February 23, 2015 Project Management Office Attn: Paul Stovesand / Darrell Calloway 425 S. Euclid Ave, 2nd Floor St. Louis, MO 63110 RE: 1.20 – BJH North Building or 1.30 – SLCH Expansion Event Number #?? Type – Adverse Weather Day Dear Paul / Darrell, This letter serves as notification of an adverse weather day in accordance with Article 6 of the Agreement for Construction. This lost time cannot be recovered by adding manpower in the affected trades or other trades during standard pay rate work periods and manpower is not available when needed. Date Lost: Monday, February 23, 2015 Type of Adverse Weather Event: Cold Conditions, Concrete Plants Closed – (February 23, 2015) (Weather Data Sheets Attached) Critical Trade/Work Activities Affected: Drilled Piers (Activity Code 1.30-C-2B-001260) Tie Beams (Activity Code 1.30-C-2B-001290) Below is a photo taken today of the site that reflect today’s adverse weather conditions: The adverse weather event listed above will be carried in the adverse weather report and evaluated for overall impact on the project schedule. Respectfully, Jordan Sanders Jordan Sanders Project Engineer | BJH North Building Adam Nanney Adam Nanney Project Engineer | SLCH Enclosures: P6 Critical Path Schedule Weather Underground Report 1.20 – North CC’s cc: Bob Fritz Phillip Lee Jordan Sanders Kendra Santa Nichole Plunkett Cary Cantwell John Morton Timothy Madden Yvette Shepherd 1.30 – SLCH cc: Bob Fritz John Gillespie Adam Nanney Phillip Lee Kendra Santa Nichole Plunkett Cary Cantwell John Morton Timothy Madden Yvette Shepherd
© Copyright 2026 Paperzz