARTS LISTING AND PROPERTY BOOK REQUISITIONS WITH UNIT PERSONNEL • AMC TO PROVIDE ASSISTANCE AS REQUIRED RC Mob Station Home Station HOME STATION/DEMOB STATION: • AC: SUBMIT PROPERTY BOOK AND 10/20 REQUISITIONS • RC: SUBMIT REQUISITIONS FOR PROPERTY BOOK LOSSES • RC: DMS VALIDATES FMC PRIOR TO SHIPMENT TO HOME STATION • RC: 10/20 REQUISITIONS PROCESSED • RC: DEMOB CELLS WILL ACT AS EXECUTIVE AGENT AT EACH DEMOB SITE. WILL VERIFY ARRIVAL, FMC STATUS AND FACILITATE MOVEMENT OF EQUIPMENT TO HOME STATION.
© Copyright 2026 Paperzz