Lockout/Tagout Posted Procedure Lockout Points

Lockout/Tagout Posted Procedure
ID#:
CMA2-430266
Created:
6/29/2012
Revised:
7/26/2012
2
Lockout
Points
Facility:
Description:
Brady Camden - Cell
135/140
Location:
Cell 135/140
This is an example of the LINK360 Lockout Tagout App Long Form.
The long form lets you freely define separate steps in the
procedure and position photos next the relevante instructions.
Note:
Lockout Application Process
1. Notify affected personnel. 2. Properly shut down machine. 3. Isolate all energy sources. 4. Apply lockout devices, locks, &
tags. 5. Verify total de-energization of all sources.
Lockout Steps
Step #
Action
1
Note
This machine generates extremely high
temperatures. Leave door open for at least one
hour to allow for proper cooling.
2
Electrical
The E-1 Disconnect is located on the East side
of the machine. Turn Disconnect to the off
position and lock out. Use a Lock device.
Info
Main Disconnect
E-1: Wear PPE to lockout. Inside
Page 1 of 2
Lockout/Tagout Posted Procedure
ID#:
CMA2-430266
Created:
6/29/2012
Revised:
7/26/2012
2
Lockout
Points
Facility:
Description:
Brady Camden - Cell
135/140
Location:
Cell 135/140
This is an example of the LINK360 Lockout Tagout App Long Form.
The long form lets you freely define separate steps in the
procedure and position photos next the relevante instructions.
Note:
Lockout Steps
Step #
3
Gas
Action
Info
The G-1 Ball Valve is located on the Top side
of the machine. Turn Valve to the off position
and lock out. Use a Ball valve lockout device.
Natural Gas Valve
G-1
Y2443213
Y2443141 MS2443213
MS2443141
Lockout Removal Process
1. Ensure all tools and items have been removed. 2. Confirm that all employees are safely located. 3. Verify that controls are in
neutral. 4. Remove lockout devices and reenergize machine. 5. Notify affected employees that servicing is completed.
Page 2 of 2