Profile Liner Technology for isolation of complicated zones while drilling Our factory PERECRYVATEL LLC Profile Liner Technology Applicable: For isolation of complicated zones with total loss while drilling For isolation of productive layers from blocking it by drilling mud and cement For casing repairing while drilling Application area: Vertical wells Deviated wells Horizontal wells Technology for well design simplification Standard With PL application • Profile liner set in series when meet the loss zones • Isolate the layers without diameter loss • Make the well design more simple 1 2 3 4 5 6 Expanding of cylindrical parts PL expanding by internal pressure Profile liner’s pipe PL running Reaming the hole Hole condition with loss Profile Liner Technology Type & technical parameters of expandable profile liner Profile liner size, in Well diameter, in Pressure differential, psi Profile Liner type D D1 s d d1 d2 P P1 PL-295 10,748 10.63 0,315 11,626 * 11,811 11,626 1160 1943 PL-216 7,874 7,677 0,315 8,5 ** 8,504 8,5 1812 2610 PL-216U 7,874 7,677 0,315 8,5 7,716 7,5 1935 2842 PL-168K 5,354 5,276 0,197 6 5,551 5,665 *** 5,5 2030 2465 5,591 4,803 4,748 2320 3190 5,197 PL-146K 4,646 4,567 0,197 PL-146U 5.197 5.118 0,197 5,709 5,197 - 2320 2465 PL-168K 5,354 5,276 0,197 5,945 5,591 - 2030 2465 PL-146K 4,646 4,567 0,197 5,197 4,803 - 2320 3190 D – PL diameter in cylinnrical parts; D1 – PL diameter in profiled parts; s – thickness; d – Hole diameter; d1 – ID of PL after PL setting ; d2 – Bit diameter after PL setting; Р – Pressure for PL setting; Р1 – Max. allowable inside pressure for PL ; 4,882**** Shape of Profile Liners Initial shape of pipe Connection of Profile Liner Connection for welding Threaded connections Packer elements on PL PL for 8-1/2” hole PL for 12-1/4” hole Easy drillable polymer shoe (on the left) running tool with left thread (on the right) Testing stand at the factory Profile pipe before and after expanding After expanding 1 m of profiled pipe can withstand to 150 Klbs (70 t) of axial load Underreamers The well should be reamed by underreamer before PL running Roller Reamers Applicable for reaming of cylindrical part of PL and for calibration of inside parts of PL after PL setting in a well Roller Reamers Isolation by stage Connection of PL from the top. Well No.14124 Abdrahmanovskoe Field, Tatarstan, Russia Connection of PL to PL from the bottom. Well No.202 Orenburgskoe Field, Russia Well No. 35 in Samara region it was set 7 Profile Liners without loss in diameter Application of profile liner technology in Kupal Field, IRAN in 2003 1. 2. 3. 4. 5. Threaded connections – 15 Welded connections – 45 Total length of PL – 435,5 m. PL was set when the bottom was at 3790m TD after PL setting – 4135 m ISOLATION OF PRODUCTIVE LAYERS BY PROFILE LINERS PROFILE LINER MANUFACTURING AT UNIQUE STAND Profile Liner before shipment 20 ECONOMIC EFFICIENCY 1. Time reduce for well drilling 2. Cost reduce for casing using 3. Cost reduce for drilling mud services 4. Cost reduce for transportation 5. Additional oil production due to the period of well drilling reduced TECHNOLOGICAL EFFICIENCY 1. Solve the problem with total loss while drilling 2. Time reduce for well drilling 3. Isolate the layers without loss in diameter 4. Applicable without cementing 5. Intermediate casing excluded 6. Simplification of well design 7. Profile liner set in series when meet the loss zones 8. Reduced energy and materials Office 43, bld. 40/1, Kuibysheva str, Octyabrskiy city,, 452614, Rep.Bashkortostan, Russian Federation ph./fax: +7 (34767) 4-17-25, +7-909-310-11-13 e-mail: [email protected] www.diddt.com Thanks for your attention!
© Copyright 2026 Paperzz