theater

RESET
&
Technology Insertion
BG Roger A. Nadeau
DCG, Systems of Systems
Integration
RDECOM
9 September 2004
RESET
• Return Systems to Pre-deployment Condition
– Inspect and Repair to 10/20 Standards
– Eliminate Desert Induced Damage
– Repair Crash / Battle Damage Systems
– Replace Attrited Systems
• Apply Approved MWOs
• Apply Enhancements to Address Critical, Safety, Readiness
and Warfighting Deficiencies
Done in Theater of Operations
RECAP
• Return Systems to Near Zero Hours / Zero Miles Condition
• Technology Insertion Where Appropriate
Done at Depot/Industry Location
Lethal
Survivable
Dominates the
Battlefield
Agile
Survivable
Heavy Task Force,
Force Multiplier
Not Invincible
Needs Survivability
Enhancement Options
Agility Better Suited to Army Transformation
Survivability through Agility
SASO/MOUT Survivability Enhancements Critical
Non-Linear Battlefield Puts Thin Skinned Assets at High Risk
Must Have Survivability Options for Tactical Truck Fleet
Reliability Enhancements Also a Critical Need
Technology Insertion
What is needed?
Expected?
When?
With how much risk?
S&T Organizations
Army S&T
Other DOD S&T
Other Govt S&T
U.S. Industry S&T
Current Transition Processes
For S&T Projects
X X
X
What is coming?
From who?
When?
Does it work?
With how much risk?
My investment?
PEO Programs
FY1 FY2 FY3 FY4 FY5 FY6 FY7 FY8 FY9
X
Program 1
FOG X
OF
TECHNOLOGY
X
TRANSITIONS
Program 2
X
Program 3
Products
for the
Warfighter
International S&T
User Needs, Requirements, Experiments, Assessments
BACKUP
Operational Readiness Impacts
Enablers
Funding
– Long Lead Time Parts
– Induction
Seed Assets
– Backfill / Swap-out with Return of Assets for Theater
– Reduces Lead-time of Return to Units
– Buy At Least 90 days of Readiness
End State
– Supports DA G3 Priorities
Must Have for
Next Fight
AMC Reset Summary
APS
Non - APS
• 995 Aircraft to be Reset
• 789 Aircraft Available for Reset, (Worldwide)
Aviation
• 210 Aircraft Currently Inducted
•
•
•
•
206 of 218 Unit Sets Turned in.
Currently Supporting CONOPS.
Scheduled to Support OEF-5 / OIF-3.
Tasked to Prepare 1215 Trks ISO CMATT.
Total Issued 263
ARF
(Guam)
•
•
•
•
•
1X1 Bde ( Watson) On-Station SEP 03
1 CL V ( Page) On-Station Jul 04
1 CS1(TBD):Apr 05
Sustainment Cargo Ship: TBD
HA/DR Ship: TBD
ARF
(Diego)
•
•
•
•
•
1X1 Bde ( Soderman), May 04
CS2: (TBD)
1 CL V ( Carter), Mar 04
Sustainment Cargo Ship: TBD
HA/DR Ship: TBD
SWA
Returns
• 281 Aircraft Completed
• 9 Battalions Scheduled for Reset
Patriot
• 3 Battalions Inducted (Bliss, Germany, Qatar)
• 6 Battalion Completed (Bliss, Germany)
• 3 ID on Target to meet July Reset.
Ground
Systems
• Equip f/ 82d & 101st Moving to Depots.
• Selected Seeds Approved for Depots.
(Tanks, Bradleys, HETS, HMMWVs, etc.)
13
Redeployment Equipment Flow
THEATER
UNITS
Redeployment
Assembly Area
Equipment
Requiring Depot
Level Maint
CONUS
DEPOT
AMC
AC
Units Serviceable &
Reparable Equipment
Home
Station
RC DEMOB CELLS
Chain of Cmd
Responsible for TM 10/20
Inspections and maintenance
THEATER:
• 10/20 TI & ORDER, APPLY PARTS
• PROPERTY BOOK INVENTORY, ADJUSTMENT
DOCUMENTS POSTED, REQUISITIONS
PREPARED
• REDEPLOY PARTS LISTING AND PROPERTY
BOOK REQUISITIONS WITH UNIT PERSONNEL
• AMC TO PROVIDE ASSISTANCE AS
REQUIRED
RC
Mob
Station
Home
Station
HOME STATION/DEMOB STATION:
• AC: SUBMIT PROPERTY BOOK AND 10/20 REQUISITIONS
• RC: SUBMIT REQUISITIONS FOR PROPERTY BOOK LOSSES
• RC: DMS VALIDATES FMC PRIOR TO SHIPMENT TO HOME
STATION
• RC: 10/20 REQUISITIONS PROCESSED
• RC: DEMOB CELLS WILL ACT AS EXECUTIVE AGENT AT
EACH DEMOB SITE. WILL VERIFY ARRIVAL, FMC STATUS
AND FACILITATE MOVEMENT OF EQUIPMENT TO HOME
STATION.