Membrane cryostats for large volume neutrino detectors European cryogenic days June 9th, GENEVA Disclaimer CONFIDENTIAL 09/06/2016 GTT for European cryogenic days This document is strictly confidential. Any unauthorised access to, appropriation of, copying, modification, use or disclosure thereof, in whole or in part, by any means, for any purpose, infringes GTT’s rights. This document is part of GTT’s proprietary knowhow and may contain trade secrets protected worldwide by TRIPS and EU Directives against their unlawful acquisition, use and disclosure. It is also protected by Copyright law. The production, offering or placing on the market of, the importation, export or storage of goods or services using GTT’s trade secrets or know-how is subject to GTT’s prior written consent. Any violation of these obligations may give rise to civil or criminal liability. © GTT, 2010-2016 2 Agenda 1- Company overview 09/06/2016 GTT for European cryogenic days 2- A first prototype: 17 m³ LAr tank 3- Two new 600 m³ LAr tanks CONFIDENTIAL 4- Next step 3 CONFIDENTIAL 1 09/06/2016 GTT for European cryogenic days Company overview 4 GTT in brief An engineering company with more than 50 years of experience in the design of the Membrane Cargo Containment Systems for cryogenic liquids 09/06/2016 GTT for European cryogenic days GTT is a public company listed on the Euronext Stock Exchange (Paris) About 120 ships and onshore tanks currently on order Around 380 highly qualified people, mainly at head office, but also present worldwide (1) CONFIDENTIAL One project already designed for CERN and two others ongoing As at December 31st, 2015 5 GTT membrane technologies NO96 system Mark III system Primary stainless steel membrane Top bridge pad Corner panel Metallic insert 09/06/2016 GTT for European cryogenic days Hard wood key Inner hull Insulation panel Resin ropes Primary Invar membrane Invar tongue Composite secondary membrane (Triplex) Primary insulation box Coupler Secondary Invar membrane CONFIDENTIAL Inner hull Secondary insulation box 6 CONFIDENTIAL 2 09/06/2016 GTT for European cryogenic days A first prototype: 17m³ Lar tank 7 Context Main targets of the « prototype », a 17m3 tank containing liquid Argon Approving membrane technology in contact with Argon (keep the Argon very pure) Approving the thermal efficiency of the insulation system CONFIDENTIAL 09/06/2016 GTT for European cryogenic days Approving the instrumentation system developed to detect neutrinos A real challenge for GTT First time for GTT to design container for Liquid Argon: Argon specificities -188°C 1400 kg/m³ Keep an high purity of the stored Argon (no pollution from containment system) Thermal flux limited to 5W/m² Foam density: 70kg/m³ Top cap about 20 crossing pipes in 6m² Removable element CONFIDENTIAL Tank: Three liners of insulation (1m) 09/06/2016 GTT for European cryogenic days Tightness of the primary container reaching 10-9 mbar.l.s-1 An innovative solution Adapted to CERN needs: 3 isolating layers: 400mm + 2*300mm Specific panels arrangement Stainless steel (tank) Invar (Top Cap) Dedicated corrugation arrangement (1.2m high) in upper part of the tank CONFIDENTIAL A mix between two insulation systems made of: 09/06/2016 GTT for European cryogenic days Double containment Construction already completed Containment system for tank: Built at CERN premises Built at premises Already delivered at CERN Next steps: Instrumentation installation is ongoing Top cap installation scheduled during summer Cool down of the tank in the second half 2016 CONFIDENTIAL Containment system for top cap: 09/06/2016 GTT for European cryogenic days By , a company specialized in the GTT’s membrane system installation CONFIDENTIAL 3 09/06/2016 GTT for European cryogenic days Two new 600 m³ LAr tanks 12 CONTEXT: Two different detectors GTT’s system has been selected for this new step of development NP02 tank : Single phase TPC as a prototype for the DUNE CONFIDENTIAL NP04 tank : 09/06/2016 GTT for European cryogenic days Double phase TPC (Time Projection Chamber ) as a prototype for the DUNE experiment Franco Sergiampietri, 31 July 2017, 13 A new challenge for GTT Two liners of insulation (0,8m) Triple containment system Foam density: 90kg/m³ High density of crossing pipes (mainly on top side) About 60 elements from Ø30 to 700mm CONFIDENTIAL Pipes crossing 3 liners 09/06/2016 GTT for European cryogenic days First time for GTT to design: CONFIDENTIAL 4 09/06/2016 GTT for European cryogenic days Next step 15 LBNF/DUNE project CONFIDENTIAL 09/06/2016 GTT for European cryogenic days Final goal? 16 09/06/2016 GTT for European cryogenic days Thank you for your attention CONFIDENTIAL Jérôme Pellé • [email protected] 17
© Copyright 2026 Paperzz