Technical overview H2020-Water1b-2015 PM2 Stockholm 14-15 June 2017 This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement no 689785 saltgae.eu CO H2020-Water1b-2015 WP1: ended in M9 • MS1-Best performing microalgal/bacteria consortium identified • • Results: Tested WW: tannery, fish ponds, cheese whey Tannery: D. salina on 10% (sterilised WW - not applicable) reality salinity will be too low, mixed consortium of self selected algae expected Algen salinity tests for existing & marine & saltpan species Fishpond: Spirulina and Chlorella low nutrients in WW; how will be solved? Whey WW (original WW from Silvio or not?): Tetraselmis suecica on 5% WW, WW inhibitory for Spirulina and • • • Chlorella • • Study of microbial community: dominant algal and bacterial species and their associations; primers designed for quantification of algal-bacterial ratio in demos-done Pending tasks: MS1 to be submitted (reviewed by CO and TM) saltgae.eu CO H2020-Water1b-2015 WP2: Valorisation of Sludge • • • M2 - Design and dimensioning of process for Primary Treatment and pre-treatment (i.e. DAF) (BBA M12): done for all demo sites M3 – Anaerobic Digestion processes and CO2 recovery optimised at lab scale (NOVA M18): in progress! Pending: supply of equipment to demo sites – Who, Where, What – WG discussion! AD trials for methanogenic phase – results needed for further work and construction salinity levels (needed for AD reactors construction, DCU needs it) optimisation of CO2 recovery? List of equipment for demos: in deliverable D2.1– communication with partners – is there anything unclear about who delivers what & who pays? Containers equipment at KOTO (BBA, KOTO; ALGEN) - what goes in to the containers? WG dissussion saltgae.eu CO H2020-Water1b-2015 WP3: Valoristaion of HRAP effluents • • M4 – Selection of pre-treatment strategy; Relevance of ED on each studied sample assessed; New pump and ERD tested in lab environment (iBET M16) Pending / deviations: ED tested on WW from Arava and KOTO at lab scale, will not be implemented (no budget, not feasible) report to PO? (EXT, BBA no budget for ED EXT does ED lab scale tests: delivery of WW (done? Costs!) few m3 of pretreated WW delivered to who/when?? WG discussion! Pump tests needed on demo sites: transfer of PM / hours from WP3 to WP6? Delay in supply of pumping station – BBA BBA has no budget for pretreatment and RO (who delivers and pays for demos?) + pumps – does DCU supply? WG discussion! Only RO at ARV and kOTO (really both?) saltgae.eu CO H2020-Water1b-2015 WP4: Valorisation of algae biomass • • Objectives: optimisation of harvesting, biomass refinements, develope and demonstrate animal feed, coatings and adhesives, 3D printing Results / pending: optimisation of harvesting biomass refinements animal feed trials: need to adapt to situation o Produmix new numbers and proposed changes (no need for PO approval probably): o testing for fish meal and antimicrobial activity (instead of soya replacement and omega 3); o partners need to send algae (200g dry sample); o NEW CALCULATIONS-is this acceptable/feasible for partners to provide? Fish meal: 76,5kg needed, AB: 64,6 kg algae needed (141 kg total, previously: 533 kg) o Archimede sent 150kg of algae for tests; Coatings: what has been done? 3D printing, progress? saltgae.eu CO H2020-Water1b-2015 WP4: Valorisation of algae biomass • Pending: D4.1. (M14) - next month! Systems design for harvesting and refinement, algae characterisation saltgae.eu CO H2020-Water1b-2015 WP5: HRAP Integration and Process Optimisation Pending: • D5.1 deliverable • Sensor system construction and integration in existent system (OXI-BBA-DCU-ARV-KOTO-ARCH)-WG discussion! • OXI: Chemitec doing tests for P and Chl (Sample from ARCH in process, KOTOs will be delivered after PM) • Decision about how many modules, which sensors, range (budget!) • Proposed: pH, cond, NH4, NO3, PAR, Chl; one per pond// offline: P in supernatant after harvesting (tests running) • OXI needs info on Chl levels • Sensors for WP3 (RO-DCU), WP2 (AD-BBA), anyone else?: WG discussion! saltgae.eu CO H2020-Water1b-2015 Working Groups discussions: topics to cover WP2 • Supply of equipment to demo sites – Who, Where, What • Containers equipment at KOTO (BBA, KOTO; ALGEN) - what goes in to the containers? WP3 • BBA has no budget for pretreatment and RO (who delivers and pays for demos?) + pumps – does DCU supply? • EXT does ED lab scale tests: delivery of WW (samples sent? Costs!) few m3 of pretreated WW delivered to who/when?? WP5 • Sensor system construction and integration into existing system (OXI-BBA-DCU-ARV-KOTO-ARCH • Sensors for WP3 (RO-DCU), WP2 (AD-BBA), anyone else? saltgae.eu CO H2020-Water1b-2015 Deviations • • • • • Species ED only lab scale Salinity in Italian demo Biomass use Size of AD • DoW partA & partB saltgae.eu CO H2020-Water1b-2015 Deliverable planning • • • • Table of contents Assignment of work Main story Coverage of DoW • • • Structure Spelling Language • Dates, avoid unnecessary delays WP leader Deliverable editor Next: D4.1 Systems design for harvesting and refinement, algae characterisation (IBET M14 Jul-2017 ) D2.2 Optimisation of anaerobic processes and CO2 recovery solution (NOVA M18 Nov-2017 ) D3.2 Optimisation of final systems ready for demonstration trials (IBET M18 Nov-2017) saltgae.eu CO
© Copyright 2026 Paperzz