inventorization of sewage treatment plants

CONTROL OF URBAN POLLUTION
SERIES: CUPS/ / 2015
INVENTORIZATION OF SEWAGE
TREATMENT PLANTS
MARCH, 2015
CENTRAL POLLUTION CONTROL BOARD
(Ministry of Environment and Forests, Govt. of India)
Parivesh Bhawan, East Arjun Nagar,
Delhi – 110032
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
CONTENTS
1.0
INTRODUCTION ............................................................................................................1
2.0
OBJECTIVE OF THE STUDY ........................................................................................2
2.1
METHODOLOGY OF STUDY ....................................................................................2
3.0
INVENTORY OF SEWAGE TREATMENT PLANTS ....................................................3
4.0
STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS...................................7
4.1
STPs AT ANDHRA PRADESH ...................................................................................7
4.2
STPs AT ANDAMAN & NICOBAR ISLAND .............................................................7
4.3
STPs AT ARUNACHAL PRADESH............................................................................7
4.4 STPs AT ASSAM .............................................................................................................8
4.5
STPs AT BIHAR ..........................................................................................................8
4.6
STPs AT CHANDIGARH ............................................................................................8
4.7
STPs AT CHHATTISGARH ........................................................................................9
4.8
STPs AT Daman Diu & Dadra Nagar Haveli.................................................................9
4.9
STPs AT DELHI...........................................................................................................9
4.10
STPs AT GOA ........................................................................................................ 11
4.11
STPs AT GUJARAT ............................................................................................... 12
4.12
STPs AT HARYANA ............................................................................................. 19
4.13
STPs AT HIMACHAL PRADESH ......................................................................... 21
4.14
STPs AT JAMMU & KASHMIR ............................................................................ 26
4.15
STPs AT JHARKHAND ......................................................................................... 28
4.16
STPs AT KARNATAKA ........................................................................................ 29
4.17
STPs AT KERALA ................................................................................................. 32
4.18
STPs AT LAKSHADWEEP .................................................................................... 33
4.19
STPs AT MADHYA PRADESH ............................................................................. 33
4.20
STPs AT MAHARASHTRA ................................................................................... 35
4.21
STPs AT MANIPUR ............................................................................................... 40
4.22
STPs AT MEGHALAYA ........................................................................................ 40
4.23
STPs AT MIZORAM .............................................................................................. 41
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
5.
4.24
STPs AT NAGALAND ........................................................................................... 41
4.25
STPs AT ODISHA .................................................................................................. 41
4.26
STPs AT PUDUCHERRY....................................................................................... 43
4.27
STPs AT PUNJAB .................................................................................................. 44
4.28
STPs AT RAJASTHAN .......................................................................................... 51
4.29
STPs AT SIKKIM ................................................................................................... 56
4.30
STPs AT TAMILNADU ......................................................................................... 57
4.31
STPs AT TELANGANA ......................................................................................... 69
4.32
STPs AT TRIPURA ................................................................................................ 70
4.33
STPs AT UTTAR PRADESH ................................................................................. 70
4.34
STPs AT UTTRAKHAND ...................................................................................... 75
4.35
STPs AT WEST BENGAL ...................................................................................... 78
CONCLUSION.................................................................................................................. 81
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
1.0 INTRODUCTION
Urban water supply and sanitation are important basic needs for the improvement of the
quality of life and enhancement of productive efficiency of the people. In urban areas, water
is tapped for domestic and industrial uses from rivers, streams, wells and lakes. Almost 80%
of the water supplied for domestic use, comes out as wastewater. In most of the cases
wastewater is let out untreated and it either sinks into the ground as a potential pollutant of
ground water or is discharged into the natural drainage system causing pollution in
downstream areas. Wastewater needs to be conveyed to sewage treatment plants and treated
wastewater must meet the aesthetic standards of ambient environment for receiving water
bodies.
Sewage Treatment plants are used to treat sewage generated from residential, institutional,
commercial and industrial establishments which includes household waste liquid
from toilets, baths, showers, kitchens, sinks and so forth that is disposed of via sewers. In
India, different treatment technologies like ASP, UASB, Oxidation pond and advanced
technologies like SBR, MBR are adopted for the treatment of sewage. Central Pollution
Control Board carried out study on status of Municipal wastewater generation and treatment
capacity in Metropolitan cities, Class I cities and Class II towns of India and published a
document (CUPS/61/2005-06). The sewage generation is about 38254 MLD whereas
treatment capacity developed is only about 12000 MLD and 269 numbers of STPs are
installed in India. Growth of Urbanization in India is at rapid rate. This is illustrated in Figure
1 and summarized in Table 1.
37.7
POPULATION IN CRORES
28.5
21.8
15.6
10.7
2.6
2.6
2.8
3.3
1901
1911
1921
1931
4.4
1941
6.2
1951
7.8
1961
1971
1981
1991
2001
2011
Figure 1: Bar diagram shows growth of urban population 1901-2011
| INTRODUCTION 1
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Table 1: Decadal Urban Population Growth Since 1901
Year
Total
Rural
Urban
Urban, as % Decadal
%
of total
increase
in
urban
population
10.84
-
1901
238,396,327
212,544,454
25,851,873
1911
252,093,390
226,151,757
25,941,633
10.29
0.35
1921
251,321,213
223,235,043
28,086,170
11.18
8.3
1931
278,977,238
245,521,249
33,455,989
11.99
19.1
1941
318,660,580
274,507,283
44,153,297
13.86
32.0
1951
361,088,090
298,644,381
62,443,709
17.29
41.4
1961
439,234,771
360,298,168
78,936,603
17.97
26.4
1971
548,159,652
439,045,675
109,113, 977
19.91
38.2
1981
683,329,097
523,866,550
159,462,547
23.34
46.1
1991
846,302,688
628,691,676
217,611,012
25.71
36.5
2001
1,027,015,247
741,660,293
285,354,954
27.78
31.1
2011
1,210,193,422
83,30,87662
377,105,760
31.16
32.2
The facilities like housing and water supply, sanitation also increased with urbanization.
However, facility of sewage management has not received the required focus. As a result,
untreated sewage is discharged into open storm water drains causing pollution to water
bodies.
2.0 OBJECTIVE OF THE STUDY
As stated earlier, Central Pollution Control Board (CPCB) has carried out study on status
of Municipal wastewater generation and treatment capacity in Metropolitan cities, Class I
cities and Class II towns of India and published a document (CUPS/61/2005-06) and
(CUPS/70/2009-10) and assessed the 269 number of STPs with capacity of 12000 MLD.
There is need to update the information on Sewage treatment facility as urbanization of
country increases with rapid pace and therefore the treatment facility for sewage is also
increased.
2.1 METHODOLOGY OF STUDY
CPCB has designed format for collation and collection on STPs from all 35 State Pollution
Control Boards and Pollution Control Committees. The format is attached at Annexure-I.
CPCB has communicated with SPCBs/PCCs numerous times and provided the prescribed
format.
| OBJECTIVE OF THE STUDY 2
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
3.0 INVENTORY OF SEWAGE TREATMENT PLANTS
CPCB has carried out an inventorization of Sewage Treatment Plants (STPs) located in
India in the year 2014-15. There are 816 STPs having capacity of 23277MLD in 28
States/UTs of India. Out of 816 STPs, 522 STPS are operational, 79 STPs are Nonoperational, 145 STPs are under construction and 70 STPs are proposed for construction.
The detail is mentioned in table -2 and figure-2 and 3.
Table 2: Break-up of STPs
Sl.No.
1.
2.
3.
4.
5.
Status
Operational
Non-operational
Under Construction
Proposed
Total
Nos. Of STPs
522
79
145
70
816
Proposed
8%
Capacity (MLD)
18883.2
1237.16
2528.36
628.64
23277.36
Non-operational
10%
Under Construction
18%
Operational
64%
Figure 2: Pi-chart show distribution of Number of STPs
Proposed
3%
Non-operational
Under Construction
5%
11%
Operational
81%
Figure 3: Pi-chart show distribution of capacity of STPs
| INVENTORY OF SEWAGE TREATMENT PLANTS 3
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Arunachal Pradesh, Andaman & Nicobar Islands, Chhattisgarh,Daman Diu & Dadra Nagar Haveli,
Lakshadweep, Manipur and Nagalanddo not have treatment facility. Maharashtra, Gujarat, Delhi,
Maharashtra has the maximum sewage treatment capacity. Detailed break-up of STPs state -wise
is placed in Table 3. Figure 4 depicts installed capacity distribution among different stated of
India and Figure 5 show the number of STPs among different states of India.
Installed Capacity (MLD)
Andhra Pradesh
Bihar
Delhi
Gujarat
Himachal Pradesh
Jharkhand
Kerala
Madhya Pradesh
Mizoram
Puducherry
Rajasthan
Tamil Nadu
Tripura
Uttrakhand
Assam
Chandigarh
Goa
Haryana
Jammu & Kashmir
Karnataka
Maharashtra
Meghalaya
Odisha
Punjab
Sikkim
Telangana
Uttar Pradesh
West Bengal
Figure 4: Pi-chart depicting installed capacity distribution in India
Total No. of STPs
Andhra Pradesh
Bihar
Delhi
Gujarat
Himachal Pradesh
Jharkhand
Kerala
Madhya Pradesh
Mizoram
Puducherry
Rajasthan
Tamil Nadu
Tripura
Uttrakhand
Assam
Chandigarh
Goa
Haryana
Jammu & Kashmir
Karnataka
Maharashtra
Meghalaya
Odisha
Punjab
Sikkim
Telangana
Uttar Pradesh
West Bengal
Figure 5: Pi-chart depicting STPs distribution in India
| INVENTORY OF SEWAGE TREATMENT PLANTS 4
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Table 3: Break-Up of STPs Located In Different States/UTs of India
Sl. No.
State/UT
Capacity of
Municipal
STPs
No. of
Municipal
STPs
Operational
Capacity
(MLD)
No. of STPs
Operational
Nonoperational
Capacity
(MLD)
No. of
STPs Nonoperational
Under
Construction
Capacity
(MLD)
No. of STPs
Under
Constructions
Proposed
Capacity
(MLD)
No. of STPs
Proposed
247.27
12
156.27
9
-
-
91
3
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4
Andhra
Pradesh
Arunachal
Pradesh
Andaman &
Nicobar
Islands
Assam
0.21
1
0.21
1
-
-
-
-
-
-
5
Bihar
124.55
6
99.55
5
25
1
-
-
-
-
6
7
Chandigarh
Chhattisgarh
314.5
-
5
-
314.5
-
5
-
-
-
-
-
-
-
8
9
2693.7
-
35
-
2671.2
-
34
-
22.5
-
1
-
-
-
-
-
10
Delhi
Daman Diu
& Dadra
Nagar Haveli
Goa
74.58
7
34.5
4
-
-
40.08
3
-
-
11
Gujarat
3062.92
51
2111.64
32
498
4
359.5
8
93.78
7
12
Haryana
852.7
41
805
38
2.7
2
45
1
-
-
13
114.72
66
79.51
36
35.21
30
-
-
-
-
264.74
19
145.74
15
2
1
117
3
-
-
15
Himachal
Pradesh
Jammu &
Kashmir
Jharkhand
117.24
15
117.24
15
-
-
-
-
-
-
16
Karnataka
1304.16
57
1112.05
44
-
-
192.11
13
-
-
17
Kerala
152.97
10
112.87
6
3
1
37.1
3
-
-
1
2
3
14
| INVENTORY OF SEWAGE TREATMENT PLANTS 5
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No.
State/UT
Capacity of
Municipal
STPs
No. of
Municipal
STPs
Operational
Capacity
(MLD)
No. of STPs
Operational
Nonoperational
Capacity
(MLD)
No. of
STPs Nonoperational
Under
Construction
Capacity
(MLD)
No. of STPs
Under
Constructions
Proposed
Capacity
(MLD)
No. of STPs
Proposed
18
19
Lakshadweep
Maharashtra
5160.36
76
4683.9
60
344.5
10
131.96
6
-
-
20
482.23
17
475.48
14
6.75
3
-
-
-
-
21
Madhya
Pradesh
Manipur
-
-
-
-
-
-
-
-
-
-
22
Meghalaya
1
1
-
-
1
1
-
-
-
-
23
24
Mizoram
Nagaland
10
-
1
-
-
-
-
-
10
-
1
-
-
-
25
Odisha
385.54
13
158.04
7
-
-
227.5
6
-
-
26
27
Puducherry
Punjab
68.5
1245.45
6
86
17.5
921.45
3
38
15.2
4
51
276.7
3
31
32.1
13
28
Rajasthan
865.92
63
384.5
16
-
-
149.3
11
332.12
36
29
30
31
Sikkim
Tamil Nadu
Telangana
31.88
1799.72
685.8
11
73
18
8
1140.83
634.8
1
33
17
5
5.17
-
1
1
-
18.88
521.08
51
9
28
1
132.64
-
11
-
32
Tripura
0.05
1
0.045
1
-
-
-
-
-
-
33
34
35
Uttar Pradesh
Uttrakhand
West Bengal
2646.84
152.9
416.9
73
24
28
2372.25
90.75
235.36
62
10
16
89.59
181.54
7
12
170
39.15
-
3
12
-
15
23
-
1
2
-
23277.36
816
18883.2
522
1237.16
79
2528.36
145
628.64
70
Total
Note : ‘ – ‘ indicates that information not received from concerned SPCB/PCC
| INVENTORY OF SEWAGE TREATMENT PLANTS 6
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
4.0 STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS
As stated earlier, CPCB has communicated to provide information on STPs as per prescribed
format to all 35 SPCBs/PCCs. All SPCBs/PCCs provide the information in prescribed format
andArunachal Pradesh,Andaman & Nicobar Islands, Chhattisgarh,Daman Diu & Dadra Nagar
Haveli, Lakshadweep, Manipur and Nagaland has informed that they do not have sewage
treatment plant in their territory. Details of STPs of remaining 28 States/UTs are mentioned in
subsequent section.
4.1 STPs AT ANDHRA PRADESH
Andhra Pradesh has total number of 12 STPs having capacity of 247 MLD. Out of 12 STPs, 03
STPs of capacity 91 MLD are under construction. Detail is mentioned in Table 4.
Table 4:-STPs –Andhra Pradesh
Sl. No.
City/town
STP Location
STP
Status
STP
Technolog
Consent
Commissio (Operational Installe y (UASB /
Status
ned in
/Nond
ASP / OP /
(Year)
Operational/ Capacit
SBR /
Under
y MLD
MBR/
Construction
FAB Etc.)
)
Rajamundry
Rajamundry,
Operational
30
1.
2.
3.
4.
EG district
Tukivakam
Azithsinghnagar
Azithsinghnagar
Tirupathi
Vijayawada
5.
6.
7.
8.
9.
Visakhapatnam
Auto Nagar
Ramalingeswara
Nagar
Poornanadampe
t
Appughar
Muvasalava
10.
Old town
11.
12.
Port area
Pedda Chruvu
Vizianagaram
Information
not provided
Operational
Operational
Under
Construction
Operational
Operational
25
27.27
40
Operational
14
Operational
Under
Contstruction
Under
Contstruction
Operational
Operational
25
13
10
10
Information
not provided
38
10
5
4.2 STPsAT ANDAMAN & NICOBAR ISLAND
Andaman & Nicobar Islands has zero number of STPs.
4.3 STPs AT ARUNACHAL PRADESH
Arunachal Pradesh has zero number of sewage treatment plants.
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 7
Information
not provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
4.4 STPs AT ASSAM
Assam has 1STP of capacity 0.21 MLD.Table 6 shows the details of STP in Assam.
Table 6: STPs- Assam
Sl. NO
City/town
STP Location
1.
Ds Hospitality
(Assam) Ltd
GMDA truck
yard near IBP
petrol pump
NH-37
STP
Commission
ed in (Year)
Status
(Operational/
NonOperational/U
nder
Construction)
Information
Not provided
Construction
completed
STP
Installed
Capacity
MLD
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
0.21
SAFF
Consent
Status
NOC
Accorded
4.5 STPsAT BIHAR
There are 06 numbers of STPs having treatment capacity of 125 MLD. 01 STP installed at
Pahari, Patna is non-operational. Details of STPs of Bihar are shown in Table 7.
Table 7: STPs-Bihar
Sl. No
City/town
STP Location
STP
Status
STP
Technolog
Consent
Commissio (Operational/ Installe y (UASB /
Status
ned in
Nond
ASP / OP /
(Year)
Operational/ Capacit
SBR /
Under
y MLD
MBR/
Construction
FAB Etc.)
)
Patna
Saidpur
STP
Operational
4.55
ASP
Information
1
Old Unit, Patna
not provided
2
Saidpur
STP,Patna
Operational
45
ASP
3
Beur STP,
Patna, Bihar
Pahari, Patna-7
Operational
35
ASP
4
Information
not provided
Not functional
at the time
monitoring
25
Aerated
Lagoon
Aerated
Lagoon
Aerated
Lagoon
5
Karmalichak
Karmalichak
Operational
4
6
Bhagalpur
Bhagalpur STP
Operational
11
Consent
from SPCB
has been
provided but
not renewed
4.6 STPs AT CHANDIGARH
In Chandigarh, there are 05STPs with capacity of 314 MLD. Only 01 STP at Raipur Kalan has
valid consent to operate and remaining STPs do not have valid consent to operate. Detail
information of plants is placed in Table 8.
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 8
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI.No.
City/Town
Table 8: STPs-Chandigarh
Status
STP Location
STP
Commissio (Operational/
Nonned in
Operational/U
(Year)
1
Diggian, Mohali
2
3 BRD, Near
Sector-47,
Chandigarh
Chandigarh
3
Raipur Kalan,
Chandigarh
Raipur Khurd,
Chandigarh
Dhanas,
Chandigarh
4
5
1966 (1st
Phase)
1987 (2nd
Phase) 1991
(3rd Phase)
2004 & it
commissione
d in Nov.,
2007
2003
nder
Construction)
30 MGDOperational
15 MGDUnder
Renovation
Operational
STP
Installed
Capacity
MLD
205
73
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
UASB-30
MGD,
ASP-15
MGD
Operational
23
11 MGDSBR, 5
MGDUASB
UASB
2003
Operational
6
ASP
2013
Operational
7.5
SBR
Consent
Status
This is in
the
jurisdiction
of PPCB
No, under
process
No, under
process
Yes
4.7 STPs AT CHHATTISGARH
Chhattisgarh has zero number of sewage treatment plants.
4.8 STPs AT Daman Diu & Dadra Nagar Haveli
Daman Diu 7 Dadra Nagar Haveli has zero number of sewage treatment plants.
4.9 STPs AT DELHI
Delhi has 35 numbers of sewage treatment plants having treatment capacity of 2693.7 MLD. 01
STP installed at Ghitorni is non-operational. Details of STPs of Delhi are shown in Table 10.
Table 10: STPs-Delhi
Sl. No
City/town
STP Location
STP
Commission
ed in (Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installed
Capacity
MLD
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
STP
Akshardham
2014
Operational
2
STP Kondli
phase-I
1987
Operational
45
ASP
3
STP Kondli Old
Phase-II
1989
Operational
112.5
ASP
1
Akshardham
Kondli
4.5 MBR
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 9
Consent
Status
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP Kondli
Phase-III
STP Kondli New
Phase-IV
4
STP
Commission
ed in (Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installed
Capacity
MLD
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
2001
Operational
45
ASP
2014
Operational
202.5
ASP
2000
2002
Operational
90
ASP
Operational
22.5
EA
1999
Operational
45
ASP
2002
Operational
45
ASP
Operational
180
ASP
Rithla New
1989
2014
Operational
180
ASP
Rohini Sec-25
2002
Operational
67.5
ASP
13
Okhla Phase - I
1937
Operational
135
ASP
14
Okhla Phase - II
1982
Operational
54
ASP
Okhla Phase-III
Operational
202.5
ASP
Okhla Pase-IV
1993
1993
Operational
166.5
ASP
17
Okhla Phase-V
2001
Operational
72
ASP
18
Okhla Phase-VI
Keshopur
Nilothi-I
Keshopur
Nilothi-II
Keshopur
Nilothi-III
2011-2012
Operational
135
ASP
1958
Operational
54
ASP
1975
Operational
90
ASP
1990
Operational
180
ASP
Nilothi-IV
Coronation
Pillar-I
coronation
Pillar-II
2002
Operational
180
1957
Operational
45
ASP
Trickling
Filtration
1999
Operational
90
ASP
Narela-I
2001
Operational
45
ASP
Narela-II
2014
Operational
27
ASP
Vasant Kunj-I
1982
Operational
22.5
EA
5
6
7
8
Papankalla
STP Papankalla
Nazafgarh
STP Nazafgarh
Yamuna Vihar
9
10
11
12
15
16
Rithla
Rohini
Okhla
19
20
Keshopur
21
22
23
Coronation
24
25
26
27
Narela
Vasant Kunj
Yamunavihar
Phase - I
Yamunavihar
Phase - II
Rithla Old
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 10
Consent
Status
Information
not provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
STP
Commission
ed in (Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installed
Capacity
MLD
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
City/town
STP Location
1997
Operational
9.9
EA
1997
Operational
13.5
EA
1998
Operational
9.9
Bio-Far
31
Dr. Sen
Nursing Home
Nalla
Delhi Gate
Nalla
Vasant Kunj-II
Vasant KunjIII
Dr. Sen
Nursing Home
Nalla
Delhi Gate
Nalla
1998
Operational
9.9
Bio-Far
32
Mehrauli
Mehrauli
2003
22.5
ASP
33
Ghitorni
Ghitorni
2014
Operational
Non
Operational
22.5
ASP
34
Timarpur
Timarpur
-
Operational
27
OP
35
Chilla
Chilla
2014
operational
40.5
SBR
28
29
30
Sl.
1
2
3
4
5
Consent
Status
Information
not provided
4.10 STPs AT GOA
Goa has 07 numbers of sewage treatment plants having treatment capacity of 74.58 MLD.
031STPs of capacity 40.08 MLDare under construction. Details of STPs of Goa are shown in
Table 11.
Table 11: STPs-Goa
No City/town
STP Location
STP
Status
STP
Technolog Consent
Commission (Operational/
Instal y (UASB / Status
ed in (Year)
Nonled
ASP / OP /
Operational/
Capa
SBR /
Under
city MBR/ FAB
Construction)
MLD
Etc.)
Calangute
Calangute
2014
Under
0.08
MBR
CTE
Contstruction
Navelim
2000
Operational
7.5
ASP
Valid till
October 15,
2014
Margao
Navelim
2014
Under
20
ASP
CTE
Shirvodem
Construction
Mormugao
Baina
Operational
14
ASP
Applied for
1985
renewal
Baina
Under
20
SBR
CTE
2014
Construction
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 11
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
6
7
Patto
Panaji
Tonca
2002
2005
Operational
0.5
TF
Operational
12.5
ASP
Valid till
2016
Valid till
2015
4.11 STPs AT GUJARAT
Gujarat has 51 numbers of sewage treatment plants having treatment capacity of 3062.92 MLD.
04 STPs of capacity 498 MLD are Non-Operational, 08 STPs of capacity 359.5 MLD are under
construction and 07 STPs of capacity 93.78 MLD are proposed. Details of STPs of Gujarat are
shown in Table 12.
Table 12: STPs-Gujarat
Sl. No
City/town
STP Location
STP
Status
STP
Technolog
Consent
Commissio (Operational/ Installe y (UASB /
Status
ned in
Nond
ASP / OP /
(Year)
Operational/U Capacit
SBR /
nder
y MLD
MBR/
Construction)
FAB Etc.)
STP of Capital
2008
Operational
76
ASP
Valid CCA
1
Project, Jaspur,
up to
Gandhinagar
24/03/2016
Basan STP, S
2014
Constructed
2
SBR
NOC(CTE)
2
No. 218,219,
(Proposed) but yet not
Granted
Near IIT, Palajcommissioned
Basan road,
Basan. Tal. &
Gandhinagar Dist.
Gandhinagar
Sargasan
2014
Operational
10
SBR
NOC(CTE)
3
Sewage
Granted
Treatment Plant
and applied
S. No. 111,
for CCA of
Sargasan, Tal.
the GPCB
& Dist.
Gandhinagar
STP of VMSS,
2000
Operational
43
ASP
Consent
4
Atladara-I
Valid up to
18/09/2014
STP of VMSS,
1998
Operational
52
UASB
Consent
5
Tarsali
Valid up to
15/09/2014
Vadodara
STP of VMSS,
1998 Operational
66
ASP
Consent
6
Gajrawadi
Valid up to
23/09/2014
STP of VMSS,
2004 Operational
43
UASB
Consent
7
Atladara-II
Valid up to
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 12
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
28/10/2014
8
STP of VMSS,
Kapurai
2010 Operational
43
ASP
9
STP of VMSS,
Sayaji Garden
2010 Operational
8.5
ASP
10
STP of VMSS,
Chhani
Talaja
Nagarpalika,
Bhavnagar,
Gujarat
Under
Construction
2005 Operational
21
ASP
3
ASP
Proposed
35
UASB
Proposed
45
UASB
11
Talaja
12
Ruvapari Road
,Bhavnagar,
Gujarat
Bhavnagar
13
Nari Road
Bhavnagar,
Gujarat
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 13
Consent
Valid up to
19/04/2015
Consent
Valid up to
19/04/2015
CTE
granted
-
Presently
having
Oxidation
Pond 20
MLD
capacity
consists 5
MLD
industrail
effluent of
GIDC,
Chitra &
15 MLD
domestic
W/W
Presently
having
Oxidation
Pond 20
MLD
capacity
consists 5
MLD
industrail
effluent of
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
GIDC,
Chitra &
15 MLD
domestic
W/W
14
Kunkavav
Kunkavav, Dist.
Amreli, Gujarat
Proposed
1.35
OP
15
Dhari
Dhari, Dist.
Amreli
Proposed
3.2
OP
16
Khambha
Khambha, Dist.
Amreli
Proposed
1.5
OP
17
Liliya Mota
Proposed
1.73
OP
18
Savarkundla
Proposed
6
OP
19
Palitana
Operational
4.5
OP
20
Ahmedabad
Liliya Mota,
Dist. Amreli,
Gujarat
Savarkundla
Nagarpalika,
Dist. Amreli,
Gujarat
Palitana, Dist.
Bhavnagar,
Gujarat
S. No.
93,10,113,115,1
17(P),118,119,9
2,104,105,109,1
11,112,116,120
near
Vinobabhavena
gar, Vill.
Vinzol,
Ahmedabad
2011 Operational
70
UASB
2005
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 14
Applied for
CTE of the
Board
Applied for
CTE of the
Board
Applied for
CTE of the
Board
Applied for
CTE of the
Board
Informatio
n not
provided
13/08/2018
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
21
22
23
City/town
Ankleshwar
Nagarpalika,
Ankleshwar,
Dist.
Bharuch
Ankleshwar
Notified
Area
Authority,
GIDC,
Ankleshwar,
Dist.
Bharuch
Kevadia
Colony, Dist.
Narmadada
24
25
Ahmedabad
26
STP Location
Sukhavali,
Ankleshwar
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
2001 Operational
STP
Installe
d
Capacit
y MLD
150
Technolog
Consent
y (UASB /
Status
ASP / OP /
SBR /
MBR/
FAB Etc.)
OP
Informatio
n not
provided
Plot No. 624/B,
GIDC,
Ankleshwar
2008 Operational
22.5
ASP
Obtained
Kevadia
Colony, Ta.
Nandod, Dist.
Narmada
Old Pirana
Sewage
Treatment
Plant, Pirana
Road,
Behrampura
Pirana Sewage
Treatment Plant
60 MLTD in
compund of 106
MLD STP,
Pirana Road,
Behrampura
New Pirana
Sewage
Treatment
Plant, Pirana
Octroi Naka,
Pirana Road,
Ahmedabad
2007 Operational
2.64
OP
Obtained
2001 Operational
106
UASB
CCA,
Obtained
valid up to
10/03/2016
2010 Operational
60
ASP
CCA,
valid up to
11/04/2018
182
OP
CCA,
refected on
21/06/2011
2001
Not in
Operation
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 15
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
STP Location
STP
Commissio
ned in
(Year)
New Pirana
Sewage
Treatment Plant
(180MLD),
Near 182 MLD
STP. Pirana,
Ahmedabad
Old Vasna
Sewage
Treatment Plant
Near V.N.
Bridge, Narol
Sarkhej High
Way
Vasna STP-135,
between V.N.
Bridge and Toll
from Sabarmati,
Vasna
2008
Status
(Operational/
NonOperational/U
nder
Construction)
Operational
2001
Operational
126
UASB
CCA,
valid up to
10/03/2016
2011
Operational
35
ASP
CCA,
valid up to
11/04/2018
30
New Vasna
STP, NarolSarkhje High
Way
1995
Not in
operational
76
OP
31
Vasna STP,
97/A/1, at
Sabarmati
River, Vasna
2011
Not in
operational
240
ASP
CCA
Renewal
Appln
rejected on
26/05/2011
CCA,
valid up to
28/07/2018
32
AMC, Jalvihar,
Old Vadarj
Proposed
Open Land, yet
construction
not started
60
-
Applied for
CTE
33
AMC, Jalvihar,
Near Bhavans
College,
Khanpur
Proposed
Open Land, yet
construction
not started
60
-
Applied for
CTE
27
28
29
City/town
STP
Installe
d
Capacit
y MLD
180
Technolog
Consent
y (UASB /
Status
ASP / OP /
SBR /
MBR/
FAB Etc.)
ASP
CCA,
valid up to
11/04/2018
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 16
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
-
1/10/2010
STP not in
working
condition
Operational
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Under
Constructio
n
-
51
ASP
1/2/2004
Operational
12
ASP
-
Under
Contstruction
56
-
Applied for
CTE
-
Under
Contstruction
70
-
Applied for
CTE
2009
In operational
15
ASP
Expired on
17/06/2014
and applied
for renewal
34
Sanand
Sanand
35
Vallabh
Vidhyanagar
Vill. Vallabh
Vidhyanagar
1987 Old
STP
36
Raiya STP,
Vill. Raiya
Rajkot Managar
Palika Rajkot
37
STP Rajkot
Municipal
Corporation S
No.
61,64,111,120&
121 Paiki,
Ishwarya
Temple Road,
Vill.Madhapar, Dist.
Rajkot
STP of Rajkot
Mahanagar
Palika at
Raiyadhar,
Raiya Road,
Rajkot
STP of Rajkot
Mahanagar
Palika at
Gauridad, Ta &
Dist. Rajkot
Block No. 1/P,
11/P 13to19 at
Asarma, Ta.
Choryasi, Dist.
Surat
Rajkot
38
39
40
Surat
2015
Status
(Operational/
NonOperational/U
nder
Construction)
Under
Construction
STP
Installe
d
Capacit
y MLD
20.5
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 17
Consent
Status
STP
Nagarpalik
a
-
AWH53277
Validity up
to
17/03/2016
AWH52754
Validity up
to
07/02/2015
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
STP Location
STP
Commissio
ned in
(Year)
STP
Installe
d
Capacit
y MLD
2003
Status
(Operational/
NonOperational/U
nder
Construction)
In operational
41
Near Anand
Park Society,
Opp. Akhand
Anand College
42
City S. No. 10
Paiky 11& 13
Paiky14, Final
Plot 119
Survey No. 46,
Vadod
1958
In operational
82.5
UASB
Valid up
to
28/03/2019
2011
In operational
100
ASP
44
Bhatar, SMC.
Surat
1999
In operational
162
ASP
45
S. No. 44,45,51,
56-62
1995
In operational
100
ASP
46
Moje. Dindoli
2009
In operational
66
ASP
47
Karanj, SMC,
Surat
1999
In operational
142
ASP
48
Vill. Khajod,
Ta. Choryasi,
Dist. Surat
2009
In operational
25
ASP
49
Block No. 128,
Kosad Amroli
Road, Kosad
2012
In operational
84
ASP
50
Sandhpore
Pardi, Valsad
Jamnagar
Municipal
Corporation,
Jamnagar
1998
Operational
16
ASP
2015
Under
Construction
70
ASP
Valid up
to
28/04/2016
Valid up
to
31/01/2019
Valid up
to
17/02/2019
Valid up
to
10/12/2018
Valid up
to
09/03/2019
Expired on
17/06/2014
and applied
for renewal
Expired on
18/04/2013
extension
pending
Not
obtained
CTE
obtained
43
51
City/town
155
Technolog
Consent
y (UASB /
Status
ASP / OP /
SBR /
MBR/
FAB Etc.)
ASP
Valid up
to
05/02/2019
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 18
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
4.12 STPs AT HARYANA
Haryana has 41 numbers of sewage treatment plants having treatment capacity of 852.7 MLD. 02
STPs of capacity 2.7 MLD are Non-Operational and 01 STP of capacity 45 MLD is under
construction. Details of STPs of Haryana are shown in Table 13.
Table 13: STPs-Haryana
Status
Technolog
STP
STP
(Operational/
y (UASB /
Installe
Commissio
NonASP / OP /
Consent
Sl. No
City/town
STP Location
d
ned in
Operational/U
SBR /
Status
Capacit
(Year)
nder
MBR/
y MLD
Construction)
FAB Etc.)
1
Sonipat
2
Panipat
Shiv road
STP Panipat
Dodala road,
Siwah
Operational
35
UASB
Under
Construction
45
UASB
Jattal Road
Operational
25
UASB
Gurgaon-I
Operational
157.5
UASB
5
Gurgaon-II
Operational
67.5
ASP
6
Badshapur
Operational
45
SBR
7
Mirjapur
Operational
45
SBR
Pratapgarh
Operational
50
SBR
9
Palwal
Operational
9
SBR
10
Hodal
Operational
9
MBR
11
Sector-4
Near Shv
Colony WCJ
New Anaj
Mandi Indri
Gharonda
Railway Road
Operational
40
Operational
Non
Operational
8
1.5
Operational
3
UASB
Oxidation
Pond
oxidation
Pond
oxidation
Pond
3
4
8
Gurgaon
Faribadab
12
Karnal
13
14
15
Bhadurgarh
16
Bahadurgarh
Information
not provided
Information
not provided
Operational
USB
Bahadurgarh
Operational
36
SBR
17
Jhajjar
Jhajjar
Operational
5.5
MBBR
18
Kalanur
Kalanur
Operational
3.5
MBBR
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 19
Information
not provided
Information
not provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Operational
20
SBR
Operational
10
SBR
Operational
Operational
30
5
SBR
SBR
21
22
Chakri Dadri
Bhiwani Town
Plant-I
Bhiwani Town
Plant-II
Dardi Road
Bhiwani
Chakri, Dadri
23
Meham
Meham
Operational
5
MBBR
24
Rohtak
Rohtak
Nasiaji Road
Rewari
Kaluwat
Village
Operational
10
SBR
Operational
16
MBBR
Operational
6.5
MBBR
Operational
18
ASP
Operational
39
ASP
15
ASP
1.2
19
20
25
Bhiwani
Rewari
26
27
28
Panchkula
29
STP Panchkula
Sector 20
STP Panchkula
Sector 20
STP Panchkula
Sector 28
30
Kalka
STP Kalka
Operational
Non
Operational
31
Beri
STP, Beri Town
Operational
2
EA
Oxidation
Pond
32
Jind
STP, Jind
Operational
15
MBBR
33
Uchana
STP, Uchana
STP Narvana
Operational
4.5
EA
Operational
3.5
MBBR
STP- II No.,
Narvana
Operational
3.75
MBBR
STP-SBR,
Operational
10
SBR
34
Narvana
35
36
Kaithal
Information
not provided
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 20
Consent
Status
Information
not provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP-MBBR,
Kaithal
37
38
Ambala
39
40
STP Location
STP
Commissio
ned in
(Year)
Yamuna
Nagar
41
Ambala
STP Ambala
City Naya Gaon
STP Yamuna
Nagar- Radaur
Road
STP Yamuna
Nagar- Baddi
Majra
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Operational
10
MBBR
Operational
4.5
MBBR
Operational
3.25
MBBR
Operational
25
UASB
Operational
10
UASB
Consent
Status
4.13 STPs AT HIMACHAL PRADESH
Himachal Pradesh has 66 numbers of sewage treatment plants having treatment capacity
114.72 MLD. 30 STPs of capacity 35.21 MLD are under construction. Details of STPs
Himachal Pradesh are shown in Table 14.
Table 14: STPs-Himachal Pradesh
Status
Technolog
STP
STP
(Operational/
y (UASB /
Installe
Commissio
NonASP / OP /
Sl. No
City/town
STP Location
d
ned in
Operational/U
SBR /
Capacit
(Year)
nder
MBR/
y MLD
Construction)
FAB Etc.)
1
2
3
Bilaspur
of
of
Consent
Status
STP
Ghumarawin
2005-2006
operational
1.2
ASP
RCOP
valid upto
31.03.2016
STP Naina Devi
ji
2005-2006
operational
1.35
ASP
RCOP
valid upto
31.03.2016
STP Bilaspur
Information
not provided
Non
operational
1.5
Septic
Tank
COP given
upto 2016
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 21
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
STP
ChambaBarga
4
20.03.2008
operational
1.5
ASP
RCOP
valid upto
31.03.2016
STP
ChambaBhagot
25.02.2008
operational
0.898
ASP
RCOP
valid upto
31.03.2011
6
STP Shitla
Bridge
23.03.2010
operational
0.2
ASP
COE upto
2011
7
STP Hamirpur,
Distt. Hamirpur
Zone II
06.08.2008
operational
1.35
ASP
RCOP
valid upto
31.03.2015
STP Hamirpur,
Distt. Hamirpur
Zone I
23.01.2010
operational
3.13
ASP
RCOP
valid upto
31.03.2015
23.01.2010
operational
0.68
ASP
Information
not provided
Non
operational
Non
operational
5
8
Chamba
Hamirpur
STP Hamirpur,
Distt. Hamirpur
Zone III
STP Sujanpur,
Zone-II
9
10
11
STP Nadaun
12
STP
BhootnathKullu
Kullu
2006-2007
operational
1.75
ASP
Informatio
n not
provided
1.69
2.5
ASP
13
STP Manali
2006-2007
operational
1.82
ASP
14
STP Badah
2008-2007
operational
0.38
ASP
15
STP Lanka
Baker
2009-2010
operational
2.57
ASP
16
STP Mela
Ground
(Bhunter)
2006-2007
operational
0.99
ASP
17
STP Sharabai
(Bhunter)
2006-2007
operational
0.46
ASP
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 22
RCOP
valid upto
31.03.2018
RCOP
valid upto
31.03.2016
RCOP
valid upto
31.03.2018
RCOP
valid upto
31.03.2015
RCOP
valid upto
31.03.2016
RCOP
valid upto
31.03.2016
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Information
not provided
Informat
ion not
provided
RCOP
valid upto
31.03.2014
COP is
valid upto
31.03.2011
RCOP
valid upto
31.03.2015
18
Una Zone-C
19
Mehatpur, D
Distt. Una
operational
20
STP Sujanpur
Zone-I
operational
1.5
EAP
Non
operational
1.65
ASP
COE given
on
01.10.2010
Non
operational
786 user
Septic
Tank/Soak
pit
COE given
on
01.10.2010
COE given
on
30.09.2014
Una
21
22
STP,
Santokhgarh,
Distt. Una zoneII
STP,
Santokhgarh,
Distt. Una zoneI
operational
ST
ST
23
STP,Una zoneA
Non
operational
2.53
ASP
24
STP Garget
Non
operational
3.14
EAP
25
STP Una zone
D
Non
operational
0.63
ASP
26
STP Mehatpur
ABC
Non
operational
0.77
ASP
27
STP-North
Disposal Shimla
2003
operational
5.8
EAP
28
STP Dhalli,
Shimla
2003
operational
0.76
EAP
29
STP-Summer
hill, Shimla
2003
operational
3.93
EAP
30
STPSnowdown,
Shimla
2003
operational
1.35
EAP
Shimla
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 23
COE given
on
11.12.2014
COE gien
on
30.09.2014
COE given
on
02.06.2012
RCOP
valid upto
31.03.2016
RCOP
valid upto
31.03.2016
RCOP
valid upto
31.03.2016
RCOPvalid
upto
31.03.2016
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
31
STP
Rampur,(Khopr
i) Distt Shimla
operational
1
ASP
RCOP
valid upto
31.03.2016
32
Rampur
(Choohabag)
operational
0.5
ASP
RCOP
valid upto
33
STP Rohroo
operational
1.015
EAP
34
STP
SanjualiMalyan
a
operational
4.44
EAP
19.35
Anaerobic
Systmecum
Aerobic
System
35
Information
not provided
STP Lalpani
operational
36
STP Jubbal
operational
0.65
EAP
37
STP Narkanda
Non
operational
0.45
EAP
38
STP Kotkhai
Zone-I
Non
operational
0.305
EAP
39
STP Kotkhai
Zone-II
Non
operational
0.16
EAP
40
STP Suni
Non
operational
0.65
EAP
41
STP Theog
Non
operational
1.15
EAP
STP Khaliar,
DisttMandi
2004-2005
operational
0.47
ASP
43
STP
RaghunathKaPa
dhar, Mandi
2004-2005
operational
3.83
ASP
44
STP, Sunder
Nagar, Distt.
Mandi
2007-2008
operational
3.55
ASP
42
Mandi
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 24
RCOP
valid upto
31.03.2016
RCOP
valid upto
31.03.2016
RCOP
valid upto
31.03.2016
RCOP
valid upto
31.03.2016
COE given
on
28.07.2010
COE given
on
09.06.2011
COE given
on
09.06.2011
COE given
on
28.11.2013
COE given
on
24.12.2015
RCOP
valid upto
31.03.2016
RCOP
valid upto
31.03.2016
Without
consent
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
45
STP Rewalsar
46
47
48
Kangra
STP Sarkaghat,
Distt. Mandi
zone C
STP at
NeriKhadd,
Joginder Nagar,
Distt. Mandi
STP
Dharamsala,
Distt. Kangra
Information
not provided
Non
operational
0.35
Aerobic
Sludge
Digestion
Non
operational
1.67
EAP
COE given
on
15.01.2014
COE given
on
06.10.2008
2009-2010
operational
1.735
EAP
RCOP
valid upto
31.03.2015
10.10.2006
operational
5.15
AD
RCOP
valid upto
31.03.2018
49
STP
Jwalamukhi,
Distt. Kangra
19.10.2004
operational
3.66
AD
RCOP
valid up to
31.03.2013
50
STP Palampur
2005
operational
0.351
AD
Without
Consent
51
STP Kangra
zone I
52
STP Kangra
zone II
53
Non
operational
1.68
EAP
Non
operational
1.46
EAP
STP Kangra
zone III
Non
operational
0.59
EAP
54
STP Dehra
Non
operational
1.38
Aerobic
Sludge
Digestion
55
STP Nagrota
29.03.2007
Non
operational
1.34
ASP
56
STP Nurpur
Information
not provided
Non
operational
3.13
Aerobic
Sludge
Digestion
57
STP
Bhangsunag
Non
operational
0.224
ASP
STP Rekongpeo, Distt.
Kinnaur
operational
1
ASP
58
Kinnaur
Information
not provided
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 25
COE given
on
15.03.2008
COE given
on
15.03.2008
COE given
on
15.03.2008
COE given
on
27.08.2008
COE given
on
29.03.2007
COE given
on
06.09.2010
COE given
on
08.11.2011
COP valid
up to
31.03.2008
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
STP Solan Zone
B
Non
operational
2.9
EAP
STP Arki
Non
operational
0.7
EAP
STP, Paonta
Sahib Zone II
Non
operational
1
ASP
62
STP, Paonta
Sahib Zone III
Non
operational
1.72
ASP
63
STP, Paonta
Sahib Zone I
operational
0.44
ASP
STP Keylong
phase-I
Non
operational
0.188
Septic
Tank
Non
operational
0.289
Septic
Tank
Non
operational
0.215
Septic
Tank
59
Solan
60
61
64
Sirmour
Lahaul&Spiti
65
STP Keylong
phase-II
66
STP Keylong
phase-III
Sl.
1
2
3
Information
not provided
COE given
on
10.04.2008
COE given
on
06.02.2007
COE given
on
08.07.2008
COE given
on
08.07.2008
COE given
on
08.07.2008
COE given
on
20.12.2008
COE given
on
20.12.2008
COE given
on
20.12.2008
4.14 STPs AT JAMMU & KASHMIR
Jammu & Kashmirhas 19 numbers of sewage treatment plants having treatment capacity of
264.74 MLD. 03 STPs of capacity 117 MLD are under construction and 01 STPs of capacity 02
MLD is non-operational. Details of STPs of Jammu & Kashmir are shown in Table 15.
Table 15: STPs-Jammu & Kashmir
Status
Technolog
STP
STP
(Operational/
y (UASB /
Installe
Commissio
NonASP / OP /
Consent
No
City/town
STP Location
d
ned in
Operational/U
SBR /
Status
Capacit
(Year)
nder
MBR/
y MLD
Construction)
FAB Etc.)
2009-10
Bhagwati Nagar
(UEEDOperational
10
UASB
Applied
Jammu)
Jammu
MPD/CPWD
2009
operational
1
ASP
Not applied
Satwari
Non
Reasikatra
KatraBhawan
2005
2
ASPA
-doOperational
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 26
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
4
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
Katra
Basement, near
Gita Mandir
2006
Operational
0.5
ASP
--do-
under
construction
27
UASB
Not applied
under
construction
30
UASB
Not applied
Applied
Bhagwati
Nagar
5
Jammu
Likely to be
commission
ed in 201314 UEED
Jammu
Likely to be
commission
ed in the
year 201314 UEED
Jammu
6
Bhagwati
Nagar
7
Hazratbal –
Srinagar
2006
operational
7.5
MBBR
8
Habak
2006
operational
3.2
MBBR
Nishat
2006
-do-
4.5
MBBR
1993-94
-do-
17.1
ASP
9
Srinagar
Srinagar
Barinambal
SKIMS
Srinagar
Nallah Amir
khan Srinagar
Barinbal
Srinagar
Barinbal
Srinagar
-
-do-
2.4
ASP
2010-11
LAWDA
-do-
5.4
SBR
-do-
-do
16.1
SBR
-do-
-do-
7
SBR
15
Noor Bagh
UEED
Srinagar
Proposed/Under
construction
60
ASP
16
Alochibagh
2010-11
do
50.24
Not
specified
DPR
10
11
12
13
14
Srinagar
17
SrinagarParimpora
Parimpora
2010-11
do
11.98
ASP
18
Srinagar
Mujgund
UEED
do
3.82
SBR
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 27
Informatio
n not
provided
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
19
4.15
Sl.No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
B.D.Cantt
Srinagar
Under Army
do
5
ASP
STPs AT JHARKHAND
Jharkhand has 15 numbers of sewage treatment plants having
MLD. Details of STPs of Jharkhand are shown in Table 16.
Table 16: STPs-Jharkhand
City/town
STP Location
STP
Status
Commissio (Operational/
ned in
Non(Year)
Operational/U
nder
Construction)
IEL Gomia
50 years ago Operational
Township
BSL
Not Known Operational
Township(a)
Sector 12
(b) Sector 6
Not Known Operational
Bokaro
(c) Sector 11
Not Known Operational
Jmshedpur
(d) Dhandabara
(e) Camp II
(f) BGH
STP Kharkai
STP Bara
Baridih STP
Unit-I
Baridih STP
Unit-II
Jadugoda STP
UCIL
Jadugora, ES NarwaPahar
STP
Moubhandar
HCL
Moubhandar Moubhandar
Not Known
Not Known
Not Known
1952
1994
1952
Operational
Operational
Operational
Operational
Operational
Operational
Consent
Status
treatment capacity of 117.24
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
SAS
Consent
Status
No
1.6
Lagoon
10.4
5.85
2.57
11.4
0.582
1.17
16
45
Lagoon
Lagoon
Lagoon
Lagoon
Lagoon
ASP
ASP
OP
Informatio
n not
provided
31/12/2014
31/12/2014
Up to 2013
4.5
1964
Operational
OP
7.65
1995
Operational
ASP
4.086
1995
Operational
ASP
2
1985
Operational
Classified
0.8
Operational
3.636
Filtration
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 28
Up to
31/12/2013
Up to
31/12/2012
Up to
31/12/2012
Up to
31/12/2007
Up to
31/12/2007
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
4.16
STPs AT KARNATAKA
Karnatakahas 57 numbers of sewage treatment plants having treatment capacity of 1304.16
MLD. 13 STPs of capacity 192.11 MLD are under construction. Details of STPs of Karnataka
are shown in Table 17.
Table 17: STPs-Karnataka
Status
Technolog
STP
STP
(Operational/
y (UASB /
Installe
Commissio NonASP / OP / Consent
Sl. No. City/town
STP Location
d
ned in
Operational/U
SBR /
Status
Capacit
(Year)
nder
MBR/
y MLD
Construction)
FAB Etc.)
Nayandanahalli
Operational
180
1
-I
Nayandanahalli
Operational
75
2
-I
Kempambudhi
Operational
3
1
Informatio Informatio
NagasandraOperational
163
4
Information
n not
n not
Yemalur post,
not provided
provided
provided
Chalaghatta
Village-STP-I
Bangaluru
NagasandraOperational
55
5
Yemalur post,
Chalaghatta
Village-STP-II
NagasandraOperational
30
6
Yemalur post,
Chalaghatta
Village-STP-III
Kadabeesanahal
Operational
50
7
li
Bangaluru
Madiwala
Operational
4
8
Informatio Informatio
Nagasandra
20
9
Information Operational
n not
n not
Hebbal
60
10
not provided Operational
provided
provided
Yelahanka
Operational
10
11
Jakkur
Operational
10
12
Rajacanal
Operational
40
13
K.R. Puram
Operational
20
14
Cubbon Park
Operational
1.5
15
Lalbagh
Operational
1.5
16
Ramanagar
Ramanagar
Operational
7.56
17
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 29
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No. City/town
STP Location
18
19
20
Kolar
Srinivasapura
Chikballapura
21
Kolar
Chikballapur
a
22
23
24
25
26
Hassan
Mandya
30
31
Mysore
32
37
38
39
Chintamanai
Kollegal
Chamarajnag
ar
27
28
29
33
34
35
36
STP
Commissio
ned in
(Year)
Chikamagalu
r
Karwar
Mangalore
Chamarajnagar
Hassan
Chikkegowdana
doddi, Mandya
Guttahalu,
Mandya
Maddur
Srirangapatana
Rayankere,
Mysore
Vidyaranyapura
m, Maysorfe
Kesare,
Maysore
Hunsur,
Maysore
K. R. Nagar
K. R. Nagar
Bannur
Chikamagalur
Karkalla
Bhatkala
Kavoor STP
and Tertiary
Information
not provided
Status
(Operational/
NonOperational/U
nder
Construction)
Operational
Operational
Under
Contstruction
Yet to
commission
Operational
STP
Installe
d
Capacit
y MLD
Consent
Status
Informatio
n not
provided
Informatio
n not
provided
10.16
3
3.1
2
3.34
Under
Contstruction
Operational
Operational
9
Operational
1.58
Operational
Operational
Operational
3.5
1.39
60
Operational
67.65
Operational
30
Operational
3.9
Operational
Operational
Operational
Under
Contstruction
Operational
Operational
In operational.
Operating at 18
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
10
9.2
1.44
1.45
3.85
25
1.5
3.5
43.5
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 30
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No. City/town
STP Location
treatment Plant
40
41
Pachanady STP
Jeppinamogaru
STP
Surathkal STP
42
43
44
45
46
47
Sullia,
Mangalore
Udupi
Udupi
Bagalkote
Bagalkote
48
Badam
49
Haveri
50
51
52
53
Haveri
Bellary
Gulbarga
Ranebennur
Ananthpur
Cowl bazar
Gulbarga
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
MLD capacity
Trail run
Under
Contstruction
Under
Contstruction
STP has
installed, UGD
work under
construction
Operational
Operational
Operational
yet to
commission
Yet to
commission
Under
Contstruction
Yet to
commission
Operating
Operating
Under
Information Contstruction
not provided Under
Contstruction
Operational
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
8.75
20
16.5
20
12
5.5
3
5
4.3
4.71
7.5
30
15
55
54
Raichur
Raichur
55
Davangere
Davangere
56
Bhadravati
Bhadravati
Operational
5.83
57
Tumkur
Tumkur
Operational
25
Informatio
n not
provided
20
19.45
Informatio
n not
provided
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 31
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
4.17
STPs AT KERALA
Kerala has 10 numbers of sewage treatment plants having treatment capacity of 152.97 MLD.
Out of 10 STPs, 01 STP of capacity 03 MLD is Non-Operational and 03 STPs of capacity
37.1 MLD are under construction. Details of STPs of Kerala are shown in Table 18.
Table 18: STPs-Kerala
Sl. No.
City/town
STP Location
STP
Status
STP
Technolog
Consent
Commissio (Operational/ Installe y (UASB /
Status
ned in
Nond
ASP / OP /
(Year)
Operational/U Capacit
SBR /
nder
y MLD
MBR/
Construction)
FAB Etc.)
Thiruvananth Muttathara,
01.11.2013 Operational
107
ASP with
Consent
1
apuram
extended
issued ob
aeration
03.03.2014
valid upto
31.03.2016
Marine Drive1984
Operational
0.6
ASP with
Under
2
GCDA-STP
extended
Processing
aeration
Ernakulam
KWA STP at
1970
Operational
4.5
ASP
Consent to
3
Elamkulam
Operate
valid upto
30.06.2015
Kottayam
Kumarakam(Co
2007
Operational
0.09
Diffused
Consent
4
mmon STP for
aeration
valid upto
House Boat)
attached
30.06.2015
growth
process
Alappuzha
Kunnumma
2014
Operational
0.18
Electrolytic Consent
5
village
coagulation expires on
(Common STP
31.12.2014
for House Boat)
Applied for
renewal
Kannur
Thaliparamba
2013
Operational
0.5
ASP
Not applied
6
for consent
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 32
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No.
City/town
STP Location
STP
Commissio
ned in
(Year)
7
Guruvayoor
Municipality
Chakkamkanda
STP Units
Constructed
4 years back
8
Kollam
Kureepuzha
Status
(Operational/
NonOperational/U
nder
Construction)
NonOperational
STP
Installe
d
Capacit
y MLD
3
Construction
not started
11.6
Construction
not started
12
Information
not provided
9
Kochi
10
Kozhikode
Mundenvely
Karimpanampala
m
Information
not provided
Construction not
started
13.5
Technolog
Consent
y (UASB /
Status
ASP / OP /
SBR /
MBR/
FAB Etc.)
ASP
Consent
issued
valid upto
21.03.2011
Not applied
for renewal
MBBR
Consent to
establish
issued
valid upto
04.04.2014
applied for
renewal
MBBR/SB Consent to
R
establish
issued
valid upto
25.05.2014
MBBR
Consent to
establish
issued
11.05.2010
valid upto
10.05.2013
applied for
renewal
4.18
STPs AT LAKSHADWEEP
Lakshadweep has zero number of sewage treatment plant.
4.19
STPs AT MADHYA PRADESH
Madhya Pradesh has 17 numbers of sewage treatment plants having treatment capacity of
482.23MLD.Out of 17 STPs, 03 STPs of capacity 6.75 MLD are Non-Operational. Details of
STPs of Madhya Pradesh are shown in Table 19.
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 33
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Table 19: STPs-Madhya Pradesh
Sl. No
City/town
1
STP Location
STP
Commission
ed in (Year)
Status
(Operational/N
onOperational/Un
der
Construction)
Ujjain
Information Operational
not provided
STP
Installed
Capacity
MLD
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
Consent
Status
52
Informatio
n not
provided
Operational
53
Waste
stabilizatio
n pond
OPS
Karnal
Technolog
y
50
WSP
Not
obtained
consent
obtained
78
USAB
Not
obtained
12
USAB
6
OP
Ujjain
2
3
2001
Laltipara
1.11.2010
6
Burhanpur
Burhandpur
2009
Operational
Maintained &
running by
IMC through
contractor
Maintained &
running by
IMC through
contractor
Not in working
condition
7
MC Jabalpur
2012
Operational
150
FAB
8
Gwarighat
Maholi
Dhamkheda
15/10/01
Operational
25
9
Badwai
15/10/01
Operational
17
10
Gondermau
15/10/01
Operational
2.36
WSP
Oxidation
pond
Oxidation
pond
15/10/01
Operational
10
12
Kotra Singhpur
(NRCP) Ekant
Park
2008
Operational
8
13
Bawadia Kalan
1975
Operational
13.56
14
Bio-Filteration
Mata Mandir
4
Gwalior
Sadaval
Indore
5
11
MC Bhopal
Kabitkhedi,
2006
Kabitkhedi,
2009
1959
Operational
4.56
WSP
Oxidation
pond
Oxidation
pond
BioFiltration
Plant
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 34
Not
obtained
Not
obtained
Not
obtained
valid upto
31/12/13
valid upto
31/12/13
valid upto
31/12/13
valid upto
31/12/13
Not
obtained
Not
obtained
Not
obtained
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
15
City/town
Nagda
STP Location
Vidisha
Vidisha
17
Keolari
Keolari
SI.No.
City/Town
Amravati
3
4
STP Location
Two at
Lalkhedi
Amravati
CIDCO STP
Near Airport
Aurangabad
Near Salim Ali
Sarovar Hudco
5
6
STP
Installed
Capacity
MLD
Information
not provided
Operational
Non
operational
0.75
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
Karnal
Technolog
y
Karnal
Technolog
y
Karnal
Technolog
y
Consent
Status
Informatio
n not
provided
STPs AT MAHARASHTRA
Maharashtra has 76 numbers of sewage treatment plants having treatment capacity of
5160.36MLD. 10 STPs of capacity 344.5 MLD are Non-Operational and 06 STPs of capacity
131.96 MLD are under construction. Details of STPs of Maharashtra are shown in Table 20.
Table 20: STPs-Maharashtra
1
2
Status
(Operational/N
onOperational/Un
der
Construction)
Non
operational
Nagda
16
4.20
STP
Commission
ed in (Year)
Bhiwandi
Nizampur
Katai
7
Chandrapur
Pathanpura
STP
commissione
d in
Status(Operati
onal/ NonOperational/
Under
Construction)
STP
Installed
Capacity
(MLD)
Technology
(UASB/AS
P/OP/SBR/
MBR/FAB
ETC.)
Apr.13
Operational
30.5
ASP
Applied
Consent
Status
Dec.12
Non
operational
44
ASP
Applied
1998
Operational
6.5
ASP
Applied
Feb.2013
Operational
5
SBR
Applied
Operational
Operational
17
Applied
Under
Under
construction construction
13
Under
commission
ing
25
Digester
and
Chlorinatio
n with
sludge
lagoons
ASP
Under
commissioning
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 35
Applied
Not applied
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI.No.
City/Town
STP Location
8
Rahamat Nagar
9
STP
Installed
Capacity
(MLD)
Technology
(UASB/AS
P/OP/SBR/
MBR/FAB
ETC.)
Consent
Status
Under
commissioning
45
ASP
Not applied
1978
Non
Operational
16
Primary
Clarifier
Applied
1980
Non
Operational
14
SBR
Applied
Jan.13
Operational
15
SBR
Applied
Jan.13
Operational
25
SBR
Applied
final stage
of
commission
ing
final stage
of
commission
ing
Non
Operational
40
SBR
Applied
Non
Operational
40
SBR
Applied
Information
not provided
Non
Operational
Operational,
2
SBR
Applied
Operational
43.5
STP
commissione
d in
Under
commission
ing
Adharwadi
10
Motagaon
11
Barave
12
Adharwadi
13
Kalyan
Dombivali
Chinchpada
14
Motagaon
15
Status(Operati
onal/ NonOperational/
Under
Construction)
16
Titwala east
Titwala west
17
Kasba Bawda
Information
not provided
1974
Kasba Bawda
2014
Operational
76
Jessel Park
2008
Operational
2
Shrusti complex
2008
Non
operational
Colaba
1988
Operational
18
Kolhapur
19
20
Mira
Bhaindar
21
Greater
Mumbai
1
SBR
Applied
Primary
Clarifier,
Trickling
Filter, SBR
ASP
Applied
1.5
ASP
Applied
41.1
Primary &
Secondary
treatment ,
Aerated
Lagoons
Applied
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 36
Applied
Applied
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI.No.
City/Town
STP Location
STP
commissione
d in
Status(Operati
onal/ NonOperational/
Under
Construction)
STP
Installed
Capacity
(MLD)
22
Love Grove,
worli
1990
Operational
756.9
23
Bandra
2003
Operational
796.9
24
Versova
1992
Operational
25
Malad
1998
26
Bhandup
27
28
Technology
(UASB/AS
P/OP/SBR/
MBR/FAB
ETC.)
Consent
Status
Primary &
Secondary
treatment ,
Aerated
Lagoons
Primary &
Secondary
treatment ,
Aerated
Lagoons
Applied
180
Primary &
Secondary
treatment ,
Aerated
Lagoons
Applied
Operational
240
Applied
2002
Operational
280
Primary &
Secondary
treatment ,
Aerated
Lagoons
Primary &
Secondary
treatment ,
Aerated
Lagoons
Ghatkopar
2003
Operational
300
Primary &
Secondary
treatment ,
Aerated
Lagoons
Applied
Charkop
2009
Operational
6
Primary &
Secondary
treatment ,
Aerated
Lagoons
Applied
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 37
Applied
Applied
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI.No.
29
30
31
City/Town
Nagpur
Nanded
Waghela
STP
commissione
d in
Status(Operati
onal/ NonOperational/
Under
Construction)
Bhandewadi,
Mar-01
Operational
100
Bondar
26/03/97
Operational
87
ASP,Prima Applied
ry Clarifier,
secondary,
tertiary
ASP
Applied
Elichpur
30
ASP
Applied
78
UASB
reactor
Applied
STP Location
STP
Installed
Capacity
(MLD)
Technology
(UASB/AS
P/OP/SBR/
MBR/FAB
ETC.)
Consent
Status
32
Tapovan 1
Information Operational
not provided
2003
Operational
33
Tapovan 2
2010
Operational
52
ASP
Applied
Panchak 1
2003
Operational
7.5
ASP
Applied
35
Panchak 2
2012
Operational
21
ASP
Applied
36
Chehadi 1
2006
Operational
22
ASP
Applied
37
Chehadi 2
2012
Operational
20
ASP
Applied
38
CBD Belapur
6/10/2011
Operational
19
SBR
Till
31/05/2017
39
Nerul sec.50
15/04/08
Operational
100
ASP
Till
31/05/2017
40
Sanpada
15/04/12
Operational
37.5
ASP
41
Vashi
30/06/08
Operational
100
ASP
Kopar khairane
1/1/2012
Operational
87.5
ASP
43
Airoli
30/04/08
Operational
80
ASP
44
Nerul sec.2
Operational
10
ASP
45
Ghansoli
taken from
cidco
22/06/10
Operational
27
ASP
Till
31/05/2017
Till
31/05/2017
Till
31/05/2017
Till
31/05/2017
Till
31/05/2017
Till
31/05/2017
34
Nashik
42
Navi
Mumbai
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 38
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI.No.
City/Town
STP Location
STP
commissione
d in
Status(Operati
onal/ NonOperational/
Under
Construction)
STP
Installed
Capacity
(MLD)
Technology
(UASB/AS
P/OP/SBR/
MBR/FAB
ETC.)
85
ASP
50
ASP
Consent
Status
46
Kamothe
Feb.2012
47
Kalamboli
Dec.11
48
Chikali Phase-I
1987
Operational
16
ASP
Till
31/05/2017
Till
31/05/2017
Applied
49
Chikali Phase-II
2000
Operational
16
SBR
Applied
50
Chinchwad
Phase I
Chinchwad
Phase II
2000
Operational
30
FAB
Applied
2008
Operational
30
FAB
Applied
Kasarwadi
Phase I
1999
Operational
40
FAB
Applied
2003
Operational
40
FAB
Applied
2010
Operational
40
FAB
Applied
55
Kasarwadi
Phase II
Kasarwadi
Phase III
Sangvi Phase I
2001
Operational
15
FAB
Applied
56
Sangvi Phase II
2012
Operational
20
FAB
Applied
57
58
59
60
61
Pimpale Nilakh
Ravet
Charoli
Akurdi
Erandawane
2007
2009
2012
2011
2004
Operational
Operational
Operational
Al Operational
Operational
20
20
21
30
50
62
Bopodi
2004
Operational
18
63
Bahiroba
2003
Operational
130
Tanajiwadi
2004
Operational
17
65
Vitthalwadi
2009
Operational
32
66
Baner
2010
Operational
30
51
52
53
Pimpi
Chinchwad
54
64
Pune
Operational
Operational
FAB
FAB
FAB
FAB
Extended
aeration
Extended
aeration
ASP
Applied
Applied
Applied
Applied
Applied
Biotower
with
Extended
aeration
Extended
aeration
SBR
Applied
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 39
Applied
Applied
Applied
Applied
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI.No.
City/Town
67
68
69
70
Mundhava
Kharadi
Sangli 100 Ft
road
Sangli Miraj
Kupwad
71
72
Solapur
Thane
75
76
Bedag road ,
Miraj
Dhulgaon
73
74
STP Location
Ulhasnagar
Solapur
STP
commissione
d in
Status(Operati
onal/ NonOperational/
Under
Construction)
2009
2012
1976
Operational
Operational
Non
Operational &
under
construction
1976
Non
Operational &
under
construction
commission Under
ing
commissioning
Information Non
not provided Operational
STP
Installed
Capacity
(MLD)
45
40
12.76
Technology
(UASB/AS
P/OP/SBR/
MBR/FAB
ETC.)
Consent
Status
SBR
SBR
Primary,O
P
Applied
Applied
Applied
9.2
Primary,
OP
Applied
27
Primary,
OP
Primary
Applied
SBR, ( CTech)
SBR, ( CTech)
SBR, ( CTech)
Digester
and
Chlorinatio
n
31.12.16
55
Kopri
17/02/12
Operational
120
Kalwa
not started
100
Mumbra
not started
Khande
Golivali
2006
Non
Operational
Non
Operational
Operational
32
28
Applied
Informatio
n not
provided
Applied
4.21 STPs AT MANIPUR
Manipur has zero number of sewage treatment plants.
4.22 STPs AT MEGHALAYA
Meghalaya has 1 sewage treatment plant having treatment capacity of 1 MLD. 1STP of capacity
1 MLD is Non Operational at Shillong. Details of STPs of Meghalaya are shown in Table 21.
Table 21: STPs-Meghalaya
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 40
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
1 Shillong
4.23
Sl. No
NEIGRIHMS,
Mawdiandiang,
East Khasi Hills
District
04.07.2006
Status
(Operational/
NonOperational/U
nder
Construction)
Non Operational
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
1
ASP
30.06.2012
STPs AT MIZORAM
Mizoram has 01 sewage treatment plant having treatment capacity of 10 MLD. 01 STP of
capacity 10 MLD is Under Construction at Aizawal Mizoram. Details of STPs of Mizoram are
shown in Table 22.
City/town
Aizawal
Mizoram
1
STP Location
STP
Commissio
ned in
(Year)
Table 22: STPs-Mizoram
Status
STP
(Operational/
Commissio
NonSTP Location
ned in
Operational/U
(Year)
nder
Construction)
Bethlehem
Vengthlang (on
Under
the bank of
Information Construction
Chite stream)
not provided
STP
Installe
d
Capacit
y MLD
10
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
PS+ASP
Consent
Status
CoE in
2011,
renewed on
2012
4.24
STPs AT NAGALAND
Nagaland has zero number of sewage treatment plants.
4.25
STPs AT ODISHA
Odisha has 13 numbers of sewage treatment plants having treatment capacity of 385.54MLD.
6STPs of capacity 227.5 MLD are Under Construction. Details of STPs of Odisha are shown
in Table 23.
Table 23: STPs-Odisha
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 41
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
1
Roulkela
2
3
OCL,
Rajgangpur
4
5
6
L&T
Kansbahal
Cuttack
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
July,2007
Operational
18
OP
31.03.2016
March,2005
Operational
3.24
OP
25.03.2011
Operational
43.2
SBR
Line-2 Step-2
May,2011
Operational
7.2
SBR
STP
20-09-1990
Operational
38.4
SBR
STP Location
STP-I: Steel
Township
sector-14
STP-II: Steel
Township
Sector-22
Township AreaSTP1
Mattagajpur
Jun-05
Operational
33
OP
7
Mattagajpur
Information
not provided
Under
Construction
16
ASP
8
Bidanasi
Information
not provided
Under
Construction
36
ASP
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 42
31.03.2015
31.3.2015
The CMC
has applied
Consent on
20.08.2014
& is under
process.(Th
is STP will
be
Dismantled
)
Obtained
Consent to
establish
from the
board
Obtained
Consent to
establish
from the
board
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
9
Puri
Mangalaghat
2013
Operational
15
ASP
10
Bhubaneswar
Rokta
Information
not provided
Under
Construction
48
ASP
11
Meherpalli
Under
Construction
56
ASP
12
Kochilaput
Under
Construction
43.5
ASP
13
Basuaghai
Under
Construction
28
ASP
4.26
The
Muncipalit
y has not
obtained
Consent to
establish &
Consent to
operate
from the
Board
The BMc
has
obtained
Consent to
establiseh
from the
Board
Obtained
Consent to
establiseh
from the
Board
obtained
Consent to
establiseh
from the
Board
obtained
Consent to
establiseh
from the
Board
STPs AT PUDUCHERRY
Puducherryhas 06 numbers of sewage treatment plants having treatment capacity of 68.5
MLD. 03 STPs of capacity 51 MLD are Under Construction. Details of STPs of Puducherry
are shown in Table 24.
Table 24: STPs-Puducherry
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 43
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
1
2
Lawspet,
Puducherry
3
4
Dubrayapet,
Puducherry
5
6
Reddiarpalya
m,
Puducherry
4.27
STP Location
Sewage Farm,
Lawspet,
Puducherry
Sewage Farm,
Lawspet,
Puducherry
Sewage Farm,
Lawspet,
Puducherry
Dubrayapet,
Puducherry
Dubrayapet,
Puducherry
Kanaganeri,
Reddiarpalyam,
Puducherry
STP
Commission
ed in (Year)
Information
not provided
Status
(Operational/N
onOperational/Un
der
Construction)
STP
Installed
Capacity
MLD
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
Operational
12.5
Oxidation
Pond
Operational
2.5
UASB
Under
Contstruction
17
SBR
Operational
2.5
UASB
Under
Contstruction
Under
Contstruction
17
SBR
17
SBR
Consent
Status
Informatio
n not
provided
STPs AT PUNJAB
Punjab has 86 numbers of sewage treatment plants having treatment capacity of
1245.45MLD. 04 STPs of capacity 15.2 are Non-Operational, 31 STPs of capacity 276.7
MLD are Under Construction and 13 STPs of capacity 32.1 MLD are proposed. Details of
STPs of Punjab are shown in Table 25.
Table 25: STPs-Punjab
SI. No.
City/ Town
STP location
STP
commissione
d in (Year)
1
Ludhiana
Bhattian
2007
2
Ludhiana
Bhattian
3
Ludhiana
Jamalpur
Status
(Operational/
Nonoperational/
under
construction
STP
installed
capacity
Technology(UASB
/ASP/ OP/
SBR/ MBR/
FAB etc.
Consent
status
Operational
111
UASB
2012
Operational
50
SBR
2008
Operational
48
UASB
Not
Obtained
Not
Obtained
Not
Obtained
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 44
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI. No.
City/ Town
STP location
4
Ludhiana
Baloke
2008
5
Ludhiana
Baloke
2011
6
Nawanshahr
7
Banga
8
Hoshiarpur
9
Tanda
10
Mukerian
11
Dasuya
12
Sham
Churasi
Village
Gujarpur
At Happowal
Road Banga
Jalandhar
Byepass
At Tanda to
Miani Road
Village
Attalgarh
Near Model
Town, Dasuya
(Dasuya to
Miani Road)
Sham Churasi
13
BBMB
Township,
Talwara
Municipal
Council,
Fazilka
Municipal
Council,
Abohar,
Distt. Fazilka
14
15
BBMB
Township
STP
commissione
d in (Year)
Status
(Operational/
Nonoperational/
under
construction
STP
installed
capacity
Technology(UASB
/ASP/ OP/
SBR/ MBR/
FAB etc.
Operational
152
UASB
Operational
105
SBR
6
SBR
3
SBR
30
MBBR
4
MBBR
4
MBBR
4
Waste
Stablizatio
n Ponds
1
Not
Applied
8
Waste
Stablizatio
n Ponds
SBR
Under
Construction
Under
Construction
Information Under
not provided Construction
Under
Construction
Under
Construction
2013
Operational
Under
Information Construction
not provided
2013
Operational
Consent
status
Not
Obtained
Consent to
operate
under
Water Act,
1974 had
been
expired on
15.03.2012
.
Not
Applied
Not
Applied
Not
Applied
Not
Applied
Not
Applied
Not
Applied
Granted
Fazilka
2007
Operational
8
WSP
Not
obtained
Abohar
Yet to
commission
Under
construction
25
SBR
Not
obtained
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 45
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI. No.
City/ Town
STP location
STP
commissione
d in (Year)
16
Municipal
Council,
Jalalabad
(w), Distt.
Fazilka
Municipal
Council,
Talwand
Bhai, Distt.
Ferozepur
Municipal
Council,
Zira, Distt.
Ferozepur
Nagar
Panchayat,
Makhu,
Distt.
Ferozepur
Municipal
Corporation,
Moga
Municipal
Council,
Dharamkot,
Distt. Moga
Municipal
Corporation,
Bathinda
Municipal
Council,
Rampura
Phul
Municipal
Council,
Bhucho
Mandi
Jalalabad (w)
2013
Talwandi Bhai
17
18
19
20
21
22
23
24
STP
installed
capacity
Technology(UASB
/ASP/ OP/
SBR/ MBR/
FAB etc.
Consent
status
Operational
8
MBBR
Not
obtained
Yet to
commission
Under
construction
4
MBBR
Not
obtained
2014
Operational
8
MBBR
Not
obtained
Makhu
Yet to
commission
Under
construction
4
MBBR
Not
obtained
Moga
2013
Operational
27
SBR
Not
obtained
Dharmkot
Yet to
commission
Under
construction
4
MBBR
Not
obtained
Bathinda
2013
Operational
52
SBR
Not applied
/obtained
Rampura
2012
Operational
7.5
MBBR
Not applied
/obtained
Bhucho
2013
Operational
3
OP
Not applied
/obtained
Zira
Status
(Operational/
Nonoperational/
under
construction
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 46
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI. No.
City/ Town
STP location
25
Nagar
Panchayat,K
otfatta
Municipal
Council,Mou
r
Municipal
Council,Ram
an Mandi
Municipal
Council,Sang
at Mandi
Municipal
Council,Goni
ana
Nagar
Panchayat,
Talwandi
Sabo
Kotfatta
26
27
28
29
30
31
32
33
34
35
36
37
38
Municipal
Council,Muk
atsar
Municipal
Council,Mal
out
Municipal
Council,Gidd
erbaha
Nagar
Panchayat,Ba
ri Wala
Municipal
Council,Man
sa
Municipal
Council,Bud
STP
commissione
d in (Year)
Status
(Operational/
Nonoperational/
under
construction
STP
installed
capacity
Technology(UASB
/ASP/ OP/
SBR/ MBR/
FAB etc.
Consent
status
2014
Operational
1.5
OP
Not applied
/obtained
Maur
Not
installed
Under
construction
N.A.
NA
Not applied
/obtained
Raman Mandi
Not
installed
Under
construction
N.A.
NA
Not applied
/obtained
1.5
OP
Not applied
/obtained
Operational
3
OP
Applied
and under
process
Not applied
/obtained
Sangat
Goniana
Not
commission
ed yet
2013
Not yet
operated
Talwandi Sabo
2013
Operational
3
SBR
Balamgarh
Road
Balamgarh
Road
Jalaalabad Road
2012
Non
Operational
Non
Operational
Operational
3.5
MBBR
5.7
MBBR
8.7
MBBR
Not
commission
ed yet
Not
commission
ed yet
Not
installed
Under
construction
N.A.
NA
Not applied
/obtained
Under
construction
N.A.
NA
Not applied
/obtained
Construction
not yet started
N.A.
NA
Not applied
/obtained
Mansa
2014
Operational
14
MBBR
Not applied
/obtained
Budhlada
2014
Operational
6.5
MBBR
Not applied
/obtained
Malout
Gidderbaha
Bariwala
2012
2012
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 47
Not applied
/obtained
Not applied
/obtained
Not applied
/obtained
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI. No.
City/ Town
STP location
STP
commissione
d in (Year)
Status
(Operational/
Nonoperational/
under
construction
STP
installed
capacity
Technology(UASB
/ASP/ OP/
SBR/ MBR/
FAB etc.
Bareta
Not
commission
ed yet
2014
Not yet
operated
Consent
status
N.A.
OP
Not applied
/obtained
Operational
4
OP
Not applied
/obtained
Not applied
/obtained
hlada
39
40
41
Municipal
Council,Bare
ta
Nagar
Panchayat,
Sardulgarh
Nagar
Panchayat,
Bhikhi
Sri
Hargobindpu
r
Dera Baba
Nanak
Pathankot
Sardulgarh
Bhikhi
2014
Operational
3
OP
2014
Nonoperational
1
Stabilizatio
n Ponds
Not
obtained
2014
Operational
1.5
2014
Under
construction
Operational
27
Stabilizatio
n Ponds
SBR
10
SBR
Not
obtained
Not
obtained
Not
obtained
46
47
Samana
Distt. Patiala
Adampur
Alawalpur
Near village
Rampur,
Talwara
Dera Baba
Nanak
Near ladochak
village
Sehajpura
Road, Samana
Adampur
Adampur
4
1
-
48
Nakodar
Nakodar
Proposed
Information Proposed
not provided
31.10.2014 Under
construction
Proposed
Information Proposed
not provided
Proposed
6
SBR
42
43
44
45
49
50
51
Nurmahal
Shahkot
Goraya
52
Phillaur
53
54
Lohian
Nurmahal
Shahkot
Goraya
2010
2001
Operational
Phillaur
30.09.2014
Lohian
-
Under
construction
Proposed
4
3
4
-
2.6
Duckweed
3
SBR
1.5
-
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 48
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI. No.
City/ Town
STP location
55
Phagwara
Phagwara
STP
commissione
d in (Year)
Status
(Operational/
Nonoperational/
under
construction
STP
installed
capacity
Technology(UASB
/ASP/ OP/
SBR/ MBR/
FAB etc.
2008
Operational
20
UASB
56
2014
Under
stabilization
8
MBBR
57
30.09.2014
8
MBBR
100
UASB
Jalandhar
Pholriwal
2008
Under
construction
Operational
59
Pholriwal
2011
Operational
25
SBR
60
Pholriwal
30.09.2014
25
SBR
61
STP on
Kapurthala
Road, Jalandhar
30.06.2014
Under
construction
Under
stabilization
50
SBR
62
30.09.2014
Under
construction
25
SBR
Under
construction
10
SBR
Proposed
4
-
2006
Operational
25
UASB
Under
stabilization
4
WSP
Proposed
4
Under
construction
Operational
2.5
SBR
2.6
WSP
58
Jalandhar
64
Kartarpur
at Jaitewali,
Hoshiarpur
Road, Jalandha
STP at
Bhambiawali,
G.T Road,
Jalandhar
Kartarpur
65
Kapurthala
Kapurthala
66
Bholath
Bholath
05.02.2014
67
Bhogpur
Bhogpur
-
68
Begowal
Begowal
30.07.2014
69
Sultanpur
Lodhi
Sultanpur
Lodhi-I
2003
63
70
71
Sultanpur
Lodhi-II
Dhilwan
Dhilwan
31.10.2014
-
Information Proposed
not provided
2.6
Proposed
2.5
Informatio
n not
provided
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 49
Consent
status
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI. No.
City/ Town
STP location
STP
commissione
d in (Year)
72
Naya Nangal
Naya Nangal
1994
Status
(Operational/
Nonoperational/
under
construction
Operational
STP
installed
capacity
Technology(UASB
/ASP/ OP/
SBR/ MBR/
FAB etc.
8
ASP
73
BBMB
Township
Naya Nangal
1991
Operational
6.75
ASP
74
Naya Nangal
Naya Nangal
Under
Construction
Information (Likely to be
not provided commissioned
by 30/09/2014)
Consent
status
Not
Obtained
Obtained,
expired on
31/03/2010
5
Informatio
n not
provided
MBBR
75
Anandpur
Sahib
Anandpur Sahib
Feb, 2010
Operational
8
76
Zirakpur
Sept, 2013
Operational
17.3
77
Roopnagar
1/7/2013
Operational
10
78
Roopnagar
Village
Singhpura,
Tehsil Dera
Bassi.
Vill Badi
Haveli
Vill Sadabarat
2
79
Roopnagar
Vill Rasoolpur
About 2-3 Operational
weeks back
About 2
Operational
months back
MBBR
80
81
82
Chamkaur
Sahib
Kharar
Kurali
Bela Road,
Chamkaur
Sahib
Kharar
Kurali
Obtained,
expired on
31/12/2013
Obtained
SBR
SBR
Under
construction
(90 % work
completed)
(Likely to be
commissioned
by 30/09/2014)
Under
construction
Information
(60 % work
not provided
completed)
Information
Construction
not provided
almost
complete
SBR
2.5
SBR
1.7
11
5
Not
obtained
Not
obtained
Not
obtained
SBR
SBR
SBR
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 50
Informatio
n not
provided
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
SI. No.
City/ Town
STP location
STP
commissione
d in (Year)
Status
(Operational/
Nonoperational/
under
construction
STP
installed
capacity
Technology(UASB
/ASP/ OP/
SBR/ MBR/
FAB etc.
83
Jaula Kalan
Jaula Kalan
Under
construction
Informat
ion not
provided
84
Lalru
Lalru
1.5
85
Mohali
Mohali
9/9/2009
Under
construction,
will be
commissioned
within 06
months
Operational
Oxidation
pond based
on settled
sewage
system
SBR
45
UASB
86
Machhiwara
Machhiwara,
Ludhiana
Yet to be
commission
ed
Under
construction
4
SBR
Consent
status
Not
obtained
NA
4.28
STPs AT RAJASTHAN
In Rajasthan, there are 63 numbers of sewage treatment plants with capacity of 865.92 MLD.
Out of 63 STPs, 11 STPs of capacity 149.3 MLD are Under Construction and 36 STPs of
capacity 322.12 MLD are proposed. Details of STPs of Rajasthan are shown in Table 26.
Table 26: STPs-Rajasthan
Status
Technolog
STP
STP
(Operational/
y (UASB /
Installe
Commissio NonASP / OP / Consent
Sl. No City/town
STP Location
d
ned in
Operational/U
SBR /
Status
Capacit
(Year)
nder
MBR/
y MLD
Construction)
FAB Etc.)
Swaran Jayanti
Park, Vidyadhar
Nagar
2014
Operational
1
MBBR
Gajodhar Pura
2013
Operational
30
ASP
3
Amer Road
2008
Operational
27
ASP
4
Delawas-I
2006
Operational
62.5
ASP
1
2
Jaipur
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 51
CTO
04.03.2014
CTO
09.09.2013
CTO
1.8.2007
CTO
25.02.2010
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No City/town
5
STP Location
STP
Commissio
ned in
(Year)
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
6
7
Central Park
8
Ralawata
9
Jawahar Circle
10
Sahakar Marg
11
Talkatora
JDA Ramniwas
Garden
Agayara
Ramgarh
2011
Operational
1
MBBR
2012
Operational
20
WSP
14
Bhiwadi
2012
Operational
4
15
PHED Nandari
Information
Operational
not provided
20
SBR
Anaeobic
&
Facultative
Ponds
Proposed
50
ASP
Operational
50
ASP
Facultative
stabilizatio
n Ponds
13
Alwar
Jodhpur
Salawas (Phase
- II)
Salawa (Phase I)
16
17
18
Sawaimadhp
ur
Sawaimadhopur
Operational
STP
Installe
d
Capacit
y MLD
Delawas-II
Jaisinghpura
Khor
12
2010
Status
(Operational/
NonOperational/U
nder
Construction)
62.5
ASP
50
ASP
1
MBBR
30
ASP
1
MBBR
Information Proposed
not provided
2
Informatio
n not
provided
Proposed
1
2010
Operational
Under
Information Construction
not provided Under
Construction
2010
2011
2012
Operational
Operational
10
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 52
Consent
Status
CTO
01.07.2011
CTO
16.06.2011
CTE
13.07.2010
CTE
17.08.2010
CTO
03.06.2010
Application
for
CTE/CTO
not applied
Application
not
submitted
CTO
26.04.2011
CTO
17.01.2013
CTO
26.03.2012
CTE
31.01.2007
CTE Under
Considerati
on
CTE
29.10.2012
CTO
26.10.2012
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No City/town
19
Bikaner
STP Location
Vallabha
Garden
20
Bhilwara
Sewage
21
Bhilwara
Bhilwara
Sewage
22
Udaipur
23
Eklingpura,
PHED
Pratappura
STP
Commissio
ned in
(Year)
2007
Status
(Operational/
NonOperational/U
nder
Construction)
Operational
Information
not provided Proposed
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
20
Anaerobic
Lagoors
Fceulative
lessons
4.5
ASP
2012
Operational
5.5
ASP
2014
Operational
20
MBBR
Proposed
5
UASBR
Rajsamand
24
Nathdwara
Constructed
4.3
Informatio
n not
provided
25
Kishopura,
Ladpura
Under
Construction
30
SBR
Under
Construction
6
SBR
26
Kota
27
28
Jaisalmer
Balita Ladpura
Dad Devi Road,
Village Dhakad
Kheri, Tehsil
Ladpura
Constructed
20
Kisan Ghat
Under
Construction
10
Kishangar
Under
Construction
10
Ajmer
29
Information
not provided
Informatio
n not
provided
Anaerobic
&
Facultative
Ponds
Anaerobic
&
Facultative
Ponds
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 53
Consent
Status
CTO
application
dated
29.03.2012
under
constructio
n
CTE
27.05.2013
CTO
issued
6.12.2012
CTO
11.03.2014
CTE
30.07.2012
Application
for
CTE/CTO
not applied
CTE
31.010.201
2
CTE
26.10.2012
Application
for
CTE/CTO
not applied
CTE
22.02.2013
CTE
13.05.2009
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No City/town
STP Location
30
Ganahera
Pushkar
Proposed
3.5
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Waste
stabilizatio
n ponds
31
Anasagar
Proposed
13
ASP
32
Khanpura
40
ASP
33
Proposed
Under
Construction
20
ASP
34
Dholpur
Khanpura
Tagawali
Village
Rajkhera,
Dholpur RUIDP
STP
35
Bundi
Devpura
Pali
36
37
38
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Under
Construction
10
Under
Construction
8
Information
not provided Proposed
10
Jalore
Proposed
10
Didwana
Proposed
5
Sumerpur Pali
Jalore
STP
Commissio
ned in
(Year)
UASB
Waste
stabilizatio
n ponds
Waste
stabilizatio
n ponds
Waste
stabilizatio
n ponds
40
Barmer
Barmer
Proposed
10
SBR
Waste
stabilizatio
n ponds
Waste
stabilizatio
n ponds
41
Karoli
Karoli
Proposed
5
UASB
42
Bharatpur
Gopal Nangla
Proposed
8
SBR
Nagor
39
Balwa Road
Proposed
8
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 54
Consent
Status
CTE
17.08.2012
CTE
22.08.2012
CTE
26.10.2012
CTE
12.04.2006
CTE
19.09.2012
CTE
31.07.2012
CTE
19.09.2012
CTE Under
Considerati
on
CTE
23.09.2014
CTE
19.09.2012
CTE
19.09.2012
CTE
07.08.2012
CTE
13.08.2012
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
43
Chittorgarh
Bhoikhera
Proposed
5
UASB
44
Sirohi
Proposed
6
ASP
45
Mont Abu
Fatehpur
Shekhawati
Proposed
7.5
SBR
46
Nani Beed
Sikar
10
Informatio
n not
provided
Proposed
5
Informatio
n not
provided
Proposed
10
UASB
Proposed
8.5
UASB
Proposed
7
Sikar
Devipura Beed
Sikar
47
48
49
Jhunjhunu
50
51
52
Bikaner
Hanumangar
h
54
Sikar
Bagar Road
Muncipal
Council
Gaisar Churu
Churu
53
Proposed
Nagar Palika
Sardar Shar
Nagar Palika
Sardar Shar
Nathaniya
Village
Abhohar
Bypass Near
Railway Track,
Hanuman Jun.
Information
not provided
WSP
Waste
stabilizatio
n ponds
Consent
Status
CTE
20.01.2012
CTE issued
17.08.2012
CTE
19.09.2013
Application
for
CTE/CTO
not applied
Application
for
CTE/CTO
not applied
CTE
26.10.2012
CTE Under
Considerati
on
CTE
13.08.2012
Proposed
4
Proposed
9.6
WSP
Proposed
12
MBBR
CTE
19.09.2012
CTE
19.09.2012
CTE
22.08.2012
7.5
Waste
stabilizatio
n ponds
CTE
21.09.2012
Proposed
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 55
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No City/town
55
56
Jhalawar
57
STP Location
5
Jhalrapatan
Proposed
3
WSP
Jhalrapatan
Proposed
6
ASP
59
Nagur
Makarana
62
63
Balotra
4.29
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Proposed
Tonk
61
STP
Installe
d
Capacit
y MLD
Near
Ganganagar
Road Chak
3KNT
Tonk
Sriganganaga
r
Status
(Operational/
NonOperational/U
nder
Construction)
upflow
anaerobic
sludge
blanket
followed
by holding
ponds
58
60
STP
Commissio
ned in
(Year)
Septic tank
with
anaerobic
Filter
Proposed
1.016
Proposed
6
SBR
Suratgarh Road
Proposed
10
ASP
Idagah Ponding
Proposed
10
ASP
Sugar Mil
Ponding
Proposed
15
ASP
Balotra
Proposed
9
SBR
Information
not provided
Consent
Status
CTE
19.09.2012
CTE issued
24.01.2013
CTE issued
04.04.2013
CTE
03.05.2011
CTE
03.09.2013
CTE Under
Considerati
on
CTE Under
Considerati
on
CTE Under
Considerati
on
CTE Under
Considerati
on
STPs AT SIKKIM
Sikkim has 11numbers of sewage treatment plants having treatment capacity of 31.88MLD.
01 STP of capacity 05 MLD is Non-Operational at Adampool in Gangtok, 09 STPs of
capacity 18.11 MLD are Under Construction. Details of STPs of Sikkim are shown in Table
27.
Table 27: STPs-Sikkim
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 56
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
Non
Operational
STP
Installe
d
Capacit
y MLD
5
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Trickling
Filter
1
Adampool
1987
2
Adampool
2011
8
FAB
Adampool
Operational
Under
Construction
3
4.69
FAB
4
Lower Sichey
Under
Construction
3.9
FAB
5
Rainpool
1.27
MBR
Gangtok
6
Lower Syari
7
Singtam
Singtam
8
Rangpo
Rangpo
9
Namchi
Namchi
10
Jorethang
Jorethang
11
Melli
Melli
Under
Construction
Under
Construction
Information Under
not provided Construction
Under
Construction
under
Construction
under
Construction
Under
Construction
1.6
SBR
0.66
MBR
0.96
MBR
3.62
FAB
1.7
WSP
0.48
MBR
4.30
Consent
Status
Informatio
n not
provided
STPs AT TAMILNADU
Tamil Nadu has 73numbers of sewage treatment plants having treatment capacity of
1799.72MLD. 01 STP of capacity 5.17 MLD is Non-Operational at Virapalayam in Erode
district, 28 STPs of capacity 521.08 MLD are Under Construction and 11 STPs of capacity
132.64 MLD are proposed. Details of STPs of Tamil Nadu are shown in Table 28.
Table 28: STPs-Tamil Nadu
Status
Technolog
STP
STP
(Operational/
y (UASB /
Installe
Commissio
NonASP / OP /
Consent
Sl. No
City/town
STP Location
d
ned in
Operational/U
SBR /
Status
Capacit
(Year)
nder
MBR/
y MLD
Construction)
FAB Etc.)
Sewage
Information Under
Informatio
7
STP
Ambattur
Treatment Plant not provided construction
n not
1
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 57
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Pumping
Station, TNHB
Colony,
Ayapakkam
provided
M/s.Sewage
Treatment plant
for perambalur
Municipality,
Perambalur
District
Under
Operation
4.20
3
M/s.Ariyalur
Municipality
Sewage
Treatment
Plant, Ariyalur
Distrct
Under
construction
4.16
4
Kondungaiyur
(a)
5
(b)
6
©
In operation
80
7
Koyambedu (a)
60
(b)
In operation
Under
construction
9
©
In operation
34
10
Nesapakkam (a)
In operation
40
11
(b)
In operation
54
2
8
12
Ariyalur
Chennai
©
Consent
Status
Information In operation
not provided
In operation
Information
not provided In operation
110
80
120
23
Convention
al activated
sludge
process
with
aeration
Convention
al activated
sludge
process
with
aeration
Cconventio
nal
Cconventio
nal
Cconventio
nal
Cconventio
nal
Cconventio
nal
Cconventio
nal
Cconventio
nal
Cconventio
nal
Cconventio
nal
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 58
Informatio
n not
provided
Informatio
n not
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
13
City/town
Coimbatore
North
14
15
Coimbatore
South
16
17
18
Dindigul
STP Location
M/s.Sewage
Treatment plant
P N Palayam
Coimbatore (N)
T.K.,
Coimbatore
District
M/s.CBE
CORPORATIO
N STP AT
UKKADAM,
Ukkadam ,
Coimbatore
south ,
Coimbatore
M/s.CBE
CORPORATIO
N STP AT
NANJUNDAP
URAM,
Uppilipalayam,
Coimbatore
M/s.SEWAGE
TREATMENT
PLANT
ONDIUDUR,
Coimbatore
M/s.POLLACH
I MUNICIPAL
SEWAGE
TREATMENT
PLANT,
Coimbatore
M/s.DINDIGU
L
CORPORATIO
N
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
provided
Not Yet
Establishment
In operational
Condition
CTE of the
Board stayed
by Honourable
High Court of
Madras
Construction
under process
3.53
Cconventio
nal
70
Sequential
Batch
Reactor
(SBR)
40
Sequential
Batch
Reactor
(SBR)
60
Sequential
Batch
Reactor
(SBR)
11.5
Sequential
Batch
Reactor
(SBR)
13.5
Activated
Sludge
Process
Construction
under process
Information
not provided
Under
Operation
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 59
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
20
UASB Sewage
Treatment
Plant,
Vairapalayam,
Erode District
Erode City
Municipal
Corporation.
Sewage
Treatment
Plant,
Peelamedu
Village, Erode
21
Dharmapuri
Municipality
UGSS System
In operation
4.860
22
Krishnagiri
Municipality
Under
Operation
9.19
23
Madurai
Corporation
STP
Sakkimangalam
STP Aringar
Anna Maligai
Tallakulam
Madurai
Madurai
Corporation
STP
Avaniapuram
STP Aringar
Anna Maligai,
Madurai
19
Erode
24
Hosur
Madurai
Presently not
under
operation
5.17
Civil
construction
works under
progress
50.55
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
Anaerobic
Treatment
with UASB
technology
Aerobic
treated
with
Moving
Bed Bio
Reactor
technology
(Conventio
nal)
Biological
Treatment
(Conventio
nal)
Biological
Treatment
Information
not provided In Operation
45.7
SBR
In Operation
125
SBR
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 60
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
18
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Cycli
Activated
Sludge.
Based on
Sequential
batch
reactor
(CAS/SBR
)
Cycli
Activated
Sludge.
Based on
Sequential
batch
reactor
(CAS/SBR
)
54
Activated
Sludge
Process
60
Activated
Sludge
Process
STP
Installe
d
Capacit
y MLD
Under
construction
25
M/s.Tambaram
Municipality Common STP
26
M/s.Chennai
Metropolitan
Water Supply
and Sewage
Board Common STP
at
Sholinganallur
27
28
M.M.Nagar
M/s.Chennai
Metropolitan
Water Supply
and Sewage
Board - New
Perungudi 54
MLD STP
M/s.Chennai
Metropolitan
Water Supply
and Sewage
Board - New
Perungudi 54
MLD STP
Phase II (60
MLD)
30
Under
construction
In Operation
Information
not provided
In Operation
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 61
Consent
Status
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
30
M/s.SEWAGE
TREATMENT
PLANT of
Alandur
Municipality @
Perungudi
M/s.SEWAGE
TREATMENT
PLANT
Maraimalai
Nagar
Municipality
31
M/s.CMWSSB
Navalur Sewage
Treatment Plant
32
Nagapattina
m
M/s.Nagappatin
am
Municipality
STP at
Nagapattinam
33
Nagercoil
Underground
Sewage System
to Nagercoil
Municipality,
Agastheeswara
m Taluk,
Kanyakumari
Dist
34
Namakkal
Namakkal
municipality
29
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
In Operation
In Operation
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
12
Activated
Sludge
Process
2.2
Activated
Sludge
Process
6
Activated
Sludge
Process
Under
construction
Under
construction
9.63
Consent
Status
Convention
al
Information
not provided
Information
not provided
To be
Commissioned
Yes, STP in
Operation
20.86
1.5
STP
Proposed.
Extended
Aeration
Process
Convention
al
(Activated
sludge
process)
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 62
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
WSP
Techonology
Sewage
Treatment Plant
, Bhavani
Municipality
Construction
stoped due to
public
agitation
36
Perundurai
Town
Panchayat
Sewage
Treatment Plant
Construction
under progress
37
Pudukkottai
Municipality
STP (Under
Construction)
Not yet
commissioned
10.62
38
Sivagangai
Municipality
Not et
established
4.92
Activated
Sludge
Process
Activated
Sludge
Process
System
8.19
Activated
Sludge
Process
system
2.415
Activated
Sludge
Process
system
44.67
Convention
al
(Aeration
pond)
35
Perundurai
Pudukkottai
Sivagangai
39
40
Tanjavur
41
Ramanathapura
m Municipality
Muthukulathur
Town
Panchayat
M/s.Thanjavur
Municipality
Sewage
Treatment Plant
, Tanjavur
Information
not provided In Operation
Not yet
established
In Operation
3.94
Convention
al &
Treatment
3.07
Convention
al &
Treatment
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 63
Consent
Status
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
M/s.Kumbakon
am
Municipality
Sewage
Treatment Plant
- Tajnavur Dist
42
In Operation
M/S
Underground
Sewerage
Scheme To
Vallam Town
Panchayat,
Thanjavur.
43
Proposed
17
2.3
M/s.CHINNAM
ANUR
MUNICIPALIT
Y SEWAGE
TREATMENT
PLANT ,
UTHAMAPAL Information
AYAM
not provided
TALUK, Theni
44
THENI
45
M/s.THENI ALLINAGARA
M
MUNICIPALIT
Y SEWAGE
TREATMENT
PLANT,
S.F.No.107,The
ni-Allinagaram,
Theni Taluk,
CTO Issued
CTE Issued
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
Convention
al
(Aeration
pond)
Convention
al
(Aeration
pond)
Extended
Aeration
System
(Activated
Sludge
Process)
3.99
Extended
Aeration
System
(Activated
Sludge
Process)
15.1
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 64
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
Tiruvannama
lai
46
Tiruvannamalai
Municipality
STP.
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Activated
Sludge
Process
followed
by
Disinfectio
n
Activated
sludge
process
(Extended
Aeration
System)
STP Location
47
Tiruppur
North
M/s. New
Tirupur Area
Development
Corporation
Ltd., Tiruppur
48
Tiruppur
South
UDUMALPET
MUNICIPALIT
Y - STP
49
STP Avadi
50
Sewage
Treatment Plant
Thirumazhisai
Town
Panchayat
51
Common STP –
UGSS,
Tiruvallur
Tiruvallur
52
53
Udhagamand
alam
Kandal STP
Minigarden
STP
STP
Commissio
ned in
(Year)
Status
STP
(Operational/
Installe
Nond
Operational/U
Capacit
nder
y MLD
Construction)
In Operation
8.7
In operation.
Construction
Information works are
not provided under progress
15
36
Activated
Sludge
Process
Sequential
Batch
Reactor
Technolog
y
Under CTE
3
Extended
Aeration
Process
DPR – Under
Process
6.2
Operation
5
Information
not provided Operation
2
Under CTE
7.81
MBBR
System
Biological
method
Biological
method
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 65
Consent
Status
Informatio
n not
provided
Information
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Vellore City
Corporation
STP
54
VELLORE
Status
STP
(Operational/
Installe
Nond
Operational/U
Capacit
nder
y MLD
Construction)
The STP is
nearing
completion.
Conveyance
works are
under progress.
The trial run of
STP is
proposed
within a
10.72
month.
MLD
M/s Villupuram
Municipality
UGSS with STP
Zone - I,
Kakuppam
Village,
Villupuram
55
Proposed Unit
Villupuram
56
Salem
57
M/s Villupuram
Municipality
UGSS Zone II
S.F.No.
86/1,Erumanant
hangal Village,
Villupuram
Taluk
Villupuram
District
MANKUTTAI
SEWAGE
TREATME
PLANT, Salem
Corporation ,
Salem
Proposed Unit
Proposed
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
not provided
Convention
al
Activated
Sludge
Process
Proposed
Unit
9
3.5
Information
not provided
Proposed
Unit
Collection
Aeration
Chlorinatio
n
35
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 66
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
VANDIPETTA
I SEWAGE
TREATMENT
PLANT, Salem
Status
(Operational/
NonOperational/U
nder
Construction)
Proposed
58
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Collection
Aeration
Chlorinatio
n
Consent
Status
44
VELLAKUTT
AI SEWAGE
TREATMENT
PLANT , Salem
Corporation ,
Salem
Proposed
59
Collection
Aeration
Chlorinatio
n
23
ANAIMEDU
SEWAGE
TREATMENT
PLANT, Salem
Proposed
60
Collection
Aeration
Chlorinatio
n
6
METTUR
MUNICIPALIT
Y STP, Salem
Proposed
METTUR
MUNICIPALIT
Y STP SALEM
CAMP, City
S.No:2, Mettur
Proposed
61
5.5
62
METTUR
MUNICIPALIT
Y STP NEAR
MTPS, Salem
63
STP
Installe
d
Capacit
y MLD
Information
not provided
Collection
Aeration
Chlorinatio
n
Collection
Aeration
Chlorinatio
n
1
Proposed
Collection
Aeration
Chlorinatio
n
1
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 67
Information
not provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
JALAKANDA
PURAM
SEWAGE
TREATMENT
PLANT,
Jalakandapuram
, Salem
64
65
66
67
68
Status
(Operational/
NonOperational/U
nder
Construction)
Proposed
STP
Installe
d
Capacit
y MLD
TRICHY
Under
Operational
Condition
Karur
Sewage
Treatment
Plant, Karur
Municipality,
Under
operation
15
Tirunelveli
Tirunelveli City
Municipal
Corporation
STP
In operation
24.2
Sriperumbud
ur
Thoothukudi
Sewage
Treatment Plant
Kancheepuram
STP Town
Panchayat
Sriperumbudur,
Thoothukudi
Municipal
Corporation
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Collection
Aeration
Chlorinatio
n
Consent
Status
2.34
Trichy
Corporation
Sewage
treatment Plant
69
70
STP Location
STP
Commissio
ned in
(Year)
88.64
Pretreatment
systems,
Anaerobic
ponds,
Facultative
Ponds, and
Polishing
Ponds
14.71
Convention
al Aeration
Pond
Biological
treatment
(Activated
Sludge
process)
Waste
Stabilisatio
n Pond
system
STP yet to be
installed
8.5
Sequential
Batch
Reactor
(SBR)
technology
Project under
execution
27
MBR
Information In operation
not provided
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 68
Information
not provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
71
72
Cuddalore
Virudhunaga
r
73
STP Location
Alwarthirunaga
ri Town
Panchayat
Cuddalore
Municipality
TWAD Board
Underground
sewer system
STP
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
Project under
execution
Under
Construction
ETP is
receiving
effluent from
partial area out
of 7.65 MLD
expected only
0.5MLD is
Received
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
12.25
Convention
al
Aerobic
Treatment
8.37
Activated
Sludge
process
Technolog
y
1.23
Consent
Status
4.31
STPs AT TELANGANA
Telangana has 18 numbers of sewage treatment plants having treatment capacity of 685.8
MLD. 01 STP of capacity 51 MLD is Under Construction at Attapur in Greater Hyderabad.
Details of STPs of Telangana are shown in Table 29.
Table 29: STPs-Telangana
Sl. No City/town
STP Location
STP
Status
STP
Technolog Consent
Commissio (Operational/ Installe y (UASB / Status
ned in
Nond
ASP / OP /
(Year)
Operational/U Capacit SBR /
nder
y MLD MBR/
Construction)
FAB Etc.)
Amberpet
Operational
339
1
2
Attapur
Under
Contstruction
51
3
Durgamcheruvu
Operational
5
Information
not provided Operational
4
4
5
6
7
8
Greater
Hyderabad
Kattendan, RR
District
Kukatpally
Langar house
Miralam tank
Nagole
Operational
Operational
Operational
Operational
Informatio
n not
provided
12
1.2
10
172
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 69
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
9
10
11
12
13
14
Bhadrachala
m
Ramagunda
m
15
16
17
Manchiryala
18
4.32
Sl. No
Nallacheruvu
(Uppal)
Necklace road
(Khairtabad)
Peddachruvu
(Nacharam)
Safilguda
Saroornagar
Bhadrachalam
Operational
30
Operational
20
Operational
10
Operational
Operational
Operational
0.6
2.5
4
Malkapur,
Godavarikani
Ramagundam
Operational
14
Operational
4
Reddy colony
Operational
4
Saikunta
Operational
2.5
STPs AT TRIPURA
Tripura has 01 STPof treatment capacity 0.045 MLD. Details of STPs of Tripura are shown in
Table 30.
Table 30: STPs-Tripura
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
Consent
certificate
was issued
on
18.02.2014
1
4.33
Indian Check
Post, Akhaura
Border,
Agartala
17.01.2014 Operational
0.045
MBBR
STPs AT UTTAR PRADESH
Uttar Pradesh has 73 numbers of sewage treatment plants having treatment capacity of
2646.84 MLD. 07 STPs of capacity 89.59 MLD are Non-Operational,03 STPs of capacity 170
MLD are Under Construction and 01 STP of capacity 15 MLD is proposed. Details of STPs of
Uttar Pradesh are shown in Table 31.
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 70
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
2
Table 31: STPs-Uttar Pradesh
STP Location
STP
Status
Commissio (Operational/
ned in
Non(Year)
Operational/U
nder
Construction)
Boodhi Ka
Operational
Nagla
Pilakhar
Operational
3
Dhandhupura
4
Jaganpur,
Sikandarpur
Bhim Nagri,
Devri Road.
Sadarwan
(Bichupri)
Sadarwan
(Bichupri) New
Sl. No
City/town
1
5
Agra
6
7
STP
Installe
d
Capacit
y MLD
2.25
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
WSP
10
WSP
Information Operational
not provided
Operational
78
UASB
14
UASB
Operational
12
UASB
2013 Operational
40
UASB
2014 Operational
36
UASB
Consent
Status
Not
obtained
Not
obtained
Not
obtained
Not
obtained
Not
obtained
Not
obtained
Not
obtained
8
Dhandhupura
New
2014 Operational
24
UASB
Not
obtained
9
Kalindi Vihar
2014 Operational
4.5
UASB
10
STP at near
Tiksi Mandir,
Etawah (In
Yamuna Action
Plan)
STP at Mauza
Umrain, Etawah
(In State Sector
and UIDSSMT)
2000 Operational
10.445
OP
Not
obtained
Not
obtained
2014 Trail run
complete but
presently NonOperational
13.5
OP
Not applied
STP at Moja
Ordya, Padaria,
Mainpuri (In
State Sector and
UIDSSMT)
2013 Not
Operational on
full capacity
23
UASB
Not applied
0.5
Abanded
Informatio
n not
provided
11
12
Etawah
Mainpuri
13
Mathura
Kalidah,
Vrindavan
Information
not provided
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 71
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
14
Vrindavan Near
Pagal Baba
Mandir
Masani
15
16
Trans Yamuna,
Jamunapar
Dinapur
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Varanasi
Noida
Saharanpur
Muzaffarnag
ar
31
35
Bhagwanpur
DLW,
maduadih
Sector-50
Sector-54
Sector-54
Sector-50
Sector-123
Sector-91
Sector-54
Sector-168
Kansa, Greater
Noida
Malhipur
Muzaffarnagar
STP Naini,
Allahabad
Salori
Rajapur,
Allahabad
32
33
34
STP Location
Allahabad
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
NonOperational
2006 NonOperational
2006 Operational
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
OP
Consent
Status
13.59
OP
Not applied
14.5
OP
Not applied
Not applied
4
Not applied
Operational
80
Operational
Information Operational
not provided
Operational
Operational
Operational
Operational
Operational
Information Operational
not provided Operational
Operational
2013 Operational
9.8
12
Trickling
Filter
ASP
ASP
34
27
9
25
35
5
33
50
137
UASB
UASB
OP
SBR
SBR
OP
SBR
SBR
SBR
Applied
2008 Operational
2008 Operational
38
32.5
UASB
OP
Not applied
Not applied
Not applied
Not applied
Informatio
n not
provided
Operational
80
ASP
Not applied
Operational
2013 Operational
29
60
Not applied
Not applied
Pongahat,
Allahabad
2013 Operational
10
Numayadahi,
Allahabad
2013 Operational
50
FAB
UASB &
Aerated
Lagoon
BTR (Bio
Tower
Reactor)
BTR (Bio
Tower
Reactor)
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 72
Not applied
Not applied
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
36
Kodra,
Allahabad
37
Pakka Pokhara,
Ramai Patti
WSB STP,
Vindhyanchal
38
39
Mirzapur
Farrukhabad
40
41
42
43
Kanpur
44
45
46
47
48
49
Ghaziabad
50
51
52
Farrukhabad
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
2013 Operational
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
BTR (Bio
Tower
Reactor)
UASB
Consent
Status
Not applied
2.7
WSP(Wast
e
Stabilizatio
n Pond)
OP
Operational
Operational
Operational
Sept, 2014
5
130
210
UASB
ASP
UASB
Not applied
Not applied
Not applied
Operational
Sept, 2014
Operational
Dec., 2014
Proposed
43
ASP
Not applied
42
ASP
Not applied
15
UASB
Not applied
2001 Operational
56
UASB
2001 Operational
70
UASB
2012 Operational
56
SBR
Grant
2012 Operational
56
SBR
Grant
2012 Operational
74
SBR
2013 Operational
56
SBR
Informatio
n not
provided
Grant
Govindpuram
Sis Hindon
Sadullabad,
Loni
2012 Operational
30
SBR
25
Operational
14
Information Operational
not provided
4
1992 Operational
STP Jajmau
1989
STP Jajmau
1999
Bingava
Proposed
Kanpur(JNNUR
M)
Jajmau
Proposed
(JNNURM)
Sajari Kanpur
Proposed
Baniyapur
Kanpur
Indirapuram
Trans Hindon
Dudahera,
Vijay Nagar,
Sis Hindon
Indirapuram
Trans Hindon
Dudahera,
Vijay Nagar,
Sis Hindon
Indirapuram
Trans Hindon
STP
Installe
d
Capacit
y MLD
Proposed
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 73
Not applied
Not applied
Not applied
Informatio
n not
provided
Informatio
n not
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
provided
53
Madhuban
Babudham
Yojna GZB. Sis
Hindon
54
Yet to
commission
Construction
completed (
Development
of Housing
Project is
under
Construction)
Information Under
not provided Construction
56
SBR
Informatio
n not
provided
55
Morti
Ghaziabad Sis
Hindon
Doulatganj
56
Bharwara
2011 Operational
345
57
STP Near
Hathiya Nala
Sultanpur
Ahara Road,
Zone-A,
Anupshar
Ahara Road,
Zone-B,
Anupshar
MDA STP
Ganganagar
2008 Operational
5
OP
2009 Operational
0.805
OP
2009 Operational
1.75
OP
2012 Operational
10
ASP
MDA STP,
Shradhapuri,
Phase-II
MDA STP
Rakshapuram,
Meerut
MDA STP
Sports
Complex, Delhi
Road, Meerut
MDA STP
Sports
Vedvyaspuri,
2012 Operational
6
ASP
58
59
Bulandsahar
60
61
62
Meerut
63
64
56
SBR
2002 Operational
56
FAB
Not applied
UASBR
Not applied
Not applied
2012 Operational
6
ASP
2013 Operational
7
ASP
2013 Operational
15
ASP
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 74
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP Location
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
Meerut
65
66
67
68
69
70
71
Moradabad
72
73
Rampur
4.34
MDA STP
Pallavpurm-I
MDA STP,
Shradhapuri-I,
Phase-II
MDA STP
Shatabdinagar
MDA STP Lohia
Nagar, Hapur
Road, Meerut
MDA STP
Pandavnagar,
Meerut
MDA STP
Pallavpurm-II,
Meerut
Rampur Road
Near Hanuman
Murti Tiraha,
Gulabbari
Mordabad Delhi
Road,Vikas
Pradhikaran,
MDA
Kemri Road
2012 Operational
7
ASP
2012 Operational
6
ASP
2011 Operational
15
ASP
2011 Operational
10
ASP
Information
not provided
2007 Operational
1
ASP
2009 Operational
5
ASP
58
SBR
2012 Non Operational
(non availability
of sewage)
20
ASP
2014 Non Operational
(connectivity
problem due to
non availability
of sewage)
15
Information
not provided
Under
Contstruction
Information
not provided
UASB
STPs AT UTTRAKHAND
Uttarakhand has the treatmentcapacity of 152.9 MLD and 24 numbers of STPs. Out of 24
STPs, 12 STPs having treatment capacity of 39.15 MLD are under construction and 02 STPs
of capacity 23 MLD are tendering under process. Details of STPs of Uttarakhand are shown in
Table 32.
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 75
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
1
City/town
STP
Location
Table 32: STPs-Uttarakhand
Status
STP
(Operational/
STP
Commissi
NonInstalled
oned in
Operational/U Capacity
(Year)
nder
MLD
Construction)
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
Bakh
2003-2004 Operational
2
MBBR
2
Almora
Bhimtal
(Nainital)
Bhimtal
2009-2010 Operational
1.25
3
Nainital
Rushi
2009-2010 Operational
10
UASB
Settling
Tank with
tricking
Filter
4
Rishikesh
lakkarghat
1984 Operational
6
OP
2009 Operational
3.5
FAB
2010 Operational
3
SBR
3.5
SBR
2
MBBR
1.4
Soil Bio
Technology
(SBT)
1
SBR
6
Near Bus
Srinagar
Station
Swargashra
m
Ved Niketan
7
Tapovan
(Tehri)
Tapovan
8
Uttarkashi
Gyansu
5
9
10
Devprayag
Gangotri
Bah Bazar
Gangotri
Informatio
n not
Under
provided
Construction
2012 Operational
Under
Informatio
Construction
n not
provided
Under
Construction
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 76
Consent Status
Working and in
use
Working and in
use
Working and in
use
Insufficient for
present
population,
25MLD
capacity is
being proposed
Scheme handed
over to
Uttarakhand Jal
Sansthan
Commissioned
Work is under
progress,
expected to be
completed in
Dec 2014
Working and in
use
Work is under
progress,
expected to be
completed in
Dec 2014
Work is under
progress,
expected to be
completed in
Nov 2014
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
11
12
City/town
STP
Location
STP
Commissi
oned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installed
Capacity
MLD
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
Jagjeetpur
Jagjeetpur
1990 Operational
2010 Operational
18
27
ASP
SBR
13
Sarai,
Jawalapur
Dec-13 Operational
18
SBR
14
Bhattafall
Under
Construction
3.12
SBR
15
Landhor
South
Under
Construction
1.3
SBR
Landhor
North
Under
Informatio Construction
n not
provided
0.8
SBR
Kulri
Under
Construction
0.9
SBR
Indira Nagar
Under
Construction
5
SBR
Mothorowala
Under
Construction
20
SBR
Haridwar
Mussoorie
16
17
18
19
Dehradun
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 77
Consent Status
performance
well within
NRCD limits
DO
Performance
Satisfactory
(under
observation
Work is under
progress,
expected to be
completed in
Dec 2014
Work is under
progress,
expected to be
completed in
Dec 2014
work is under
progress,
expected to be
completed in
Dec 2014
Work is under
progress,
expected to be
completed in
Dec 2014
Work is under
progress,
expected to be
completed in
March 2015
Work is under
progress,
expected to be
completed in
June 2014
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No
City/town
STP
Location
STP
Commissi
oned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installed
Capacity
MLD
Technology
(UASB /
ASP / OP /
SBR /
MBR/ FAB
Etc.)
Jakhan
Under
Construction
1
SBR
21
Vijay Colony
Under
Construction
0.42
SBR
22
Salawala
Under
Construction
0.71
SBR
23
Informatio
n not
provided
Tendring
Mothorowala
Under Process
20
SBR
24
Kaulagarh
Tendring
Under Process
3
SBR
20
Consent Status
Work is under
progress,
expected to be
ompleted in Oct
2014
Work is under
progress,
expected to be
completed in
Oct 2014
Work is under
progress,
expected to be
completed in
Oct 2014
Application
under process.
Expected to be
completed in
June 2016
Application
under process.
Expected to be
completed in
June 2016
4.35
STPs AT WEST BENGAL
West Bengal has total number of 28 STPs having treatment capacity of 416.9 MLD. Out of 24
STPs,12STPs of capacity 181.54 MLD are Non-Operational. Details of STPs of West Bengal
are shown in Table 33.
Table 33: STPs-West Bengal
Status
Technolog
STP
STP
(Operational/
y (UASB /
Installe
Commissio NonASP / OP / Consent
Sl. No City/town
STP Location
d
ned in
Operational/U
SBR /
Status
Capacit
(Year)
nder
MBR/
y MLD
Construction)
FAB Etc.)
1
Titagarh
Titagarh
Operational
4.5
ASP
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 78
No
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
Sl. No City/town
STP Location
2
Titagarh
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
Non
Operational
Non
Operational
STP
Installe
d
Capacit
y MLD
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Consent
Status
4.5
OP
No
10
ASP
No
8.5
ASP
Not Known
10
OP
NO
5
Jagaddal
Bhatpara New
Jagaddal
Bhatpara Old
Jagaddal
Bhatpara
6
KANKINAR
A
KANKINARA
STP,
MADRAIL,Bha
tpara
Non
Operational
10
OP
NO
7
Baidyabati
Baidyabati
Operational
6
OP
No
8
Bandipur
Bandipur
Operational
14
OP
Not Known
9
Konnagar
Not Known
22
OP
No
10
Panihati
Information Operational
not provided
12
OP
No
11
Kona
Konnagar
Panihati
(Natagarh)
Kona, Chakpara
( Anandanagar
gram Panchayet
)
Operational
30
OP
No
Trickling
Filter
No
3
4
12
Jagaddal
Bhatpara
Chandannag
ore
13
14
Bansberia
Non
Operational
Non
Operational
Chandannagar,
Khalisani,
ChinsurahHighly
Operational
18.16
Chandannagar,
Khalisani,
ChinsurahHighly
Non
Operational
4.54
Bansberia
Operational
0.3
OP
Waste
stabilisatio
n pond
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 79
No
No
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
STP
Commissio
ned in
(Year)
Status
(Operational/
NonOperational/U
nder
Construction)
STP
Installe
d
Capacit
y MLD
Sl. No City/town
STP Location
15
Kamarhati
Kamarhati,
Mathkol, near
Belgachia
Metro Car Shed
Operational
40
16
Naihati
Naihati
Operational
11.56
17
Garulia
Garulia
Not Known
18
Garden
Reach
Under
Maintanance
19
Serampore
Garden Reach
Serampore, at
Jannagar Road,
Serampore
20
Maheshtala
Mahestala,
Nungi
21
Budge Budge Budge Budge
22
Bhadreswar
Bhadreswar
23
Howrah
Howrah
24
Kalyani
Technolog
y (UASB /
ASP / OP /
SBR /
MBR/
FAB Etc.)
Trickling
Filter
No
7.9
47.5
ASP
No
Operational
Non
Operational
Non
Operational
4.25
Operational
11
Operational
6
OP
Operational
3.7
OP
Non
Operational
18.89
4
7.6
45
26
Berhampore
STP Kalyani - I
STP Kalyani II
STP
Berhampore
27
Cossipore
Chitpore
STP Cossipore
Chitpore
Operational
45
ASP
28
Nabadwip
STP Nabadwip
Operational
10
OP
25
No
ASP
Waste
stabilisatio
n pond
Trickling
Filter
Waste
stabilisatio
n pond
Waste
stabilisatio
n pond
Aerated
Lagoon
Trickling
Filter
Trickling
Filter
Information
not provided Operational
Consent
Status
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 80
No
No
No
Not Known
No
No
Informatio
n not
provided
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]
5. CONCLUSION
CPCB access the data provided by SPCBs/PCCs and concluded that 816 number of STPs are
available having treatment capacity of 23,277 MLD equipped with different technologies like
ASP, OP, USAB, SBR etc. Out of 816 STPs, 522 STPs Operational, 79 STPs NonOperational, 145 STPs Under Construction and 70 STPs are proposed. It was also find out that
maximum STPs having ASP based treatment technology and nowadays SBR based technology
widely used for treatment of sewage.To check the performance and status from STPs, CPCB
has initiated performance evolution of STPs in India.
| CONCLUSION 81