Organization Chart - Maintenance Modification of indrustrial process

COMPANY PROFILE
FOR
PLANT MAINTENANCE AND SERVICES
SUBMITTED
BY
THAINUMPON CONSTRUCTTON LIMTED PARTNERSHIP
41/70 Nong-wa Road Tambol Huaypong, Amphur Muangrayong, Rayong 21150
Tel. 038-682186 Fax. 038-682186 , Mobile : 088-893 7369
E-mail : [email protected]
INTRODUCTION
Thainumpon construction limited partnership of companies established in 2010 where initially
offer maintenance service to petrochemical plant, power plant and process plants.
Now, the scope of service of Thainumpon is expanded to cover all engineering and construction
works to completely and perfectly respond to the customers' requirement as classified as follow:- Responsible for the maintenance and modification work
- Responsible for plant construction
During the part, Thainumpon has strongly strived to deliver best quantity standard work
to the customers as it proved by in creasing number of customer and constantly growth of
the company. Our management team and all staffs have well realized to continuously
develop and improved their performances to delivers the best quality service to our
customers forever.
Table Of Contents
1.
Company Name
2.
Organization Chart
3.
Office and Factory Address
4.
Location of Factory
5.
Business Field
6.
Design Tasks
7.
Tool and Equipment
8.
Quality Assurance and Control
9.
Major Experience List
1.
Company Name
2.
Organization Chart
Manager
Mr.Sarawut Suwanrueng
Tel. 088-893 7369
Supervisor
Mr.Panom Thongsri
Mr.Wichai Prachanklang
Foreman 4 Person
Fitter 20 Person
Welder 10 Person
Helper 8 Person
Assistant manager
Project manager
Mr.Daorung Suwanrueng
Mr.Pongsin Sopha
Tel. 085-096 7575
085-352 7841
Site engineer
Safety Officer
Adminsiter
Mr. Thavorn Poonperm
Mr.Mallapol lodpana
Mrs. Katin Suwanrueng
Tel.087-781 7698
Tel. 089-806 5184
Tel. 091-861 7869
QA/QC Manager
Field Safety
Phurchasing
Mr.Kanpet Terdyotin
Mr.Piyapong N.
Mrs. Katin Suwanrueng
Tel. 080-636 3554
Tel. 090-053 7490
Tel. 091-861 7869
QA/QC
Mr.Puttapong Sornsuphap
Mr.Witoon Machasri
Field Safety
Store keeper
Miss. Suparat Churkamhod
Mr. Sakda Chonrueng
Tel. 080-806 5184
Tel. 087-740 9185
3.
GENERAL INFORMATION
1.
Office / Factory Address
:
2.
Contact Person
:
:
:
:
:
:
:
:
:
:
:
:
41/70 Nong-wa Road Tambol Huaypong, Amphur
Muangrayong, Rayong 21150
Mr. Sarawut / Manager
Tel. 038-682186 Fax. 038-682186
Mobile. 088-893 7369
E-mail : [email protected]
Mr. Daorung / Assistant Manager
Tel. 038-682186 Fax. 038-682186
Mobile. 085-096 7575
E-mail : [email protected]
Mr. Pongsin / Project Manager
Tel. 038-682186 Fax. 038-682186
Mobile. 085-352 7841
E-mail : [email protected]
4.
Location Map Of Factory
View For Maintenance Workshop
5.
Business Field
Thainumpon construction and supply partnership has long experience on the plant
maintenance and modification works. Our service of Gold steel are as follows
1. Plant Maintenance and Services
2. Plant Equipment Installation
3. Piping Modification
4. Steel Structure Fabrication
6.
Design Tasks
Thainumpon construction and supply partnership are the engineering companies.
The design function is one of our responsibility, especially to support our main business fields.
These design tasks are :
1. Plant design ( ANSI B31.1 )
2. Pressure vessel design ( ASME code )
3. Fabrication drawing and shop drawing
4. Operation and maintenance manual
Detail Working
Piping modify and steel structure installation
Detail Working
Fire protection system work
BSTMT-Project ( Amata city rayong )
Detail Working
Piping system work
ABP3 Combined Cycle Cogeneration Plant Project ( Amata nakorn chonburi )
Detail Working
Piping system work
ABP3 Combined Cycle Cogeneration Plant Project ( Amata nakorn chonburi )
Detail Working
CT Make-up water tank installation
ABP3 Combined Cycle Cogeneration Plant Project ( Amata nakorn chonburi )
Detail Working
Storage tank fabrication
Steelcraft Co.,Ltd.
7.
Tool And Equipment
8.
Quality Assurance and Control
In order to keep our quality and standard, not only quality manual but also many
working procedures have developed continuously. The working procedure that have been
implemented for the previous projects are as follows;
1. Above Ground Piping Construction Procedure
2. Under Ground Piping Construction Procedure
3. Welding Procedure Specification for Under Ground Piping
4. A Liquid Penetrant Examination Test Procedure
5. A Radiographic Examination Test Procedure
6. Chemical Cleaning Procedure
7. Equipment Installation Procedure
8. Bolt Torque Inspection
9. Equipment Installation Inspection
10. Steel Structure Fabrication and Erection Procedure
11. Inspection and Test Plan for Steel Structure
12. Painting Procedure
In term of quality control, Thainumpon have experienced inspectors to carry out inspection
and testing in both workshop and field work all the time. Our system of inspection is
implemented through inspection test plan that can be generated by our project team.
9.
Major Experience Lists
Client
Project / Location
Volume /Baht
CMI-Thai Services Co.,Ltd
IRPC Plant / Thai MAA
3,700,000.00
RMS Quality Co.,Ltd
ABPR2 Combined Cycle Cogeneration Plant
5,600,000.00
Amata City Rayong
RMS Quality Co.,Ltd
ABP3 Combined Cycle Cogeneration Plant
9,200,000.00
Amata Nakorn Chonburi
Maintech Group
ABP3 Combined Cycle Cogeneration Plant
2,900,000.00
Amata Nakorn Chonburi
Sawatudom Engineering
Factory Rayong
Workshop Rayong
1,400,000.00