Petroleum Development Oman L.L.C. UNRESTRICTED 13th June 2001 Document ID : CP-145 Optimisation Management Code of Practice Author: Reviewed: I. Blair K. Al Harthy A.T. Jones W. van Zandvoord F.M. Clayton UPR, UOP, OIL/3, OTW UPT OBP/57G UPT/1 OYP/53 UPT/1 Keywords: Optimisation, Management Code of Practice This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part of this document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted in any form by any means (electronic, mechanical, reprographic recording or otherwise) without prior written consent of the owner. Optimisation Management Code of Practice Version 1 Authorised For Issue 13/06/2001 Signed : Amran Marhubi, UPD Director Petroleum Engineering Revision History Version No. Revision - 0 Revision - 1 13/6/2001 Date 12/10/00 13/6/2001 Author Francis Clayton, UPT/1 I. Blair, UPT K. Al Harthy, OBP/55 A.T. Jones, UPT/1 W. van Zandvoord, OYP/53 Page 2 Scope / Remarks Initial version Updated after review by assets CP-145 Optimisation Management Code of Practice Version 1 Contents 1. INTRODUCTION ............................................................................................................... 4 1.1 Background ...................................................................................................................... 4 1.2 Purpose ............................................................................................................................. 4 1.3 Target Audience ............................................................................................................... 4 1.4 Structure of This Document ............................................................................................. 4 2. SCOPE & OBJECTIVES.................................................................................................... 5 2.1 Scope ................................................................................................................................ 5 2.2 Fundamentals for this Code of Practice ............................................................................ 5 2.3 Related Business Control Documents .............................................................................. 5 2.4 Review and Improvement................................................................................................. 5 3. ROLES & RESPONSIBILITIES ....................................................................................... 6 3.1 Roles & Responsibility Matrix ......................................................................................... 6 4. PRACTICES TO BE FOLLOWED ................................................................................... 7 4.1 PDO Optimisation Management Process ......................................................................... 7 4.2 Generic Model for Optimisation Management ................................................................. 8 4.3 Sequential Activities ........................................................................................................ 9 4.4 Specifications and Data Management ............................................................................ 10 5. APPLICATION & STEP-OUT APPROVAL ................................................................. 11 5.1 Application ..................................................................................................................... 11 5.2 Step-out and Approval ................................................................................................... 11 APPENDICES ......................................................................................................................... 12 A1 Glossary of Terms, Definitions and Abbreviations................................................... 12 A2 References ................................................................................................................ 12 13/6/2001 Page 3 CP-145 Optimisation Management Code of Practice 1. INTRODUCTION 1.1 Background Version 1 Maximising the production from the existing assets is an important part of the business. Prior to 2000, management of optimisation was only within the Asset Teams, with the result that different systems have evolved, relatively independently of each other. A Production Management Process was developed in 2000, under the custodianship of UOD (Operations Functional Director) which divides production management into the categories Rig sequence management, Well addition/optimisation, MOL optimisation, Financial issues, Surface production optimisation and Subsurface optimisation. A structure of meetings and review has been created to manage the overall process. The latter two areas, Surface and Subsurface optimisation, have been combined under UPD (Petroleum Engineering Functional Director). The sub-process under UPD involves a team of optimisation focal points from all the assets. Members of the team meet on a monthly basis to address issues around the corporate optimisation portfolio and to present asset production and optimisation PIs. This team is responsible for identifying and implementing best practices in the area of production optimisation and is tasked with developing and maintaining this Optimisation Management Code of Practice (OMCoP) and Specifications (OMS). The first issue of the OMCoP and OMS (Version 0, October 2000) was developed using the analysis of benchmarking questionnaires sent to the Oil Asset Teams (Refs.1 and 2) and the results of Produce the Limit peer assists in Nimr (March 2000) (Ref.3) and Yibal (July 2000). The current version is the result of significant review with the assets to agree a simpler, more coherent Optimisation process. 1.2 Purpose The OMCoP provides a structured and auditable framework for management of optimisation of PDO’s production. The overall objective of optimisation in PDO is to maximise economic production from PDO's existing wells and facilities. The purpose of this Code of Practice and the Management Specifications is to define optimisation, to document the process, roles and responsibilities, to list the key processes and procedures to be adhered to, and to provide a source of references to policies, codes of practice, procedures, guidelines, documents and forms that play a role in optimisation. 1.3 Target Audience The target audience is all parties involved with the optimisation of wells and facilities in PDO and in particular Production Programmers, Production Technologists, Reservoir Engineers, Well Analysts, Petrophysicists and Engineers. The document is available via the EDMS system. 1.4 Structure of This Document The document discusses the following aspects of optimisation management in sequence: 13/6/2001 he PDOOptimisation Management process (Section 4.1) A generic model for optimisation management (Section 4.2) Sequential activities (Section 4.3) Specifications and data management (Section 4.4) Page 4 CP-145 Optimisation Management Code of Practice 2. SCOPE & OBJECTIVES 2.1 Scope Version 1 The scope of optimisation covers two general areas, Wells and Facilities 2.2 Wells: Optimisation of a well can be considered over the period of its life from when it is initially fully beaned up (usually within three months of first production) until the point near to the end of its life where optimisation activities are no longer economically viable. Both inflow and outflow optimisation are included. Facilities: Production optimisation of facilities concerns the removal of bottlenecks that cause oil and gas production to be constrained. These can be direct bottlenecks such as flowlines/pipelines that are too small or indirect bottlenecks such as inadequate water handling facilities. Also included is product process optimisation by reducing system losses, improving oil recovery and reducing overall system backpressures. Fundamentals for this Code of Practice This Code of Practice, including the Management Specifications, describes the detailed management procedures, activities and responsibilities involved in the management of optimisation in PDO in support of the PDO Business Policy on product flow asset development. 2.3 Related Business Control Documents The following documents which specifically relate to this Code of Practice in the standards hierarchy: Policy Product flow asset development Product flow asset integrity PL-34 PL-35 Code of Practice Operate Wells & Facilities Optimisation Management Code of Practice CP-115 CP-145 Specification Optimisation Management Specifications SP-1191 Existing Well Management GU-372 Procedure Guideline 2.4 Review and Improvement This OMCoP will be reviewed annually to guarantee that it reflects current thinking and practices. The OMCoP is the responsibility of the CFDH for Production Technology, who will carry out this review and update the document. New revisions will be reviewed by the CFDH Well Services, CFDH Reservoir Engineering and CFDH Production Operations as co-owners of this OMCoP, before authorisation by the CFDH for Production Technology. This version of the OMCoP and OMS focuses on well optimisation. Future versions will include more rigorous definition of the facilities optimisation process. This is the responsibility of CFDHs of Operations (UOP) and Programming (OIL/3). 13/6/2001 Page 5 CP-145 Optimisation Management Code of Practice 3. ROLES & RESPONSIBILITIES 3.1 Roles & Responsibility Matrix Version 1 The following summarises the roles and related responsibilities required to both manage and implement the Code of Practice in the following matrix: Role CFDH Production Technology, OYP (UPT) Discipline Engineer Production Technology, UPT/1 CFDH Operations, OFO (UOP) Senior PT Asset/ PFAT PT and Programmers Asset/PFATS CFDH Reservoir Engineering, OQP (UPR) 13/6/2001 Related Responsibilities Responsible for technical standards relating to subsurface optimisation management and for the overall optimisation process in PDO. Responsible for content and update of the document. Responsible for managing the original document, issuing and recording the update. Responsible for technical standards relating to surface optimisation management Ensure standards and requirements of the Optimisation Code of Practice and Management Specifications are adhered to and actively managed in the asset. Establish & ensure day-to-day activities identification & tracking is updated/maintained in accordance with the roles defined in the Optimisation Code of Practice and Management Specifications. Jointly responsible (with UPT) for technical standards relating to forecasting Page 6 CP-145 Optimisation Management Code of Practice 4. Version 1 PRACTICES TO BE FOLLOWED The following section describes the overall optimisation management process and the underlying activities and specifications relating to optimisation management in PDO. As such it is intended as a single source reference to all activities, roles & responsibilities, specifications, procedures and guidelines relating to optimisation. All activities herein are recommended practices that will be subject to audit. Step-outs to these guidelines should be justified on a case-by-case basis to UPT by the assets involved. 4.1 PDO Optimisation Management Process Overall optimisation management in PDO is depicted below. It is aimed at managing a portfolio of candidates to maximise production gains from optimisation, by making optimal use of existing resources or indicate the need for increased resources. This Code of Practice considers surface and subsurface optimisation. Most optimisation effort is devoted to well optimisation because this is where short-term gains are most readily realised. Facilities optimisation is also included. It is also possible that some of the largest and most sustainable gains can be made through simple changes to the surface facilities, e.g. removal of chokes, changing out restrictive valves etc. Inter - Asset Optimisation (Role of the Short Term Optimisation Teams) Within Asset Optimisation UOD Review Optimisation Code of Practice Produce the Limit Best Practices Proposal for mobile staff resources for optimisation Monthly reports Monthly reporting template Production Management Process Teams Corporate advice & Best Practice UPD Short Term Production Optimisation UPT, UPT/1, OTW, 1 representative from each PFAT OTM Surface Optimisation & Deferments OTW OxO/2/4 OCM Financial Support Issues OCF, OCF/x OIM Main oil line and Scheduled Deferment Optimisation OIL, OxL TWM Rig Sequence Finalisation TWE/11, OxL CEM Additional Rig Resources Finalisation CEM/2, OxL It is the role of the Short Term Optimisation Team, under UPD, to ensure that resources available at a corporate level are allocated in support of the company's optimisation and production targets. 13/6/2001 Page 7 CP-145 Optimisation Management Code of Practice 4.2 Version 1 Generic Model for Optimisation Management The full well and facilities lifecycle is shown below. Optimisation occurs during the ‘Operate and Maintain’ phase (EPBM A.71/2). As with all parts of the lifecycle a continuous feedback process is in place. The elements of this loop are: Monitoring: This consists of ongoing data capture and storage and initial analysis on a short term (daily basis) to highlight failures or significant losses of production. Candidate Identification and Tracking: Candidates are identified using automated exception reporting or more detailed analysis by individuals and by multi-disciplinary teams. A portfolio of candidates, classified according to corporate standards, is ranked to maximise overall production gains. Well and Facilities Lifecycle Operate / Maintain & Optimise Design / Construct Monitor Candidate ID & Tracking Abandon Implementation Results Tracking Sequential Activities And Feedback Loops Data capture & management Classification Identification Initial analysis Fault Quantification Tracking Ranking prioritisation Planning, programming Quantification standards Review Execution reporting Portfolio mgt Forecasting Procedures, Tools, Techniques & Data Management Implementation: Potential optimisation candidates are developed into proposals, programmed into the short-term (90-day) plan and then implemented in the field. Results Tracking: optimisation performance and gains are determined according to corporate standards. Reviews of performance are used to improve future activity planning and implementation. 13/6/2001 Page 8 CP-145 Optimisation Management Code of Practice 4.3 Version 1 Sequential Activities The following sections represent the activities involved in Optimisation Management. Matrices defining detailed responsibilities and suggested processes for these activities are contained in the Optimisation Management Specifications. Best in class methods will be used to reduce cycle time in Production Optimisation processes. In all cases, the involvement of an integrated team is recommended. 4.3.1 Monitoring All wells and facilities will be monitored in accordance with the Optimisation Management Specifications. Where possible use will be made of automated systems such as CAO. Integrated teams will ensure that the different requirements of day-to-day, medium term and long term monitoring are addressed. 4.3.2 Candidate Identification and Tracking All assets will have systems in place to rapidly identify and rank optimisation candidates in accordance with the Optimisation Management Specifications, which includes - Integrated teams, including interior staff, will ensure that all potentials and constraints are quantified and considered when selecting candidates. All optimisation activities will be classified according to standard categories. Potential gains and economics will be estimated according to corporate standards. Each team will maintain and regularly review and rank an optimisation portfolio. Deliberate de-optimisations to reduce loads (e.g. wear) will be included in the portfolio. An UTC hurdle will be used. Optimisation candidates have UTCs less than the current corporately specified development UTC. Incremental activity, which is funded through corporate or offsets, will be prioritised based on YACI. All optimisation candidates will be tracked. All assets should progress towards the next generation of candidate identification methods: using the hydrocarbon availability model combined with calibrated production system models. 4.3.3 Implementation Once identified, optimisation candidates will be implemented as rapidly as possible and so the following will be performed in accordance with the Optimisation Management Specifications - Optimisations should be approved at the minimum level commensurate with the Manual of Authorities using the minimum documentation specified. - Action tracking systems will be used for optimisations that do not require any formal proposals. - PIs related to the speed of implementation will be used and continuous improvement targets will be set and monitored. Targets, Forecasting and Reporting Targets. Annual targets will be set for optimisation at both a team and corporate level, as defined in the Optimisation Management Specifications. The targets will be based on the Asset team’s Optimisation Forecast, as per corporate target-setting norms. Forecasting of optimisation gains will ensure that the short-term gain can be identified, whilst maintaining consistency with the long-term forecast. Optimisation should be forecast as a separate item within NFA. Forecasting will be according to the latest corporate specifications. 13/6/2001 Page 9 CP-145 Optimisation Management Code of Practice Version 1 Reporting. Corporate reporting will be against the set targets. At a team level data should be gathered that will allow reporting of costs, UTCs and gains by optimisation type and well or facility category. 4.3.4 Results Tracking The data, as specified in the Optimisation Management Specifications, will be recorded for all optimisation activities and will be updated on a monthly basis. An end of year forecast will be reported on a monthly basis. Reported gains will be based on - the total current optimisation, known as the ‘cumulative declined gain’, which is the sum of individual current declined gains. validated well tests both before and after the optimisation activity. comparison with a ‘no optimisation forecast’. an accelerated decline compared to the historical NFA. Optimisations that show a loss, including deliberate de-optimisations, will be tracked and reported. Results will be stored so that they are accessible to all departments in PDO, so that a corporate database can be developed. 4.4 Specifications and Data Management The Optimisation Management Specifications define the requirements for the following; 13/6/2001 Responsibilities Definitions of activity categories Optimisation management activities Documentation IT Tools Targets and forecasting Performance Indicators Page 10 CP-145 Optimisation Management Code of Practice 5. APPLICATION & STEP-OUT APPROVAL 5.1 Application Version 1 This OMCoP must be applied throughout the producing life of all wells and facilities in PDO. 5.2 Step-out and Approval All activities herein are recommended practices that will be subject to audit. Variance from this Code of Practice must be approved by the Corporate Functional Discipline Head for Production Technology, OYP (UPT) on a case-by-case basis by the assets involved Control of this Code of Practice (ensuring that activities are carried out in accordance with the OMCoP) lies with the persons responsible for the activities, as specified in Section 3.1 of this document, and in the Optimisation Management Specifications. 13/6/2001 Page 11 CP-145 Optimisation Management Code of Practice Version 1 APPENDICES A1 Glossary of Terms, Definitions and Abbreviations CAO CEM CFDH EDMS EPBM NFA OMCoP OMS PI UTC UPT (OYP) YACI A2 Computer-aided operations Corporate Planning Department Corporate Functional Discipline Head. In charge of staff planning and development for the discipline within PDO. Electronic Data Management System Shell E&P: EP Business Model No Further Activity Optimisation Management Code of Practice Optimisation Management Specifications Performance Indicator Unit Technical Cost CFDH for Production Technology Year-Average Capital Intensity References 1. Optimisation Questionnaire, F. Clayton, UPT/1, 13/6/00, http://sww.pdo.shell.om/edms_rec_get/003675305 2. Optimisation Questionnaire Analysis, F. Clayton, UPT/1, 13/6/00, http://sww.pdo.shell.om/edms_rec_get/003675484 3. Nimr PtL Way Forward, Husam Al-Jahadmy, ONE/2, 8/5/00, http://sww.pdo.shell.om/edms_rec_get/003675656 13/6/2001 Page 12 CP-145
© Copyright 2026 Paperzz