2013 Comprehensive Water System Plan August 2014 Acknowledgements Engineering Firm HDR Engineering, Inc. 606 Columbia Street NW, Suite 200 Olympia, WA 98501 (360) 570-4400 Silverdale Water District Board of Commissioners: Marcus Hoffman, John Poppe, Mike Sechrest General Manger: Morgan Johnson Assistant General Manager: Skip Beahm Additional Contributors: Tim Knapp, Maintenance Manager Jeannie Screws, Finance Manager August 2014 Contents Executive Summary 1.0 Introduction ................................................................................................... 1-1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 2.0 Water System Description .............................................................................. 2-1 2.1 2.2 2.3 2.4 2.5 2.6 3.0 Water System Ownership and Management ...................................................... 1-1 Overview of Existing System .............................................................................. 1-1 Authorization and Purpose ................................................................................. 1-1 Summary of Plan Contents ................................................................................ 1-1 Definition of Terms ............................................................................................. 1-1 List of Abbreviations ........................................................................................... 1-1 Water System Plan Review ................................................................................ 1-1 Introduction ......................................................................................................... 2-1 Water Service Area ............................................................................................ 2-1 2.2.1 History..................................................................................................... 2-1 2.2.2 Topography............................................................................................. 2-1 2.2.3 Water Service Area................................................................................. 2-1 Water Service Agreements ................................................................................ 2-1 2.3.1 Water Service Area Agreement .............................................................. 2-1 Satellite System Management ............................................................................ 2-1 Existing Water Facilities ..................................................................................... 2-1 2.5.1 Pressure Zones ...................................................................................... 2-1 2.5.2 Supply Facilities ...................................................................................... 2-1 2.5.3 Pump Station Facilities ........................................................................... 2-1 2.5.4 Storage Facilities .................................................................................... 2-1 2.5.5 Distribution and Transmission System ................................................... 2-1 2.5.6 Pressure Reducing Stations ................................................................... 2-1 2.5.7 Water System Interties ........................................................................... 2-1 2.5.8 Telemetry and Supervisory Control System ........................................... 2-1 2.5.9 Water System Operation and Control ..................................................... 2-1 Adjacent Water Systems .................................................................................... 2-1 2.6.1 City of Bremerton .................................................................................... 2-1 2.6.2 City of Poulsbo........................................................................................ 2-1 2.6.3 Subase Bangor ....................................................................................... 2-1 2.6.4 Island Lake Water System ...................................................................... 2-1 2.6.5 North Perry Avenue Water District.......................................................... 2-1 2.6.6 Erland Point Water Company ................................................................. 2-1 2.6.7 Kitsap County Public Utility District No. 1 ............................................... 2-1 2.6.8 Other Systems ........................................................................................ 2-1 Land Use and Population ................................................................................ 3-1 3.1 Introduction ......................................................................................................... 3-1 Contents Silverdale Water District i 2013 Comprehensive Water System Plan August 2014 3.2 3.3 3.4 4.0 Water Demand Forecast ................................................................................. 4-1 4.1 4.2 4.3 4.4 4.5 5.0 Compatibility with other Plans ............................................................................ 3-1 3.2.1 Introduction ............................................................................................. 3-1 3.2.2 Growth Management Act ........................................................................ 3-1 3.2.3 Kitsap County Comprehensive Plan ....................................................... 3-1 3.2.4 Silverdale Sub-Area Plan........................................................................ 3-1 3.2.5 Kitsap County-wide Planning Policy ....................................................... 3-1 3.2.6 Kitsap County Coordinated Water System Plan ..................................... 3-1 Land Use ............................................................................................................ 3-1 Population .......................................................................................................... 3-1 3.4.1 Household Trends .................................................................................. 3-1 3.4.2 Existing and Future Population ............................................................... 3-1 Water Production History ................................................................................... 4-1 Customer Categories, Connections, and Consumption ..................................... 4-1 Water Balance and Distribution System Leakage .............................................. 4-1 Water Use Factors and Equivalent Residential Units ......................................... 4-1 Water Demand Forecast .................................................................................... 4-1 4.5.1 20-Year Water Demand Forecast ........................................................... 4-1 Policies and Design Criteria ............................................................................ 5-1 5.1 5.2 5.3 5.4 Introduction ......................................................................................................... 5-1 Supply Policies ................................................................................................... 5-1 5.2.1 Quality Protection ................................................................................... 5-1 5.2.2 Quantity .................................................................................................. 5-1 5.2.3 Fire Flow ................................................................................................. 5-1 5.2.4 Conservation........................................................................................... 5-1 5.2.5 Reclaimed Water .................................................................................... 5-1 5.2.6 Regional Participation ............................................................................. 5-1 Customer Service Policies ................................................................................. 5-1 5.3.1 Duty to Serve .......................................................................................... 5-1 5.3.2 Water Service and Connection ............................................................... 5-1 5.3.3 Temporary Services................................................................................ 5-1 5.3.4 Emergency Service................................................................................. 5-1 5.3.5 Planning Boundaries............................................................................... 5-1 Facility Policies ................................................................................................... 5-1 5.4.1 Minimum Standards ................................................................................ 5-1 5.4.2 Pressure ................................................................................................. 5-1 5.4.3 Velocities ................................................................................................ 5-1 5.4.4 Storage ................................................................................................... 5-1 5.4.5 Transmission and Distribution ................................................................ 5-1 5.4.6 Supply and Pump Stations ..................................................................... 5-1 5.4.7 Pressure Reducing Stations ................................................................... 5-1 5.4.8 Control .................................................................................................... 5-1 5.4.9 Maintenance ........................................................................................... 5-1 Contents Silverdale Water District ii 2013 Comprehensive Water System Plan August 2014 5.5 5.6 6. Water Source and Quality............................................................................... 6-1 6.1 6.2 6.3 6.4 7. Financial Policies ................................................................................................ 5-1 5.5.1 General ................................................................................................... 5-1 5.5.2 Connection Charges ............................................................................... 5-1 Organizational Policies ....................................................................................... 5-1 5.6.1 Structure ................................................................................................. 5-1 5.6.2 Staffing ................................................................................................... 5-1 Introduction ......................................................................................................... 6-1 Existing Water Sources and Treatment .............................................................. 6-1 6.2.1 Water Sources ........................................................................................ 6-1 6.2.2 Water Treatment ..................................................................................... 6-1 Water Rights ....................................................................................................... 6-1 6.3.1 Overview ................................................................................................. 6-1 6.3.2 Existing Water Rights ............................................................................. 6-1 6.3.3 Water Rights Planning ............................................................................ 6-1 Water Quality Monitoring .................................................................................... 6-1 6.4.1 Overview ................................................................................................. 6-1 6.4.2 District Water Quality Monitoring Program Overview ............................. 6-1 6.4.3 District Water Quality Monitoring Plans .................................................. 6-1 6.4.4 Wellhead Protection Program ................................................................. 6-1 6.4.5 Consumer Confidence Report ................................................................ 6-1 Water System Analysis ................................................................................... 7-1 7.1 7.2 7.3 7.4 7.5 7.6 7.7 Introduction ......................................................................................................... 7-1 Pressure Zones .................................................................................................. 7-1 7.2.1 Zone Demand Split ................................................................................. 7-1 7.2.2 Zone Peak Hour Demand ....................................................................... 7-1 7.2.3 Zone System Pressure ........................................................................... 7-1 Source Capacity Evaluation ............................................................................... 7-1 7.3.1 Source Analysis Criteria ......................................................................... 7-1 7.3.2 Source Capacity Analysis Results .......................................................... 7-1 Water Supply Facilities Evaluation ..................................................................... 7-1 7.4.1 Supply Analysis Criteria .......................................................................... 7-1 7.4.2 Supply Analysis Results ......................................................................... 7-1 Storage Facilities ................................................................................................ 7-1 7.5.1 Design Criteria ........................................................................................ 7-1 7.5.2 Storage Analysis ..................................................................................... 7-1 Distribution and Transmission System ............................................................... 7-1 7.6.1 Analysis Criteria ...................................................................................... 7-1 7.6.2 Hydraulic Model ...................................................................................... 7-1 7.6.3 Hydraulic Analyses ................................................................................. 7-1 7.6.4 Deficiencies ............................................................................................ 7-1 Limiting Factors and Carrying Capacity.............................................................. 7-1 Contents Silverdale Water District iii 2013 Comprehensive Water System Plan August 2014 8. Operations and Maintenance.......................................................................... 8-1 8.1 8.2 8.3 8.4 9. Water System Improvements ........................................................................ 9-1 9.1 9.2 9.3 9.4 10. Introduction ......................................................................................................... 8-1 Normal Operations ............................................................................................. 8-1 8.2.1 District Personnel.................................................................................... 8-1 8.2.2 Personnel Responsibilities...................................................................... 8-1 8.2.3 Available Equipment ............................................................................... 8-1 8.2.4 Routine Operations ................................................................................. 8-1 8.2.5 Continuity of Service ............................................................................... 8-1 8.2.6 Routine Water Quality Sampling............................................................. 8-1 8.2.7 Cross-Connection Control ...................................................................... 8-1 8.2.8 Recordkeeping and Reporting ................................................................ 8-1 8.2.9 Operations and Maintenance Records ................................................... 8-1 8.2.10 Safety Procedures and Equipment ......................................................... 8-1 8.2.11 Environmental Awareness Practices ...................................................... 8-1 Emergency Operations ....................................................................................... 8-1 8.3.1 Capabilities ............................................................................................. 8-1 8.3.2 Emergency Response Program.............................................................. 8-1 Preventive Maintenance ..................................................................................... 8-1 8.4.1 Reservoirs............................................................................................... 8-1 8.4.2 Distribution System ................................................................................. 8-1 8.4.3 Tools and Equipment .............................................................................. 8-1 Introduction ......................................................................................................... 9-1 Description of Improvements .............................................................................. 9-1 9.2.1 Water System Improvements since Last Water System Plan ................ 9-1 9.2.2 Water Main Extensions ........................................................................... 9-1 9.2.3 Facility Improvements ............................................................................. 9-1 9.2.4 Water System Acquisitions ..................................................................... 9-1 9.2.5 Reclaimed Water Improvements ............................................................ 9-1 9.2.6 Miscellaneous Improvements ................................................................. 9-1 Estimating Costs Of Improvements .................................................................... 9-1 Schedule of Improvements ................................................................................. 9-1 9.4.1 Future Project Cost Adjustments ............................................................ 9-1 Financial Plan ............................................................................................... 10-1 10.1 10.2 10.3 Historical Financial Review............................................................................... 10-1 Water Rates ..................................................................................................... 10-1 Development of Financial Plan ......................................................................... 10-1 10.3.1 Projected Revenues ............................................................................. 10-1 10.3.2 Future Expenses................................................................................... 10-1 10.3.3 Project Financing .................................................................................. 10-1 10.3.5 Reserve Levels ..................................................................................... 10-1 10.3.5 Overview of Future Water Rates .......................................................... 10-1 Contents Silverdale Water District iv 2013 Comprehensive Water System Plan August 2014 10.4 Summary .......................................................................................................... 10-1 Tables Table 1-1. Table 1-2. Table 1-3. Water System Ownership Information .................................................................. 1-1 2011 Water System Data ...................................................................................... 1-2 Abbreviations ........................................................................................................ 1-5 Table 2-1. Table 2-2. Table 2-3. Pump Station Summary ...................................................................................... 2-14 Reservoir Summary ............................................................................................ 2-18 Water Main Size Inventory .................................................................................. 2-25 Table 3-1. Water District Population Trends and Projections ................................................ 3-7 Table 4-1. Table 4-2. Table 4-3. Table 4-4. Table 4-5. Table 4-6. Table 4-7. Table 4-8. Table 4-9. Table 4-10. Annual Well Production (MG), 2006-2011 ............................................................ 4-1 Monthly Well Production (MG), 2006-2011 ........................................................... 4-2 Peaking Factor, 2006-2011 .................................................................................. 4-3 Water Consumption (MG), 2006-2011 (1) .............................................................. 4-4 Bimonthly Water Consumption (MG), 2006-2011 (1) ............................................. 4-5 Largest Water Customers ..................................................................................... 4-7 2011 Water Balance ............................................................................................. 4-8 Distribution System Leakage and Non-Revenue Water (MG) .............................. 4-9 Equivalent Residential Unit (ERU) Analysis ....................................................... 4-11 Water Demand Forecast ..................................................................................... 4-15 Table 5-1. Regulatory Agencies ............................................................................................. 5-1 Table 6-1. Table 6-2. Existing Ground Water Rights .............................................................................. 6-3 Surface Water Rights ............................................................................................ 6-3 Table 7-1. Table 7-2. Table 7-3. Table 7-4. Table 7-5. Table 7-6. Table 7-7. Table 7-8. Table 7-9. Table 7-10. Table 7-11. Table 7-12. Table 7-13. Table 7-14. Table 7-15. Table 7-16. Table 7-17. Table 7-18. Pressure Zone Percentage of Total Demand ....................................................... 7-1 Peak Hour Peaking Factors by Pressure Zone .................................................... 7-2 Minimum and Maximum Distribution System Pressures....................................... 7-3 Water Source Capacity Evaluation ....................................................................... 7-5 Zone 3, 3.2, 5 and 7 Supply Evaluation ................................................................ 7-7 Zone 2 and 4 Supply Evaluation ........................................................................... 7-8 Zone 6 Supply Evaluation ..................................................................................... 7-9 Zone 7 Supply Evaluation ................................................................................... 7-10 Total System Storage Evaluation ....................................................................... 7-15 Zone 3, 3.2, 5, and 7 Storage Evaluation ........................................................... 7-17 Zone 2, 4, and 6 Storage Evaluation ................................................................. 7-18 Zone 6 Storage Evaluation ................................................................................. 7-19 Zone 5 and 7 Storage Evaluation ....................................................................... 7-20 Zone 7 Storage Evaluation ................................................................................. 7-21 Tank Levels in Modeling Scenarios .................................................................... 7-23 Peak Hour Analysis Summary ............................................................................ 7-25 Fire Flow Analysis Summary .............................................................................. 7-26 Water System Physical Capacity Documentation Based on MDD ..................... 7-33 Table 8-1. Personnel Certification.......................................................................................... 8-4 Contents Silverdale Water District v 2013 Comprehensive Water System Plan August 2014 Table 9-1. Table 9-2. Table 9-3. Water Main Unit Costs ........................................................................................ 9-20 Cost of Capital Facilities ..................................................................................... 9-21 Proposed Improvements Implementation Schedule ........................................... 9-22 Table 10-1. Table 10-2. Table 10-3. Table 10-4. Table 10-5. Table 10-6. Table 10-7. Historic Financial Information ($000’s) ............................................................... 10-1 Bi-Monthly Water Rates – 2012 and Current ...................................................... 10-2 Current Capital Facility Charges (CFCs) and Other Fees by Meter Size ........... 10-3 Current Front Footage Charge By Class of Service ........................................... 10-3 Projected Six-year Revenue ($000’s) ................................................................. 10-4 Summary of Projected Capital Improvement Projects ($/000) ............................ 10-7 Projected Six-year Financial Plan ....................................................................... 10-8 Figures Figure 2—1. Existing Water System Map ................................................................................. 2-2 Figure 2—2. Existing System Hydraulic Profile ......................................................................... 2-5 Figure 2—3. Service Area and Adjacent Systems .................................................................. 2-31 Figure 3—1. Land Use Map ...................................................................................................... 3-3 Figure 4-1. Figure 4-2. Figure 4-3. Figure 4-4. Monthly Water Production (2006-2011) ................................................................ 4-2 Consumption by Customer Category .................................................................... 4-5 Bimonthly Water Consumption (2006-2011) ......................................................... 4-6 Water demand forecast (2012-2032) .................................................................. 4-16 Figure 6—1. Asbestos Concrete Waterline Map ....................................................................... 6-8 Figure 7—1. Figure 7—2. Figure 7—3. Figure 7—4. Figure 7—5. Storage Components .......................................................................................... 7-11 2012 Peak Hour Pressure .................................................................................. 7-27 2032 Peak Hour Pressure .................................................................................. 7-28 2012 Fire Flow Map ........................................................................................... 7-29 2032 – Fire Flow Map ........................................................................................ 7-30 Figure 8—1. Organization Chart ................................................................................................ 8-2 Figure 8—2. Staff Duties ........................................................................................................... 8-3 Figure 9—1. CIP Map ................................................................................................................ 9-2 Contents Silverdale Water District vi 2013 Comprehensive Water System Plan August 2014 Appendices 1-1 1-2 1-3 Water Facility Inventory Comments on Draft Comprehensive Water System Plan SEPA Process Documentation 2-1 2-2 Retail Water Service Area Agreement Intertie Agreement with Public Utility District No. 1 of Kitsap County 3-1 Consistency Statement Checklist 4-1 4-2 4-3 Water Use Efficiency Plan Water Use Efficiency Performance Report (2011) Comprehensive Water System Plan Amendment Reclaimed Water 5-1 5-2 Water System Policies (Resolutions) Water System Construction Standards and Details 6-1 6-2 6-3 6-4 6-5 Water Rights Certificates and Permits Water Rights Self-Assessment Forms Water Quality Monitoring Plans Wellhead Protection Program Consumer Confidence Report 8-1 8-2 8-3 Cross Connection Control Program Records Retention Requirements and Public Notification Materials Water Shortage Response Plan 10-1 Financial Analysis Details Contents Silverdale Water District vii 2013 Comprehensive Water System Plan August 2014 Executive Summary Purpose of the Plan The water system owned and operated by the Silverdale Water District (District) contains an extensive amount of infrastructure, much of which is invisible to the people that receive water from it. The water system requires qualified personnel to manage, operate, and maintain it, and an ongoing capital improvement program to replace old components as necessary in order to provide reliable service and high quality water, while meeting the requirements established by federal and state laws. The District’s 2013 Comprehensive Water System Plan (Plan) serves an important role in management of the system by providing a thorough assessment of the District’s programs and needs. It will be the District’s “road map” over the coming years and provide a basis for annual budget decisions. The Plan has been prepared in accordance with Washington Administrative Code (WAC) 246290-100 and guidelines established by the Washington State Department of Health (DOH). This 2013 version of the Plan serves as an update to the District’s 2005 Plan. The objectives of the updated Plan are to: Evaluate existing water demand data and project future water demands. Analyze the existing water system to determine if it meets minimum requirements mandated by DOH and the District’s own policies and design criteria. Identify water system improvements that resolve existing system deficiencies and accommodate future needs of the system for at least 20 years into the future. Prepare a schedule of improvements that meets the goals of the District’s financial program. Evaluate past water quality and identify water quality improvements, as necessary. Document the District’s operations and maintenance program. Address supplemental requirements, such as water conservation, reclaimed water, crossconnection control, wellhead protection and water quality monitoring. This Plan has been reviewed by adjacent purveyors, Kitsap County, and DOH. District History, Service Area, and Existing System The District was established in 1929. The original system consisted of an earth and timber diversion dam on Wood Creek and wood stave piping that conveyed surface water to 60 customers. Since 1930, the District has renovated the water system, supplemented the system with additional supply and storage facilities, expanded the distribution network and acquired several small, private water systems. The District’s system now relies on multiple groundwater Executive Summary Silverdale Water District ES-1 2013 Comprehensive Water System Plan August 2014 supply wells and nearly 772,000 lineal feet of potable water main to serve approximately 6,000 service connections. The District is located in central Kitsap County, Washington, on a peninsula between the Hood Canal and Puget Sound. The District’s existing Retail Service Area boundary encompasses an area of approximately 25.22 square miles within unincorporated Kitsap County and includes the community of Silverdale. Kitsap County experienced significant development and population growth between 1990 and 2010. The population in Kitsap County between 2000 and 2010 increased by 9.3%, while the District’s population increased by approximately 12% during the same time period. The District’s population within the water service area is expected to grow from 20,665 people in 2011, to approximately 28,640 people in 2032. Table ES-1 provides a summary of the water system and key system information. Table ES-1. Water System Data Description Water Service Area Population (2011) Existing Retail Water Service Area Total Connections (2011) Total ERUs (2011) Water Use per ERU (2009-2011 average) Annual Supply (2011) Average Day Demand (2011) Maximum Day Demand (2011) Distribution System Leakage Number of Pressure Zones Number of Active Wells & Total Capacity Number of Pump Stations & Total Capacity Number of Active Reservoirs & Total Capacity Number of Pressure Reducing Stations Total Length of Water Main Data 20,665 25.22 square miles 5,869 10,640 197 gallons per day 713 million gallons 1.95 mgd 3.66 mgd 6% 14 11 (5,605 gpm) 8 (5,275 gpm) 12 (5.5 MG) 18 146 miles Water Service Policies The District has a duty to provide service to all new connections within its Retail Service Area, per the State’s Municipal Water Law, when the following four conditions are met: 1. Capacity. The District must have sufficient capacity to provide water to a new connection in a safe and reliable manner. 2. Consistent. The requested service must be consistent with adopted local plans and development regulations. 3. Water Rights. The District must have sufficient water rights to provide service. 4. Timely and Reasonable. The District must be able to provide service in a timely and reasonable manner to authorize service per a request. The District has enacted policies and procedures in support of its duty to provide water service. These cover a wide range of District management activities and programs, including customer Executive Summary Silverdale Water District ES-2 2013 Comprehensive Water System Plan August 2014 service, supply management, conservation and reclaimed water programs, facility design, and financial management. Water Usage: Past and Future The District continually monitors water usage (also referred to as water demand), analyzing past trends and projecting future needs. For the most recent three years (2009-2011), average day production has been 2.0 million gallons per day (mgd), while the maximum day demand was 4.3 mgd, resulting in a peaking factor of 2.1. An important water demand parameter in water system planning is the Equivalent Residential Unit (ERU). The ERU value represents the average amount of water consumption by a single family household and is calculated by dividing the single family water consumption by the total number of single family connections. This value is significant because it allows the District to analyze trends in residential water use, and it is a means by which to translate total system demand to an equivalent number of households, which in turn is used to evaluate infrastructure capacity. The District has experienced a decline in the ERU water use factor over the past ten years, likely most influenced by the implementation of water conservation activities. The ERU value was 240 gallons per day (gpd) in 2006, but dropped to 182 gpd in 2011. Over the three year period of 2009-2011, the average ERU water use factor was 197 gpd. This is the value used for longrange forecasting purposes in this Plan. The District has prepared a water demand forecast that contains a range of potential future demands. The forecast provides a baseline demand projection, built upon Kitsap County growth forecasts and assuming the present per-ERU water consumption remains constant. Reductions in this baseline projection are made, taking into account the effects of further conservation efforts (i.e., a 3% reduction in single family household use over the coming six years, per the District’s established water use efficiency goals) and the use of reclaimed water to replace potable supplies for purposes such as large-area irrigation (which reduces peak season demands on the water system). Figure ES-1 provides a summary of recent demands and the 20-year water demand projection. The baseline projection call for an increase in average day water demand from 2.01 mgd in 2012 to 2.70 mgd in 2032. Maximum day demand during the same period is projected to increase from 4.22 mgd to 5.67 mgd. Executive Summary Silverdale Water District ES-3 2013 Comprehensive Water System Plan August 2014 Figure ES-1. Water Demand Forecast (2012-2032) Executive Summary Silverdale Water District ES-4 2013 Comprehensive Water System Plan August 2014 System Analysis The Plan contains a detailed analysis of the District’s source, storage, and distribution systems. The capacity of existing infrastructure is compared with current and projected water demands to identify system deficiencies. In summary, the District’s source and storage facilities have sufficient capacity to meet current levels of demand as well as needs beyond the 20-year planning horizon. This includes the District’s water rights, well pumping capacities, and storage facilities. However, the District continues to explore improvements that increase its redundancy and reliability with respect to provision of water supply. The distribution system was analyzed using a computer hydraulic model, which identified specific locations in the piping system where improvements are warranted, primarily to increase available fire flow. A summary of the District’s “carrying capacities” is provided in Table ES-2. This identifies the maximum number of ERUs that existing facilities can support. Such analyses aid in identifying capacity deficiencies and provide the foundation for some capital improvement projects. As noted in the table, annual water rights are the limiting water system component, with a current ERU capacity of 14,658. By comparing this carrying capacity with the current and projected number of ERUs (based on the baseline demand forecast, and also depicted in the table below), it can be seen that existing facilities are able to support needs through the 20-year planning horizon. Table ES-2. Water System Carrying Capacities Water System Component Physical Capacity (as ERUs) Water Rights (Annual, Qa) 14,658 Water Rights (Instantaneous, Qi) 23,181 Source Pumping Capacity 19,510 Equalizing Storage 27,195 Standby Storage 14,721 Year Projected Demand (as ERUs) Current (2012) 10,232 6-Year (2018) 10,903 20-Year (2032) 13,752 In addition to water quantity, the District’s system has been analyzed with respect to water quality compliance. The District maintains a comprehensive water quality monitoring program and provides chlorination at all active well sources. This has resulted with the District being in compliance with all state and federal drinking water requirements. Capital Improvement Program and Financing Plan System improvements have been identified that address a variety of needs. The improvements are listed and prioritized in a capital improvement program (CIP). Some projects are designed to correct current, localized deficiencies in water pressures available to customers or sufficiency of water for fighting fires. Other projects address periodic maintenance needs such as re-coating of water storage reservoirs and ongoing implementation of the District’s cross connection control and wellhead protection programs. The CIP also includes projects to replace aging waterlines, extend mains to serve currently undeveloped portions of the service area, upgrade reservoir and Executive Summary Silverdale Water District ES-5 2013 Comprehensive Water System Plan August 2014 pump station facilities, support acquisition of other small water systems, and expand the District’s reclaimed water distribution system. Table ES-3 provides a summary of the District’s 20-year CIP. Table ES-3. Capital Improvement Program 6-Year CIP ($M) 20-Year CIP ($M) (2013-2018) (2014-2032) Main Extensions $1.5 $7.3 Main Replacements $7.1 $1.6 Facility Improvements $7.3 $8.0 Small System Acquisitions $4.0 $0.7 Reclaimed Water $1.5 $6.5 Maintenance/Operations $2.4 $5.3 TOTAL $23.8 $29.5 Improvement Type Total CIP ($M) (2013-2032) $8.8 $8.7 $15.3 $4.7 $8.0 $7.7 $53.3 A financial plan was developed to evaluate how planned capital projects and expected operating costs will affect the District’s revenue needs and adherence to financial policies established by the Board. Revenues and expenses were projected for the next six years based on the District’s current budget, the above CIP, and projected growth in water sold. Rate adjustments will be required in order for the District to fully fund the capital plan and meet operating expenses. The District will further evaluate the details of needed rate adjustments and implement them over the next six years in order to meet annual expenses and remain within the desired ranges for reserve levels and debt service coverage ratios. Operations and Maintenance The District’s water system is operated and maintained by well-qualified, technically trained personnel. District staff regularly participates in safety and training programs to keep abreast of the latest changes in the water industry and to ensure smooth, reliable, and safe operation of the water system. Executive Summary Silverdale Water District ES-6 2013 Comprehensive Water System Plan August 2014 1.0 Introduction 1.1 Water System Ownership and Management Silverdale Water District (District) is a municipal corporation that owns and operates a public water system within its corporate boundaries. Water system data on file at the Department of Health (DOH) for the District’s system is shown below in Table 1-1. Table 1-1. Water System Ownership Information Information Description System Type Group A - Community - Public Water System System Name Silverdale Water District County Kitsap DOH System ID Number 793006 Owner Number 1427 Address 5300 NW Newberry Hill Road, Ste 100, Silverdale, WA 98383 Contact Mr. Morgan Johnson, General Manager Contact Phone Number (360) 447-3500 1.2 Overview of Existing System [NOTE: System information presented below is current as of the end of 2011, since the majority of the planning work conducted in support of this Water System Plan was completed in 2012.] In 2011, the District provided water service to 5,869 customer connections, or 10,640 equivalent residential units (ERU’s), within the District’s retail water service area, which primarily serves the community of Silverdale and its outlying areas. The District’s existing retail water service area is approximately 25.22 square miles within unincorporated Kitsap County and includes a portion of the Central Kitsap Urban Growth Area. The population served by the District in 2011 was approximately 20,665. The District owns and operates one satellite water system, the Silver Sound Water System, which is located within the District’s water service area and is currently operated independently from the District’s main system. Water supply is provided by 14 wells to the District’s main water system, and two wells to the satellite system. All water supplies from the 11 active sources located within the District’s main water system are chlorinated. The three inactive or emergency wells are not chlorinated. Water storage is currently provided by 12 active reservoirs that have a total capacity of 5.23 million gallons (MG). There are currently two inactive reservoirs that have a combined storage capacity 0.425 MG. Two new reservoirs are anticipated to come on-line in 2014 which will bring the total storage capacity to 7.86 MG. The combined District and satellite system has a total of 15 pressure zones with 18 pressure reducing stations, eight booster pump stations and nearly 146 miles of water main. A summary of 2011 water system data for the combined system is shown below in Table 1-2. A copy of the District’s Water Facility Inventory (WFI) is provided in Appendix 1-1. Section 1 - Introduction Silverdale Water District 1-1 2013 Comprehensive Water System Plan August 2014 Table 1-2. 2011 Water System Data Description Data Water Service Area Population 20,665 Existing Retail Water Service Area 25.22 square miles Total Connections 5,869 Total ERUs 10,640 Demand per ERU 182 gallons per day Annual Supply 712,978,650 gallons Average Day Demand 1,269 gpm Distribution System Leakage* 6% Max Day/Average Day Demand Factor 1.88 Number of Pressure Zones 14 Number of Wells & Total Capacity 14 (5,605 gpm, for 11 active wells) Number of Pump Stations & Total Capacity 8 (5,275 gpm) Number of Active Reservoirs & Total 12 (5.23 MG) Capacity Number of Pressure Reducing Stations 18 Total Length of Water Main 146 miles Note: Includes Silver Sound satellite water system data. *Includes unbilled water used for fire flow, flushing, and fire training, in addition to leakage. 1.3 Authorization and Purpose In 2012, the District authorized HDR Engineering, Inc. to prepare a comprehensive water system plan as required by state law under WAC 246-290-100. In accordance with WAC 246-290-100, the plan shall be updated and submitted to DOH every six years. The previous comprehensive water system plan was prepared for the District in 2005. The purpose of this updated comprehensive water system plan is as follows: To evaluate existing water demand data and project future water demands. To analyze the existing water system to determine if it meets minimum requirements mandated by DOH and the District’s own policies and design criteria. To identify water system improvements that resolve existing system deficiencies and accommodate future needs of the system for at least 20 years into the future. To prepare a schedule of improvements that meets the goals of the District’s financial program. To evaluate past water quality and identify water quality improvements, as necessary. To document the District’s operations and maintenance program. To address supplemental requirements, such as water conservation, reclaimed water, cross-connection control, wellhead protection and water quality monitoring. To comply with all other water system plan requirements of DOH. 1.4 Summary of Plan Contents A brief summary of the content of the sections in the plan is as follows: Section 1 - Introduction Silverdale Water District 1-2 2013 Comprehensive Water System Plan August 2014 Executive Summary provides a brief summary of the key elements of this plan. Section 1 introduces the District’s water system, the objectives of the plan and the plan organization. Section 2 presents the water service area, describes the existing water system, and identifies the adjacent water purveyors. Section 3 presents related plans, land use and population characteristics. Section 4 identifies existing water demands and projected future demands. Section 5 presents the District’s operational policies and design criteria. Section 6 discusses the District’s water source and water quality monitoring program. Section 7 discusses the water system analyses and existing system deficiencies. Section 8 discusses the District’s operations and maintenance program. Section 9 presents the proposed water system improvements, their estimated costs and implementation schedule. Section 10 summarizes the financial status of the water utility and presents a plan for funding the water system improvements. Appendices contain additional information and plans that supplement the main sections of the plan. 1.5 Definition of Terms The following terms are used throughout this plan. Capital Facilities Charge: A one-time fee paid by a property owner when connecting to the District’s water system. This fee pays for the new customer’s equitable share of the cost of the existing system. This fee offsets the costs of providing water to new customers and recognizes that the existing water system was largely built and paid for by the existing customers. Consumption: The volume of water used by the water system’s customers. The volume is measured at each customer's connection to the distribution system. Connection Charge: A one-time fee paid by a property owner when connecting to the District’s system and is made up of both the Capital Facilities Charge and Meter Installation Charge. Cross-Connection: Any physical connection, actual or potential, between a water system and any source of non-potable substance which, therefore, presents the potential for contaminating the public water system. Demand: The quantity of water required from a water supply source over a period of time necessary to meet the needs of domestic, commercial, industrial and public uses, and to provide enough water to supply fire fighting, system losses and miscellaneous water uses. Demands are normally discussed in terms of flow rate, such as million gallons per day (mgd) or gallons per minute (gpm), and are described in terms of a volume of water delivered during a certain time period. Flow rates pertinent to the analysis and design of water systems are: Section 1 - Introduction Silverdale Water District 1-3 2013 Comprehensive Water System Plan August 2014 Average Day Demand (ADD): The total amount of water delivered to the system in a year divided by the number of days in the year. Maximum Day Demand (MDD): The maximum amount of water delivered to the system during a 24-hour time period of a given year. Peak Hour Demand (PHD): The maximum amount of water delivered to the system, excluding fire flow, during a one-hour time period of a given year. A system’s peak hour demand usually occurs during the same day as the peak day demand. Distribution System Leakage (DSL): The water lost from the distribution system and includes both apparent losses and real losses. Apparent losses include categories such as theft, meter inaccuracies, and data collection errors. Real losses are the physical losses from the distribution system and include such categories as reservoir overflows, leaky valves, and water main breaks. Neither apparent nor real losses are authorized. Equivalent Residential Units (ERU’s): One ERU represents the amount of water used by an average single family residence for a specific water system. The demand of other customer classes can be expressed in terms of ERU’s by dividing the demand of each of the other customer classes by the demand represented by one ERU. Fire Flow: The rate of flow of water required during fire fighting, which is usually expressed in terms of gallons per minute (gpm). Head: A measure of pressure or force exerted by water. Head is measured in feet and can be converted to pounds per square inch (psi) by dividing feet by 2.31. Head Loss: Pressure reduction resulting from pipeline wall friction, bends, physical restrictions, or obstructions. Hydraulic Elevation: The height of a free water surface above a defined datum; the height above the ground to which water in a pressure pipeline would rise in a vertical open-end pipe. Maximum Contaminant Level (MCL): The maximum permissible level of contaminant in the water that the purveyor delivers to any public water system user, measured at the locations identified under WAC 246-290-310. Meter Installation Charge: The meter installation charge or hook-up fee is a fee paid by a property owner to reimburse the District for the cost incurred to make the physical connection to the water system. This cost includes both direct and indirect costs for installing the service line off of the system’s water main to the customer’s water meter. The charge also includes the cost of the water meter and meter box. Potable: Water suitable for human consumption. Pressure Zone: A portion of the water system that operates from sources at a common hydraulic elevation. For example, Zone 1 (H.E. 223 feet) refers to one of the District’s largest pressure zones that has tanks with an overflow elevation of 223 feet. Purveyor: An agency, subdivision of the State, municipal corporation, firm, company, mutual or cooperative association, institution, partnership, or persons or other entity owning or operating a public water system. Purveyor also means the authorized agents of such entities. Section 1 - Introduction Silverdale Water District 1-4 2013 Comprehensive Water System Plan August 2014 Reclaimed Water: Water derived in any part from wastewater with a domestic wastewater component that has been adequately and reliably treated, so that it can be used for beneficial purposes. Reclaimed water is not considered wastewater. Supply: Water that is delivered to a water system by one or more supply facilities which may consist of supply stations, booster pump stations, springs and wells. Storage: Water that is “stored” in a reservoir, or tank, to supplement the supply facilities of a system and provide water supply for emergency conditions. Storage is broken down into the following five components that are defined and discussed in more detail in Section 7: operational storage, equalizing storage, standby storage, fire flow storage and dead storage. 1.6 List of Abbreviations The abbreviations listed below in Table 1-3 are used throughout this plan. Abbreviation ADD AWWA CCR CIP CMU DBP District DOH DSL EPA ERU fps GMA gpm MCL MCLG MG MGD mg/L OSHA PDD PHD psi SDWA SOC THM UGA USGS VOC WAC WISHA Section 1 - Introduction Silverdale Water District Table 1-3. Abbreviations Description Average Day Demand American Water Works Association Consumer Confidence Report Capital Improvement Program Concrete Masonry Unit Disinfection By-Product Silverdale Water District Department of Health Distribution System Leakage US Environmental Protection Agency Equivalent Residential Unit Feet per second Growth Management Act gallons per minute Maximum Contaminant Level Maximum Contaminant Level Goal Millions gallons Million gallons per day Milligram per liter Occupational Safety & Health Administration Peak Day Demand Peak Hour Demand pounds per square inch Safe Drinking Water Act Synthetic Organic Chemical Trihalomethane Urban Growth Area United States Geological Survey Volatile Organic Chemical Washington Administration Code Washington Industrial Safety & Health Act 1-5 2013 Comprehensive Water System Plan August 2014 1.7 Water System Plan Review The draft of this Comprehensive Water System Plan was reviewed by adjacent purveyors, Kitsap County, and the State Department of Health. A summary of the comments provided on the Draft Comprehensive Water System Plan is provided in Appendix 1-2. In accordance with the State Environmental Policy Act (SEPA), a SEPA checklist was completed for this plan and a determination of non-significance was made. Documentation of the SEPA process is provided in Appendix 1-3. Section 1 - Introduction Silverdale Water District 1-6 2013 Comprehensive Water System Plan August 2014 2.0 Water System Description 2.1 Introduction This section describes Silverdale Water District’s (District) existing and future water service areas, water service agreements, and the water system and its individual components. The results of the evaluation and analyses of the existing water system are presented later in Section 7. 2.2 Water Service Area 2.2.1 History The District was established in 1929. The original system constructed in 1930 consisted of an earth and timber diversion dam on Wood Creek, 3,350 feet of wood stave transmission main from the dam to Old Town Silverdale and a four-inch wood stave distribution system in Silverdale. This initial system originally served 60 customers. Since 1930, the District has renovated the water system, supplemented the system with additional supply and storage facilities, expanded the distribution network and acquired several small, private water systems. The District’s system now consists of nearly 772,000 lineal feet of potable water main with approximately 5,869 service connections. 2.2.2 Topography The topography of the District’s retail water service area varies greatly in elevation. The lowest areas within the service area are located in the central portion of the service area, near Dyes Inlet where the elevation is approximately sea level. Elevations range from sea level in this portion of the service area to 530 feet in the western portion of the service area, near Dickey Road and Newberry Hill Road. Generally, the lower elevation areas of the District are located in the central portion of the service area and run north to south, with the higher elevations being located in the eastern and western portions of the District. 2.2.3 Water Service Area Silverdale Water District is located in central Kitsap County, Washington, on a peninsula between the Hood Canal and Puget Sound. The District’s existing retail water service area boundary encompasses an area of approximately 25.22 square miles within unincorporated Kitsap County and includes the community of Silverdale. The boundary, defined in the 2005 Kitsap County Coordinated Water System Plan, is shown in Figure 2-1. The District is responsible for providing public water service, utility management and water system development within this area. The existing retail water service area extends south to Dyes Inlet and is bounded to the north by Subase Bangor and SR 308. The water service area extends as far west as Silver Sound Lane NW and approximately one-quarter mile east of Central Valley Road NE. The District’s existing water distribution system generally follows the extents of these boundaries. Section 2 – Water System Description Silverdale Water District 2-1 2013 Comprehensive Water System Plan O FJ AT DR HW Y E ING E ST RD VIK N W AY VIKING WAY NW NW NW NW LUOTO RD Silverdale Way PRV $ VIEW RD N W $ Mt View PRV 3 08 YN E Zone 4 Spirit Ridge Well No. 4 NW ! Ø J K ! ØÚ [ LE H W Zone 4.4 EW AY ! Ø Dawn Park Well TE H WY BRO WN SVIL Zone 3.2 NE S TA Spirit Ridge Reservoir, Well No. 3 & BPS AL $ Olympic View PRV Central Valley PRV NW SIL VE RD K J KJ H ST ATE WY $ Shadow Glen 0.3MG & 0.13MG (Inactive) Reservoirs OLYMPIC HOO D CANA L Zone 4.5 CENTRAL VALLEY RD NW Zone 5.1 LI BERTY BAY 8 30 CLEAR CREEK RD NW SUBASE BAN GO R 30 5 N E 3 RA MP Westridge PRV Zone 4.2 $ Zone 3 Westwind Reservoir Well and BPS T ST A N SO Chena Wells No.1 & 2 (Inactive), BPS (Inactive) ST A TE H S T WY 3 AT N W E HW Y3 NW NW $ ! Ø Selbo Well DYES INLET NW FAIRGROUN DS RD CENTRAL KITSAP UGA Y NW NE MCWILLIAMS RD AN D RD NW CHIC OW A [ Ú J K ! [ Ø Ú K BEC HW CHI CO BAY W YN NW AT E A W H ST Y TE 3 H W Y NW 3 RIDDELL RD NE RIDDELL RD PINE RD NE ST RD NE FAIRGRO UNDS RD STATE HWY 303 NE Newberry Hill PRV HO LL S EA Eldorado Reservoir Well & BPS NE WAAGA WAY ! Ø Hess Well Loretta Heights Reservoir Windsong PS Zone 2 TRACYTON BLVD NW $ Chena Reservoir NW NW W A W AG AA A GA W AY W AY Huckle Ridge PRV Shelley PRV Walgren PRV J K Newberry $ Hill PRV ! Ø [! Ú Ø J K AY L RD J K ! Ø Ridgetop PRV WA Y W Hillsboro PRV $ $ NW BUCKLIN HILL RD HIL $ TO P Ridgetop ReservoirWA AG Well & BPS N A W $ ØDickey Well J K [ ! Ú (Inactive) $ 4.1 Zone [ J K ! ØÚ GA AA W ER ! Ø J K [ Ú Dickey Reservoir & BPS D Provost Reservoir Well and BPS NW H O LLY Zone 1 RIDGETOP BLVD NW AN $ Zone 7 E AT ST $ Anderson HillN WPRV NW NEWBERRY HILL RD NW Vintage PRV ! Ø! Ø Woxson Reservoir & Well Y 3 NW ! Ø J K [ Ú Silversound Wells No. 1 & 2 W E H CENTRAL VALLEY RD NE RD HANSB ERRY ST NW NH IL L Island Lake Reservoirs & Well Ridgeview PRV Y W ER SO J K ! Ø HW N AND 6 Hollow PRV 3 NW $ Ø J K! J K Zone $ Quail Bucklin Ridge Well & Reservoir (Inactive) Old Frontier PRV Zone 5 $ BL V D SILVERDALE UGA Schold PRV RID GE E STAT H WY NW TRIGGER AVE N W Legend [ Ú $ ! Ø J K Pump PRV Well Reservoir Retail Service Area Boundary * Urban Growth Area Water Main (in) <=4 5 6 8 10 12 >12 Pressure Zone Zone 1 Zone 9 Zone 3 Zone 4.1 Zone 2 Zone 4 Zone 5 Zone 6 Zone 7 Zone 3.2 Zone 4.2 Figure 2-1 Existing Water System Map Zone 4.4 Zone 4.5 Silverdale Water District Water System Plan Zone 5.1 Water Body * Also the District's water rights "Place of Use" I 0 1,450 2,900 5,800 8,700 Aug 2013 11,600 Feet August 2014 The District’s water rights can be used throughout the defined existing retail water service area per the 2003 Municipal Water Law, once this water system plan showing the service area is approved by DOH. As such, the District’s retail water service area is also considered to be the “Place of Use” for the District’s water rights. The external boundaries of the District’s retail water service area are not envisioned to change in the future. As is discussed later in the WSP, the District plans to acquire existing small systems that are located within its retail water service area. As such, this will serve to “fill in” portions of the District’s existing retail service area that are presently served by other utilities. 2.3 Water Service Agreements 2.3.1 Water Service Area Agreement All water purveyors located within a Critical Water Supply Service Area (CWSSA) are required to have a water service area agreement that identifies the external boundary of their service area. Water service area agreements are typically developed and signed during the development or update of a coordinated water system plan. All of Kitsap County was declared a CWSSA on March 2, 1987. The Kitsap County Coordinated Water System Plan, which documents the District’s water service area boundary, was first completed in November 1992 and was updated in 2005. A signed copy of the District’s water service area agreement is included in Appendix 2-1. 2.4 Satellite System Management A Satellite System Management Agency (SSMA) is defined as a person or entity that is certified by DOH to own or operate more than one public water system without the necessity for a physical connection between such systems. SSMA’s were created to stop the proliferation of small water systems, many of which could not meet federal and state water quality and water system planning regulations. Based on the success of SSMA’s, DOH made recommendations to the legislature to include rules for designating entities as qualified SSMA’s. In July 1995, Senate Bill 5448 became law that governs approvals of new water systems and sets forth requirements for SSMA’s. The goal of the law is to ensure that the people of Washington State will receive safe and reliable water supplies in the future from professionally managed or properly operated water systems. SSMA’s can provide three different levels of service: 1. Ownership of the satellite system. 2. Operations and management of the satellite system. 3. Contract services only. The service can be provided to new systems, existing systems which are no longer viable or existing systems placed into receivership status by DOH. The District is a SSMA, as it owns and operates one additional, small water system within its retail service area. The District owns and operates the Silver Sound Water System, which has 12 connections and two wells. It is anticipated that the Silver Sound Water System will be Section 2 – Water System Description Silverdale Water District 2-3 2013 Comprehensive Water System Plan August 2014 connected to the District’s main water system by 2014, following the completion of planned water main extensions (see Section 9 for more details). 2.5 Existing Water Facilities This section provides a detailed description of the existing water system and the current operation of the facilities. The analyses of the existing water facilities are presented in Section 7. General water system facility data is summarized on the DOH Water Facilities Inventory (WFI) form. A copy of this form is contained in Appendix 1-1. 2.5.1 Pressure Zones The District currently serves customers within an elevation range of approximately sea level in the central areas of the District’s service area, to approximately 530 feet in the western portion of the system. The wide range of elevations requires that the water pressure be increased or reduced to maintain pressures that are safe and sufficient to meet the flow requirements of the system. This is achieved by dividing the water system into 14 distinct pressure zones, as shown in Figure 2-1. The District’s satellite system is operated within an additional pressure zone. The pressure in each pressure zone is regulated by reservoir levels, pressure reducing station settings, pump station settings or a combination of these, as illustrated in the hydraulic profile, Figure 2-2. For the purpose of this plan, each of the District’s pressure zones will be referred to by their name and the maximum hydraulic elevation of the zone, as described below. The pressures in eight of the District’s 14 pressure zones are regulated by reservoir levels, as illustrated in the hydraulic profile shown in Figure 2-2. These pressure zones include Zone 1 (H.E. 223 feet), Zone 2 (H.E. 344 feet), Zone 3 (H.E. 361 feet), Zone 4 (H.E. 485 feet), Zone 5 (H.E. 503 feet), Zone 6 (H.E. 515 feet), Zone 7 (H.E. 628 feet), and Zone 3.2 (H.E. 392 feet). Pressures in Zone 1 have a maximum hydraulic elevation of 223 feet established by the surface water level in the surface water level in the Chena, Eldorado, and Provost Reservoirs. Zone 1 is one of the District’s largest pressure zones and primarily serves the commercial area of Silverdale. Pressures in Zone 2 have a maximum hydraulic elevation of 344 feet established by the surface water level in the Ridgetop Reservoir. Zone 2 serves customers in the western portion of the District’s service area, primarily south of NW Waaga Way. Pressures in Zone 3 have a maximum hydraulic elevation of 361 feet established by the surface water level in the Loretta Heights and Westwind Reservoirs. Zone 3 is primarily located west of Zone 1, along SR 3. Zone 3.2 has a maximum hydraulic elevation of 392 feet and serves customers in a small area in the north central portion of the District’s service area. Pressures in Zone 3.2 are established by the surface water level in the Shadow Glen 0.3 MG Reservoir. Section 2 – Water System Description Silverdale Water District 2-4 2013 Comprehensive Water System Plan August 2014 Zone 4 has a maximum hydraulic elevation of 485 feet and is located in the Ridgetop area near the eastern boundary of the District’s service area. Pressures in Zone 4 are established by the Island Lake 1.5 MG Reservoir, which is one of the District’s largest pressure zones. Pressures in Zone 5 have a maximum hydraulic elevation of 503 feet established by the surface water level in the Dickey Reservoir. Zone 5 is located west of Zone 3. Zone 6 has a maximum hydraulic elevation of 515 feet. Pressures in Zone 6 are established by the surface water level in the Island Lake 0.439 MG Reservoir. Zone 6 is located in the eastern portion of the District’s service area and is entirely encompassed by Zone 4. Zone 7 has a maximum hydraulic elevation of 628 feet is located in the southwest corner of the District’s service area. Pressures in Zone 7 are established by the Wixson Reservoir. Zone 9 (H.E. 537 feet) is a zone without storage, or closed zone, which is supplied by the Windsong Pump Station. The pump station pumps water from Zone 3 (H.E. 361 feet) into Zone 9 at a typical hydraulic elevation of 537 feet. Located in the southern portion of the service area, Zone 9 is one of the District’s smallest pressure zones. Five other small pressure zones operated by the District are supplied by pressure reducing stations with water from Zone 4 (H.E. 485 feet) and Zone 5 (H.E. 503). The pressure reducing stations decrease the pressure of water that is supplied to the services located in the lower elevations. Zone 4.1 has a maximum hydraulic elevation of 400 feet and is supplied water through the Ridgeview PRV. This zone is located in a small area near the southeast end of Zone 4 (H.E. 485 feet). Zone 4.2 has a maximum hydraulic elevation of 368 feet is a located west of Zone 4 near Silverdale Way NW. The Quail Hollow PRV provides water supply to the zone. Zone 4.4 has a maximum hydraulic elevation of 366 feet, is located in the north central portion of the District’s service area and is supplied with water from Zone 4 through the Westridge PRV. Zone 4.5 has a maximum hydraulic elevation of 330 feet, is located in the northeast corner of the District’s service area. Water supply is provided to the zone through the Silverdale Way PRV and the Central Valley PRVs. Zone 5.1 has a maximum hydraulic elevation of 370 feet, is located in the north west portion of the District’s service area and is supplied with water from Zone 5 through the Olympic View PRV. Pressure tanks regulate pressures in the District’s Silver Sound satellite system. The pressure tanks are connected to a pressure switch that turns on the wells in the satellite system when pressures in the tank reach a specific set point. The wells are then called to turn off after pressures are sufficiently high. Zone 004 (H.E. 488 feet) is located within the Silver Sound Water System and has a maximum hydraulic elevation of 488 feet. The zone is located along the western boundary of the District’s service area (made up of 2 wells with controls and pressure tanks in one building). Section 2 – Water System Description Silverdale Water District 2-6 2013 Comprehensive Water System Plan August 2014 2.5.2 Supply Facilities Introduction Water supply is provided by 18 wells (11 of which are presently active) to the District’s main water system and 2 wells to the satellite system. Below is a summary of the District’s wells and zones provided service by each: The Eldorado Well, Provost Well, Chena Well, and Selbo Well supply Zone 1 (H.E. 223 feet). The Ridgetop Well supplies Zone 2 (H.E. 344 feet). Westwind and Hess Wells supply Zone 3 (H.E. 361 feet). Dawn Park Well supplies Zone 3.2 (H.E. 392 feet). Bucklin Ridge and Spirit Ridge Wells supply Zone 4 (H.E. 485 feet). The Wixson and Westwind supply Zone 5 (H.E. 503 feet). Island Lake Well supplies Zone 6 (H.E. 485 feet). Wixson Well supplies Zone 7 (H.E. 628 feet). Silver Sound Wells supply Zone 004 (H.E. 488 feet). Water Treatment The District recently implemented routine disinfection on all active water sources. Chlorination is achieved by continuous injection of a 1-2 percent diluted solution from a 12.5% concentrated solution of sodium hypochlorite during operation of the pumps at the facility. The chlorination equipment consists of a 100 to 600 gallon dilution tank and metering pump for the disinfection process. The District is evaluating continued dilution of 12.5% sodium hypochlorite or a central on-site chlorine generation facility. Either method would lead to transport of the chlorine solution to other well sites, where the water supply would be treated directly. Chena Wells The Chena Wells are located near the intersection of NW Chena Road and North Olsen Road on separate sites that are fenced and secured. Chena Well No. 1 is located at the same site as the Chena Reservoir and Chena Pump Station. The Chena Well No. 2 site is located across the street from the Chena Well No. 1 site. Chena Well No. 1 was drilled in 1966. The 216-foot deep well has a supply rate of approximately 200 gpm, which is delivered by a submersible pump powered by a 25 horsepower motor. The District recently re-categorized the Chena Well No. 1 as emergency. A CMU block building houses the well’s mechanical and electrical equipment and is also used by the District to Section 2 – Water System Description Silverdale Water District 2-7 2013 Comprehensive Water System Plan August 2014 store extra parts and equipment. The building also houses the Chena Pump Station. The site does not have standby power or a power receptacle to enable connection of a portable generator. Chena Well No. 2 was drilled in 1985 and is 279 feet deep. A brick building houses the well’s mechanical and electrical equipment, which includes a line shaft pump powered by a 40 horsepower motor. The well is currently not in use due to water production issues. The District has attempted to rehabilitate the well without success. The District plans to transfer water rights from the Chena Well No. 2 to a new well that would be drilled at the same site. The Chena Well No. 2 will be decommissioned prior to the construction of a new Chena Reservoir. Chena Well No. 2 Both wells supply water into Zone 1 (H.E. 223 feet) directly and to Zone 2 (H.E. 344 feet) through the Chena Pump Station. The operation of the Chena Wells is controlled by the level in the Chena Reservoir. Eldorado Well The Eldorado Well is located near Provost Road NW in the southern portion of Zone 3 (H.E. 361 feet) on property that is fenced and secured. The Eldorado Reservoir and Pump Station are located at the same site as the well. The well is located in the same brick building as the Eldorado Pump Station. A separate small, weather-protected enclosure houses a chlorine solution storage tank and chlorine injection equipment for the well. The site does not have standby power or a power receptacle to enable connection of a portable generator. The Eldorado Well was drilled in 1998. The well is 149 feet deep and has a line shaft pump with a current supply rate of approximately 220 gpm that is powered by a 15 horsepower motor. The Eldorado Well, which is controlled by the level in the Eldorado Reservoir, supplies water into Zone 1 (H.E. 223 feet) directly or to Zone 3 (H.E. 361 feet) through the Eldorado Pump Station. Provost Well The Provost Well is located near the intersection of Morning Side Lane NW and NW Cascade Street in the central portion of Zone 3 (H.E. 361 feet) on property that is fenced and secured. The Provost Reservoir and Provost Pump Station are located at the same site. The well is located in its own CMU building adjacent to a second CMU building which houses the Provost Pump Station. The well building houses the well’s mechanical and electrical equipment. The site does not have standby power or a power receptacle to enable connection of a portable generator. The Provost Well was drilled in 1963. The well is 264 feet deep and has a line shaft pump with a current supply rate of approximately 280 gpm that is powered by a 30 horsepower motor. The Provost Section 2 – Water System Description Silverdale Water District Provost Well Building 2-8 2013 Comprehensive Water System Plan August 2014 Well supplies water into Zone 1 (H.E. 223 feet) directly and into Zone 3 (H.E. 361) and Zone 5 (H.E. 503 feet) through the Provost Pump Station. The level in the Provost Reservoir controls the operation of the well. An external enclosure houses the chlorine solution storage tank and chlorine injection equipment for the well. Selbo Well Selbo Well Site The Selbo Well is an emergency well and is located near the intersection of Kari Lane NW and NW Selbo Road on property that is fenced and secured. The well is located in its own separate CMU building. The well site also has an external enclosure to house future chlorine injection equipment, while the well building houses the well’s mechanical and electrical equipment. The site does not have standby power or a power receptacle to enable connection of a portable generator. Drilled in 1975, the Selbo well is 198 feet deep and has a line shaft pump with a current supply rate of approximately 280 gpm that is powered by a 30 horsepower motor. The Selbo Well supplies water into Zone 1 (H.E. 223 feet). The well is controlled by a SCADA timer and typically runs six hours a day per DOE requirements; however, this can be changed remotely at the District office. Ridgetop Well The Ridgetop Well is located near the intersection of Boardwalk Place NW and Ridgetop Boulevard NW on property that is fenced and secured. The Ridgetop Reservoir and Ridgetop Pump Station are also located at this site. The well is located in its own separate brick building which houses the mechanical and electrical equipment for the well. The site has a receptacle (located at the Ridgetop Pump Station building) to connect a portable engine generator for backup power supply to the well and booster pump station. Ridgetop Well Building The Ridgetop Well was drilled in 1998. The well is 1,170 feet deep and has a line shaft pump with a current supply rate of approximately 1,000 gpm that is powered by a 150 horsepower motor. The Ridgetop Well supplies water into Zone 2 (H.E. 344 feet) directly and to Zone 4 (H.E. 485 feet) through the Ridgetop Pump Station. The operation of the well is controlled by the level in the Ridgetop Reservoir. An external enclosure houses the chlorine solution storage tank and chlorine injection equipment for the well. Section 2 – Water System Description Silverdale Water District 2-9 2013 Comprehensive Water System Plan August 2014 A manganese removal treatment plant and onsite chlorine generation unit will be constructed on this site within the next two years. Hess Well The Hess Well is located in the southern portion of Zone 3 (H.E. 361 feet) near the intersection of Newberry Hill Road and State Highway 3 on property that is fenced and secured. A brick building houses the well’s mechanical and electrical equipment. The wellhead is housed outside of the well building in a locked enclosure. The site does not have standby power or a power receptacle to enable connection of a portable generator. Hess Well Building The well was drilled in 1979 and is 706 feet deep. The Hess Well has a current supply rate of approximately 270 gpm which is delivered by a submersible pump powered by a 40 horsepower motor. The Hess Well supplies water into Zone 3. The operation of the well is controlled by the level in the Loretta Heights Reservoir. An external enclosure houses the chlorine solution storage tank and chlorine injection equipment for the well. Westwind Well The Westwind Well is located near the intersection of Leeway Avenue and NW Anderson Hill Road on property that is fenced and secured. The Westwind Reservoir and Westwind Pump Station are also located at this site. The well is housed in a newer brick building that contains the mechanical and electrical equipment for both the well and booster pump station. The site has receptacles to connect a portable engine generator for backup power supply to the well and booster pump station. Westwind Well Building The Westwind Well was drilled in 1991. The well is 871 feet deep and has a submersible pump with a current supply rate of approximately 420 gpm that is powered by a 60 horsepower motor. The well is controlled by the level in the Westwind Reservoir and supplies water into Zone 3 (H.E. 361 feet) or into Zone 5 (H.E. 503 feet) through the Westwind Pump Station. An external enclosure houses the chlorine solution storage tank and chlorine injection equipment for the well. Dawn Park Well The Dawn Park Well is located in a residential area near Melody Lane on property that is fenced and secured. The well is located in an older CMU building that houses the well’s mechanical and Dawn Park Well Building Section 2 – Water System Description Silverdale Water District 2-10 2013 Comprehensive Water System Plan August 2014 electrical equipment. A separate enclosure houses the chlorine solution storage tank and chlorine injection equipment for the well. The site has receptacles for a portable electrical generator to provide backup power supply to the well. The Dawn Park Well was drilled in 1968. The well is 214 feet deep and has a current supply rate of approximately 210 gpm that is delivered by a submersible pump powered by a 30 horsepower motor. The Dawn Park Well supplies water into Zone 3.2 (H.E. 392 feet) and is controlled by the level in the Shadow Glen 0.3 MG Reservoir. Bucklin Ridge Well The Bucklin Ridge Well is located on NW Santa Fe Lane on property that is fenced and secured. The Bucklin Ridge Reservoir is also located at this site, however is currently inactive. The well is located in an older CMU building, which houses the well’s mechanical and electrical equipment. The site does not have standby power or a power receptacle to enable connection of a portable generator. Bucklin Ridge Reservoir and Well The Bucklin Ridge Well was drilled in 1976 to a depth of 483 feet. The well’s current supply rate of approximately 175 gpm is delivered by a line shaft pump powered by a 40 horsepower motor. The Bucklin Ridge Well supplies water into Zone 4 (H.E. 485 feet) directly and is controlled by a SCADA timer that is currently set to run the well approximately 12 hours a day; however this can be changed remotely at the District office. An external enclosure will house the chlorine solution storage tank and chlorine injection equipment for the well. Spirit Ridge Well No. 3 and No. 4 The Spirit Ridge Well No. 3 and Spirit Ridge Well No. 4 are located at separate sites in Zone 4 (H.E. 485 feet), northwest of Island Lake. Spirit Ridge Well No. 3 is located near NW Spirit Ridge Court East on the same site as the Spirit Ridge Reservoir and Pump Station. The Spirit Ridge Well No. 4 is located adjacent to a gas station on a site that is fenced and secure. A brick Spirit Ridge Reservoir and Well 3 building houses the well’s mechanical and electrical equipment. The well is equipped with soft start equipment, well pump control valve, and a surge anticipator valve to help prevent water hammer that may be caused by the well’s large pump. The discharge water from Spirit Ridge Well No. 4’s well pump control valve flows into the storm sewer system. Section 2 – Water System Description Silverdale Water District 2-11 2013 Comprehensive Water System Plan August 2014 The Spirit Ridge Well No. 3 is equipped with soft start equipment and a well pump control valve to help prevent water hammer. The discharge water from the well pump control valve flows into the Spirit Ridge Reservoir. This water is then pumped out of the reservoir and into the system by a small pump located in the well building. Two abandoned wells are located on the Spirit Ridge Well No. 3 site, which are occasionally used by the District as monitoring wells. Both well sites have receptacles to connect a portable engine generator for backup power supply to the wells. Spirit Ridge Well No. 3 was drilled in 1977 and is 328 feet deep. The well has a line shaft pump powered by a 100 horsepower motor that currently provides supply at a rate of approximately 830 gpm. Spirit Ridge Well No. 4 was drilled in 1985. The well is 336 feet deep and has a line shaft pump with a current average supply rate of approximately 1,600 gpm that is powered by a 200 horsepower motor. Both wells provide water supply to Zone 4 (H.E. 485 feet) and are controlled by the level in the Island Lake 1.5 MG Reservoir. External enclosures house the chlorine solution storage tank and chlorine injection equipment for each of the wells. Dickey Well The Dickey Well is an inactive well and is located in the southern portion of Zone 5 (H.E. 503 feet) adjacent to the Dickey Elementary School. The well is housed in a brick building that contains the well’s mechanical and electrical equipment. The site is not fenced, however, the well building has a steel locking door to restrict unauthorized access into the facility. The site does not have standby power or a power receptacle to enable connection of a portable generator. The Dickey Well was drilled in 1978. The Dickey Well is 601 feet deep and has a submersible pump powered by a 40 horsepower motor that currently provides water supply at a rate of approximately 145 gpm. The Dickey Well supplies water into Zone 5 (H.E. 503 feet). The operation of this well is controlled by the level in the Dickey Reservoir. Dickey Well Building Section 2 – Water System Description Silverdale Water District 2-12 2013 Comprehensive Water System Plan August 2014 Island Lake Well The Island Lake Well is located near the intersection of Plateau Circle NW and NW Hurricane Lane on property that is fenced and secured. The site is located in a residential area in the highest part of the District’s service area on the east side. The Island Lake Reservoir is also located at this site. A brick building houses the well’s mechanical and electrical equipment. The site does not have standby power or a power receptacle to enable connection of a portable generator. The Island Lake Well was drilled in 1985 to a depth of 330 feet. The well’s current supply rate of approximately 300 gpm is delivered by a line shaft pump powered by a 40 horsepower motor. Island Lake Well Pump The Island Lake Well supplies water directly into Zone 6 (H.E. 515 feet) and is controlled by the level in the Island Lake 0.439 MG Reservoir. An external enclosure houses the chlorine solution storage tank and chlorine injection equipment for the well. Wixson Well The Wixson Well is located in the western portion of the District’s service area at the same site as the Wixson Reservoir. The well site, near the intersection of Dickey Road NW and NW Newberry Hill Road is fenced and secured. The well is housed in a brick building which contains the well’s mechanical and electrical equipment. The well site is also used for storing many of the District’s surplus parts. The site does not have standby power or a power receptacle to enable connection of a portable generator. Wixson Well Piping The Wixson Well was drilled in 1990 and is 998 feet deep. The well’s submersible pump is powered by a 75 horsepower motor and has a current supply rate of approximately 300 gpm. The operation of the Wixson Well, which supplies Zone 7 (H.E. 628 feet), is controlled by the level in the Wixson Reservoir. Silver Sound Well No. 1 and No. 2 Silver Sound Well No. 1 and No. 2 are located in the western portion of the District’s service area on sites that are not fenced. The Silver Sound Well No. 1 wellhead is located on the side of a gravel access road. Protection from vehicles is not provided at the wellhead. The wellhead for Silver Sound Well No. 2 is located on the side of a residential driveway. The homeowner has installed large rocks around the wellhead to better protect it from damage. A wooden building houses the well’s eight pressure tanks, which are used to regulate pressures within the system. The building does not have standby power or a power receptacle to enable connection of a portable generator. Section 2 – Water System Description Silverdale Water District 2-13 2013 Comprehensive Water System Plan August 2014 Silver Sound Well No. 1 was drilled in 1993 and Silver Sound Well 2 was drilled in 1999. Silver Sound Well No. 1 is 364 feet deep and has a submersible pump with a current supply rate of approximately 29 gpm that is powered by a 5 horsepower motor. Silver Sound Well No. 2 is 287 feet deep and has a submersible pump with a current supply rate of approximately 30 gpm that is powered by a 5 horsepower motor. The Silver Sound Water System is not connected to the District’s main water system. The operation of both wells is controlled by the pressure in the pressure tanks. When pressure in the tanks reaches a preset level, the well supplying the tank is called to turn on. After the pressure reaches a preset level, the well is called to turn off. The Silver Sound Water System will be connected to the District’s main water system by the end of 2014. 2.5.3 Pump Station Facilities Introduction The District’s water system includes eight pump stations. Each pump station serves one of two purposes: 1) to continuously pump water into a closed zone for maintaining adequate pressures where the zone doesn’t have a reservoir for maintaining pressures, or 2) to pump water from a lower zone to a higher zone where the higher zone has one or more reservoirs to maintain pressures. Table 2-1 provides a pump station summary. Pump Station Chena Eldorado Provost Ridgetop Spirit Ridge Westwind Dickey Windsong Chena 1 Well, Reservoir and BPS Site Table 2-1. Pump Station Summary Source Discharge Source Zone H.E. Zone Zone 1 223 ft. Zone 2 Zone 1 223 ft. Zone 3 Zone 1 Zone 2 Spirit Ridge Reservoir Zone 3 Zone 5 Zone 3 223 ft. 344 ft. Zone 3 & 5 Zone 4 Discharge H.E. 344 ft. 361 ft. 361 ft. & 503 ft. 485 ft. 374 ft. 361 ft. 503 ft. 361 ft. Zone 4 Zone 5 Zone 7 Zone 9 485 ft. 503 ft. 628 ft. 548 ft. A detailed description of each pump station is provided below. Chena Pump Station The Chena Pump Station was constructed in 1976. The pump station is located on property that is owned by the District, near the intersection of NW Chena Road and Olsen Road NW. The booster pump station resides in the same CMU block building as Chena Well No. 1 on a site that is also shared with the Chena Reservoir. The pump station has one centrifugal pump that is used Section 2 – Water System Description Silverdale Water District 2-14 2013 Comprehensive Water System Plan August 2014 to pump water from Zone 1 (H.E. 223 feet) into Zone 2 (H.E. 344 feet). The pump is rated at 300 gpm and powered by a 20 horsepower motor. The current maximum pumping rate of the facility is approximately 300 gpm. The site does not have standby power or a power receptacle to enable connection of a portable generator. The Chena Pump Station is disconnected from the system. A future upgraded pump station that will be capable of delivering 1,500 gpm is currently being designed and will be located on the Chena Well No. 2 site. Eldorado Pump Station The Eldorado Pump Station, which was constructed in 2001, is located near Provost Road NW in the southern portion of Zone 3 (H.E. 361 feet). The Eldorado Reservoir and Well are also located on this site. A brick building houses the pump station and well’s mechanical and electrical equipment. The pump station has two centrifugal pumps that are used to pump water from Zone 1 (H.E. 223 feet) into Zone 3. Both of the pumps are powered by 20 horsepower motors. The pump Eldorado Pumps station is capable of delivering 600 gpm. The site does not have standby power or a power receptacle to enable connection of a portable generator. The Eldorado Pump Station is controlled by levels in the Loretta Heights Reservoir. Provost Pump Station The Provost Pump Station was constructed in 1980 to pump water from Zone 1 (H.E. 223 feet) to Zone 3 (H.E. 361 feet). The pump station was later upgraded in 1986 to also enable it to pump directly into Zone 5 (H.E. 503 feet). The pump station is located near the intersection of Morning Side Lane NW and NW Cascade Street on a site that is shared with the Provost Reservoir and Well. Provost BPS Building A CMU block building houses the pump station’s mechanical and electrical equipment. The centrifugal pump that serves Zone 5 (H.E. 503 feet) is rated at 210 gpm and powered by a 40 horsepower motor. The pump serving Zone 3 (H.E. 361 feet) is rated at 320 gpm and is powered by a 20 horsepower motor. The site does not have standby power or a power receptacle to enable connection of a portable generator. The Provost Zone 3 Pump Station is controlled by levels in the Westwind Reservoir and the Provost Zone 5 Pump Station is controlled by levels in the Dickey Reservoir. Section 2 – Water System Description Silverdale Water District 2-15 2013 Comprehensive Water System Plan August 2014 Ridgetop Pump Station The Ridgetop Pump Station was constructed in 1992 and is located on a site that is shared with the Ridgetop Reservoir and Well, near the intersection of Boardwalk Place NW and Ridgetop Boulevard NW. The pump station has two centrifugal pumps that are used to pump water from Zone 2 (H.E. 344 feet) into Zone 4 (H.E. 485 feet). One of the pumps is rated at 930 gpm and is powered by a 60 horsepower motor. The second pump is rated at 530 gpm and is powered by a 40 horsepower motor. The site has a power receptacle to Ridgetop Pumps enable connection of a portable generator. The operation of the Ridgetop Pump Station is controlled by levels in the Island Lake Zone 4 Reservoir. Spirit Ridge Pump Station The Spirit Ridge Pump Station was constructed in 1996. The pump station is located near NW Spirit Ridge Court East on a site that is shared with the Spirit Ridge Reservoir and Spirit Ridge Well No. 3. A brick building houses the pump station and well’s mechanical and electrical equipment. The pump station has one centrifugal pump that is used to pump water from the Spirit Ridge Reservoir into Zone 4 (H.E. 485 feet). The pump is rated at 60 gpm and is powered by a 5 horsepower motor. The booster pump station is equipped with a power receptacle to enable connection Westwind BPS Pumps of a portable engine generator. The Spirit Ridge Pump Station is controlled by levels in the Spirit Ridge Reservoir. The Spirit Ridge Pump Station begins pumping when the water in Spirit Ridge Reservoir reaches an elevation of 373.5 or 16 feet above the base to prevent an overflow. Westwind Pump Station The Westwind Pump Station was constructed in 1992. The pump station is located near the intersection of Leeway Avenue and NW Anderson Hill Road on a site that is shared with the Westwind Reservoir and Well. A brick building houses the pump station and well’s mechanical and electrical equipment. The station is equipped with two centrifugal pumps that pump water from Zone 3 (H.E. 361 feet) into Zone 5 (H.E. 503 feet). Both of the pumps are rated at 325 gpm and powered by 25 horsepower motors. The site has a receptacle to connect a portable engine generator set for backup power supply to the pumps. The Westwind Pump Station is controlled by levels in the Dickey Reservoir. Section 2 – Water System Description Silverdale Water District 2-16 2013 Comprehensive Water System Plan August 2014 Dickey Pump Station Dickey BPS Pumps The Dickey Pump Station was constructed in 2000. The pump station is located near the intersection of Dickey Road NW and NW Newberry Hill Road on a site that is shared with the Dickey Reservoir. A brick building houses the pump station’s mechanical and electrical equipment. The station is equipped with two 450 gpm centrifugal pumps that are powered by 25 horsepower motors. The pump station pumps water from Zone 5 (H.E. 503 feet) into Zone 7 (H.E. 628 feet). The site does not have standby power or a power receptacle to enable connection of a portable generator. The Dickey Pump Station is controlled by levels in the Wixson Reservoir. Windsong Pump Station The Windsong Pump Station was constructed in 1984 and is located near the intersection of NW Terrace View Drive and Windfall Place NW. A CMU block building houses the pump station’s mechanical and electrical equipment. The site does not have standby power or a power receptacle to enable connection of a portable generator, however; the pump station is equipped with a natural gas generator. The Windsong Pump Station pumps water from Zone 3 (H.E. 361 feet) into the closed Zone 9 (H.E. 548 feet) and the operation of the pump station is controlled by demands in Zone 9 (H.E. 548 feet). Windsong BPS This pump station received a major over haul in 2010. It now operates on six pumps: three on shore power (50 gpm, 50 gpm, and 15 gpm), three on the natural gas generator (50 gpm, 500 gpm, and 500 gpm). Two pressure tanks are also installed. The pump station operates as follows: Initially if there is a demand on the system for 15 seconds, a jockey pump (15 gpm capacity) will activate. If the pump station needs to provide flows in excess of 12 gpm, a 50 gpm pump will be activated and the jockey pump will shut-off. If demands exceed 40 gpm, the jockey pump will be reactivated. If demands exceed 50 gpm, both 50 gpm pumps will deliver flow and the jockey pump will shut off. When flows exceed 90 gpm, the jockey pump will be reactivated and both 50 gpm pumps will run. Demands above 100 gpm will activate the generator and one of the 500 gpm pumps will begin delivering flow. If the pressure falls below 105 psi, the generator will start and a 500 gpm pump will turnon and begin delivering flow. Section 2 – Water System Description Silverdale Water District 2-17 2013 Comprehensive Water System Plan August 2014 If power is lost, the generator will turn-on and the 50 gpm pump that is generator controlled will run. All pumps will shut-off if there is zero demand for a duration of 2 minutes. 2.5.4 Storage Facilities The District’s water system has 14 storage facilities, of which 12 are currently active. All but one of the active reservoirs float off of the pressure zone that they serve and provide flow into the system by gravity. The Spirit Ridge Reservoir serves Zone 4 (H.E. 485 feet), but has an overflow elevation that is lower than the hydraulic grade of the zone. The Spirit Ridge Pump Station, located at the same site, is utilized to pump water out of the reservoir and into Zone 4 (H.E. 485 feet). The Shadow Glen 0.13 MG Reservoir and the Bucklin Ridge 0.125 MG Reservoir have been taken out of service by the District. A reservoir summary is provided in Table 2-2. Table 2-2. Reservoir Summary Capacity Reservoir H.E. Chena 250,000 gal. 223 ft. Eldorado 70,000 gal. 223 ft. Provost 250,000 gal. 223 ft. Ridgetop 625,000 gal. 344 ft. Loretta Heights 200,000 gal. 361 ft. Westwind 300,000 gal. 361 ft. Shadow Glen (0.3 MG) 300,000 gal. 392 ft. (1) Shadow Glen (0.13 MG) 130,000 gal. 361 ft. Island Lake (1.5 MG) 1,500,000 gal. 485 ft. Island Lake (0.439 MG) 438,642 gal. 515 ft. Spirit Ridge 50,000 gal. 380 ft. Dickey 250,000 gal. 502 ft. Wixson 1,000,000 gal. 628 ft. (1) Bucklin Ridge 125,000 gal. 345 ft. (1) Reservoirs currently not in service. Reservoir Service Zone Zone 1 & 2 Zone 1 & 3 Zone 1, 3, & 5 Zone 2 & 4 Zone 3 Zone 3 & 5 Zone 3.2 N/A Zone 4 Zone 6 Zone 4 Zone 5 & 7 Zone 7 N/A A more detailed description of each storage facility is provided below. Chena Reservoir The Chena Reservoir is located near the intersection of NW Chena Road and Olsen Road NW on a fenced site that is shared with the Chena Pump Station and Chena Well No. 1. The reservoir provides 250,000 gallons of water storage directly to Zone 1 (H.E. 223 feet). The storage capacity of the Chena Reservoir is also available to Zone 2 (H.E. 344 feet) through the Chena Pump Station. The 41-foot diameter, 26-foot tall steel reservoir was constructed in 1975 and provides 9,875 gallons of storage per foot height. The reservoir’s base elevation is 197.5 feet and the overflow elevation is 223 feet. The reservoir is equipped with an exterior level gauge and a single 12-inch diameter water main serves as the reservoir’s common inlet and outlet pipe. The reservoir is anchored for seismic Section 2 – Water System Description Silverdale Water District 2-18 2013 Comprehensive Water System Plan August 2014 events per 1975 standards. The telemetry equipment for the reservoir is housed in a separate onsite electrical enclosure. The reservoir’s altitude valve is located in an underground vault adjacent to the reservoir. The District has a functional chlorine injection point installed just after the altitude valve. This injection point is used to ensure a proper chlorine residual into Pressure Zone 1. Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. A new 2 MG Chena Reservoir will be built in the next few years to accommodate future demands. The existing Chena Reservoir will be converted to reclaimed water after the new reservoir is built and the reclaimed water becomes available. Eldorado Reservoir The Eldorado Reservoir is located near Provost Road NW at the southern end of Zone 3 (H.E. 361 feet) on a site that is fenced and secured. The Eldorado Pump Station and Well are also located on this site. The reservoir provides 70,000 gallons of water storage directly to Zone 1 (H.E. 223 feet). The storage capacity of the Eldorado Reservoir is also available to Zone 3 (H.E. 361 feet) through the Eldorado Pump Station. The 20-foot diameter, 32foot tall steel reservoir was constructed in 1987 and provides 2,350 gallons of storage per foot height. The reservoir’s base elevation is 191 feet and the overflow elevation is 222.2 feet. Eldorado Reservoir The reservoir is equipped with an exterior level gauge and a single 8-inch diameter water main serves as the reservoir’s common inlet and outlet pipe. The reservoir is anchored for seismic events per 1987 standards. The Eldorado Pump Station building houses the reservoir’s telemetry equipment and the reservoir’s altitude valve is located in an underground vault adjacent to the reservoir. Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. Provost Reservoir The Provost Reservoir is located near the intersection of NW Cascade Street and Morningside Lane NW on a fenced site that is shared with the Provost Pump Station and Well. The reservoir provides 250,000 gallons of water storage directly to Zone 1 (H.E. 223 feet). The storage capacity of the Provost Reservoir is also available to Zone 3 (H.E. 361 feet) and Zone 5 (H.E. 503 feet) through the Provost Pump Provost Reservoir Station. The 34.5-foot diameter, 36.4-foot tall steel reservoir was constructed in 1954 and provides 6,992 gallons of storage per foot height. The reservoir’s base elevation is 187 feet and the overflow elevation is 223 feet. The reservoir is equipped with an exterior level gauge and a single 8-inch diameter water main serves as the reservoir’s common inlet and outlet pipe. The reservoir is anchored for seismic Section 2 – Water System Description Silverdale Water District 2-19 2013 Comprehensive Water System Plan August 2014 events per 1954 standards. The reservoir’s telemetry equipment is housed in the same building as the Provost Pump Station. An altitude valve is located in an underground vault at the site. Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. Ridgetop Reservoir The Ridgetop Reservoir is located near the intersection of Ridgetop Boulevard NW and Boardwalk Place NW on a fenced site that is shared with the Ridgetop Pump Station and Well. The reservoir provides 625,000 gallons of water storage directly to Zone 2 (H.E. 344 feet). The storage capacity of the Ridgetop Reservoir is also available to Zone 4 (H.E. 485 feet) through the Ridgetop Pump Station. The 60foot diameter, 32.5-foot tall steel reservoir was constructed in 1992 and provides 21,149 gallons of storage per foot height. The reservoir’s base elevation is 312.5 feet and the overflow elevation is 344.5 feet. Ridgetop Reservoir The reservoir is equipped with an exterior level gauge and an 8-inch diameter water main serves as the reservoir’s inlet pipe. The reservoir’s outlet pipe is a 12-inch diameter water main. The reservoir is anchored for seismic events per 1992 standards. The reservoir’s telemetry equipment is housed in the same building as the Ridgetop Pump Station. An altitude valve is located in an underground vault at the site. Currently, the well water from the Ridgetop well is aerated at the top of the Reservoir. This configuration will change with the new treatment plant being constructed and anticipated to be online in 2013/2014. Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. Loretta Heights Reservoir The Loretta Heights Reservoir is located near the intersection of NW Francis Drive and Bach Lane in the south end of Zone 5 (H.E. 503 feet) on a fenced site. The reservoir provides 200,000 gallons of water storage directly to Zone 3 (H.E. 361 feet). The 37-foot diameter, 27.4-foot tall steel reservoir was constructed in 1983 and provides 8,043 gallons of storage per foot height. The reservoir’s base elevation is 335 feet and the overflow elevation is 361 feet. The reservoir is equipped with an exterior level gauge and a single 8-inch diameter water main serves as the reservoir’s common inlet and outlet pipe. The reservoir is anchored for seismic events per 1983 standards. The telemetry equipment is housed in a separate electrical housing adjacent to the reservoir. The reservoir has an altitude valve, which is located in an underground vault at the site. Loretta Heights Reservoir Section 2 – Water System Description Silverdale Water District 2-20 2013 Comprehensive Water System Plan August 2014 Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. Westwind Reservoir The Westwind Reservoir is located near the intersection of Leeway Avenue NW and NW Anderson Hill Road on a fenced site that is shared with the Westwind Pump Station and Well. The reservoir provides 300,000 gallons of water storage directly to Zone 3. The storage capacity of the Westwind Reservoir is also available to Zone 5 (H.E. 503 feet) through the Westwind Pump Station. The 44-foot diameter, 28.5-foot tall steel reservoir was constructed in 1992 and provides approximately 11,370 gallons of storage per foot height. The reservoir’s base elevation is approximately 333 feet and the overflow elevation is 361 feet. The reservoir is equipped with an exterior level gauge. An 8-inch water main serves as the reservoir’s inlet pipe, while a 10-inch diameter water main serves as the reservoir’s outlet pipe. The 10-inch water main does have the capability to serve as an inlet pipe for water from Zone 5 if needed. The reservoir is anchored for seismic events per 1992 standards. The reservoir’s telemetry equipment is housed in the same building as the Westwind Well and Pump Station. Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. Shadow Glen 0.3 MG Reservoir The Shadow Glen 0.3 MG Reservoir is located at the north end of Thomas Drive NW on a fenced site in the northwest portion of Zone 3.2 (H.E. 392 feet). The site is shared with the inactive Shadow Glen 0.13 MG Reservoir. The inactive reservoir does not provide any usable storage and does not extend to the height of the active reservoir. The maximum hydraulic elevation difference between the active 3.0 MG and inactive 0.15 MG reservoir is approximately 30 ft. The active reservoir provides Shadow Glen Reservoir 300,000 gallons of water storage directly to Zone 3.2 (H.E. 392 feet). The 30-foot diameter, 62-foot tall steel reservoir was constructed in 1994 and provides approximately 5,287 gallons of storage per foot height. The reservoir’s base elevation is approximately 330.7 feet and the overflow elevation is 392.2 feet. The reservoir is equipped with an exterior level gauge and a single 10-inch diameter water main serves as the reservoir’s common inlet and outlet pipe. The reservoir is anchored for seismic events per 1994 standards. The reservoir’s telemetry equipment is housed in an above grade electrical enclosure adjacent to the reservoir. An underground vault houses the reservoir’s altitude valve, which allows water to flow from Zone 5 to Zone 3.2. Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. Section 2 – Water System Description Silverdale Water District 2-21 2013 Comprehensive Water System Plan August 2014 Shadow Glen 0.13 MG Reservoir The Shadow Glen 0.13 MG Reservoir is located at the north end of Thomas Drive NW on a fenced site that is shared with the Shadow Glen 0.3 MG Reservoir. The reservoir is not currently in use due to service issues and was taken offline when the Shadow Glen 0.3 MG Reservoir was constructed in 1992. The reservoir has a water storage capacity of 130,000 gallons. The 26-foot diameter, 30-foot tall concrete reservoir was constructed in 1975 and can provide 3,971 gallons of storage per foot height. The reservoir’s base elevation is 326.5 feet and the overflow elevation is 361 feet. Island Lake 1.5 MG Reservoir The Island Lake 1.5 MG Reservoir is located near the intersection of Plateau Circle and NW Hurricane Court on a fenced site that is shared with the Island Lake 0.439 MG Reservoir and the Island Lake Well. The reservoir provides 1,500,000 gallons of water storage directly to Zone 4 (H.E. 485 feet). The 64-foot diameter, 65.5foot tall steel reservoir was constructed in 1986 and provides 24,063 gallons of storage per foot height. The reservoir’s base elevation is 420 feet and the overflow elevation is 485 feet. Island Lake 1.5 MG Reservoir The reservoir is equipped with an exterior level gauge and a 12-inch diameter water main serves as the reservoir’s outlet pipe. The reservoir has been upgraded with Tide-Flex mixing valves that serve as the inlet pipe. The reservoir is anchored for seismic events per 1986 standards. The reservoir’s telemetry equipment is housed in the Island Lake Well building. Both Island Lake reservoirs are connected with a check valve, which allows water to transfer from the 1.5 MG reservoir to the 0.439 MG reservoir. A portion of the reservoir site has been leased to a telecommunications company that installed a cellular tower on the property. The Central Kitsap School District has installed a reflector dish on the reservoir. Seismic control valves are installed on the reservoir along with a mag meter style flow meter. The seismic control valve is operated through the flo-loc system. Island Lake 0.439 MG Reservoir The Island Lake 0.439 MG Reservoir is located near the intersection of Plateau Circle and NW Hurricane Court on a fenced site that is shared with the Island Lake 1.5 MG Reservoir and the Island Lake Well. The reservoir provides 438,642 gallons of water storage directly to Zone 6 (H.E. 515 feet). The 28-foot diameter, 95.1-foot tall steel reservoir was constructed in 2008 and provides 4,606 gallons of storage per foot height. The reservoir’s base elevation is 420 feet and the overflow elevation is 515 feet. The reservoir is equipped with an exterior level gauge and two 12-inch Section 2 – Water System Description Silverdale Water District Island Lake 0.439MG Reservoir 2-22 2013 Comprehensive Water System Plan August 2014 diameter water mains serving as the reservoir’s outlet and pipes. The reservoir has been upgraded with Tide-Flex mixing valves that serve as the inlet pipe. The reservoir is anchored for seismic events per 2008 standards. The reservoir’s telemetry equipment is housed in the Island Lake Well building. Both Island Lake reservoirs are connected with a check valve, which allows water to transfer from the 1.5 MG reservoir to the 0.439 MG reservoir. A portion of the reservoir site has been leased to a telecommunications company that has installed a cellular tower on the property. Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. Spirit Ridge Reservoir Spirit Ridge Reservoir BPS and Well 3 The Spirit Ridge Reservoir is located on Silverdale Way NW on a fenced site that is shared with the Spirit Ridge Pump Station and Spirit Ridge Well No. 3. The reservoir acts as a holding tank for discharge water produced from the Spirit Ridge Well No. 3. The Spirit Ridge Pump Station pumps water from the reservoir directly to Zone 4 (H.E. 485 feet). The 20-foot diameter, 23-foot tall steel reservoir was constructed in 1977 and provides 2,350 gallons of storage per foot height. The reservoir’s base elevation is 357.5 feet and the overflow elevation is 380 feet. The reservoir is equipped with an exterior level gauge. A single 8-inch diameter water mains serve as the reservoir’s common inlet and outlet pipe. The reservoir is anchored for seismic events per 1977 standards. The reservoir’s telemetry equipment is housed in the same building as the Spirit Ridge Well No. 3. Dickey Reservoir The Dickey Reservoir is located on Dickey Road NW, west of NW Dickey Place on a fenced site that is shared with the Dickey Pump Station. The reservoir provides 250,000 gallons of water storage directly to Zone 5 (H.E. 503 feet). The storage capacity of the Dickey Reservoir is also available to Zone 7 (H.E. 628 feet) through the Dickey Pump Station. The 44.5-foot diameter, 23-foot tall steel reservoir was constructed in 1979 and provides 11,643 gallons of storage per foot height. The reservoir’s base elevation is 480 feet and the overflow elevation is 502.5 feet. Dickey Reservoir and BPS The reservoir is equipped with an exterior level gauge and a single 10inch diameter water main serves as the reservoir’s common inlet and outlet pipe. The reservoir is anchored for seismic events per 1979 standards. Seismic control valves are installed on the reservoir along with a mag meter style flow meter. The seismic control valve is operated through the flo-loc system. The Dickey Pump Station building houses the reservoir’s telemetry equipment. The reservoir’s altitude valve is located in an underground vault adjacent to the reservoir. Section 2 – Water System Description Silverdale Water District 2-23 2013 Comprehensive Water System Plan August 2014 The District currently plans to construct a new 0.75 MG Dickey Reservoir that is planned to come on-line at the end of 2014. The new reservoir will be located slightly southeast of the Willamette Meridian Rd & Anderson Hill Rd intersection. Wixson Reservoir The Wixson Reservoir is located near the intersection of Dickey Road NW and NW Newberry Hill Rd. on a fenced site that is shared with the Wixon Well. The reservoir provides 1,000,000 gallons of water storage for Zone 7 (H.E. 628 feet). The 43-foot diameter, 94-foot tall steel reservoir was constructed in 1991 and provides 10,862 gallons of storage per foot height. The reservoir’s base elevation is 535.5 feet and the overflow elevation is 628.5 feet. The reservoir is equipped with an exterior level gauge. An 8-inch diameter water main serves as the reservoir’s inlet pipe and a 12-inch diameter water main serves as the reservoir’s outlet pipe. The reservoir is anchored for seismic events per 1991 standards. The reservoir’s telemetry equipment is housed in the same building as the Wixson Well. Seismic control valves are installed on the reservoir along with a magnetic meter style flow meter. The seismic control valve is operated through the flo-loc system. Wixson Reservoir Bucklin Ridge Reservoir The Bucklin Ridge Reservoir is located on NW Santa Fe Lane on a fenced site that is shared with the Bucklin Ridge Well. The reservoir is not currently in use by the District because the overflow elevation is too low to adequately serve customers in the higher elevations near the reservoir. As development occurs in the lower elevations to the west, the Bucklin Ridge Reservoir will be connected to the District’s system and become active. The reservoir has water storage capacity of 125,000 gallons. The 28-foot diameter, 28-foot tall steel reservoir was constructed in 1975 and can provide 4,606 gallons of storage per foot height. The reservoir’s base elevation is 317 feet and the overflow elevation is 344.5 feet. 2.5.5 Distribution and Transmission System The District’s retail water service area contains approximately 146 miles of water main ranging in size from 3/4-inch to 16-inches. As shown in Table 2-3, much of the water main (approximately 45 percent) within the service area is 8-inches in diameter and 32 percent of all water main is larger than 8-inch diameter. Table 2-3 does not include reclaimed water piping. Section 2 – Water System Description Silverdale Water District 2-24 2013 Comprehensive Water System Plan August 2014 Table 2-3. Water Main Size Inventory Diameter (Inches) Length (Feet) % of Total ¾ 198 0.03% 1.5 240 0.03% 2 30,836 4% 2.5 2,583 0.33% 3 161 0.02% 4 48,146 6.24% 6 93,980 12.19% 8 351,490 45.58% 10 107,710 13.97% 12 118,330 15.34% 14 3,986 0.52% 16 13,521 1.75% Total 771,181 100% As shown in Table 2-4, approximately 16 percent of the water main in the system is asbestos cement (AC). The District has made it a priority of replacing the AC main in its distribution system. It is anticipated by the District that they will replace approximately 12,000 ft of AC in the next four years. In addition, the District has an ongoing program to replace water mains with a history of breaks or leaks. This allows the District to focus efforts on problematic water mains that may or may not also be AC water mains. All new water main installations are required to use ductile iron or HDPE water main in accordance with the District’s construction standards. Table 2-4. Water Main Material Inventory Water Main Material Length (Feet) % of Total Asbestos Cement 121,954 15.8% C-900 97,465 12.6% Ductile Iron 509,930 66.0% HPDE 22,331 2.9% PVC 19348 2.5% Galvanized Iron 153 0.02% Total 750,822 100.00% The life expectancy of water main is generally 50 years. Approximately 19 percent of the water main in the system will be 50 years or older during the next 20 years. Most of this main is asbestos cement water main that was installed in the 1960’s and 1970’s. The District replaced a significant amount of water main in the 1990’s. This reflects the District’s commitment to maintaining its system and reducing water loss through leaks in old mains. 2.5.6 Pressure Reducing Stations Pressure reducing stations are connections between adjacent pressure zones that allow water to flow from the higher pressure zone to the lower pressure zone by reducing the pressure of the water as it flows through the station, thereby maintaining a safe range of pressures in the lower zone. A pressure reducing station is essentially a below-grade vault (typically concrete), which normally contains two pressure reducing valves, sometimes a pressure relief valve, piping and Section 2 – Water System Description Silverdale Water District 2-25 2013 Comprehensive Water System Plan August 2014 other appurtenances. The pressure reducing valve hydraulically varies the flow rate through the valve (up to the flow capacity of the valve) to maintain a constant pressure on the downstream side of the valve for water flowing into the lower pressure zone. Pressure reducing stations can serve multiple purposes. They can function as an active supply facility by maintaining a continuous supply of water into a lower zone that has no other source of supply, such as a well or reservoir. Pressure reducing stations can also function as standby supply facilities that are normally inactive (no water flowing through them). The operation of this type of station is typically triggered by a drop in water pressure near the downstream side of the station. A typical application of this function is a pressure reducing station that is only needed to supply additional water to a lower zone during a fire flow situation. The pressure setting of the control valve within the station allows it to remain closed during normal system operation and open only during high demand conditions, like fire flows, to provide the additional supply needed. The District’s water system has a total of 18 pressure reducing stations, as shown in profile view in Figure 2-2. One pressure reducing station is located on the boundary between Zone 7 (H.E. 628 feet) and Zone 5 (H.E. 503 feet) on NW Newberry Hill Road. Four pressure reducing stations are located at the boundary between Zone 5 (H.E. 503 feet) and Zone 3 (H.E. 361). These pressure reducing stations are located on Newberry Hill Road, Walgren Road, Shelley Road and Old Frontier Road. The pressure reducing station located on Quail Hollow Road at the boundary between Zone 4 (H.E. 485 feet) and Zone 4.2 (H.E. 390 feet), is the only source of supply to Zone 4.2 (H.E. 390 feet). Similar to this pressure reducing station, the pressure reducing station located at the boundary between Zone 4 (H.E. 485 feet) and Zone 4.4 (H.E. 366 feet) on Westridge Road serves as the only source of supply to Zone 4.4 (H.E. 366 feet). The Ridgetop pressure reducing station is located at the boundary between Zone 4 (H.E. 485) and Zone 2 (H.E. 344). A pressure reducing station is located at the boundary between Zone 5.1 (H.E. 370) and Zone 5 (H.E. 503 feet) at Olympic View Road. One pressure reducing station is located at the boundary between Zone 5 (H.E. 503 feet) and Zone 3.2 (H.E. 392 feet) on Mt. View Road. One pressure reducing station is located at the boundary between Zone 4 (H.E. 485 feet) and Zone 2 (H.E. 344 feet) on Hillsboro Road. The pressure reducing station located at the boundary between Zone 4 (H.E. 485 feet) and Zone 4.1 (H.E. 400 feet) on Ridgeview Road serves as the only source of supply for Zone 4.1 (H.E. 400 feet). Two pressure reducing stations are located at the boundary between Zone 4 (H.E. 485 feet) and Zone 4.5 (H.E. 330 feet), which serve as the only sources of supply for Zone 4.5 (H.E. 330 feet). These pressure reducing stations are located on Central Valley Road and Silverdale Way. One pressure reducing station is located at the boundary between Zone 4.2 (H.E. 390 feet) and Zone 1 (H.E. 223 feet) on Schold Road. One pressure reducing station is located at the boundary between Zone 2 (H.E. 344 feet) and Zone 1 (H.E. 223 feet) on Huckle Ridge Road. Two pressure reducing stations are located at the boundary of Zone 3 (H.E. 361 feet) and Zone 1 (H.E. 223 feet) one on Anderson Hill Road and another on Vintage Road. Section 2 – Water System Description Silverdale Water District 2-26 2013 Comprehensive Water System Plan August 2014 2.5.7 Water System Interties Water system interties are physical connections between two adjacent water systems. Interties are normally separated by a closed isolation valve or control valve. Emergency supply interties provide water from one system to another during emergency situations only. An emergency situation may occur when a water system loses its main source of supply or a major transmission main and is unable to provide a sufficient quantity of water to its customers. Normal supply interties provide water from one system to another during non-emergency situations and are typically supplying water at all times. The District’s water system currently has two interties. The District recently negotiated with Kitsap County Public Utility District No. 1 (PUD) to establish two interties. The purpose of these interties is to allow the PUD to wheel water between the PUDs two water service areas located to the north and to the west of the District’s water system. The District will receive a fee for allowing the water to transfer through its system. A copy of the intertie agreement is included in Appendix 2-2. The District is planning to develop interties with the City of Bremerton along Tracyton Boulevard, KPUD’s Keyport water system along state highway 308, and Erland Point water system to the south of the District. 2.5.8 Telemetry and Supervisory Control System Successful operation of water system requires gathering and using accurate water system information. A telemetry and supervisory control system gathers information and can efficiently control a system by automatically optimizing facility operations. A telemetry and supervisory control system also provides instant alarm notification to operations personnel in the event of equipment failure, operation problem, flood, fire, or other emergency situations. There are two types of telemetry systems: Distributed Control Systems (DCS) and Supervisory Control and Data Acquisition (SCADA). The District employs the SCADA system at all of its facilities. The system consists of remote telemetry units (RTUs) at the District’s wells, pump stations, altitude and solenoid valves, and water reservoir sites. The remote telemetry units send data via radio signals to the master telemetry unit (MTU) located at the District office. The MTU system is designed to monitor and control all facilities in the system. Monitoring and control of the MTU system can also be remotely accessed off-site by authorized District staff. 2.5.9 Water System Operation and Control The District’s water system, which consists of several well, pump station and reservoir sites, is operated and controlled differently for each pressure zone, as described below. Zone 1 (H.E. 223 feet) is supplied with water from the Eldorado and Provost Wells, and the Chena Altitude Valve. The operation of the wells is controlled by surface water levels in the Zone 1 (H.E. 223 feet) reservoirs. Wells are called to operate according to preset reservoir drawdown levels and are called to turn off upon a preset maximum level. This is accomplished Section 2 – Water System Description Silverdale Water District 2-27 2013 Comprehensive Water System Plan August 2014 automatically through the transfer of reservoir level data from the reservoir site’s RTU to the well site’s RTU. The RTUs also send well and reservoir data to the MTU at the District office for data collection and alarm notification purposes. Water can also be supplied to Zone 1 (H.E. 223 feet) from the higher zones through control valves located at the Provost and Eldorado Reservoirs as well as a series of four pressure reducing stations, the Anderson Hill, Schold, Vintage, and Huckle Ridge PRVs. The Eldorado, Provost and Chena Pump Stations transfer water from the zone for use in the higher zones in the system. Zone 2 (H.E. 344 feet) is supplied with water from the Ridgetop Well, Ridgetop Control Valve, Ridgetop PRV, and Hillsboro PRV. The operation well is controlled by the surface water level in the Zone 2 (H.E. 344 feet) reservoirs. Wells, control valves, and pumps are called to operate according to preset reservoir drawdown levels and are called to turn off upon a maximum fill level. This is accomplished in the same manner as described previously for Zone 1 (H.E. 223 feet). The pressure reducing station is operated hydraulically based on pressures downstream of the pressure reducing station in Zone 2 (H.E. 344 feet). Water can be transferred to Zone 4 (H.E. 485 feet) through the Ridgetop Pump Station and to Zone 1 (H.E. 223 feet) through the Huckle Ridge PRV and the Chena Reservoir altitude valve. Zone 3 (H.E. 361 feet) is supplied with water from the Eldorado Pump Station, Westwind Well, Hess Well, Provost Pump Station, Loretta Heights Control Valve, Westwind Control Valve, Walgren PRV, Newberry Hill PRV and Shelley PRV. The operation of the pumps, control valves, and wells is controlled by the surface water level in the Zone 3 (H.E. 361 feet) reservoirs. Wells, control valves, and pumps are called to operate according to preset reservoir drawdown levels and are called to turn off upon a maximum fill level. This is accomplished in the same manner as described previously for Zone 1 (H.E. 223 feet). The pressure reducing stations are operated hydraulically based on pressures downstream of the pressure reducing stations in Zone 3. The Windsong and Westwind Pump Stations transfer water to higher zones in the system, whereas the Anderson Hill and Vintage PRV transfers water from Zone 3 (H.E. 361 feet) into the lower zones. Zone 3.2 (H.E. 392 feet) is supplied by the Dawn Park Well, which is controlled by the surface water level in the Shadow Glen 0.3 MG Reservoir. The well is called to operate according to a preset reservoir drawdown level and is called to turn off upon a preset maximum fill level. This is accomplished in the same manner as described previously for Zone 1 (H.E. 223 feet). The Shadow Glen Control Valve and Mountain View PRV can also supply water to Pressure Zone 3.2. Zone 4 (H.E. 485 feet) is supplied with water from the Bucklin Ridge Well, the Spirit Ridge Wells No. 3 and No. 4, the Ridgetop Pump Station and the Spirit Ridge Pump Station. The operation of the wells and pump stations is controlled by the surface water level in the Island Lake 1.5 MG Reservoir. Wells and pumps are called to operate according to preset reservoir drawdown levels and are called to turn off upon a maximum fill level. This is accomplished in the same manner as described previously for Zone 1 (H.E. 223 feet). Water is transferred to lower zones in the system through the Ridgetop control valve as well as the Westridge, Quail Hollow, Hillsboro, Silverdale Way, Central Valley, Ridgetop and Ridgeview PRVs. Section 2 – Water System Description Silverdale Water District 2-28 2013 Comprehensive Water System Plan August 2014 Zone 4.1 (H.E. 400 feet) is supplied with water from Zone 4 (H.E. 485 feet) through the Ridgeview PRV. Pressures are maintained in Zone 4.1 (H.E. 400 feet) by the pressure reducing station regardless of demands. Zone 4.2 (H.E. 390 feet) is supplied with water from Zone 4 (H.E. 485 feet) through the Quail Hollow PRV. Pressures are maintained in Zone 4.2 (H.E. 390 feet) by the pressure reducing station regardless of demands in the zone. Zone 4.4 (H.E. 366 feet) is supplied with water from Zone 4 (H.E. 485 feet) through the Westridge PRV. Pressures are maintained in Zone 4.4 (H.E. 366 feet) by the pressure reducing station regardless of demands in the zone. Zone 4.5 (H.E. 330 feet) is supplied with water from Zone 4 (H.E. 485 feet) through the Central Valley PRV and the Silverdale Way PRV. Pressures are maintained in Zone 4.5 (H.E. 330 feet) by the pressure reducing stations regardless of demands in the zone. Zone 5 (H.E. 503 feet) is supplied with water from the Westwind Pump Station, Provost Pump Station, Dickey Altitude Valve, and Newberry Hill PRV. The operation of the pumps, control valves, and wells is controlled by the surface water level in the Dickey Reservoir. Wells, control valves, and pumps are called to operate according to preset reservoir drawdown levels and are called to turn off upon a preset maximum fill level. This is accomplished in the same manner as described previously for Zone 1 (H.E. 223 feet). The pressure reducing station is operated hydraulically based on pressures downstream of the pressure reducing station in Zone 5 (H.E. 503 feet). Water can be transferred to the lower zones in the system through the Walgren, Newberry Hill and Shelley PRVs as well as the Loretta Heights control valve. Zone 5.1 (H.E. 370 feet) is supplied with water from Zone 5 (H.E. 503 feet) through the Olympic View PRV. Pressures are maintained in Zone 5.1 (H.E. 370 feet) by the pressure reducing station regardless of demands in the zone. Zone 6 (H.E. 515 feet) is supplied with water from the Island Lake Well. The operation of the well is controlled by the surface water level in the Island Lake 0.439 MG Reservoir. The reservoir is connected by a check valve to Zone 4 (H.E. 485 feet), which is served by the Island Lake 1.5 MG Reservoir. However, the Island Lake 0.439 MG Reservoir is operated at a higher hydraulic elevation to maintain adequate pressures in Zone 6 (H.E. 515 feet). The Island Lake Well is called to operate according to preset reservoir drawdown levels and is called to turn off upon a preset maximum fill level. This is accomplished in the same manner as described previously for Zone 1 (H.E. 223 feet). Zone 7 (H.E. 628 feet) is supplied with water from the Dickey Pump Station and Wixon Well. The operation of the pump station and well is controlled by the surface water level in the Wixson Reservoir, which are called to operate according to preset reservoir drawdown levels and are called to turn off upon a preset maximum fill level. This is accomplished in the same manner as described previously for Zone 1 (H.E. 223 feet). Water can be transferred to the lower zones in the system through the Newberry Hill PRV and the Dickey control valve. Section 2 – Water System Description Silverdale Water District 2-29 2013 Comprehensive Water System Plan August 2014 Zone 9 (H.E. 548 feet) is a closed zone that is supplied with water from the Windsong Pump Station. Demands in Zone 9 (H.E. 548 feet) control the operation of the pumps in the Windsong Pump Station. Various pumps are called on as demands fluctuate in the zone. Because Zone 9 (H.E. 548 feet) is a closed zone, at least one pump at the Windsong Pump Station must be in continuous operation to maintain adequate pressures. Zone 004 (H.E. 472 feet) in the Silver Sound water system is not physically connected to the District’s main water system. The Silver Sound Wells No. 1 and No. 2 supply water to the zone and are operated based on the pressures in the system’s pressure tanks. The wells are called to operate according to a preset low pressure in the tank, and are called to turn off upon the pressure in the tank reaching the maximum setpoint. 2.6 Adjacent Water Systems The area outside and immediately adjacent to the District’s existing water service area is unincorporated Kitsap County. Most of the water systems located close to the District are relatively small. Some of the larger systems in Kitsap County that are relatively close to the District’s service area include the City of Bremerton, the City of Poulsbo, Subase Bangor, Island Lake Water System, North Perry Avenue Water District, and Erland Point Water Company. Additionally, three public water systems, owned and operated by the PUD, are located adjacent to the District’s service area boundary, as shown in Figure 2-3. A brief description of each water system follows. 2.6.1 City of Bremerton The City of Bremerton water system is located southeast of the District’s service area boundary. The Bremerton water system serves approximately 55,000 people and the Bremerton Naval Complex. Bremerton’s water supply comes primarily from the Union River, located in a managed watershed. This source is supplemented with groundwater from area wells. Water sources are treated with chlorine as required for disinfection purposes and the pH of the water is adjusted prior to entering the distribution system for corrosion control. The Union River supply is now disinfected through a new advanced disinfection UV facility. The water system consists of approximately 289 miles of distribution pipe, 18 reservoirs and 9 pump stations. Approximately 8 million gallons of water is delivered to Bremerton’s customers each day. There is currently a small area of overlap between the City of Bremerton’s water service area and the District’s service area. This area is an uncontested overlap area, meaning that both water systems supply this area. Future connections in this area will require agreement between the two water systems in order to determine which water system will serve the new connections. The District and the City of Bremerton have had recent discussions regarding an intertie, but have not settled on an agreement. Section 2 – Water System Description Silverdale Water District 2-30 2013 Comprehensive Water System Plan SUBASE BANGOR WATER DISTRICT KITSAP PUBLIC UTILITY DISTRICT NO. 1 CITY OF POULSBO WATER SYSTEM LI BERTY BAY Mobile Home on Scadia Loop and SR 308 Clear Creek Mobile Home Park HOO D CANA L KITSAP PUBLIC UTILITY DISTRICT NO. 1 Allevena Puddingstone ISLAND LAKE WATER SYSTEM Brianwood NORTH PERRY AVENUE WATER DISTRICT Crystal Creek Sunset Hills SILVERDALE WATER DISTRICT Washington Water Service Co. KITSAP PUBLIC UTILITY DISTRICT NO. 1 DYES INLET CITY OF BREMERTON WATER SYSTEM Eldorado Hill TRACYTON WATER DISTRICT CHI CO BAY ERLAND POINT WATER COMPANY Legend Systems Adjacent to District Erland Point Water Co. City of Bremerton Kitsap Public Utility District No. 1 North Perry Ave Water Dist Island Lake Water District Tracyton Water District Subase Bangor Water District City of Poulsbo Water System Silverdale Water District Systems or Overlap Areas within District Other Water Systems Uncontested Overlap (Bremerton) Figure 2-3 Service Area and Adjacent Systems Uncontested Overlap (Island Lake) Uncontested Overlap (North Perry) Water Body Silverdale Water District Water System Plan Retail Service Area Boundary * * Also the District's water rights "Place of Use." Apr 2014 I 0 2,000 4,000 8,000 Feet August 2014 2.6.2 City of Poulsbo The City of Poulsbo water system is located to the northeast of the District’s service area boundary across Liberty Bay. Poulsbo is supplied with water from groundwater wells located in the Big Valley area (Big Valley Wells 1 & 2) and from east of the City in the Lincoln Road area (Pugh Road and Lincoln Road Wells). The wells have a combined capacity of approximately 1,650 gallons per minute. Additionally, the City maintains an intertie with the PUD for 120 gpm of water supply. Poulsbo’s distribution system consists of nine storage facilities with a combined capacity of approximately 3 MG of water, five pump stations, and approximately 53 miles of pipe ranging from 2 inches to 12 inches. The City provides treatment and disinfection of its water supplies. Water produced by the City is chlorinated as required for disinfection purposes. Additionally, the City adds fluoride to its water supply at the sources as an additional health benefit. There are no plans for interties between Poulsbo’s and the District’s system at this time. 2.6.3 Subase Bangor The Subase Bangor water system is located north of the District’s water service area boundary. The water system serves approximately 5,340 people through approximately 1,290 connections. Nine groundwater wells provide water supply to the system. Water produced from the wells is chlorinated for disinfection purposes and treated for corrosion control. There are no current plans for interties between Bangor’s system and the District’s system at this time. 2.6.4 Island Lake Water System The Island Lake water system is located east of the District’s water service area boundary. The system serves approximately 660 customers. The Island Lake Water System is supplied with water from two groundwater wells, which are not currently treated. There is a small area of overlap between the Island Lake Water System service area and the District’s service area. This area is an uncontested overlap area, meaning that both water systems supply this area. Future connections in this area will require agreement between the two water systems as to which water system will serve the new connections. The District currently does not have any connections in the uncontested overlap area. There are currently no plans to construct interties between Island Lake Water System and the District’s system. 2.6.5 North Perry Avenue Water District The North Perry Avenue Water District water system is located to the east of the District’s water service area. The North Perry Avenue Water District’s system serves approximately 7,792 connections and is supplied with water from 10 wells. North Perry Avenue Water District also has two backup wells and one well that is drilled but not in service. Water from the wells is chlorinated for taste and odor. There are currently no plans to construct interties between the North Perry Avenue Water District’s system and the District’s system. Section 2 – Water System Description Silverdale Water District 2-32 2013 Comprehensive Water System Plan August 2014 2.6.6 Erland Point Water Company The Erland Point Water Company’s water system is located to the southeast of the District’s water service area. The system is supplied by three groundwater wells, which are currently not treated. The Erland Point Water Company water system serves approximately 1,570 residences. The District and the Erland Point Water Company have had recent discussions regarding an intertie, but have not settled on an agreement. 2.6.7 Kitsap County Public Utility District No. 1 The Kitsap County Public Utility District No. 1 owns and operates three separate water systems that are supplied by PUD wells. All three water systems are adjacent to the District’s service area, which are located to the north, northeast and southwest of the District. The PUD also owns and operates three other separate water systems (Brianwood, Avellana, and Eldorado Hills) within the District’s service area. The PUD began providing utility service as a water system manager in the 1970s through the assumption of several small, privately-owned water systems and municipal water districts. In the late 1980s, the PUD was designated lead agency for development of the county’s Coordinated Water System Plan and the County’s Ground Water Management Plan. In the process, the PUD initiated a comprehensive, county-wide water resource monitoring program which includes well water levels, rainfall, stream flow and a Well Identification Number program. The PUD currently serves approximately 3,200 residents in the areas it serves adjacent to the District’s service area. There has been discussion between the PUD and the District regarding the consolidation of the PUD’s Brianwood, Avellana, and Eldorado Hills systems into the Silverdale Water District; however no agreement is in place at this time. 2.6.8 Other Systems Other small systems located within the District’s service area include Puddingstone, Clear Creek, and Washington Water. Section 2 – Water System Description Silverdale Water District 2-33 2013 Comprehensive Water System Plan August 2014 3.0 Land Use and Population 3.1 Introduction The District’s retail water service area boundary encompasses an area of approximately 25.22 square miles within unincorporated Kitsap County and includes the community of Silverdale. The County establishes land use regulations for the area served by the District. The Kitsap County Comprehensive Plan, which was completed in 2006 and recently updated in 2012, was developed to meet the requirements of the State of Washington Growth Management Act (GMA). The GMA (RCW 36.70A) requires, among other things, consistency between land use planning and utility plans and their implementation. This section demonstrates the compatibility of the District’s Comprehensive Water System Plan with other plans, identifies the designated land uses within the existing and future service area, and identifies population projections within the District’s planning area. 3.2 Compatibility with other Plans 3.2.1 Introduction To ensure that the Comprehensive Water System Plan is consistent with the land use policies that guide it and other related plans, the following planning documents and regulations were examined: 3.2.2 Growth Management Act Kitsap County Comprehensive Plan Kitsap County-wide Planning Policy Kitsap County Coordinated Water System Plan Growth Management Act The State of Washington Growth Management Act of 1990, and its 1991 and 1993 amendments, defined four goals relevant to this water plan. 1. 2. 3. 4. Growth should be in urban areas; There should be consistency between land use and utility plans and their implementation; There should be concurrency of growth with public facilities and services; Critical areas should be designated and protected. Urban Growth Area The GMA requires that Kitsap County and other jurisdictions cooperate in designating Urban Growth Areas (UGA). As part of the development of the Kitsap County 2006 Comprehensive Plan, the County designated an Urban Growth Areas that would accommodate projected Section 3 – Land Use and Population Silverdale Water District 3-1 2013 Comprehensive Water System Plan August 2014 population growth for the County and provide resource conservation. In September 2011, the Central Puget Sound Growth Management Hearings Board (Case No. 07-3-0019c) rendered a decision that Kitsap County must re-examine Urban Growth Areas (UGA) expanded during the 2006 Comprehensive Plan update process. The Urban Growth Areas were revised and updated in 2012, and are reflected on Figure 2-1. Consistency The GMA requires planning consistency from two perspectives. First, it requires consistency of plans among jurisdictions. This means that plans and policies of the District and Kitsap County must be consistent (RCW 36.70A.100). Second, the GMA requires that the planning activities and capital budget decisions and implementation of the water system plan be consistent with the comprehensive plan (RCW 36.70A.120). The 2003 Municipal Water Law also requires that water system plans are consistent with local plans and regulations. The signed Consistency Statement Checklist included in Appendix 3-1 from Kitsap County documents the determination of the agency that this comprehensive water system plan is consistent with the County’s plans and regulations. Concurrency Concurrency means that adequate public facilities and services must be provided at the time growth occurs. For example, growth should not occur where schools, roads and other public facilities are overloaded. Concurrency ensures that public dollars are used efficiently and that quality of life is preserved. To achieve this objective, the GMA directs growth to areas already served or readily served by public facilities and services (RCW 36.70A.110). It also requires that when public facilities and services cannot be maintained at an acceptable level of service, that new development should be prohibited. Critical Areas The GMA requires that critical areas be designated and protected. Critical areas include fish and wildlife habitat, flood zones, aquifer recharge areas, streams, creeks, wetlands and other surface water, and geologic hazard areas such as steep slopes and liquefaction zones. Appendix 1-3 contains a SEPA checklist that addresses these and other environmental concerns. 3.2.3 Kitsap County Comprehensive Plan Chapter 2 of Kitsap County’s 2012 Comprehensive Plan provides a descriptive land use vision regarding how growth and development should occur over a 20-year period. While the land use element goals and policies set fourth general standards for locating land uses, the Comprehensive Plan Future Land Use Map, which has been reproduced and is shown in Figure 3-1, indicates geographically where certain types of land use may be appropriate. The Future Land Use Map is a blueprint for development of an area, whereas the zoning and critical areas ordinances (CAOs) provide enforcement with regards to state law. Section 3 – Land Use and Population Silverdale Water District 3-2 2013 Comprehensive Water System Plan HW R E E HW Y3N W AT NW VIKING WAY NW LI BERTY BAY (K) (K) (RI) (RC) CENTRAL VALLEY RD NW OLYMPIC (RP) NE S TA (P) TE H WY 3 08 (M) LE H W YN E VIEW RD N W (RC) 5N E H ST ATE WY 8 30 NW NW LUOTO RD 30 (RR) Y CLEAR CREEK RD NW Y NE WA STAT (IC) ST IN G SUBASE BAN GO R HOO D CANA L RD FJ O VIK (RC) (M) D BRO WN SVIL (N) NW (P) MP YN (I) (P) ST A (UL) (UL) (UH) W N SO L RD W N Y3 HW (UH) (U) (P) A AG A NW (P) WA Y W (RC) AY NW NW W A W AG AA A GA W AY W NW BUCKLIN HILL RD AY (UM) (MU) DYES INLET NE WAAGA WAY (U) (I) (RC) (UL) (N) (UM) (U) (I) (UL) (UL) TRACYTON BLVD NW (P) (S) (UL) ST A TE (N) (I) (UH) HIL (UM) W W RIDGETOP BLVD NW ER (UL) BL V D (R) (UH) (N) NW NEWBERRY HILL RD TO P N D (I) EW A VE RD SIL (P) AN (MU) (UH) (UL) Y GA AA W NW H NW (H) (RP) TE (RR) (UM) (N) (UH) NW FAIRGROUN DS RD (P) RD NW D E (U) H W Y H W Y NW (RC) Rural Residential (RR) Business Park (B) Military (M) Rural Wooded (RW) Forest Resource Lands (F) Mixed Use (MU) Senior Living Homestead (S) Highway/Tourist Commercial (H) Neighborhood Commercial (N) Urban Cluster Residential (UC) Illahee Greenbelt (IG) Park (P) Urban High Residential (UH) Incorporated City (IC) Regional Commercial (R) Urban Low Residential (UL) Industrial (I) Residential Low (RL) Urban Medium Residential (UM) Keyport Village Low Residential (K) Rural Commercial (RC) Urban Reserve (UR) Keyport Village Residential (K) Rural Industrial (RI) Urban Restricted (U) Lake (L) Rural Protection (RP) Urban Village Center (UV) I 1,450 2,900 (MU) (UM) (UH) (UL) (IC) Retail Service Area Boundary Light Industrial (LI) 0 (UM) (H) (N) (UH) NE RIDDELL RD (UL) (UL) Business Center (B) Source of Data: Kitsap County GIS (2012) (UH) (UH) (UH) MAY ST N W AT E STAT ST Legend (UH) (H) (UL) PINE RD NE W YN 3 3N W (UH) (MU) (MU) CHI CO BAY (RC) (RR) RD (UM) (MU) (MU) (P) AN HW LY NE MCWILLIAMS RD HANSB ERRY ST NW K BEC (RR) (M) NW H OL (H) (H) (UM) HO LL S EA (RR) (U) CHIC OW A (RW) (UM) Y NW STATE HW Y 3 NW (U) (RR) (I) NE FAIRGRO UNDS RD STATE HWY 303 NE RD (UM) (U) CENTRAL VALLEY RD NE NH IL L (P) NW W ER SO (N) (RR) 3 (B) (B) (U) RID GE (RR) KITSAP MALL BLVD N W N AND (P) (UL) (P) AL (RR) (RR) (H) (RI) W (U) E STAT (B) (L) (UL) (UL) (RR) H WY NW TRIGGER AVE 3 RA (RR) 5,800 Figure 3-1 Land Use Map Silverdale Water District Water System Plan 8,700 Aug 2013 11,600 Feet August 2014 The Land Use Chapter of the Kitsap County Comprehensive Plan is consistent with goals and concerns of the GMA. Like the GMA, the Land Use Element seeks to accommodate growth while preserving the County’s character and protecting the environmentally sensitive areas. It seeks to promote a strong local economy and vital commercial, industrial and military districts by focusing economic development within them and establishing development guidelines. The Utilities Element (Chapter 7) ensures that new development will be adequately served without compromising existing levels of service, similar to the principal of concurrency as defined in the GMA. The District encompasses an area of approximately 25.22 square miles within Kitsap County. Undeveloped lots exist within the District’s water service area and infilling is expected and encouraged in these areas. 3.2.4 Silverdale Sub-Area Plan The County completed the Silverdale Sub-Area Plan in 2006 and is included as a component of the Kitsap County Comprehensive Plan. The Silverdale Sub-Area Plan includes many of the same elements as the County’s Comprehensive Plan; however, it focuses on the specific needs and unique features of the Silverdale community. The Silverdale Sub-Area Plan also establishes detailed guidelines and policies for the future development and growth of the area. According to the plan, the Silverdale Sub-Area intends to accommodate future growth for a mix of residential, commercial, and industrial development. 3.2.5 Kitsap County-wide Planning Policy The Kitsap County Council adopted the Kitsap County-wide Planning Policy (CPP) in 1992. The plan was effective on July 10, 1995. Since this time, the plan has been amended several times with the last amendment occurring in November 2007. The CPP serves as a framework for the County’s and City’s comprehensive plans and for sub-area plans that are developed for unincorporated communities within Kitsap County. Consistent with the GMA’s goals, it establishes UGAs within the County to encourage growth in urban areas and to reduce urban sprawl. The CPP also guides development in rural, unincorporated Kitsap County including Silverdale. The County’s policy goals seek to reduce urban sprawl, protect rural areas, encourage a vital diversified economy, provide affordable housing throughout the County and coordinate protection of environmentally sensitive areas. 3.2.6 Kitsap County Coordinated Water System Plan The Kitsap County Coordinated Water System Plan (CWSP) Regional Supplement was adopted in 1992 and updated in 2005 under the direction of the Kitsap County Water Utility Coordinating Committee (WUCC) and Kitsap County. The members of the WUCC include the Kitsap County Commissioners, the Kitsap County Department of Community Development, the Kitsap County Health District and representatives from all public water systems with more than fifty service connections that provide service within the Critical Water Supply Service Area (CWSSA). On March 2, 1987 the Kitsap County Commissioners declared all of Kitsap County a CWSSA. Section 3 – Land Use and Population Silverdale Water District 3-4 2013 Comprehensive Water System Plan August 2014 The purpose of the 1992 CWSP Regional Supplement was to assist the area’s water utilities in establishing an effective process for planning and development of public water systems and restricting the proliferation of small public water systems. The 2005 Update is not a generalized planning document, but rather a detailed local and state management program. It provided a refinement of the process and strategy for the existing water utilities to define their role in a program to satisfy the County’s Comprehensive Plan. The water system plan accomplishes this by addressing service area boundaries, minimum design standards, service review procedures, appeals procedures, long-term regional water supply strategies, water conservation program and goals, and the satellite system management program. 3.3 Land Use The Silverdale UGA (and three parcels of the Central Kitsap UGA) lie within the District’s service area and encompasses an area of approximately 5,507 acres. The District’s existing retail water service area is much larger than the Silverdale UGA with 25.22 square miles (16,141 acres). Historically the County’s zoning designations have governed land uses. With the adoption of the County’s Comprehensive Plan, the Land Use Map shown in Figure 3-1 now guides development within Kitsap County. The Land Use Map is therefore utilized by the District to anticipate future growth and demand levels in particular sections throughout its service area. The area served by the District is primarily residential, comprised largely of single family residents. Approximately 65 percent of the existing service area that lies within the Silverdale and Central Kitsap is designated for residential use. Approximately 6 percent of the existing service area is designated for rural commercial use and 4 percent is designated for industrial uses. The remaining 25 percent of the land use is zoned for business centers/parks, lakes, military, parks mixed use, rural wooded, rural protection, senior living homestead and urban restricted. Within the existing retail water service area and outside of the UGAs, approximately 65 percent of the land use is for residential use. Approximately 0.5 percent of this land area is designated for commercial use and 0.2 percent is designated for industrial uses. The remaining 34 percent of the land use is zoned for business centers/parks, lakes, military, parks mixed use, rural wooded, rural protection, senior living homestead and urban restricted. 3.4 Population 3.4.1 Household Trends As stated in the previous section, the District’s service area is primarily a residential community comprised mostly of single family residences. In 2011, approximately 5,213 housing units, or 63 percent, were single family residential and 3,053 housing units, or 37 percent, were multi-family residential. Household trends have remained consistent for both single family and multi-family housing units between 2000 and 2010, based on Washington State Office of Financial Management (OFM) post-census data. It is assumed the trend will continue through the year 2032. Section 3 – Land Use and Population Silverdale Water District 3-5 2013 Comprehensive Water System Plan August 2014 The average household size is assumed to be 2.5 for single family units and 1.8 for multi-family units, based on the 2012 Kitsap County Comprehensive Plan. This assumption is consistent with other planning studies within Kitsap County regarding population projections. The 2011 population within the District’s service area is assumed to be approximately 20,665 based on the WFI. 3.4.2 Existing and Future Population Kitsap County experienced significant development and population growth between 1990 and 2010. The population in Kitsap County between 2000 and 2010 increased by 9.3%, while the District’s population increased by approximately 12% during the same time period. The District’s population within the water service area is expected to grow from 20,665 people in 2011 to approximately 28,640 people in 2032. Table 3-1 illustrates the historical population growth since 1995, and the projected future growth within the District’s service area. The historical population data shown in the table represent the estimated population within Silverdale Water District for each year. It was assumed for the purposes of this analysis that the economy will continue with slow growth until 2015; therefore, an annual growth rate of 1.0% (medium level projection) was applied to the District’s population for the years 2012 to 2015. The Kitsap CPP assumes a 1.71% annual growth rate for the Silverdale UGA, and a rate of 0.87% for non-UGA lands. However, for long-range (i.e., beyond 6 years) water system planning purposes, the higher value is used for the District’s entire service area. This is done in order to be “conservative” (i.e., to ensure there is adequate water supply to support growth throughout the service area). Therefore, the rate of 1.71% was applied for years 2016 to 2032. Section 3 – Land Use and Population Silverdale Water District 3-6 2013 Comprehensive Water System Plan August 2014 Table 3-1. Water District Population Trends and Projections Year Population Historical(1) 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 15,519 16,741 17,308 17,924 18,235 18,266 18,638 18,873 18,871 19,086 19,304 19,524 19,746 19,971 20,199 20,429 20,665 Projected(2) (3) 2018 (6 year) 2025 2032 (20 year)(3) 22,620 25,450 28,640 (1) Populations for years 1995-2003 are consistent with the District’s 2005 WSP. Populations for years 2004-2010 were interpolated based on 2004 and 2011 population. (2) Projections are based on an annual growth rate of 1.0% for years 2012 to 2015 and 1.71% for years 2016 to 2032. (3) Year 2012 is considered to be the base year regarding projections; therefore, year 2018 is planning year 6 and year 2032 is planning year 20. Section 3 – Land Use and Population Silverdale Water District 3-7 2013 Comprehensive Water System Plan August 2014 4.0 Water Demand Forecast This section provides a summary of historical water production and consumption for the District, as well as detailed forecasts of future water demand. 4.1 Water Production History Water production is defined for the District as the total volume of water withdrawn from its groundwater supplies. The District’s annual production history for 2006-2011 is presented in Table 4-1, based upon well meter records. Table 4-2 shows monthly production from 2006 to 2011. Data from 2011 indicates the total system production was 713 million gallons. Figure 4-1 provides a monthly comparison for the years 2008 to 2011. Table 4-1. Annual Well Production (MG), 2006-2011 2006 2007 2008 2009 2010 2011 Wixson Well 39 35 32 36 28 53 Dickey Well 55 53 1 6 0 0 Hess Well 28 22 13 17 16 22 Westwind Well 54 62 123 117 107 91 Eldorado Well 51 20 40 31 23 30 Dawn Park Well 19 16 16 17 15 11 Provost Well 80 96 80 65 56 47 Chena Well #1 0 0 0 0 0 0 Chena Well #2 0 0 0 0 0 0 Selbo Well 0 0 0 0 0 0 Ridgetop Well 0 0 0 0 0 0 Ridgetop Well #2 145 165 191 162 107 63 Bucklin Ridge Well 76 78 57 69 66 33 Island Lake Well 34 34 95 40 40 39 Spirit Ridge Well #3 163 48 26 73 155 164 Spirit Ridge Well #4 97 163 95 167 92 157 Frontier Woods Well 0 0 0 0 0 0 Westgate Well 0 0 0 0 0 0 Silver Sound Well 2 2 2 2 1 1 Silver Sound Well #2 0 0 0 0 0 0 Total 845 794 772 804 707 713 (1) As of 2011, all wells connect to the main system with the exception of the Silver Sound Wells, which are expected to be connected by the end of 2014. Section 4 - Water Demand Forecast Silverdale Water District 4-1 2013 Comprehensive Water System Plan August 2014 Table 4-2. Monthly Well Production (MG), 2006-2011 2006 2007 2008 2009 2010 January February March April May June July August September October November December Total 50 46 50 51 71 83 124 122 87 62 50 50 845 37 47 50 50 71 91 117 93 84 54 49 50 794 54 44 47 46 59 76 116 96 84 56 41 52 772 50 42 50 51 56 106 124 106 71 52 48 48 804 44 42 50 49 48 62 100 105 64 47 51 44 707 2011 49 42 47 46 52 63 80 108 86 51 45 44 713 Figure 4-1. Monthly Water Production (2006-2011) Table 4-3 provides a summary of average day and maximum day production from 2006 to 2011. Maximum day production is defined as the highest amount of water produced on a single day and typically occurring in the summer. Included in Table 4-3 is the peaking factor, which is determined by dividing the maximum day production by the average daily production. For the most recent three years (2009-2011), average day production has averaged 2.0 million gallons per day (mgd), the maximum day demand has averaged 4.3 mgd, and peaking factor has averaged 2.1. This peaking factor was used to develop maximum day demand forecasts, as described in a later section. Section 4 - Water Demand Forecast Silverdale Water District 4-2 2013 Comprehensive Water System Plan August 2014 Table 4-3. Peaking Factor, 2006-2011 Average Day Maximum Day Max Day/Average Day Production (MGD) Production (MGD) Peaking Factor 2.31 5.02 2.18 2.17 4.42 2.04 2.11 4.60 2.18 2.20 5.00 2.27 1.93 4.13 2.14 1.95 3.66 1.88 2006 2007 2008 2009 2010 2011 2009-2011 2.03 4.26 2.10 Average(1) (1) Six years of data was analyzed, however the average uses the most recent three years to focus on current trends. 4.2 Customer Categories, Connections, and Consumption The District maintains billing record summaries for water sold in each customer category. The seven customer billing categories are: single family residential, single family residential (satellite consumption), multi-family residential, non-residential, irrigation, construction, and wholesale. The wholesale category represents customers that have master meters supplying a number of mobile homes. As such, they are not truly “wholesale” customers, however because that nomenclature is used in the billing system, it is retained in this analysis. As of 2012, the District owns and operates one satellite water system, the Silver Sound Water System, which is located within the District’s retail service area and is currently operated independently from the District’s main system. This water system includes 12 connections and two wells. It is anticipated that the Silver Sound Water System will be connected to the District’s main water system by 2014 following the completion of planned water main extensions. At the end of 2011, the District served 5,869 connections. The majority of these (63%) were single family residential. The total annual consumption from 2006 to 2011 by each customer class is shown in Table 4-4. The 2009-2011 average percentage of consumption by customer class is shown in Figure 4-2. Single family residential (satellite consumption), construction, and wholesale consumption do not appear in the figure due to minimal (less than 1%) consumption. Section 4 - Water Demand Forecast Silverdale Water District 4-3 2013 Comprehensive Water System Plan Single Family Residential (Satellite Consumption)(3)(4) 1.92 2.12 1.77 1.83 0.17 0.19 MultiFamily Non-Single Family Residential Irrigation Construction(3) Wholesale (3) Section 4 - Water Demand Forecast Silverdale Water District 2.15 2.05 1.97 2.07 1.84 1.81 1.91 696 Average Daily Consumption (MGD) (2) 785 749 720 756 672 661 Total Consumption 4-4 2013 Comprehensive Water System Plan 2006 433 122 166 49 8 7 2007 402 119 172 45 1 7 2008 385 113 169 40 4 7 2009 407 115 174 49 3 7 2010 355 118 159 33 2 6 2011 346 113 156 36 2 6 2009-2011 369 0.73 115 163 40 2 6 Average(5) (1) From District billing records. (2) Total consumption divided by 365 days/year. (3) Consumption less than 1%. (4) Includes Frontier Woods Water System (2006) and Westgate Water System (2006-2007), all other systems include years 2006-2011. (5) Six years of data was analyzed, however the average uses the most recent three years to focus on current trends. Year Single Family Residential Table 4-4. Water Consumption (MG), 2006-2011 (1) August 2014 August 2014 Figure 4-2. Consumption by Customer Category (2009-2011 Average) The bimonthly water consumption for the last six years is provided in Table 4-5. The bimonthly distribution of actual water use may differ somewhat from this representation since billing numbers are based on meter read dates, which lag behind actual use. Bimonthly distribution of water consumption for 2006-2011 is shown in Figure 4-3. Table 4-5. Bimonthly Water Consumption (MG), 2006-2011 (1) 2006 2007 2008 2009 2010 (2) December-January 96 106 98 99 94 March-April 91 84 82 84 84 May-June 109 108 97 92 88 July-August 181 187 173 205 148 September-October 215 170 178 181 166 November-December 94 94 93 95 92 Total 785 749 720 756 673 (1) From District billing records. (2) The December-January consumption values include December of prior year. Section 4 - Water Demand Forecast Silverdale Water District 2011 89 84 82 131 175 100 662 4-5 2013 Comprehensive Water System Plan August 2014 Figure 4-3. Bimonthly Water Consumption (2006-2011) The 20 largest customers in the District are in the non-residential and multi-family categories. Together, they comprise approximately 20% of the total consumption in the system. Table 4-6 summarizes the water consumption associated with the 20 largest customers. Where water use for irrigation is metered separately from other domestic use, this is detailed. Section 4 - Water Demand Forecast Silverdale Water District 4-6 2013 Comprehensive Water System Plan August 2014 Customer Table 4-6. Largest Water Customers 2009 2010 Consumption Consumption (MG) (MG) 15.4 15.4 12.5 12.8 11.0 12.2 2011 Consumption (MG) 15.1 12.1 11.0 2009-2011 Average (MG) Treetop Apartments 15.3 Ilarraza, Natasha 12.5 Quail Hollow Apartments 11.4 PPR Kitsap Mall LLC Irrigation Uses 2.3 2.9 1.8 2.3 Domestic/Potable Uses 9.2 8.6 8.4 8.8 Subtotal 11.6 11.5 10.2 11.1 Crista Ministries 8.1 7.3 7.8 7.8 Outlook Apartments 7.9 7.2 7.9 7.7 Silverdale Beach Hotel 7.1 7.4 7.3 7.3 Darden Restaurants 7.9 7.5 6.0 7.1 Harrison Memorial Hospital Irrigation Uses 2.2 1.6 1.7 1.8 Domestic/Potable Uses 4.8 4.5 4.1 4.4 Subtotal 7.0 6.1 5.7 6.3 YMCA of Pierce and Kitsap Counties 0.0 0.0 6.0 6.0 Clearbrook Living Center 5.3 5.2 5.3 5.3 Central Kitsap Jr. High & Additional Facilities Irrigation Uses 3.7 2.4 2.8 3.0 Domestic/Potable Uses 2.1 1.8 2.1 2.0 Subtotal 5.9 4.2 4.9 5.0 Vintage @ Silverdale LLC 4.0 5.3 5.1 4.8 Ridgetop Jr. Irrigation Uses 5.0 2.4 3.6 3.7 Domestic/Potable Uses 0.7 0.7 0.6 0.7 Subtotal 5.7 3.1 4.2 4.4 Costco Corp (Vendor #03839-00) 3.9 4.1 3.2 3.7 West Sound Plaza LLC 3.8 3.6 2.6 3.3 Oxford Suites - Silverdale 3.2 3.3 3.3 3.3 Silverdale Ridge Apartments, LLC 1.7 4.1 3.8 3.2 Apple American MS #5 1.8 1.7 2.7 2.1 Country Meadows-Encore Community 1.7 1.8 2.6 2.0 Sub-total - Metered Non-Residential Irrigation Users 13.2 9.3 9.9 10.8 Sub-total - Metered Non-Residential Domestic Users 80.1 80.9 82.3 85.1 Sub-total - Metered Residential Domestic Users 32.0 33.7 34.6 33.5 Total 125.3 123.9 126.8 129.4 (1) The total 2011 YMCA of Pierce and Kitsap Counties consumption is reflected in the total 2009-2011 Average Consumption slightly skewing the Sub-total Metered Domestic Users average value and Total value. Section 4 - Water Demand Forecast Silverdale Water District 4-7 2013 Comprehensive Water System Plan August 2014 4.3 Water Balance and Distribution System Leakage A water balance is an accounting of all water that is produced. The District’s 2011 water balance is shown in Table 4-7. The table is a slightly modified version of the format recommended for use by the American Water Works Association. Table 4-7. 2011 Water Balance Level 1 Level 2 Level 3 1. Billed Water Exported Revenue Water Billed Authorized Consumption Unbilled Authorized Consumption Water Produced Non-Revenue Water (6) 2. Billed Metered Consumption 3. Billed Unmetered Consumption 4. Unbilled Metered Consumption 5. Unbilled Unmetered Consumption 6. Unauthorized Consumption Apparent Losses 7. Customer Metering Inaccuracies Real Losses Total 8. Known Leakage 9. Assumed Leakage Volume (MG) % of Produced Water 0 1 0% 662 2 93% 10 5 1% 5 2 1% 0 3 0% 0 3 0% 0 3 0% 0 3 0% 36 4 5% 713 2 100% (1) This category does not apply to the District. (2) Data Source: "Silverdale Water District Billing Records" spreadsheet provided by District staff. (3) District staff do not track this number, therefore zero was used in the water balance. (4) Water Production minus all other categories. (5) This represents 144 single family connections and was estimated using the 2009-2011 ERU value of 197 gpd per single family connection. These were customers of the Apex water system, which the District recently acquired, and will be metered by the end of a State Revolving Fund Loan funded project that will improve the water mains and be completed by mid 2016. (6) Non-revenue water includes unbilled uses such as flushing, fire fighting, and fire training, as well as leakage. The water balance allocates the water produced to different categories at three different levels. Level 1 allocates the water to either Revenue Water or Non-Revenue Water. As implied by the names, Revenue Water generates income while Non-Revenue Water does not. This is helpful in understanding what percent of water production generates income for the District. Additionally, non-revenue water needs to be factored into the demand forecast. The District’s 2011 water production is divided into 94% Revenue Water and 6% Non-Revenue Water. Level 2 splits Non-Revenue Water into the following three sub-categories, which are useful in identifying potential additional revenue sources and identifying the magnitude of leaks or other losses that could be addressed: Section 4 - Water Demand Forecast Silverdale Water District 4-8 2013 Comprehensive Water System Plan August 2014 Unbilled Authorized Consumption: Includes uses such as water system flushing, firefighting, and unbilled contractor use. Typically, it is standard practice not to charge for uses falling into this sub-category. However, it is always a prudent idea to review these uses to ensure that a legitimate revenue opportunity is not missed. The District estimates unbilled authorized consumption was approximately 1% in 2011. Apparent Losses: Includes unauthorized uses and customer meter inaccuracies, both of which are lost revenue opportunities. Real Losses: Includes various types of system leaks. A certain level of leakage is unavoidable; however, leakage beyond that level should be repaired to avoid unduly burdening both the natural resource and the physical infrastructure. Any amount that cannot be assigned to another category is considered a real loss under the American Water Works Association’s protocol, as well as per the formula for calculating distribution system leakage under Washington State’s Water Use Efficiency Rule. Level 3 further splits water into additional sub-categories to support further estimation and water management. A longer history of other water balance elements, namely non-revenue water and distribution system leakage is provided in Table 4-8. Year 2006 2007 2008 2009 2010 2011 2009-2011 Average(5) Table 4-8. Distribution System Leakage and Non-Revenue Water (MG) Distribution System Non-Revenue Water Billed Unbilled Leakage (4) Water Authorized Authorized Produced Consumption Consumption Qty Percent of Qty Percent of (MG) (1) (MG) (2) (MG) (2) (MG) Consumption (3) (MG) Production 845 794 772 804 707 713 785 749 720 756 673 672 3 0 4 4 0 5 59 46 51 48 34 40 8% 6% 7% 6% 5% 6% 56 46 48 44 33 36 7% 6% 6% 6% 5% 6% 741 701 3 41 6% 38 5% (1) Data Source: "Silverdale Water District Water Production" spreadsheet provided by District staff. (2) Data Source: "Silverdale Water District" spreadsheet provided by District staff. (3) Used for developing the demand forecast. Note this is intentionally different than non-revenue as a percent of production and purchases. (4) Distribution system leakage is defined in the Water Use Efficiency Rule as water production and purchases minus authorized consumption. (5) Six years of data was analyzed, however the average uses the most recent three years to focus on current trends. The District’s distribution system leakage averaged 5% of production from 2009 to 2011. This is below the 10% threshold mandated by the Water Use Efficiency Rule; therefore, the District is not required to develop a Water Loss Action Plan. Note that the 2009, 2010, and 2011 distribution system leakage numbers in Table 4-8 are different (higher) than those reported in the District’s WUE annual performance reports. This was due to a data acquisition error when Section 4 - Water Demand Forecast Silverdale Water District 4-9 2013 Comprehensive Water System Plan August 2014 obtaining consumption data from the billing system for those reports. That error has been rectified and the 2012 annual performance report will reflect accurate consumption data. 4.4 Water Use Factors and Equivalent Residential Units Equivalent Residential Units (ERUs) are a method of representing all types of water use as an equivalent number of single-family households. The ERU value represents the average amount of water consumption by a single family household and is calculated by dividing the single family water consumption by the number of single family connections. Table 4-9 summarizes the single family water consumption from 2006 through 2011, the number of connections, and the calculated ERU value. The most recent three-year average (2009 to 2011) is 197 gpd per ERU. This analysis also yielded information regarding the number of ERUs for the other water use categories. For each category, the total consumption was divided by the ERU demand factor to arrive at a number of ERUs. Section 4 - Water Demand Forecast Silverdale Water District 4-10 2013 Comprehensive Water System Plan Number of Residential Connections or ERUs(2) ERU Water Demand Factor (GPD/ERU)(3) Number of MultiFamily ERUs(4) # of Nonresidential ERUs(5) # of Irrigation ERUs(6) Section 4 - Water Demand Forecast Silverdale Water District 89 33 578 644 565 631 558 483 694 # of Nonrevenue ERUs(9) 10,284 9,595 9,809 10,142 10,049 10,162 10,640 Total ERUs(10) 4-11 2013 Comprehensive Water System Plan 77 89 90 87 86 93 # of Wholesale ERUs(8) 86 16 58 40 23 35 # of Construction ERUs(7) 2006 433 4,944 240 1,389 1,898 557 2007 402 4,979 221 1,473 2,130 558 2008 385 5,099 207 1,501 2,231 531 2009 407 5,115 218 1,447 2,188 615 2010 355 5,111 190 1,696 2,284 479 2011 346 5,213 182 1,707 2,350 548 2009-2011 369 5,146 197 1,616 2,274 547 Average11 (1) From Table 3-5. (2) Provided by the District. (3) Single-family residential consumption (from Table 4-4) divided by number of single-family residential connections. (4) Multi-family residential consumption (from Table 4-4) divided by the ERU water demand factor. (5) Nonresidential consumption (from Table 4-4) divided by the ERU water demand factor. (6) Irrigation consumption (from Table 4-4) divided by ERU water demand factor. (7) Construction consumption (from Table 4-4) divided by ERU water demand factor. (8) Wholesale consumption (from Table 4-4) divided by ERU water demand factor. (9) Non-revenue consumption (from Table 4-8) divided by the ERU water demand factor. (10) Sum of all calculated ERUs. (11) Six years of data was analyzed, however the average uses the most recent three years to focus on current trends. Year Residential Consumption (MG)(1) Table 4-9. Equivalent Residential Unit (ERU) Analysis August 2014 August 2014 4.5 Water Demand Forecast As the District’s population grows and commercial/industrial development occurs, demands on the water system will increase accordingly. To anticipate the level of water supply requirements and to adequately plan for system improvements required to satisfy future needs, the District has developed a water demand forecast. The time horizon for the WSP is 20 years in length (i.e., years 2013 to 2032). The following sections describe how the water demand forecast was prepared. 4.5.1 20-Year Water Demand Forecast A multi-step process was taken in developing the water demand forecast, as described below. The following four demand forecasts were developed: 1) baseline, 2) with conservation, 3) with reclaimed water, and 4) with conservation & reclaimed water. Step 1 Single Family Demands. The projection for single family demands is the number of single family ERUs multiplied by the 2009-2011 average ERU value of 197 gpd. The number of single family ERUs is increased over the planning period to account for anticipated increased development in the area. It was assumed for the purposes of this analysis that the economy will continue with slow growth until 2015; therefore, an annual growth rate of 1.0% (medium level projection) was applied to the District’s number of single family ERUs for the years 2012 to 2015. Kitsap County Wide Policies provide a 1.71% annual growth rate for the Silverdale UGA; therefore, this rate was applied to the number of single family ERUs for years 2016 to 2032. The growth rates were based on the Office of Financial Management (OFM) Washington State Growth Management Population Projections for Kitsap County. In addition, the Kitsap Regional Coordinating Council has indicated in the Kitsap County Population Distribution Chart (Originally Adopted 2007) that the Silverdale UGA growth rate is anticipated to be 1.71% through 2025. Step 2 Multifamily Demands. The projection for multi-family demands began with the 2011 actual consumption for the multi-family billing category minus the multi-family largest users. For years 2012 to 2015, the demand is increased by an annual growth rate of 1.0% (medium level projection) and 1.71% (high level projection) for years 2016 to 2032, based on demographic forecasts in the OFM. Step 3 Non-residential Demands. The projection for the non-residential demands began with the 2011 actual consumption for the non-residential billing category minus the nonresidential largest users. For years 2012 to 2015, the demand is increased by an annual growth rate of 1.0% (medium level projection) and 1.71% (high level projection) for years 2016 to 2032, based on demographic forecasts in the OFM. Step 4 Irrigation Demands. The projection for irrigation demands began with the 2011 actual consumption, which was then increased by the annual growth rate of 1.0% for years 2012-2015 and 1.71% for years 2016-2032, based on demographic forecasts in the OFM. Section 4 - Water Demand Forecast Silverdale Water District 4-12 2013 Comprehensive Water System Plan August 2014 Step 5 Construction Demands. The projection for construction demands began with the 2011 actual consumption, which was then increased by the annual growth rate of 1.0% for years 2012-2015 and 1.71% for years 2016-2032 based on demographic forecasts in the OFM. Step 6 Largest Users Demands. The demand projection for the “Large Users” category used the 2009-2011 average actual consumption for the 20 largest users, which was held constant through Year 20 as no substantial growth is anticipated by most customers. One exception is the Harrison Hospital. The hospital is expecting a significant expansion; therefore, current water use was doubled for future use assumptions in an effort to be conservative. Step 7 Wholesale Demands. The projection for wholesale demands began with the 2011 actual consumption and was held constant. It is assumed that the wholesale demands will not increase or decrease significantly, as this category relates to a small number of mobile home parks. Step 8 Potential Water System Acquisition Demands. The District may acquire other existing water systems in the future, which would increase overall system demands. Four such systems (single-family residential), some of which have been the subject of acquisition discussions between the District and current owners, are: 1. Avellana Acquisition: Currently owned and operated by Kitsap Public Utility District (KPUD). There are negotiations for SWD to take ownership of this system. There are currently 38 connections that would become part of zone 5. 2. Brianwood Acquisition: Another system owned and operated by KPUD. This system has 125 connections and would become part of zone 3. 3. Eldorado Acquisition: A third system owned and operated by KPUD. Eldorado is situated at the southern end of the SWD service area and has 146 connections that would be split between three pressure zones; 7, 5 and 3. 4. Crystal Creek Acquisition: The Crystal Creek water system is located off of Old Frontier Road and is owned and operated by Washington Water Supply Company. This system has 41 connections and would be incorporated into zone 5. Negotiations for acquisition have been on and off over the years. Step 9 Subtotal Average Day Demand (ADD). The subtotal for the Average Day Demand is a summation of all the categories above. Step 10 Non-Revenue Water. The demand projection for Non-Revenue Water multiplies the subtotal ADD by the non-revenue factor. The non-revenue factor used the 2009-2011 average of 6% of billed consumption (see Table 4-8). This factor is assumed to remain constant for years 2012 to 2032. Step 11 Total Average Day Demand (ADD). The subtotal ADD and non-revenue water added together. This is considered the baseline demand forecast for ADD. Step 12 Maximum Day Demand (MDD). A peaking factor of 2.1 (2009-2011 average) is applied to the ADD for all categories. This is considered the baseline demand forecast for MDD. Section 4 - Water Demand Forecast Silverdale Water District 4-13 2013 Comprehensive Water System Plan August 2014 Step 13 Conservation Adjustment. The amount of water saved by the conservation program was estimated and the demand forecast was reduced by this amount. The District has developed a water conservation program, as described in Appendix 4-1. Specific conservation-related goals were established as part of this 2013 Water System Plan, as documented in Appendix 4-1, per the Water Use Efficiency (WUE) Rule requirements. A recent WUE annual performance report is provided in Appendix 4-2. The demand forecast with conservation reflects an anticipated 3% reduction in the single family customer category between 2012 and 2018. This reduction was accomplished by steadily reducing the single family water use factor from 197 gpd per single family connection in 2012 to 191 gpd by 2018, which is an annual reduction of 0.5%. Silverdale plans to continue conservation efforts beyond 2018. However, since the conservation goals beyond 2018 are not defined at this time, the single family water use factor was reduced by only 0.25% annually between 2018 and 2032. Step 14 Reclaimed Water Adjustment. The amount of potable water that will be replaced by reclaimed water was estimated and the demand forecast was reduced by this amount. The reclaimed water estimates are based on: 1) the District’s 2009 Dyes Inlet Water Reclamation Facility Feasibility Study, 2) the District’s 2011 amendment to its 2005 Water System Plan (which focused on reclaimed water and is included as Appendix 4-3 (minus Appendices 5 and 6, which contain Construction Conditions and Standards, and the SEPA Checklist), and 3) subsequent refinements by District staff. Reclaimed water is expected to become available in 2017 and the District anticipates steadily increasing use of reclaimed water to 1.0 mgd MDD by the end of the 20-year planning period of this WSP. The ADD savings is calculated based on peaking factors defined in the 2009 Feasibility Study. As presented in Table 4-10, the baseline water demand forecast (without additional conservation and reclaimed water effects considered) for Planning Year 6 (2018) is projected to be 2.14 MGD on an average day basis and 4.49 MGD on a maximum day basis. This level of demand increases to 2.70 MGD and 5.67 MGD by Year 20 (2032), on average and maximum day bases, respectively. The results of the forecast including additional conservation and the reductions associated with anticipated reclaimed water use are also presented in Table 4-10 and Figure 4-4. This analysis indicates that by 2032, the maximum day demand may be reduced by approximately 1.19 MGD as a result of continued conservation efforts and implementation of the reclaimed water program. The impact on average day demand (a reduction of approximately 0.28 MGD) is less significant, since the majority of the reclaimed water related reductions are irrigation season based. The baseline demand projections are used for analysis purposes throughout the WSP, so as to be conservative. Section 4 - Water Demand Forecast Silverdale Water District 4-14 2013 Comprehensive Water System Plan August 2014 Water Use Category Single-Family Residential Multi-Family Residential Non-residential Irrigation Construction Largest Users(1) Multi-Family Residential Non-residential Table 4-10. Water Demand Forecast Base (2012) 6-Year (2018) Demand Demand (MGD) (MGD) ERUs ERUs ADD MDD ADD MDD 5,265 1.04 2.17 5,689 1.12 2.34 1,125 0.22 0.46 1,219 0.24 0.50 847 0.17 0.35 919 0.18 0.38 513 0.10 0.21 556 0.11 0.23 33 0.01 0.01 35 0.01 0.01 Wholesale (2) Potential Water System Acquisition Demands Subtotal Non-Revenue Water Total Demand (Baseline) 20-Year (2032) Demand (MGD) ERUs ADD MDD 7,213 1.42 2.97 1,546 0.30 0.64 1,165 0.23 0.48 705 0.14 0.29 45 0.01 0.02 466 1,336 86 0.09 0.26 0.02 0.19 0.55 0.04 466 1,336 86 0.09 0.26 0.02 0.19 0.55 0.04 466 1,423 86 0.09 0.28 0.02 0.19 0.59 0.04 NA NA NA NA NA NA 350 0.07 0.14 9,671 560 10,232 1.90 0.11 2.01 3.99 0.23 4.22 10,307 597 10,903 2.03 0.12 2.14 4.25 0.25 4.49 12,999 753 13,752 2.56 0.15 2.70 5.36 0.31 5.67 NA 0 0 -169 -0.03 -0.07 -456 -0.09 -0.19 (4) NA 0 0 -129 -0.03 -0.13 -966 -0.19 -1.00 Total Demand (with conservation) 10,231 2.01 4.22 10,735 2.11 4.42 13,296 2.61 5.48 Total Demand (with reclaimed water) 10,231 2.01 4.22 10,775 2.12 4.36 12,786 2.51 4.67 Total Demand (with conservation & reclaimed water) 10,231 2.01 4.22 10,606 2.09 4.29 12,330 2.42 4.48 Additional Conservation(3) Reclaimed Water ERU = Equivalent Residential Unit; ADD = Average Day Demand; MDD = Maximum Day Demand; MGD = Million Gallons per Day For years 2012-2015, the projected annual growth rate is 1.0% per year based on OFM historical data. For years 2016-2032, the projected annual growth rate is 1.71% per year based on OFM high level projections. ADD is based on a water use factor of 197 gpd/ERU. MDD is based on a peaking factor of 2.1 with exception to Largest Users and Reclaimed Water. (1) Largest Users is a subset of multi-family and non-residential demand and is assumed to be constant through the entire planning period. Future demand assumptions for the Harrison Hospital due to anticipated expansion. (2) Wholesale relates to a small number of mobile home parks ; therefore, the demand is held constant. (3) Conservation efforts are assumed to reduce the water use per single family household by 0.5% annually between 2012 and 2018 and by 0.25% annually between 2018 and 2032. (4) Reclaimed Water savings assume beginning use in 2017 and steadily increasing to 1.0 mgd MDD by 2032. Section 4 - Water Demand Forecast Silverdale Water District 4-15 2013 Comprehensive Water System Plan Section 4 - Water Demand Forecast Silverdale Water District Figure 4-4. Water demand forecast (2012-2032) 4-16 2013 Comprehensive Water System Plan August 2014 August 2014 5.0 Policies and Design Criteria 5.1 Introduction The Silverdale Water District (District) operates and plans water service for District residents according to the laws, policies, and design criteria that originate from the seven sources shown in Table 5-1, which are listed in descending order from those with the broadest authority to the narrowest. Table 5-1. Regulatory Agencies Agency Laws/Policies/Design Criteria U.S. Department of Health and Human Services Federal Regulations U.S. Environmental Protection Agency Federal Regulations Washington State Department of Health State Regulations / Design Criteria Washington State Department of Ecology State Regulations Kitsap County County Regulations District Board of Commissioners Administrative Policies American Water Works Association Design Criteria These laws, policies, and design criteria guide the District's operation and maintenance of the water system on a daily basis and its planning for growth and improvements. Their overall objective is to ensure the District provides high quality water service at a minimum cost to its customers. They also set the standards that the District must meet to ensure the water supply is adequate to meet existing and future water demands of the system. The system's ability to meet these demands is detailed in Section 7 and the recommended improvements are identified in Section 9. The highest three governmental entities establishing policies and laws (U.S. Government, Washington State and Kitsap County) establish requirements in statutes, regulations, or ordinances. The Board of Commissioners adopts policies that can not be less stringent or in conflict with those established by governments above them. The District’s policies take the form of resolutions, memoranda and operation procedures, many of which are summarized in this section. The policies associated with the following categories are presented in this section: Supply Customer Service Facilities Finance Organization Section 5 – Policies and Design Criteria Silverdale Water District 5-1 2013 Comprehensive Water System Plan August 2014 5.2 Supply Policies A summary of key District policies is provided below. Select resolutions regarding some of these policies are provided in Appendix 5-1. 5.2.1 Quality Protection The District will pursue steps to meet or exceed all water quality laws and standards. The District will take all reasonable measures to protect its system and customers. 5.2.2 Quantity The District will utilize supply from the District’s own groundwater wells to supply all customers within the District’s service area. The District will plan for at least 20 years into the future, so that future water resource limitations can be handled effectively. The District will ensure that the capacity of the system, including supply sources, pump stations, and transmission mains, is sufficient to meet the maximum day demand of the system. 5.2.3 Fire Flow The District will plan its water system to provide fire flows at the rate and duration determined by the Kitsap County Fire Marshal. In general, these requirements for existing structures within the District’s service area range from a minimum of 500 gpm at 20 psi for a duration of 30 minutes for rural single family residences, to a maximum of 4,000 gpm at 20 psi for a duration of two hours for large commercial structures. Minimum fire flow requirements for non-residential buildings are generally 1,500 gpm at 20 psi for a duration of two hours. 5.2.4 Conservation The District will promote the efficient and responsible use of water through its own water conservation programs and will conserve water during a water shortage. The Silverdale Water District Water Use Efficiency Plan, which is contained in Appendix 4-1, describes the District’s current conservation program. Section 5 – Policies and Design Criteria Silverdale Water District 5-2 2013 Comprehensive Water System Plan August 2014 5.2.5 Reclaimed Water The District acknowledges that reclaimed water (i.e., water that has been derived from municipal wastewater that has been adequately and reliably treated such that it may be used for beneficial purposes) represents an important resource that can be used to extend the capacity of its potable water supplies and delivery infrastructure. This is important due to the limited amount of additional water supplies that are available in Kitsap County to meet future needs. Specifically, the District sees an opportunity to reduce the potable water system’s peak day demands by utilizing reclaimed water primarily for peak uses such as landscape and turf irrigation. In addition, the District intends to evaluate and pursue other reclaimed water opportunities regarding commercial uses (e.g., toilet flushing) and environmental applications (e.g., wetland enhancement and groundwater recharge). The District’s plan for implementing this policy direction is detailed in its Reclaimed Water Program, contained in Appendix 4-3. 5.2.6 Regional Participation The District will participate in regional supply management and planning activities to protect the environment, reduce cost of service, and improve reliability, water quality and quantity. The District is participating in the following regional activities: - Kitsap Watershed Planning for WRIA 15 - Kitsap County Water Utility Coordinating Committee - Water Purveyors Association of Kitsap (WaterPAK) - US Geological Survey Groundwater Modeling Effort for the Kitsap Peninsula Participation in these activities include attending meetings, providing information for studies and performing water quality monitoring tasks, as needed. The District will supply all customers within the District’s service area. 5.3 Customer Service Policies 5.3.1 Duty to Serve The District has a duty to provide service to all new connections within its Retail Service Area, per the Municipal Water Law, when the following four conditions are met: 1. Capacity. The District must have sufficient capacity to provide water to a new connection in a safe and reliable manner. 2. Consistent. The requested service must be consistent with adopted local plans and development regulations. 3. Water Rights. The District must have sufficient water rights to provide service. 4. Timely and Reasonable. The District must be able to provide service in a timely and reasonable manner to authorize service per a request. Section 5 – Policies and Design Criteria Silverdale Water District 5-3 2013 Comprehensive Water System Plan August 2014 Further detail on the process by which the District reviews applications for service and determines if the above conditions are met is provided in Section 5.3.2. If sufficient water resources are available, the District will normally provide water service to property lying within the District’s Retail Service Area. This water service will be consistent with the requirements of the County’s Coordinated Water System Plan. As part of its Duty to Serve, the District also acknowledges that it ultimately has a responsibility to serve all properties located within its Retail Service Area. As such, the District is prepared (and has plans) to acquire some of the small systems that are located within its service area, when conditions are appropriate. Specific potential near-term system acquisitions are discussed in more detail in Section 9. 5.3.2 Water Service and Connection The District will strive to provide potable water service to all people within the District’s water service boundary, provided all policies related to service can be met. All proposed developments within the District’s water service boundary shall connect directly to the District’s water system, unless deemed unfeasible by the District at the time of the request. Water system extensions required to provide water service to proposed developments shall conform to the District’s adopted design criteria, construction standards and specifications, as shown in the developer extension program for Silverdale Water District. Requests for new water service begin with a Water Availability Application. The application includes property location information. The District determines if water is available, or what it will be necessary to serve the property. The application shall be reviewed by the General Manager and costs shall be determined. A Water Availability Letter will be produced and returned to the applicant within two weeks. Service is scheduled upon receipt of payment and upon determination of sufficient water system capacity. The turnaround time for service installation, once the service is paid for, shall be within two weeks The District periodically evaluates the capacity of all groundwater wells and associated water rights to ensure that the system can provide adequate water service to both existing and future water customers. Storage and distribution/transmission capacity is evaluated every six years during the water system plan update process. Delays resulting from non-technical conditions that affect the District’s ability to provide new water service are the responsibility of the applicant. These conditions include, but are not limited to, environmental assessments and local ordinances. Time extensions in regards to water availability are granted in accordance with the associated permit requirements. When extensions are denied, the disputes are handled through the District’s dispute resolution process. Section 5 – Policies and Design Criteria Silverdale Water District 5-4 2013 Comprehensive Water System Plan August 2014 5.3.3 5.3.4 Any customer with a dispute may request a meeting with the General Manager; the General Manager shall require the customer to produce reasonable evidence and documentation to support the customer’s request. Any decision of the General Manager may be appealed to the Board of Commissioners of the District. A majority vote of the Board of Commissioners shall be final Temporary Services No waiver of compliance with standards is allowed for temporary water service. Emergency Service Compliance with standards may be deferred for emergency water service. Policy criteria may be waived by the Board of Commissioners for emergency service. 5.3.5 Planning Boundaries For planning purposes, the District will use retail water service boundaries established by agreement as a result of the regional coordinated water system plan (Kitsap County Coordinated Water System Plan) and as approved by the Department of Health through the Comprehensive Water System Plan approval process. Within its retail service area, the District is working to annex properties to increase the area contained within the District’s voting boundaries. 5.4 Facility Policies This section describes the planning criteria and policies used to establish an acceptable hydraulic behavior level and a standard of quality for the water system. Additional criteria are contained in the District’s Conditions and Standards, a copy of which is included in Appendix 5-2 of this plan. 5.4.1 Minimum Standards All proposed developments within the District’s service area shall conform to the District’s adopted design criteria, construction standards and specifications (which are provided in the District’s Conditions and Standards). 5.4.2 Pressure The District will endeavor to maintain a minimum pressure of 30 psi at customer meters during all demand conditions, excluding a fire or other emergency situation. The District will endeavor to maintain a maximum pressure of 130 psi in the water mains during normal demand conditions, excluding pressure surges. The District will install pressure reducing valves on individual services for reducing pressures over 70 psi. During fire conditions, the minimum pressure at customer meters and throughout the remainder of the system will be at least 20 psi. Section 5 – Policies and Design Criteria Silverdale Water District 5-5 2013 Comprehensive Water System Plan August 2014 5.4.3 During a failure of any part of the system, the maximum pressure will not exceed 150 psi. Velocities Under normal demand conditions, the velocity of water in a water main should be less than 5 feet per second (fps). During emergency conditions, such as a fire, and for design purposes, the velocity of water in a water main may exceed 5 fps, but may not exceed 10 fps. 5.4.4 Storage Storage within the distribution system must be of sufficient capacity to supplement supply when system demands are greater than the supply capacity (equalizing storage) and still maintain sufficient storage for proper pump operation (operational storage), fire suppression (fire flow storage) and other emergency conditions (standby storage). Equalizing storage must be stored above the elevation that yields a 30 psi service pressure to the highest service in the zone. Standby storage must be stored above the elevation that yields a 20 psi service pressure to the highest service in the zone. Fire flow storage must be stored above the elevation that yields a 20 psi service pressure to the highest service in the zone. The District will provide sufficient standby storage for an emergency condition in which a major supply source is out of service. The volume of storage will be consistent with that required by the current version of the Washington State Department of Health’s Water System Design Manual. The District will provide sufficient storage for a fire condition equal to the system’s maximum fire protection water demand and the required duration. The District will have high-water level and low-water level alarms. Water level indicators will be located at the District’s administrative office. Storage facilities will be located in areas where they will satisfy the following requirements: 1. Minimize fluctuations in system pressure during normal demands. 2. Maximize use of the storage facilities during fires and peak demands. 3. Improve the reliability of supply to the water system. 5.4.5 Transmission and Distribution Where practical, transmission and distribution mains will be looped to improve water quality increase reliability, increase fire flow capacity and decrease head losses. All water mains will comply with the generally recognized design criteria from the AWWA and Department of Health guidelines that follow: Section 5 – Policies and Design Criteria Silverdale Water District 5-6 2013 Comprehensive Water System Plan August 2014 1. All new construction will be in accordance with the District’s construction standards, a copy of which is included in Appendix 5-2 of this plan. 2. Distribution system design assumes that adequately sized service lines will be used. All residential service lines will be one inch or larger. Service lines will be the same size as the meter or larger. 3. The minimum diameter of distribution mains will be six inches. Water mains not required to carry fire flow and located within cul-de-sacs, as determined by the District, may be four inches in diameter. All water mains will be ductile iron or HDPE pipe. 4. All new distribution mains will be sized by a hydraulic analysis acceptable to the District. 5. All new mains providing fire flow will be sized to provide the required fire flow at a minimum residual pressure of 20 psi and maximum pipeline velocity of 10 feet per second during maximum day demand conditions. In general, new water mains that will carry fire flow in residential areas shall be a minimum of 6 inches in diameter, and looped for multi-family residential developments. New water mains in commercial, business park, industrial and school areas shall be a minimum of 12 inches in diameter, and looped. 6. Valve installations will satisfy the following criteria: a. Zone valves will be located at all pressure zone boundaries to allow future pressure zone re-alignment without the need for additional pipe construction. b. Isolation valves will be installed in the lines to allow individual pipelines to be shut down for repair or installing services. Unless it is impractical to do so, the distance between isolation valves will not exceed 300 feet in commercial areas, 1,200 feet in rural areas and 600 feet in all other areas. A minimum of three valves will be provided per cross and two valves per tee. c. Air/vacuum release valves will be placed at all high points or “crowns” in all pipelines. d. Blow-off assemblies shall be located at the end of dead-end water mains where there is not a fire hydrant. If a water main extension is expected in the future, the blow-off assembly shall have a valve the same size as the main with concrete thrust blocking. e. Individual pressure reducing or check valves must be installed on all new customer service lines in the District. The Uniform Plumbing Code requires pressure reducing valves on customer service lines if pressures are greater than 80 psi. Pressure reducing valves protect customers from high pressures in case a mainline pressure reducing station fails. Check valves prevent hot water tanks from emptying into the water system when the water main is empty or when the pressure in the main is less than the pressure in the tank, and prevent contamination of the distribution system caused by possible cross-connections in the customer's pipes or fixtures. Section 5 – Policies and Design Criteria Silverdale Water District 5-7 2013 Comprehensive Water System Plan August 2014 7. Fire hydrant installations will satisfy the following criteria: a. Fire hydrants serving detached single family dwellings or duplex dwellings on individual lots will be located not more than 600 feet on center such that all single family lots are within 300 feet from a fire hydrant, as measured along the path of vehicular access. b. Fire hydrants serving any use other than single family dwellings or duplex dwellings on individual lots will be located not more than 300 feet on center such that all lots are within 150 feet from a fire hydrant, as measured along the path of vehicular access. c. Central Kitsap Fire and Rescue (or the appropriate fire department) and the District will review all proposed fire hydrant installations to ensure the correct number, location and spacing of fire hydrants for each project. 5.4.6 Supply and Pump Stations All existing and future supply and pump stations will be modified/constructed to comply with the following minimum standards: 1. All structures will be non-combustible, where practical. 2. All buildings will have adequate heating, cooling, ventilation, insulation, lighting and work spaces necessary for on-site operation and repair. 3. Sites will be fenced to reduce vandalism and District liability where appropriate. 4. Each station will be equipped with a flow meter and all necessary instrumentation to assist personnel in operating and troubleshooting the facility. 5. Emergency power capability will be provided to at least one pump station supplying each pressure zone. Pumps will be operated automatically with flexibility in pump start/stop settings. Stations will be operated with the provision for at least two methods of control, to minimize system vulnerability. Manual override of stations will be provided for and located at the administrative office using the District’s telemetry and supervisory control system. Stations will be monitored with alarms for the following conditions: 1. Pump started automatically or manually. 2. Pump failure to start. 3. Power phase failure. 4. Communication failure. 5. Water in structure. 6. Low suction pressure. 7. High discharge pressure. Section 5 – Policies and Design Criteria Silverdale Water District 5-8 2013 Comprehensive Water System Plan August 2014 8. Intrusion and fire. 9. Water level in the well. Stations will have the following indicators: 1. Local flow indication and totalizing. 2. Flow indication and totalizing at the administrative office. 3. Recording of combined supply flow to the system. 4. Run time and number of starts. Stations will be placed wherever necessary to fulfill the following criteria: 1. Provide supply redundancy to a pressure zone. 2. Improve the hydraulic characteristics of a pressure zone. 3. Maximize storage availability and transmission capacity. 4. Improve water quality (i.e., increase circulation) and quantity. 5.4.7 Pressure Reducing Stations All pressure reducing valves will be placed in vaults that are large enough to provide ample work space for field inspection and valve repair. Vaults will drain to daylight or be equipped with sump pumps to prevent vault flooding. Pressure relief valves will be provided on the low-pressure side of the pressure reducing valves to prevent system over-pressurizing in case of a pressure reducing valve failure and will be sized by hydraulic analysis. 5.4.8 Control The District’s control system must be capable of efficiently operating the water system's components in accordance with this Plan and in response to reservoir levels, system pressures, abnormal system conditions, electrical power rate structure and water costs. The system must be reliable and kept up to date to avoid disruption of customer water service and maintain efficient use of water supplies. 5.4.9 Maintenance Facility and equipment breakdown is given highest maintenance priority. Emergency repairs will be made even if overtime labor is involved. Equipment will be scheduled for replacement when it becomes obsolete and as funding is available. Worn parts will be repaired, replaced, or rebuilt before they represent a high failure probability. Section 5 – Policies and Design Criteria Silverdale Water District 5-9 2013 Comprehensive Water System Plan August 2014 Spare parts will be stocked for all equipment items whose failure will impact the ability to meet other policy standards. Equipment that is out of service will be returned to service as soon as possible. A preventive maintenance schedule will be established for all facilities, equipment and processes. Tools will be obtained and maintained to repair all items whose failure will impact the ability to meet other policy standards. Dry, heated shop space will be available for maintenance personnel to maintain facilities. All maintenance and operations personnel will be trained to efficiently perform their job descriptions. Maintenance will be performed by the water maintenance staff and supervised by the Maintenance Manager and/or the Operations Manager. Written records and reports will be maintained on each facility and item of equipment showing operation and maintenance history. 5.5 Financial Policies 5.5.1 General The District will set rates that are based on equity, fairness and efficiency to its customers. Rates and additional charges established for the District are: 1. Cost-based rates that recover current, historical and future costs associated with the District’s water system and services. 2. Equitable charges to recover costs from customers commensurate with the benefits they receive. 3. Adequate to provide a sufficient and stable source of revenue to ensure proper operation and maintenance, development and perpetuation of the water system and preservation of the District’s financial integrity. Existing customers of the District will pay the direct and indirect costs of operating and maintaining the facilities through water rates. In addition, the water rates will include debt service incurred to finance the capital assets of the District. New customers seeking to connect to the water system will be required to pay a connection charge for an equitable share of the historical cost of the system. Connection charge revenues will be used to fund the Capital Improvement Program in conjunction with rate revenue. New and existing customers will be charged for extra services through separate ancillary charges based on the costs to provide the services. Ancillary charges can increase equitability and increase operating efficiency by discouraging unnecessary demand for services. The charges are reviewed regularly and updated annually based on the costs to Section 5 – Policies and Design Criteria Silverdale Water District 5-10 2013 Comprehensive Water System Plan August 2014 provide the service. Revenue from ancillary charges will be used to finance annual operations and maintenance. The District has established a water rate model, which appropriately assigns budgeted expenses to the customers who benefit or cause those costs to be incurred. The District maintains information systems that provide sufficient financial and statistical information to ensure conformance with rate-setting policies and objectives. User charges are sufficient to provide cash for the expenses of operating and maintaining the system. To ensure the fiscal and physical integrity of the utility, each year an amount is set aside and retained for capital expenditures, which will cover some portion of the depreciation of the water distribution plant. The amount is transferred from the General Fund to the Construction Fund for general purposes or for specific purposes. The District maintains the Rate Stabilization Fund to cover unanticipated fluctuations in cash flow. A Cash Reserve is available to cover unanticipated emergencies and maintenance needs. Fees and charges are calculated for the service area as a whole. Rates will be the same regardless of service location for existing customers. 5.5.2 Connection Charges Owners of properties that have not been assessed, charged, or borne an equitable share of the cost of the water system will pay one or more of the following connection charges prior to connection to a water main: 1. Front Footage Charge: The front footage charge is established by the District and provides for the reimbursement of a pro rata portion of the original cost of water system extensions and facilities. 2. Capital Facilities Charge: The capital facilities charge will be assessed against any property that has not participated in the development of the water system. 3. Service Installation Charge: The service installation charge recovers the cost of meter and service line installation. 4. Developer Extension Charges: These charges are for the administration, review and inspection of developer extension projects, in accordance with the District’s Developer Extension Program. 5.6 Organizational Policies 5.6.1 Structure The three members of the Board of Commissioners are elected by the registered voters in the District. The Board hires a General Manager who has the day to day responsibilities for operation of the water system. Upon recommendation by the General Manager, the Board also hires other staff. Among them are the Assistant General Manager, Maintenance Manager, and Finance Manager. The Assistant General Manager and Maintenance Manager are responsible for Section 5 – Policies and Design Criteria Silverdale Water District 5-11 2013 Comprehensive Water System Plan August 2014 operation and maintenance activities. Manager. 5.6.2 Each of these staff members reports to the General Staffing Personnel certification will comply with state standards. The District will promote staff training. Section 5 – Policies and Design Criteria Silverdale Water District 5-12 2013 Comprehensive Water System Plan August 2014 6. Water Source and Quality 6.1 Introduction The two basic objectives of a water system are to provide a sufficient quantity of water to meet customer usage demands and to provide high quality water. Section 7 discusses Silverdale Water District (District) ability to supply a sufficient quantity of water and identifies future source requirements. This section discusses the District’s existing water sources, water rights, water quality regulations and water quality monitoring results. 6.2 Existing Water Sources and Treatment 6.2.1 Water Sources The District currently draws water from 11 active wells which draw from three different aquifers to serve the District’s customers. Well depths range from approximately 125 feet to 1,100 feet. Within the District’s service area is one satellite system, which has its own groundwater source. There are two total wells that are used to serve the small satellite systems. Additional information on each of the District’s existing sources is presented in Section 2. 6.2.2 Water Treatment The District recently implemented routine disinfection on all active water sources. Chlorination is achieved by continuous injection of a 1 to 2 percent diluted solution from a 12.5 percent concentrated solution of sodium hypochlorite during operation of the pumps at the facility. The chlorination equipment consists of a 100 to 600 gallon dilution tank and metering pump for the disinfection process. 6.3 Water Rights 6.3.1 Overview A water right is a legal authorization to use a specified amount of public water for specific beneficial purposes. The water right amount is expressed in terms of instantaneous withdrawal rate and annual withdrawal volume. Washington State law requires users of public water to receive approval from the Washington State Department of Ecology (Ecology) prior to actual use of the water. This approval is granted in the form of a water right permit or certificate. However, a water right is not required for certain purposes (typically individual residences) that use 5,000 gallons per day or less of groundwater from a well. 6.3.2 Existing Water Rights The District currently holds water right permits and certificates for its sources of municipal water supply. A summary of the District’s groundwater rights is presented in Table 6-1. All of the Section 6 – Water Source and Quality Silverdale Water District 6-1 2013 Comprehensive Water System Plan August 2014 sources listed in the table are currently used by the District. The District’s instantaneous groundwater rights that are used, including the Silver Sound Satellite System, total 9,756 gpm. Of this amount, 3,093 gpm is in the form of water right applications. The District also has several surface water rights that are no longer actively used. The certificates are valid primary rights that are related to some of the District’s supplemental groundwater rights. Supplemental groundwater rights draw against the annual surface water rights that are not actively used. The District’s surface water certificates are presented in Table 6-2. The District’s water rights include several supplemental annual water rights, as shown in Table 6-1. The supplemental water rights can individually be used to their full instantaneous (gpm) and annual (acre-feet) limitations, but the total annual quantity of water pumped from all of the District’s existing municipal water rights must not exceed the primary annual water right total of 3,240.5 acre feet for groundwater and 1,153 acre-feet for surface water. Essentially, supplemental water rights allow additional wells to be used within the District’s service areas, but do not increase the total annual primary water right amount. Within the District’s service area, the Silver Sound Water System is currently the only satellite water system, having two associated wells. The water rights are still in application form. Copies of the municipal water right certificates and permits are included in Appendix 6-1. Section 6 – Water Source and Quality Silverdale Water District 6-2 2013 Comprehensive Water System Plan August 2014 Table 6-1. Existing Ground Water Rights Permit, Certificate or Claim # G1-00654C G1-20836C G1-22194C G1-23004C G1-23399C G1-23389C Existing Water Rights Maximum Maximum Annual Instantaneous Flow Volume(Qa) Rate(Qi) gpm AF/yr 350 57.5 310 200 280 112.9 210 336 200 320 188 300 G1-24920C 100 G1-24644C G1-24645C G1-24646C G1-25436C G1-*07018C G1-*10271C G1-22105C G1-25492P G1-22992P G1-21095C Subtotal Applications G1-25976A G1-26055A 365 1,600 405 300 350 100 125 1,000 690 90 6,663 G1-26631A 1,000 G1-27271A 50 G1-27467A 43 Subtotal Total Annual Supplemental Ac/yr Source Name/ Number Dawn Park Spirit Ridge 1 and 2 Selbo Road Well Bucklin Ridge Chena 1 Dickey School Graystone/Harbor Water Co. Inc. Island Lake Well Spirit Ridge 4 Chena 2 Hess Provost Road Well Eldorado Well 1 Eldorado Well 2 Wixson (2 wells) Spirit Ridge 3 Forest Creek Well 25 448 1,127 560 393 560 45 51 1,057.9 665 62.1 1,104 14.5 3,197 11/10/1986 4/22/1985 4/22/1985 4/22/1985 5/8/1989 2/14/1964 6/23/1969 9/23/1974 7/12/1989 10/28/1977 12/6/1973 4,241.9 1,000 1,000 Westwind Ridgetop Frontier Woods (2 wells) Chagnon (Nash) Silver Sound (Civilla/Smalley) 4 3,093 9,756 Priority Date 1/16/1970 8/15/1973 11/15/1974 11/16/1977 3/26/1979 5/25/1979 4 3,201 11/13/1990 11/13/1990 6/18/1992 8/24/1993 5/16/1994 0 4,241.9 Table 6-2. Surface Water Rights Existing Water Rights Permit, Certificate or Claim # S1-*01306CC S1-*03816CC S1-*13084C S1-*16361AWC Maximum Instantaneous Flow Rate(Qi) gpm 45 180 251 126 S1-*05213C 45 72.4 S1-*05214C 22 36.2 S1-*14906C 90 144.8 Total 759 1,016.4 Section 6 – Water Source and Quality Silverdale Water District Maximum Annual Volume(Qa) AF/yr Annual Supplemental Ac/yr 763 360 Source Name/ Number Woods Creek Woods Creek Woods Creek Woods Creek Eldorado S. Creek Eldorado N. Creek Eldorado S. Creek Priority Date 4/21/1925 4/26/1933 6/24/1954 9/30/1960 7/27/1940 7/27/1940 7/14/1958 360 6-3 2013 Comprehensive Water System Plan August 2014 Water Rights Evaluation An evaluation of the District’s existing water rights was performed to determine the sufficiency of the water rights to meet both existing and future water demands. Appendix 6-2 provides the detailed water rights self-assessment forms for the District’s groundwater rights, as required by the Department of Ecology. Table 6-3 provides a summary of that information, comparing the District’s existing groundwater rights with current, 6-year, and 20-year demands. As shown in this table, the District has sufficient water rights (both instantaneous and annual amounts) to meet its existing and projected 20-year demands. This is true even when the District’s water rights applications are not considered. Table 6-3. Water Rights Capacity Summary Current (2012) Maximum Maximum Annual Instantaneous Volume, Flow, Qi Qa gpm AF/yr mgd mg Existing Water Rights 6,663 3,197.0 (without Applications) 9.59 1,041 2,931 2,253.2 Water Demand 4.22 734 3,732 943.8 Surplus/(Deficiency) 5.37 307 Existing Water Rights 9,756 3,201.0 (with Applications) 14.05 1,043 2,931 2,253.2 Water Demand 4.22 734 6,825 947.8 Surplus/(Deficiency) 9.83 309 Note: Summary only considers groundwater rights. 6.3.3 6-Yr (2018) Maximum Instantaneous Flow, Qi gpm mgd 6,663 9.59 3,118 4.49 3,545 5.10 9,756 14.05 3,118 4.49 6,638 9.56 Maximum Annual Volume, Qa AF/yr mg 3,197.0 1,041 2,398.9 781 798.1 260 3,201.0 1,043 2,398.9 781 802.1 262 20-Yr (2032) Maximum Instantaneous Flow, Qi gpm mgd 6,663 9.59 3,940 5.67 2,723 3.92 9,756 14.05 3,940 5.67 5,816 8.38 Maximum Annual Volume, Qa AF/yr mg 3,197.0 1,041 3,026.7 986 170.3 55 3,201.0 1,043 3,026.7 986 174.3 57 Water Rights Planning Based on the demand projections and the District’s current water rights, it is not apparent that the District will need to obtain additional primary annual water rights within the coming 20 years. The District will strive to use its existing water sources efficiently by continuing its current conservation activities and implementing proposed measures, as outlined in the District’s Water Conservation Plan. 6.4 Water Quality Monitoring 6.4.1 Overview The quality of drinking water in the United States is regulated by the Environmental Protection Agency (EPA). Under provisions of the Safe Drinking Water Act (SDWA), the EPA is allowed to delegate primary enforcement responsibility for water quality control to each state. In the State of Washington, the Department of Health (DOH) is the agency responsible for implementing and enforcing the drinking water regulations. For the State of Washington to Section 6 – Water Source and Quality Silverdale Water District 6-4 2013 Comprehensive Water System Plan August 2014 maintain primacy (delegated authority to implement requirements) under the SDWA, the State must adopt drinking water regulations that are at least as stringent as the federal regulations. In meeting these requirements, the State has published drinking water regulations that are contained in Chapter 246-290 of the Washington Administrative Code (WAC). According to WAC 246290, a Group A public water system is defined as serving 15 or more residential connections or 25 or more people per day for 60 or more days per year. As a Group A public water system, the District is required to satisfy drinking water quality regulations and conform to monitoring and reporting requirements as described by WAC 246-290. 6.4.2 District Water Quality Monitoring Program Overview The District conducts water quality monitoring in compliance with EPA and DOH requirements. Annually the District reviews its Water Quality Monitoring Report (WQMR), as issued by DOH, and communicates any issues, or asks for clarification, with the State. The District plans for two rounds of sample collection per year. The first occurs when summer sources are running; the other at the end of the year when winter sources are operational. Generally these occur during September/October and November/ December. The approaches to monitoring for various parameters are outlined below, along with a summary of any recent or current monitoring violations. Details regarding the District’s water quality results are contained with DOH’s Sentry database system, accessible online at DOH’s website. Inorganic Chemicals (IOCs) a. The District samples for the full suite of inorganics in each well every three years. b. Nitrates are sampled for each well once per year. c. The District does not utilize IOC waivers offered by DOH. Inorganic information is often requested by customers and helps to diagnose water quality issues. It is the District’s policy to ensure frequent sampling and information gathering processes. d. Currently the District has no primary maximum contaminant level (MCL) violations. The District does have wells with manganese detections (Ridgetop, Dawn Park) and one well with detectable arsenic (Bucklin Ridge). Volatile Organic Chemicals (VOCs) a. District samples all wells for VOCs a minimum of once every six years. b. Wells with a moderate susceptibility are sampled once every three years. c. No source has tested positive for a VOC contaminate. Synthetic Organic Chemicals (SOCs) a. The District’s historical sampling record indicates no presence of SOCs in it ground water wells. Section 6 – Water Source and Quality Silverdale Water District 6-5 2013 Comprehensive Water System Plan August 2014 b. The District will purchase waivers offered by the State and reduce the amount of sampling performed in order to save financial resources. c. The State has not identified future sampling requirements for groundwater sources. If sampling is required, the District may take advantage of any waivers offered. Radionuclides a. Until 2009 the State accepted any source with a previous historical radionuclide sample to fulfill this requirement. The District did not conduct additional sampling. b. In 2009, 2010, and 2011, the District sampled all wells. Three wells had very low detections, one of which is an active source (Dawn Park Well). This well will continue to be monitored. Unregulated Contaminant Monitoring Rule (UCMR) a. Since the District serves more then 10,000 people, it is subject to performing UCMR sampling. Every three to five years the District samples all wells according to the UCMR list identified contaminates. Typically the two rounds of sampling are preformed with 12 months, five to seven months apart per EPA guidelines. b. The District historically splits the sampling schedule over two budget years. Lead and Copper a. The District is approved for reduced lead and copper monitoring. b. 30 homes are listed and sampled. c. Samples are taken during July, every three years. d. The monitoring process is as follows: 1. Letter is sent to home. 2. Sample bottle is dropped off with forms to fill out. 3. Staff monitors and picks up sample bottles and forms as customers perform sampling. 4. Letters and phone calls are used to remind customers about sampling. 5. Last samples are picked up. 6. Results will be communicated back to sample locations via a letter. 7. The District is willing to resample any questionable results. In 2012 the District had a home test higher then previous years for lead. The District re-sampled for piece of mind to the customer. Asbestos a. As of 2013, AC mains consist of approximately 15% of the total distribution system by length. Since the District still has more than 10% AC main, an Asbestos fiber sample is taken every nine years. All results have been well within the limits. The District includes in its capital budget an AC main replacement program, which after 6-years, the proposed Section 6 – Water Source and Quality Silverdale Water District 6-6 2013 Comprehensive Water System Plan August 2014 projects will reduce the percentage of AC mains in the distribution to approximately 11%. Figure 6-1 shows a map of the AC mains in the distribution system and identifies the 6 year and 20 Year replacement projects.. Coliform Monitoring Program a. The District evaluates the Coliform Monitoring Program Annually. The prescribed number of samples is distributed amongst pressure zones based on connections, population serves, and length of water main. b. Sample locations are distributed throughout the pressure zone. The District takes into account sensitive populations such as schools, hospitals, nursing facilities. c. Sample locations are distributed to cover both high turn over areas and areas of high water age. d. The District also has a policy to sample all reservoirs that are in play, with repeat samples after a coliform or e coli detection. Disinfection By Product Sampling a. The District used the EPAs IDSE sampling guidelines to write its sampling program. b. A water age map was also generated and utilized to identify the oldest and average water age in each zones. The map was generated for both average day and peak day demand conditions. c. The District is subject to reduced monitoring under the 30/40 certification. Section 6 – Water Source and Quality Silverdale Water District 6-7 2013 Comprehensive Water System Plan O FJ AT DR HW Y E ING E ST RD VIK N W AY NW VIKING WAY NW LI BERTY BAY NW LUOTO RD Silverdale Way PRV $ Central Valley PRV $ OLYMPIC Shadow Glen 0.3MG & 0.13MG (Inactive) Reservoirs VIEW RD N W $ NE S TA TE H WY 3 08 Mt View PRV K J KJ $ H ST ATE WY CENTRAL VALLEY RD NW NW 8 30 CLEAR CREEK RD NW SUBASE BAN GO R NW ! Ø J K ! ØÚ [ LE H W Spirit Ridge Well No. 4 EW AY ! Ø Dawn Park Well YN E Olympic View PRV BRO WN SVIL HOO D CANA L 30 5 N E NW SIL VE RD AL Spirit Ridge Reservoir, Well No. 3 & BPS 3 RA MP Westridge PRV $ T ST A Ridgetop ReservoirWA AG Well & BPS N A W D ER N SO Chena Wells No.1 & 2 (Inactive), BPS (Inactive) HIL Walgren PRV DYES INLET ! Ø Hess Well Loretta Heights Reservoir Newberry Hill PRV NW FAIRGROUN DS RD CENTRAL KITSAP UGA D AN HO LL S EA K BEC CHI CO BAY HW W YN NW AT E A W H ST Y TE Pump PRV Well Reservoir Retail Service Area Boundary * Urban Growth Area Water Body 3 H W Y NW 3 NE RIDDELL RD RIDDELL RD PINE RD NE ST Legend NE MCWILLIAMS RD RD NW CHIC OW A [ Ú J K ! [ Ø Ú RD NE FAIRGRO UNDS RD Y NW Windsong PS Eldorado Reservoir Well & BPS $ STATE HWY 303 NE $ NE WAAGA WAY ! Ø Selbo Well TRACYTON BLVD NW J K Newberry $ Hill PRV Chena Reservoir NW NW W A W AG AA A GA W AY W AY Huckle Ridge PRV Shelley PRV ST A TE H S T WY 3 AT N W E HW Y3 NW J K ! Ø ! Ø [! Ú Ø J K AY L RD $ Ridgetop PRV WA Y W Hillsboro PRV $ $ NW BUCKLIN HILL RD $ ØDickey Well J K [ ! Ú (Inactive) [ J K ! ØÚ GA AA W AN ! Ø J K [ Ú NW TO P $ RIDGETOP BLVD NW Anderson HillN WPRV Dickey Reservoir & BPS ! Ø J K E AT ST $ Provost Reservoir Well and BPS $ NW Vintage PRV $ [ Ú Y 3 NW ! Ø J K [ Ú W E H CENTRAL VALLEY RD NE Westwind Reservoir Well and BPS Ridgeview PRV HANSB ERRY ST NW RD ! Ø! Ø NW H O LLY J K ! Ø Y W NH IL L Silversound Wells No. 1 & 2 NW NEWBERRY HILL RD Hollow PRV HW N ER SO Island Lake Reservoirs & Well $ Quail 3 NW $ Woxson Reservoir & Well ØJ J K! K Bucklin Ridge Well & Reservoir (Inactive) Old Frontier PRV AND $ BL V D SILVERDALE UGA Schold PRV RID GE E STAT H WY NW TRIGGER AVE N W Asbestos Concrete Water Main (in) <=4 5 6 8 Figure 6-1 Asbestos Concrete Waterline Map 10 12 >12 Silverdale Water District Water System Plan 6-Yr Replacement 20-Yr Replacement * Also the District's water rights "Place of Use" I 0 1,000 2,000 4,000 6,000 8,000 Feet Aug 2013 August 2014 6.4.3 District Water Quality Monitoring Plans The following water quality monitoring plans and related information are provided in Appendix 6-3: Coliform Monitoring Plan o Sample locations (for both 50-sample and 60-sample routines) o Coliform Emergency Response Plan Flowchart o Coliform Emergency Response Plan o Triggered Source Monitoring Plan IDSE Standard Monitoring Plan Stage 1 DBP Monitoring Plan Stage 2 DBP Monitoring Plan Water Quality Monitoring Plan (example, 2012) 6.4.4 Wellhead Protection Program All federally defined Group A public water systems that use groundwater as their source are required to develop and implement a wellhead protection program. In addition, purveyors of water systems using groundwater under the direct influence of surface water (GWI) source are also required to develop and implement a watershed control program. The Washington State mandate for Wellhead Protection and Watershed Control Programs is in WAC 246-290-135, which became effective in July of 1994. In Washington State, DOH is the lead agency for the development and administration of the State’s Wellhead Protection and Watershed Control Programs. A wellhead protection program is a proactive and ongoing effort of a water purveyor to protect the health of its customers by preventing contamination of the groundwater that it supplies for drinking water. A watershed control program is an effort to identify and inventory any existing contaminant in the interacting surface water and prevent any additional contaminants from entering the water system. All required elements of a local Wellhead Protection (systems using only groundwater, applicable to the District) or Wellhead Protection and Watershed Control Program (systems with GWI and/or surface water, not applicable to the District) must be documented and included in either the Comprehensive Water System Plan (applicable to the District) or Small Water System Management Program document (not applicable to the District). A copy of the District’s Wellhead Protection Program is contained in Appendix 6-4 of this plan. As part of this water system plan update, the District has updated its inventory of potential contaminant sources, which is provided in Appendix 6-4. Notification letters have been distributed to all property owners contained in this list. In addition, the District is engaged in the following ongoing source water protection activities: Section 6 – Water Source and Quality Silverdale Water District 6-9 2013 Comprehensive Water System Plan August 2014 Ongoing monitoring with direct dial-in fax notifications for two gas stations. When alarms are received, follow-up actions are taken by the District and gas station owners. Ongoing discussions with local authorities (Kitsap County and Central Kitsap Fire and Rescue) regarding projects utilizing hazardous materials. Annual training provided to District employees through presentations by the Department of Health at WaterPAK meetings. The District is evaluating purchasing properties adjacent to wellheads. The District has prioritized the properties based on land use actions. The District is supporting the Kitsap Peninsula USGS groundwater model development. This model will help utilities and consultants better understand the groundwater in Kitsap County. With better understanding, the District can be more effective in its protection activities. 6.4.5 Consumer Confidence Report The final rule for the Consumer Confidence Report (CCR) was published in the Federal Register on August 19, 1998, and became effective on September 18, 1998. Minor revisions were posted in the Federal Register on May 4, 2000. The CCR is the centerpiece of the right-to-know provisions of the 1996 Amendments to the SDWA. All community water systems, like the District, were required to issue the first report to customers by October 19, 1999. The annual report must be updated and re-issued to all customers by July 1 of each year thereafter. The CCR is a report on the quality of water that was delivered to the system during the previous 12 months. The reports must contain certain specific elements; but may also contain other information that the purveyor deems appropriate for public education. Some, but not all of the information that is required in the reports, include the source and type of the drinking water, type of treatment, contaminants that have been detected in the water, potential health effects of the contaminants, identification of the likely source of contamination, violations of monitoring and reporting, and variances or exemptions to the drinking water regulations. A copy of the District’s 2012 CCR is contained in Appendix 6-5 of this plan. Section 6 – Water Source and Quality Silverdale Water District 6-10 2013 Comprehensive Water System Plan August 2014 7. Water System Analysis 7.1 Introduction This section presents the engineering analysis of Silverdale Water District’s (District) existing water system. Individual water system components were analyzed to determine their ability to meet policies and design criteria under both existing and future water demand conditions. The policies and design criteria are presented in Section 5 and the water demands are presented in Section 4. A description of the water system facilities and their current operation is presented in Section 2. Proposed improvements that resolve the deficiencies identified in this section are presented in Section 9. The last section of this section presents the existing system capacity analysis that was performed to determine the maximum number of equivalent residential units (ERUs) that can be served by the District’s water system. 7.2 Pressure Zones 7.2.1 Zone Demand Split Section 4 developed water demand projections for the entire system, but for the purpose of the source, storage, and hydraulic analysis, it is necessary to determine how that water demand is allocated throughout the system. The District can track water consumption in each pressure zone through monitoring reservoir levels, pump operation, and well production collected by the SCADA system. Based on data collected during 2011, an estimate for the percentage of water usage is determined by comparing the annual water usage in each zone (or group of zones) with the total water usage of the system. Table 7-1 presents the percentage of total demand for each zone (or zone combination) that is used in the subsequent analyses for current and future demand projections from Section 4. Table 7-1. Pressure Zone Percentage of Total Demand Pressure Zone/ Percentage of Zone Combination Total Demand 7.2.2 1 34% 2, 4, 4.1, 4.2, 4.4, and 4.5 35% 3 and 9 8% 3.2 1% 5 and 5.1 11% 6 5% 7 5% Zone Peak Hour Demand Peak hour demand in the District’s system is estimated from monitoring data collected from the SCADA system for each pressure zone. Six representative days from 2011 were selected to Section 7 – Water System Analysis Silverdale Water District 7-1 2013 Comprehensive Water System Plan August 2014 estimate the peak hour demand. Four of those days were a representative average day demand, and two days were a representative maximum day demand. The following is a summary of which representative days were selected for each zone’s maximum day demand to peak hour ratio. Table 7-2 provides a summary of the Peak Hour peaking factors used in the subsequent analyses. For Zones 1, 2 and 4, 3, 6, and 7, the largest observed peak hour demand occurred during a day with water usage approximating the maximum day demand. The Peak Hour ratio is taken as the average of the ratios for the two sample days (9/6/2011 and 9/12/2011) representing maximum day demand conditions. The ratio is then applied to the Maximum Day Demand to estimate Peak Hour Demand. For Zones 3.2 and 5, the largest observed peak hour demand occurred during a day with water usage approximating the average day demand. The Peak Hour Ratio is the average of the four days (1/21/2011, 4/21/2011, 6/15/2012, and 6/25/2011) with demand approximating the ADD. The ratio is then applied to the Maximum Day Demand to estimate Peak Hour Demand. Table 7-2. Peak Hour Peaking Factors by Pressure Zone Pressure Zone PH:MDD ratio 1 1.6 2, 4, 4.1, 4.2, 4.4, and 4.5 1.7 3 and 9 2.1 3.2 4.9 5 and 5.1 2.1 6 1.6 7 1.9 Notes (1) Data Source: Spreadsheet entitled Average Day Demand Calcs.xls (2) For Zones 1, 2 and 4, 3, 6, and 7, the largest observed peak hour demand occurred during a day with water usage approximately equal to the maximum day demand. The Peak Hour ratio is taken as the average of the ratios for the two sample days (9/6/2011 and 9/12/2011) representing maximum day demand conditions. The ratio is then applied to the Maximum Day Demand in the above table. (3) For Zones 3.2 and 5, the observed peak hour demand occurred during a day with water usage approximately equal to the average day demand. The Peak Hour Ratio is the average of the four days (1/21/2011, 4/21/2011, 6/15/2012, and 6/25/2011) with demand approximating the ADD. The ratio is then applied to the Maximum Day Demand in the above table. 7.2.3 Zone System Pressure The ideal static pressure of water supplied to customers is between 40 and 80 psi. Pressures within a water system’s distribution system are commonly as high as 120 psi. New services are required to have pressure regulators on the service lines to reduce the pressure to 70 psi or less. Section 7 – Water System Analysis Silverdale Water District 7-2 2013 Comprehensive Water System Plan August 2014 It is difficult for the District’s water system and most others to maintain distribution pressures between 40 and 80 psi, primarily due to the topography of the water service area. Table 7-3 lists each of the District’s fourteen pressure zones, the highest and lowest elevation served in each zone, and the minimum and maximum distribution system pressures within each zone, based on maximum static water conditions (full reservoirs and zero demands). The hydraulic analysis section later in this section presents the results of the evaluation of pressures based on the adequacy of the water mains (under dynamic conditions). The District is currently providing water at pressures of at least 30 psi throughout the majority of the water system, as shown in the table. However, there is a small area in Zone 1 (H.E. 223 feet) with pressures below 30 psi. Another location within the District’s service area with moderately low service pressures is located in the northeast portion of Zone 2 (H.E. 344 feet), near SR 303. Other areas of the District’s system have moderately low pressures. These areas are described in more detail in the Distribution and Transmission System analysis presented later in this section. In Table 7-3, the listed pressures are calculated in the water main and the actual service pressure for those areas noted as having high pressures is lower due to the required pressure regulators. The District has accepted the high pressures due to this pressure regulator requirement; therefore pressure zone improvements will not be necessary in these areas. Table 7-3. Minimum and Maximum Distribution System Pressures Highest Elevation Served Lowest Elevation Served Zone 1 2 3 3.2 4 4.1 4.2 4.4 4.5 5 5.1 6 7 9 Elevation Static Pressure Elevation Static Pressure (feet) (psi) (feet) (psi) Existing System - Before Proposed Zone Modifications 162 26 15 90 285 26 53 126 280 35 60 130 297 41 198 84 405 35 165 139 295 82 210 119 218 116 120 158 278 90 168 137 249 102 139 150 432 31 160 148 274 99 32 204 420 41 350 71 539 39 345 123 421 50 265 118 7.3 Source Capacity Evaluation 7.3.1 Source Analysis Criteria According to DOH planning requirements, sources of supply must be sufficient to meet maximum day demands (MDD). This must hold true for each pressure zone within a system, as Section 7 – Water System Analysis Silverdale Water District 7-3 2013 Comprehensive Water System Plan August 2014 well as for the system as a whole. In addition, for any “closed” pressure zone (i.e., a zone that has no storage, and for which pressure is maintained by pumping), sources must be sufficient to meet peak hour demands (PHD). The source capacity analyses presented below examine the ability of the District’s existing sources of supply to meet these requirements. Tables 7-4 through 7-8 summarize the evaluation of source capacities for the District’s total system and sub groups of pressure zones. These analyses are conducted by comparing the District’s water demand forecast, presented in Section 4, with current source capacities. All evaluations assume 24-hour-per-day source operation. 7.3.2 Source Capacity Analysis Results Total System The combined capability of the District’s active groundwater well sources to meet both existing and future demand requirements is presented in Table 7-4. The analysis is based on existing pumping capacities of the individual wells. The demands used in the evaluation for 2018 and 2032 are future demand projections without reductions from conservation efforts, as shown in Section 4. Therefore, if additional reductions in water use are achieved in the future through water conservation efforts, the total source capacity required in the future will be less than that shown in the table. The future demand requirements include projected demands for the District’s satellite system. The District intends to connect the Silver Sound Water System to the District’s main water system within the six-year planning period. Once this is connected, the District plans on abandoning the wells that supply that system; thus, their capacities are not included in Table 7-4. The results of the analysis indicate that the District has sufficient source capacity to meet existing and projected future 2032 demands. Section 7 – Water System Analysis Silverdale Water District 7-4 2013 Comprehensive Water System Plan August 2014 Table 7-4. Water Source Capacity Evaluation Year 2012 2018 2032 Max(2) Projected ERUs and Demand (1) Equivalent Residential Units (ERU's) 10,232 10,903 13,752 19,510 Average Day Demand gpd) 2,011,846 2,144,072 2,704,218 3,843,429 Maximum Day Demand (gpd) 4,216,521 4,493,648 5,667,629 8,071,200 Eldorado Well (220 gpm) 316,800 316,800 316,800 316,800 Provost Well (280 gpm) 403,200 403,200 403,200 403,200 Ridgetop Well (1000 gpm) 1,440,000 1,440,000 1,440,000 1,440,000 Westwind Well (420 gpm) 604,800 604,800 604,800 604,800 Hess Well (270 gpm) 388,800 388,800 388,800 388,800 Dawn Park Well (210 gpm) 302,400 302,400 302,400 302,400 Bucklin Ridge Well (175 gpm) 252,000 252,000 252,000 252,000 Spirit Ridge Well No. 3 (830 gpm) 1,195,200 1,195,200 1,195,200 1,195,200 Spirit Ridge Well No. 4 (1600 gpm) 2,304,000 2,304,000 2,304,000 2,304,000 Island Lake Well (300 gpm) 432,000 432,000 432,000 432,000 Wixson Well (300 gpm) 432,000 432,000 432,000 432,000 Total Available Source (gpd) 8,071,200 8,071,200 8,071,200 8,071,200 Source Surplus/(Deficiency) - Existing Sources (gpd) 3,854,679 3,577,552 2,403,571 0 Evaluation of Existing Sources Available Existing Source (gpd) Notes: (1) Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). (2) Maximum ERUs to be served with current sources, based on maximum production rate (i.e., 24 hours per day). Max ERUs = Total Available Source / Maximum Day Demand per ERU (414 gpd/ERU). 7.4 Water Supply Facilities Evaluation This section evaluates the District’s existing supply facilities to determine if they have sufficient capacity to provide water supply at a rate that meets the existing and future demands of the one or more zones they supply. For the purpose of analyzing the District’s supply facilities, the District’s total service area was broken up into multiple supply areas. These supply areas include one or more pressure zones and were determined based on the ability to transfer water between the zones included in the supply area, either through booster pump stations or pressure reducing stations. Similar to the source evaluation above, the demands used in the evaluation for 2018 and 2032 are future demand projections without reductions from conservation efforts and include the demands of the satellite system. This section also identifies facility deficiencies that are not related to the capacity of the facilities. Section 7 – Water System Analysis Silverdale Water District 7-5 2013 Comprehensive Water System Plan August 2014 7.4.1 Supply Analysis Criteria The evaluation of supply facilities to determine if they have adequate capacity is based on one of two criteria, as follows. If the supply area that the facility supplies into has water storage, then the amount of supply required is equal to the maximum day demand of the zone. If the supply area that the facility supplies does not have water storage, then the amount of supply required is equal to the peak hour demand of the supply area. The higher supply requirement of the latter criteria is due to the lack of equalizing storage that is typically utilized to provide short-term supply during times of peak system demands. 7.4.2 Supply Analysis Results Zone 3, 3.2, 5, and 7 Supply Capacity Evaluation As shown in Table 7-5, four of the District’s groundwater wells and three of the District’s pump stations provide water directly into the Zone 3, 3.2, 5, and 7 supply area. Table 7-5 summarizes the current and future supply requirements of the supply area, based on existing and projected water demands for the pressure zones contained in the supply area and the transfer amount necessary to meet the demands of Zone 9 (H.E. 537 feet). Since all of the water in Zone 9 (H.E. 537 feet) is pumped from Zone 3 (H.E. 361 feet) via the Windsong Pump Station, the Zone 3, 3.2, 5, and 7 supply facilities must have sufficient capacity to meet the supply requirements of that zone as well. The results of the analysis indicate that the existing configuration and capacities of the District’s supply facilities are sufficient to meet both the existing and projected 2032 demands of the Zone 3, 3.2, 5, and 7 supply area. Section 7 – Water System Analysis Silverdale Water District 7-6 2013 Comprehensive Water System Plan August 2014 Table 7-5. Zone 3, 3.2, 5 and 7 Supply Evaluation Year 2012 2018 2032 Max(2) Projected ERUs and Demand (1) Equivalent Residential Units (ERU's) 2,540 2,706 3,327 8,110 500,286 533,167 655,344 1,597,714 1,364,034 1,453,684 1,786,801 3,355,200 Eldorado PS (600 gpm) 864,000 864,000 864,000 864,000 Provost PS (Zone 5) (210 gpm) 302,400 302,400 302,400 302,400 Provost PS (Zone 3) (320 gpm) 460,800 460,800 460,800 460,800 Westwind Well (420 gpm) 604,800 604,800 604,800 604,800 Hess Well (270 gpm) 388,800 388,800 388,800 388,800 Dawn Park Well (210 gpm) 302,400 302,400 302,400 302,400 Wixson Well (300 gpm) 432,000 432,000 432,000 432,000 Total Available Source (gpd) 3,355,200 3,355,200 3,355,200 3,355,200 Source Surplus/(Deficiency) - Existing Sources (gpd) 1,991,166 1,901,516 1,568,399 0 Average Day Demand gpd) Maximum Day Demand (gpd) Evaluation of Existing Sources Available Existing Source (gpd) Notes: (1) Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). (2) Maximum ERUs to be served with current sources, based on maximum production rate (i.e., 24 hours per day). Max ERUs = Total Available Source / Maximum Day Demand per ERU (414 gpd/ERU). Zone 3, 3.2, 5, and 7 Supply Reliability Evaluation The number, location and configuration of the multiple wells in the Zone 3, 3.2, 5, and 7 supply area provide the District with the ability to maintain a reliable source of supply to the system. Most of the wells have a receptacle for a portable engine generator for backup power supply to ensure continuous operation of the facility in the event of a power outage. All of the well facilities are connected to the District’s telemetry and control system, so District personnel are notified immediately if any of the wells are not operating properly. The Dawn Park Well was built in the 1960s and is in generally good condition. The mechanical components of the well are aging and are beginning to corrode. The site is equipped with a receptacle for a portable engine generator set to allow for well operation during extended periods of power outages. If a power outage were to occur, the Shadow Glen Reservoir, which serves Zone 3.2 (H.E. 392 feet), can provide water supply to the zone until power was restored or the generator was brought to the site. Redundant supply is also provided to Zone 3.2 through the Mt. View PRV. Zone 3, 3.2, 5, and 7 Supply Facility Evaluation The Westwind Well is in very good condition. The Hess Well is in good condition. capabilities. Section 7 – Water System Analysis Silverdale Water District The site, however, does not have backup power 7-7 2013 Comprehensive Water System Plan August 2014 The Wixson Well is located at the same site as the Wixson Reservoir and is housed in a new building that is in good condition. The well currently does not have the capacity to fully utilize its water rights. Additionally, the site does not have backup power capabilities. Redevelopment of the well or drilling a second well may increase the yield of the source to meet its existing water rights. The Dickey Well is housed in a smaller building adjacent to an elementary school. The well building is painted to match the school. The site is not fenced, but does have an intrusion detector switch to notify the District if unauthorized entry is detected. The site does not have backup power capabilities. The District currently intends to transfer this well’s water rights to another well and abandon the facility. Zone 2 and 4 Supply Capacity Evaluation As shown in Table 7-6, four of the District’s groundwater wells and the Chena pump station provide water directly into the Zone 2 and 4 supply area. Table 7-6 summarizes the current and future supply requirements of the supply area, based on existing and projected water demands for the pressure zones contained in the supply area. The supply area also contains demands for Zones 4.1, 4.2 and 4.4 which are supplied via PRVs from Zone 4. The results of the analysis indicate that the existing configuration and capacities of the District’s supply facilities are sufficient to meet both the existing and projected 2032 demands of the Zone 2 and 4 supply area. Table 7-6. Zone 2 and 4 Supply Evaluation Year 2012 2018 2032 Max(2) Projected ERUs and Demand (1) Equivalent Residential Units (ERU's) 3,592 3,828 4,706 17,769 707,662 754,172 926,993 3,500,571 1,379,967 1,470,664 1,807,672 7,351,200 1,440,000 1,440,000 1,440,000 1,440,000 252,000 252,000 252,000 252,000 Spirit Ridge Well No. 3 (830 gpm) 1,195,200 1,195,200 1,195,200 1,195,200 Spirit Ridge Well No. 4 (1600 gpm) 2,304,000 2,304,000 2,304,000 2,304,000 0 2,160,000 2,160,000 2,160,000 Total Available Source (gpd) 5,191,200 7,351,200 7,351,200 7,351,200 Source Surplus/(Deficiency) - Existing Sources (gpd) 3,811,233 5,880,536 5,543,528 0 Average Day Demand gpd) Maximum Day Demand (gpd) Evaluation of Existing Sources Available Existing Source (gpd) Ridgetop Well (1000 gpm) Bucklin Ridge Well (175 gpm) Chena Pump Station (1500 gpm) (3) Notes: (1) Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). (2) Maximum ERUs to be served with current sources, based on maximum production rate (i.e., 24 hours per day). Max ERUs = Total Available Source / Maximum Day Demand per ERU (414 gpd/ERU). (3) Future Chena Pump Station on Chena Well No. 2 site. Section 7 – Water System Analysis Silverdale Water District 7-8 2013 Comprehensive Water System Plan August 2014 Zone 2 and 4 Supply Reliability Evaluation The number, location and configuration of the multiple wells in the Zone 2 and 4 supply area provide the District with the ability to maintain a reliable source of supply to the system. Most of the wells have a receptacle for a portable engine generator for backup power supply to ensure continuous operation of the facility in the event of a power outage. All of the well facilities are connected to the District’s telemetry and control system, so District personnel are notified immediately if any of the wells are not operating properly. Zone 2 and 4 Supply Facility Evaluation The Ridgetop Well is housed in a new building and is in very good condition. The Bucklin Ridge Well is located in an aging CMU building that is in need of general updating. The well’s mechanical equipment is corroding and needs to be updated. The site does not currently have backup power capabilities. The Spirit Ridge Wells are two of the District’s highest capacity wells and are housed at separate sites. Both of the buildings are in generally good condition. Both well sites have receptacles for a portable engine generator for backup power supply. Spirit Ridge 4 recently was upgraded with a new 250 hp motor. Zone 6 (H.E. 515 feet) Supply Capacity Evaluation The Island Lake Well supplies water to Zone 6 (H.E. 515 feet). As shown in Table 7-7, the well has sufficient capacity to meet the existing demands of the zone. The area that is served by Zone 6 (H.E. 515 feet) is fully developed, therefore it is not anticipated that demands will increase in the future. Table 7-7. Zone 6 Supply Evaluation Year 2012 2018 2032 Max(2) Projected ERUs and Demand (1) Equivalent Residential Units (ERU's) 560 597 734 1,044 Average Day Demand gpd) 110,405 117,661 144,624 205,714 Maximum Day Demand (gpd) 204,916 218,384 268,428 432,000 432,000 432,000 432,000 432,000 Total Available Source (gpd) 432,000 432,000 432,000 432,000 Source Surplus/(Deficiency) - Existing Sources (gpd) 227,084 213,616 163,572 0 Evaluation of Existing Sources Available Existing Source (gpd) Island Lake Well (300 gpm) Notes: (1) Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). (2) Maximum ERUs to be served with current sources, based on maximum production rate (i.e., 24 hours per day). Max ERUs = Total Available Source / Maximum Day Demand per ERU (414 gpd/ERU). Section 7 – Water System Analysis Silverdale Water District 7-9 2013 Comprehensive Water System Plan August 2014 Zone 6 (H.E. 515 feet) Supply Reliability Evaluation The reliability of supply to Zone 6 (H.E. 515 feet) is achieved with the Island Lake Well and check valves which connect Zone 4 (H.E. 485 feet) to Zone 6 (H.E. 515 feet). The check valves allow water from Zone 4 (H.E. 485 feet) to enter Zone 6 (H.E. 515 feet) when the hydraulic grade in Zone 6 (H.E. 515 feet) is suppressed. Zone 6 (H.E. 485 feet) Supply Facility Evaluation The Island Lake Well was built in the 1980s and is in good condition. The District recently completed a project that raised the Island Lake 0.3 MG Reservoir, which serves Zone 6 (H.E. 485 feet), by 30 feet. The overall capacity of the Reservoir is now 0.436 MG. Zone 7 (H.E. 628 feet) Supply Capacity Evaluation The Wixson Well and Dickey Pump Station supplies water to Zone 7 (H.E. 628 feet). As shown in Table 7-8, the sources have sufficient capacity to meet the existing and future demands of the zone. Table 7-8. Zone 7 Supply Evaluation Year 2012 2018 2032 Max(2) Projected ERUs and Demand (1) Equivalent Residential Units (ERU's) 493 526 646 4,177 97,207 103,596 127,335 822,857 353,801 377,054 463,457 1,728,000 432,000 432,000 432,000 432,000 1,296,000 1,296,000 1,296,000 1,296,000 Total Available Source (gpd) 1,728,000 1,728,000 1,728,000 1,728,000 Source Surplus/(Deficiency) - Existing Sources (gpd) 1,374,199 1,350,946 1,264,543 0 Average Day Demand (gpd) Maximum Day Demand (gpd) Evaluation of Existing Sources Available Existing Source (gpd) Wixson Well (300 gpm) Dickey Pump Station (900 gpm) Notes: (1) Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). (2) Maximum ERUs to be served with current sources, based on maximum production rate (i.e., 24 hours per day). Max ERUs = Total Available Source / Maximum Day Demand per ERU (414 gpd/ERU). 7.5 Storage Facilities This section evaluates the District’s existing water storage facilities to determine if they have sufficient capacity to meet the existing and future storage requirements of the system. This section also identifies facility deficiencies that are not related to the capacity of the water storage facilities. Section 7 – Water System Analysis Silverdale Water District 7-10 2013 Comprehensive Water System Plan August 2014 7.5.1 Design Criteria According to DOH requirements, water system storage volume is comprised of five separate components: Operating volume Equalizing volume Fire flow volume Standby volume Dead volume These required volume components are illustrated in Figure 7-1. All storage components are described in more detail below. Figure 7—1. Storage Components Operating and Dead Storage Volumes Operating volume is the water that lies between low and high water storage elevations set by District operations staff to control system pumps and flow control valves. Dead volume is the volume at the bottom of the tank that cannot be used because it is physically too low to provide sufficient pressures. Operational and dead volumes are subtracted from total storage to determine the effective storage available for equalizing, standby, and fire flow. Equalizing Volume Equalizing volume is the total volume needed to moderate daily fluctuations in diurnal demands during periods when the demand exceeds the capacity of the supply system. Equalizing volume requirements are greatest on the day of peak demand. Operation of a properly balanced system results in replenishment of storage facilities during times of day when the demand curve is below the capacity of the supply system, and depletion of storage facilities when the demand exceeds Section 7 – Water System Analysis Silverdale Water District 7-11 2013 Comprehensive Water System Plan August 2014 the supply capacity. The equalizing volume of a storage tank must be located at an elevation that provides a minimum pressure of 30 pounds per square inch (psi) to all customers served by the tank. Fire Flow Volume The required fire flow volume for a given pressure zone is calculated as the required fire flow multiplied by the required duration, as established by the local fire authority. Required fire flows and durations vary across the District’s service area, as it includes multiple zoning designations. The maximum fire flow volume considered in this analysis is 4,000 gpm for 2 hours. The fire flow volume of a storage tank must be located at an elevation that provides a minimum pressure of 20 psi to all customers served by the tank. DOH allows for the “nesting” of standby and fire flow storage, with the larger used for the storage volume. For the purpose of this plan, the nesting of standby and fire flow storage volumes is not considered. Standby Volume Standby volume is required to supply reasonable system demands during a foreseeable system emergency or outage. A key concept is that establishing standby volume involves planning for reasonable system outages – those that can be expected to occur under normal operating conditions, such as a pipeline failure, power outage or valve failure. Major system emergencies, such as those created by an earthquake, are intended to be covered by emergency system operations planning, since construction of sufficient reserve volume to accommodate sustained system demands under emergency conditions is not economically feasible. DOH has established guidelines for determining minimum required standby volume. This component is calculated as the greater of: two times the average day demand, less multi-source credit; or 200 gallons times the number of ERUs served by the storage facility. The multi-source credit is applicable only for pressure zones that have multiple sources of supply, and allows the required standby storage volume in such instances to be reduced. The credit assumes the largest source of supply is out of service; thus, it is calculated as the total source available to a particular pressure zone, or zone combination, less the capacity of the largest source. No credit is allowed for zones having only one source of supply. 7.5.2 Storage Analysis The storage analyses are based on an evaluation of the existing tanks providing water to the six combinations of operating areas that they serve: Total System Zone 3, 3.2, 5, and 7 Zone 2, 4, and 6 Zone 6 Section 7 – Water System Analysis Silverdale Water District 7-12 2013 Comprehensive Water System Plan August 2014 Zone 5 and 7 Zone 7 The demands used in the evaluation of future storage requirements are future demand projections without reductions from conservation efforts, as shown in Section 4. Total System Table 7-9 summarizes the results of the water storage evaluation for the existing system, based on 2012 storage requirements (i.e. demands) and capacities of existing storage facilities. The maximum combined storage capacity of the District’s storage facilities is 5.42 MG. However, the total amount of usable storage for operational, equalizing, standby and fire flow purposes is reduced to 4.00 MG, which is primarily due to the amount of dead storage (i.e. non-usable storage) in the District’s reservoirs. The highest service elevation in the zone served directly by the reservoir was used as the basis for calculating the amount of dead storage in that reservoir. There is a surplus of usable storage volume through the 2032 demand projection. The new Chena and Apex reservoirs are anticipated to be online by 2018 which increase the District’s usable storage volume to 6.55 MG. Zone 3, 3.2, 5, and 7 Table 7-10 summarizes the results of the water storage evaluation for Zones 3, 3.2, 5 and 7 based on 2012 storage requirements (i.e. demands) and capacities of existing storage facilities. A separate storage analysis was conducted for this area to ensure that the Loretta Heights, Westwind, Shadow Glen, Dickey Road, and Wixson reservoirs in these elevated zones have sufficient capacity to serve the current and projected demands from Section 4. There is a surplus of usable storage volume through the 2032 demand projection. The new Apex reservoir is anticipated to be online by 2018 which will increase the usable storage volume in the area. Zone 2, 4 and 6 Table 7-11 summarizes the results of the water storage evaluation for Zones 2, 4, and 6 based on 2012 storage requirements (i.e. demands) and capacities of existing storage facilities. A separate storage analysis was conducted for this area to ensure that the Island Lake, Ridgetop, and Spirit Ridge reservoirs in these elevated zones have sufficient capacity to serve the current and projected demands from Section 4. There is a surplus of usable storage volume through the 2032 demand projection. Zone 6 Table 7-12 summarizes the results of the water storage evaluation for Zone 6. A separate storage analysis was conducted for this zone to ensure that the Island Lake reservoir has sufficiency Section 7 – Water System Analysis Silverdale Water District 7-13 2013 Comprehensive Water System Plan August 2014 capacity to provide operational and equalizing storage. Fire flow and standby storage are provided in the Zone 2 and 4 reservoirs. There is a surplus of operational and equalizing storage volume in the Island Lake Reservoir through the 2032 demand projection. Zone 5 and 7 Table 7-13 summarizes the results of the water storage evaluation for Zones 5 and 7 based on 2012 storage requirements (i.e. demands) and capacities of existing storage facilities. A separate storage analysis was conducted for this area to ensure that the Dickey Road, Wixson, and New Apex reservoirs in Zones 5 and 7 have sufficient capacity to serve the current and projected demands from Section 4. There is a surplus of usable storage volume through the 2032 demand projection. The addition of the new Apex Reservoir increases the usable storage volume in Zone 5 and 7. Without the reservoir, a deficiency in storage would be reported with the 2018 demand projection. Zone 7 Table 7-14 summarizes the results of the water storage evaluation for Zone 7 based on 2012 storage requirements (i.e. demands) and capacities of existing storage facilities. A separate storage analysis was conducted for this Zone to ensure that the Wixson reservoir has sufficient capacity to serve the current and projected demands from Section 4. There is a surplus of usable storage volume in Zone 7 through the 2032 demand projection. Section 7 – Water System Analysis Silverdale Water District 7-14 2013 Comprehensive Water System Plan August 2014 Table 7-9. Total System Storage Evaluation Projected ERUs and Demand(1) Equivalent Residential Units (ERU's) Average Day Demand (gpd) Maximum Day Demand (gpd) Available Source (gpd)(2) Eldorado Well (220 gpm) Provost Well (280 gpm) Ridgetop Well (1000 gpm) Westwind Well (420 gpm) Hess Well (270 gpm) Dawn Park Well (210 gpm) Bucklin Ridge Well (175 gpm) Spirit Ridge Well No. 3 (830 gpm) Spirit Ridge Well No. 4 (1600 gpm) Island Lake Well (300 gpm) Wixson Well (300 gpm) Total Available Source (gpd) Multi-Source Credit (gpd)(3) Required Storage Calculations Operational Storage (mg)(4) Equalizing Storage (mg)(5) Standby Storage (mg)(6) Fire Flow Storage (mg)(7) Required Storage Greater than 30 psi at highest meter (mg)(8) Greater than 20 psi at highest meter (mg)(9) Existing Storage Greater Than 30 psi (mg)(10) Chena 0.25 MG Dickey 0.25 MG Eldorado 0.07 MG Island Lake 0.439 MG Island Lake 1.5 MG Loretta Heights 0.20 MG Provost 0.25 MG Ridgetop 0.65 MG Shadow Glen 0.30 MG Westwind 0.30 MG Wixson 1.0 MG Spirit Ridge 0.05 MG Chena 2.02 MG Apex 0.75 MG Total Existing Storage at 30 psi (mg) Storage Surplus/(Deficiency) at 30 psi (mg) Existing Storage Greater Than 20 psi (mg)(10) Chena 0.25 MG Dickey 0.25 MG Eldorado 0.07 MG Island Lake 0.439 MG Island Lake 1.5 MG Loretta Heights 0.20 MG Provost 0.25 MG Section 7 – Water System Analysis Silverdale Water District 2012 Year 2018 2032 10,232 2,011,846 4,216,521 10,903 2,144,072 4,493,648 13,752 2,704,218 5,667,629 316,800 403,200 1,440,000 604,800 388,800 302,400 252,000 1,195,200 2,304,000 432,000 432,000 8,071,200 5,767,200 316,800 403,200 1,440,000 604,800 388,800 302,400 252,000 1,195,200 2,304,000 432,000 432,000 8,071,200 5,767,200 316,800 403,200 1,440,000 604,800 388,800 302,400 252,000 1,195,200 2,304,000 432,000 432,000 8,071,200 5,767,200 577,957 0 2,042,483 480,000 1,010,710 0 2,176,723 480,000 1,010,710 118,122 2,745,399 480,000 577,957 3,100,440 1,010,710 3,667,434 1,128,833 4,354,232 86,601 14,103 18,727 119,149 451,646 86,612 61,318 322,932 89,721 122,485 252,761 0 1,626,055 1,048,098 86,601 14,103 18,727 119,149 451,646 86,612 61,318 322,932 89,721 122,485 252,761 0 804,958 27,745 2,458,758 1,448,048 86,601 14,103 18,727 119,149 451,646 86,612 61,318 322,932 89,721 122,485 252,761 0 804,958 27,745 2,458,758 1,329,925 251,825 250,000 72,956 225,437 1,006,948 209,107 222,683 251,825 250,000 72,956 225,437 1,006,948 209,107 222,683 251,825 250,000 72,956 225,437 1,006,948 209,107 222,683 0 0 7-15 2013 Comprehensive Water System Plan August 2014 Ridgetop 0.65 MG Shadow Glen 0.30 MG Westwind 0.30 MG Wixson 1.0 MG Spirit Ridge 0.05 MG (11) Chena 2.02 MG Apex 0.75 MG Total Existing Storage at 20 psi (mg) Storage Surplus/(Deficiency) at 20 psi (mg) Notes: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) 2012 676,774 211,736 318,460 503,433 52,873 0 0 4,002,233 901,793 Year 2018 676,774 211,736 318,460 503,433 52,873 2,019,455 532,208 6,553,896 2,886,462 2032 676,774 211,736 318,460 503,433 52,873 2,019,455 532,208 6,553,896 2,199,664 Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). Available source assumes source pumps are on for 24 hours in a day, at the maximum production rate. Multi-source credit assumes largest source is out of service. Required operational storage is based on observed tank level fluctuations. Required Equalizing Storage is equal to [(PHD - Total Available Source) x 150 minutes]. PHD : (Maximum Day Demand per ERU / 1440) * [(C) * (N) + F] + 18 Required Standby Storage is the greater of (2*ADD less multi-source credit) or (200 gallons per ERU). Required Fire Flow Storage = 4000 gpm x 2 hours. Total required storage greater than 30 psi is equal to the total of operational and equalizing storage. Total required storage greater than 20 psi is equal to the total of operational, equalizing, standby, and fire flow storage. The storage volume available in reservoirs at 30 and 20 psi is based on the elevation of the highest customer in the pressure zone within which the reservoir is located. The entire Spirit Ridge Reservoir volume is available to Zone 4 for Standby purposes via the Spirit Ridge Pump Station. Because the reservoir's overflow elevation is lower than the hydraulic elevation of Zone 4, no volume is available above 30 psi for operational or equalization storage. Section 7 – Water System Analysis Silverdale Water District 7-16 2013 Comprehensive Water System Plan August 2014 Table 7-10. Zone 3, 3.2, 5, and 7 Storage Evaluation Year 2012 2018 Projected ERUs and Demand(1) Equivalent Residential Units (ERU's) 2,540 2,706 Average Day Demand (gpd) 500,286 533,167 Maximum Day Demand (gpd) 1,364,034 1,453,684 Available Source (gpd)(2) Eldorado PS (600 gpm) 864,000 864,000 Provost PS (Zone 5) (210 gpm) 302,400 302,400 Provost PS (Zone 3) (320 gpm) 460,800 460,800 Westwind Well (420 gpm) 604,800 604,800 Hess Well (270 gpm) 388,800 388,800 Dawn Park Well (210 gpm) 302,400 302,400 Wixson Well (300 gpm) 432,000 432,000 Total Available Source (gpd) 3,355,200 3,355,200 Multi-Source Credit (gpd)(3) 2,491,200 2,491,200 Required Storage Calculations Operational Storage (mg)(4) 197,382 262,962 Equalizing Storage (mg)(5) 0 0 Standby Storage (mg)(6) 507,905 541,286 Fire Flow Storage (mg)(7) 420,000 420,000 Required Storage Greater than 30 psi at highest meter (mg)(8) 197,382 262,962 Greater than 20 psi at highest meter (mg)(9) 1,125,286 1,224,248 Existing Storage Greater Than 30 psi (mg)(10) Loretta Heights 0.20 MG 86,612 86,612 Westwind 0.30 MG 122,485 122,485 Shadow Glen 0.30 MG 89,721 89,721 Dickey Road 0.25 MG 14,103 14,103 Wixson 1.0 MG 252,761 252,761 Apex 0.75 MG 27,745 Total Existing Storage at 30 psi (mg) 565,682 593,428 Storage Surplus/(Deficiency) at 30 psi (mg) 368,300 330,466 Existing Storage Greater Than 20 psi (mg)(10) Loretta Heights 0.20 MG 209,107 209,107 Westwind 0.30 MG 318,460 318,460 Shadow Glen 0.30 MG 211,736 211,736 Dickey Road 0.25 MG 250,000 250,000 Wixson 1.0 MG 503,433 503,433 Apex 0.75 MG 532,208 Total Existing Storage at 20 psi (mg) 1,492,736 2,024,944 Storage Surplus/(Deficiency) at 20 psi (mg) 367,450 800,696 2032 3,327 655,344 1,786,801 864,000 302,400 460,800 604,800 388,800 302,400 432,000 3,355,200 2,491,200 262,962 0 665,324 420,000 262,962 1,348,286 86,612 122,485 89,721 14,103 252,761 27,745 593,428 330,466 209,107 318,460 211,736 250,000 503,433 532,208 2,024,944 676,659 Notes: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). Number of ERUs is based on Average Day Demand divided by 198 gpd per ERU. Available source assumes source pumps are on for 24 hours in a day, at the maximum production rate. Multi-source credit assumes largest source is out of service. Required operational storage is based on observed tank level fluctuations. Required Equalizing Storage is equal to [(PHD - Total Available Source) x 150 minutes]. PHD : (Maximum Day Demand per ERU / 1440) * [(C) * (N) + F] + 18 Required Standby Storage is the greater of (2*ADD less multi-source credit) or (200 gallons per ERU). Required Fire Flow Storage = 3500 gpm x 2 hours. Total required storage greater than 30 psi is equal to the total of operational and equalizing storage. Total required storage greater than 20 psi is equal to the total of operational, equalizing, standby, and fire flow storage. The storage volume available in reservoirs at 30 and 20 psi is based on the elevation of the highest customer in the pressure zone within which the reservoir is located. Section 7 – Water System Analysis Silverdale Water District 7-17 2013 Comprehensive Water System Plan August 2014 Table 7-11. Zone 2, 4, and 6 Storage Evaluation Projected ERUs and Demand(1) Equivalent Residential Units (ERU's) Average Day Demand (gpd) Maximum Day Demand (gpd) Available Source (gpd)(2) Ridgetop Well (1000 gpm) Island Lake Well (300 gpm) Bucklin Ridge Well (175 gpm) Spirit Ridge Well No. 3 (830 gpm) Spirit Ridge Well No. 4 (1600 gpm) Chena Pump Station (1500 gpm) Total Available Source (gpd) Multi-Source Credit (gpd)(3) Required Storage Calculations Operational Storage (mg)(4) Equalizing Storage (mg)(5) Standby Storage (mg)(6) Fire Flow Storage (mg)(7) Required Storage Greater than 30 psi at highest meter (mg)(8) Greater than 20 psi at highest meter (mg)(9) Existing Storage Greater Than 30 psi (mg)(10) Island Lake 0.439 MG Island Lake 1.5 MG Ridgetop 0.65 MG Spirit Ridge 0.05 MG Total Existing Storage at 30 psi (mg) Storage Surplus/(Deficiency) at 30 psi (mg) Existing Storage Greater Than 20 psi (mg)(10) Island Lake 0.439 MG Island Lake 1.5 MG Ridgetop 0.65 MG Spirit Ridge 0.05 MG (11) Total Existing Storage at 20 psi (mg) Storage Surplus/(Deficiency) at 20 psi (mg) Notes: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) 2012 Year 2018 2032 4,153 818,067 1,584,884 4,426 871,833 1,689,049 5,440 1,071,617 2,076,100 1,440,000 432,000 252,000 1,195,200 2,304,000 0 5,623,200 3,319,200 1,440,000 432,000 252,000 1,195,200 2,304,000 2,160,000 7,783,200 5,479,200 1,440,000 432,000 252,000 1,195,200 2,304,000 2,160,000 7,783,200 5,479,200 310,226 0 830,524 450,000 310,226 0 885,110 450,000 310,226 0 1,087,936 450,000 310,226 1,590,750 310,226 1,645,336 310,226 1,848,162 119,149 451,646 322,932 0 893,727 583,501 119,149 451,646 322,932 0 893,727 583,501 119,149 451,646 322,932 0 893,727 583,501 225,437 1,006,948 676,774 52,873 1,962,033 371,282 225,437 1,006,948 676,774 52,873 1,962,033 316,697 225,437 1,006,948 676,774 52,873 1,962,033 113,871 Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). Available source assumes source pumps are on for 24 hours in a day, at the maximum production rate. Multi-source credit assumes largest source is out of service. Required operational storage is based on observed tank level fluctuations. Required Equalizing Storage is equal to [(PHD - Total Available Source) x 150 minutes]. PHD : (Maximum Day Demand per ERU / 1440) * [(C) * (N) + F] + 18 Required Standby Storage is the greater of (2*ADD less multi-source credit) or (200 gallons per ERU). Required Fire Flow Storage = 3750 gpm x 2 hours. Total required storage greater than 30 psi is equal to the total of operational and equalizing storage. Total required storage greater than 20 psi is equal to the total of operational, equalizing, standby, and fire flow storage. The storage volume available in reservoirs at 30 and 20 psi is based on the elevation of the highest customer in the pressure zone within which the reservoir is located. The entire Spirit Ridge Reservoir volume is available to Zone 4 for Standby purposes via the Spirit Ridge Pump Station. Because the reservoir's overflow elevation is lower than the hydraulic elevation of Zone 4, no volume is available above 30 psi for operational or equalization storage. Section 7 – Water System Analysis Silverdale Water District 7-18 2013 Comprehensive Water System Plan August 2014 Table 7-12. Zone 6 Storage Evaluation 2012 Projected ERUs and Demand(1) Equivalent Residential Units (ERU's) Average Day Demand (gpd) Maximum Day Demand (gpd) Available Source (gpd)(2) Island Lake Well (300 gpm) Total Available Source (gpd) Multi-Source Credit (gpd)(3) Required Storage Calculations Operational Storage (mg)(4) Equalizing Storage (mg)(5) Standby Storage (mg)(6) Fire Flow Storage (mg)(7) Required Storage Greater than 30 psi at highest meter (mg)(8) Greater than 20 psi at highest meter (mg)(8) Existing Storage Greater Than 30 psi (mg)(9) Island Lake 0.439 MG Total Existing Storage at 30 psi (mg) Storage Surplus/(Deficiency) at 30 psi (mg) Year 2018 2032 560 110,405 204,916 597 117,661 218,384 734 144,624 268,428 432,000 432,000 0 432,000 432,000 0 432,000 432,000 0 41,913 6,038 0 0 41,913 8,577 0 0 41,913 18,014 0 0 47,951 47,951 50,491 50,491 59,927 59,927 119,149 119,149 71,198 119,149 119,149 68,659 119,149 119,149 59,222 Notes: (1) Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). (2) Available source assumes source pumps are on for 24 hours in a day, at the maximum production rate. (3) Multi-source credit assumes largest source is out of service. (4) Required operational storage is based on observed tank level fluctuations. (5) Required Equalizing Storage is equal to [(PHD - Total Available Source) x 150 minutes] . PHD : (Maximum Day Demand per ERU / 1440) * [(C) * (N) + F] + 18 (6) Required Standby Storage is provided by Zone 2 and 4 Reservoirs (7) Required Fire Flow Storage is provided by Zone 2 and 4 Reservoirs (8) Total required storage greater than 30 psi is equal to the total of operational and equalizing storage. (9) The storage volume available in reservoirs at 30 and 20 psi is based on the elevation of the highest customer in the pressure zone within which the reservoir is located. Section 7 – Water System Analysis Silverdale Water District 7-19 2013 Comprehensive Water System Plan August 2014 Table 7-13. Zone 5 and 7 Storage Evaluation 2012 Projected ERUs and Demand(1) Equivalent Residential Units (ERU's) Average Day Demand (gpd) Maximum Day Demand (gpd) Available Source (gpd)(2) Provost PS (Zone 5) (210 gpm) Westwind PS (650 gpm) Wixson Well (300 gpm) Total Available Source (gpd) Multi-Source Credit (gpd)(3) Required Storage Calculations Operational Storage (mg)(4) Equalizing Storage (mg)(5) Standby Storage (mg)(6) Fire Flow Storage (mg)(7) Required Storage Greater than 30 psi at highest meter (mg)(8) Greater than 20 psi at highest meter (mg)(9) Existing Storage Greater Than 30 psi (mg)(10) Dickey Road 0.25 MG Wixson 1.0 MG Apex 0.75 MG Total Existing Storage at 30 psi (mg) Storage Surplus/(Deficiency) at 30 psi (mg) Existing Storage Greater Than 20 psi (mg)(10) Dickey Road 0.25 MG Wixson 1.0 MG Apex 0.75 MG Total Existing Storage at 20 psi (mg) Storage Surplus/(Deficiency) at 20 psi (mg) Notes: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Year 2018 2032 1,594 314,048 887,673 1,699 334,689 946,015 2,088 411,384 1,162,797 302,400 936,000 432,000 1,670,400 734,400 302,400 936,000 432,000 1,670,400 734,400 302,400 936,000 432,000 1,670,400 734,400 76,783 0 318,831 300,000 142,363 0 339,786 300,000 142,363 0 417,649 300,000 76,783 695,614 142,363 782,149 142,363 860,012 14,103 252,761 14,103 252,761 27,745 294,609 152,246 14,103 252,761 27,745 294,609 152,246 250,000 503,433 532,208 1,285,642 503,492 250,000 503,433 532,208 1,285,642 425,629 266,864 190,081 250,000 503,433 753,433 57,819 Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). Available source assumes source pumps are on for 24 hours in a day, at the maximum production rate. Multi-source credit assumes largest source is out of service. Required operational storage is based on observed tank level fluctuations. Required Equalizing Storage is equal to [(PHD - Total Available Source) x 150 minutes]. PHD : (Maximum Day Demand per ERU / 1440) * [(C) * (N) + F] + 18 (C & F values obtained from Table 5-1 in DOH Dec 2009 WSDM) Required Standby Storage is the greater of (2*ADD less multi-source credit) or (200 gallons per ERU). Required Fire Flow Storage = 2500 gpm x 2 hours. Total required storage greater than 30 psi is equal to the total of operational and equalizing storage. Total required storage greater than 20 psi is equal to the total of operational, equalizing, standby, and fire flow storage. The storage volume available in reservoirs at 30 and 20 psi is based on the elevation of the highest customer in the pressure zone within which the reservoir is located. Section 7 – Water System Analysis Silverdale Water District 7-20 2013 Comprehensive Water System Plan August 2014 Table 7-14. Zone 7 Storage Evaluation 2012 Projected ERUs and Demand(1) Equivalent Residential Units (ERU's) Average Day Demand (gpd) Maximum Day Demand (gpd) Available Source (gpd)(2) Wixson Well (300 gpm) Dickey Pump Station (900 gpm) Total Available Source (gpd) Multi-Source Credit (gpd)(3) Required Storage Calculations Operational Storage (mg)(4) Equalizing Storage (mg)(5) Standby Storage (mg)(6) Fire Flow Storage (mg)(7) Required Storage Greater than 30 psi at highest meter (mg)(8) Greater than 20 psi at highest meter (mg)(9) Existing Storage Greater Than 30 psi (mg)(10) Wixson 1.0 MG Total Existing Storage at 30 psi (mg) Storage Surplus/(Deficiency) at 30 psi (mg) Existing Storage Greater Than 20 psi (mg)(10) Wixson 1.0 MG Total Existing Storage at 20 psi (mg) Storage Surplus/(Deficiency) at 20 psi (mg) Notes: (1) (2) (3) (4) (5) (7) (8) (9) (10) Year 2018 2032 493 97,207 353,801 526 103,596 377,054 646 127,335 463,457 432,000 1,296,000 1,728,000 432,000 432,000 1,296,000 1,728,000 432,000 432,000 1,296,000 1,728,000 432,000 43,450 0 98,687 210,000 43,450 0 105,174 210,000 43,450 0 129,274 210,000 43,450 352,137 43,450 358,623 43,450 382,724 252,761 252,761 209,311 252,761 252,761 209,311 252,761 252,761 209,311 503,433 503,433 151,296 503,433 503,433 144,810 503,433 503,433 120,709 Projected demands taken from Section 4. ERUs calculated as Average Day Demand / ERU water use factor (197 gpd/ERU). Number of ERUs is based on Average Day Demand divided by 198 gpd per ERU. Multi-source credit assumes largest source is out of service. Required operational storage is based on observed tank level fluctuations. Required Equalizing Storage is equal to [(PHD - Total Available Source) x 150 minutes]. PHD : (Maximum Day Demand per ERU / 1440) * [(C) * (N) + F] + 18 (C & F values obtained from Table 5-1 in DOH Dec 2009 WSDM) Required Fire Flow Storage = 1750 gpm x 2 hours. Total required storage greater than 30 psi is equal to the total of operational and equalizing storage. Total required storage greater than 20 psi is equal to the total of operational, equalizing, standby, and fire flow storage. The storage volume available in reservoirs at 30 and 20 psi is based on the elevation of the highest customer in the pressure zone within which the reservoir is located. 7.6 Distribution and Transmission System This section evaluates the District’s existing distribution and transmission system (i.e., water mains) to determine if they are sized and looped adequately to provide the necessary flow rates and pressures to meet the existing and future requirements of the system. This section also identifies deficiencies that are not related to the capacity of the water mains. Section 7 – Water System Analysis Silverdale Water District 7-21 2013 Comprehensive Water System Plan August 2014 7.6.1 Analysis Criteria Distribution and transmission water mains must be capable of adequately and reliably conveying water throughout the system at acceptable flow rates and pressures. The criteria used to evaluate the District’s distribution and transmission system are the state mandated requirements for Group A water systems contained in WAC 246-290-230 Distribution Systems. The pressure analysis criteria states that the distribution system “…shall be designed with the capacity to deliver the design peak hour demand quantity of water at 30 psi under peak hour demand flow conditions measured at all existing and proposed service water meters.” It also states that if fire flow is to be provided, “… the distribution system shall also provide maximum day demand (MDD) plus the required fire flow at a pressure of at least 20 psi at all points throughout the distribution system.” Hydraulic analyses of the existing system were performed under existing peak hour demand conditions to evaluate its current pressure capabilities and to identify existing system deficiencies. The existing system was also analyzed under existing maximum day demand conditions to evaluate the current fire flow capabilities and to identify additional existing system deficiencies. Additional hydraulic analyses were then performed with the same hydraulic model, but under future peak day demand conditions and with proposed improvements to demonstrate that the identified improvements will eliminate the deficiencies and meet the requirements far into the future. Following is a description of the hydraulic model and the operational conditions and facility settings used in the analyses. 7.6.2 Hydraulic Model Description A computer-based hydraulic model of the existing water system was updated using WaterCAD v8i software produced by Bentley. All facilities and water mains in the District’s water system, including dead-end mains, were modeled using current data. The water mains were entered from AutoCAD water system maps and as-built records provided by the District. Elevation data for the model’s junction nodes was electronically extracted from digital contour maps. Demand Data The hydraulic model of the existing system contains 2012 average day demand data. Supply data from the 2012 average day demand was distributed throughout the junction nodes of the model, based on actual consumption patterns of the system, as represented by the consumption levels for each of the District’s customer meter routes. Peaking factors shown in Section 4 were used to analyze the system under peak hour and peak day demand conditions. The hydraulic model of the proposed system contains 20-year demand levels that are projected for the year 2032. The distribution of demands is based on estimated future demand levels in each pressure zone. Section 7 – Water System Analysis Silverdale Water District 7-22 2013 Comprehensive Water System Plan August 2014 Facilities The hydraulic model of the existing system for the pressure analysis contains all active existing system facilities with settings that correspond to peak hour demand events. All sources of supply were operating at their normal rates of supply. In general, the District’s pump stations were modeled to operate at their normal operating state based on tank levels. The storage tank levels were modeled to reflect full utilization of operational and equalizing storage. Table 7-15 lists the tank levels used for each modeling scenario. All pressure regulating stations were modeled as being in service and operating at their normal set points. The fire flow analysis was conducted to determine the capability of the District’s existing water system to provide adequate fire flows. Fire flow goals at each node were based on the actual fire flow goal in the vicinity. In instances where multiple fire flow goals were represented by a single model node, the greater of the fire flow goals was applied to the model node. The hydraulic model of the existing system for the fire flow analyses contains all active existing system facilities with settings that correspond to peak day demand events. All sources of supply were operating at their normal rates of supply. All pressure regulating stations were modeled as being in service and operating at their normal set points. The storage tank levels were modeled to reflect full utilization of operational, equalizing and fire flow storage. Table 7-15 lists the tank levels used for each modeling scenario. The hydraulic model of the proposed system in the year 2032 contains all active existing system facilities and proposed system improvements that are identified in Section 9. The settings for all active existing and proposed facilities were set to correspond to the future peak day demand events for the fire flow analyses of the proposed water system. Otherwise, facility settings were the same as in the existing system analyses. Table 7-15. Tank Levels in Modeling Scenarios Peak Hour Demand Fire Flow Analysis (OS & EQ Depleted) (OS, EQ, Fire Depleted Chena Reservoir 0.25 MG 21.50 21.50 20.90 18.84 18.84 18.24 Dickey Road 19.50 19.50 18.97 14.14 14.14 13.61 Eldorado 27.00 27.00 26.26 24.34 24.34 23.60 Island Lake 0.438 MG 84.69 84.14 82.09 83.31 82.75 80.71 Island Lake 1.5 MG 58.00 58.00 56.46 53.06 53.06 51.52 Loretta Heights 22.20 22.20 21.58 16.80 16.80 16.18 Provost 33.00 33.00 32.15 30.34 30.34 29.49 Ridgetop 28.00 28.00 27.24 25.86 25.86 25.10 Shadow Glen 0.30 MG 52.00 52.00 50.54 39.78 39.78 38.32 Westwind Reservoir 24.50 24.50 23.84 19.10 19.10 18.44 Wixson Reservoir 1.0 MG 89.00 89.00 86.80 69.67 69.67 67.46 Spirit Ridge 0.05 MG 16.00 16.00 15.47 15.83 15.83 15.30 Calibration Hydraulic model calibration is the process of adjusting hydraulic model data so the model closely reflects actual system pressures and flows under similar demand and operating conditions. Due to the size of the District’s water system, limited field test data was available Section 7 – Water System Analysis Silverdale Water District 7-23 2013 Comprehensive Water System Plan August 2014 for full calibration of the hydraulic model. Initial Darcy-Weisbach roughness coefficients for the water mains were determined from computations that used age and material data for all pipe in the system. For example, older water mains were assigned higher roughness coefficients than new water mains, thereby accurately representing the fact that the internal surface of water pipe becomes rougher as it gets older. This approach has resulted in accurate hydraulic models for other systems without the need for extensive modifications to the model based on field data. 7.6.3 Hydraulic Analyses Several hydraulic analyses were performed to determine the capability of the system to meet the pressure and flow requirements identified in Section 5 and contained in WAC 246-290-230. Analyses were performed to determine the pressures throughout the system under existing (i.e. 2012) and future (i.e. 2018 and 2032) peak hour demand conditions. The results of these analyses were used to identify locations of low and high pressures. To satisfy the minimum pressure requirements, the pressure at all water service locations must be at least 30 psi during these demand conditions. In addition, the system should not have widespread areas with high pressures, generally considered to be more than approximately 100 psi. Table 7-16 provides a summary of low and high pressure areas in the system identified in Figures 7-2 and 7-3. All water mains with pressure less than 30 psi, as identified from the analyses, were generally located at areas of higher elevations. The areas with water pressures above 100 psi, as identified from the analyses, are located in a localized area of low elevation. Proposed improvements to increase these moderately low pressures are identified in Section 9. Although there are areas with pressures greater than 100 psi, the District has required pressure regulators on all services in these areas. Thus, pressure zone improvements were not proposed for these areas. Fire flow analyses were performed to determine the capability of the existing water system to provide fire flow throughout the water system under existing (i.e. 2012) and future (i.e. 2018 and 2032) maximum day demand conditions. The resulting fire flow in the model was compared to its general fire flow goal, which was assigned according to the predominant fire flow requirement in the District. A summary of the results of the analyses for representative system nodes is presented in Table 7-17 that are identified in Figures 7-3 and 7-4. The results of the fire flow analyses were used to identify undersized water mains and proposed water main improvements. Section 7 – Water System Analysis Silverdale Water District 7-24 2013 Comprehensive Water System Plan A B C D 1 2 3 4 5 6 7 8 9 10 11 12 13 2 and 4 1 and 3 5 5 and 7 5.1 5 5 5 3 4 4 and 4.2 4 3 5 5 7 3 and 9 Eldorado Well and downstream of Windsong PS Services along NW Newberry Hill Rd, Roundup Ln NW, and Graystone Way NW Services along Lupine Ln NW and NW Knute Anderson Rd Services along Enchantment Ave NW, NW Anderson Hill Rd and Morning Side Dr NW Services along NW Anderson Hill Rd and NW Princeton Ln Services along NW Paulson Rd and NW Poppy Ct Services along Silverdale Way NW and NM Minsty Ridge Ln Services along NW Island Lake Rd Services along Clear Creek Rd NW Services along Old Frontier Rd NW Services along NW Mountain View Rd Services along Lester Rd NW Services along Olympic View Rd NW NW Francis Dr and Norbert Pl NW Wixson Well and Reservoir State Hwy 2 NW and NW Munson St Ridgetop Blvd NW and Hillsboro Dr NW Location Section 7 – Water System Analysis Silverdale Water District ID Pressure Zone 9 39 2" and 16" 8" and 12" 4 10 8" 2", 4" and 8" 7 2 18 6 7 15 11 2 13 1 1 1 2 Number of Model Nodes 8", 10" and 12" 8", 10" and 18" 8" 8" and 12" 4", 6", and 8" 4", 8" and 12" 12" 2", 6", and 8" 2", 6", and 8" 4"-10" 8" and 10" 8" and 10" 8" and 12" Pipe Diameter (in) Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area Low elevation in service area High Pressure Area Low elevation in service area Service elevation limits available pressure Low pressure area close to well and reservoirs Service elevation limits available pressure Low Pressure Area Service elevation limits available pressure Notes <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 <100 30 30 30 30 Pressure Goal (psi) Table 7-16. Peak Hour Analysis Summary 100-139 100-119 100-111 100-121 100-109 119 100-111 117-123 107-127 103-168 111-142 102-129 102-146 >30 24 25-29 24-29 2032 Available Pressure (psi) None None None None None None None None None None None None None WMN-14 None None None Improvements 7-25 2013 Comprehensive Water System Plan 101-140 101-121 103-109 100-118 101-111 101-121 100-114 107-140 108-128 102-145 102-114 102-115 103-146 28 24 25 22-29 2012 Available Pressure (psi) August 2014 B C D E F G H I J K L M N O 5 Apex 5 3 5 4 4 4 3 4 2 1 1 3 Area between Frontier Pl NW and NW Highland Ct Area between Ridgetop Blvd NW and NW Myhre Rd Area around Dahl Road NW and Danwood Ln NW Hydrants along NW Sid Uhinck Dr Area along Hillsboro Dr NW Area between Rooney Rd NW and Provost Rd NW Levin Rd NW NW Luoto Rd and Cox Ave NW Central Valley Rd NW and Viking Way NW between NW State Highway and NE Anna Rd (multiple locations) Clear Creek Rd NW and Mt View Rd Clear Creek Rd NW and NW Blissful Ln Hydrants along Southern Boundary Rd Along streets east of Chagnon Pl NW Hydrants along Turtle Rd Location Hydrant in Northwest Area of District: along Olympic View Rd NW Section 7 – Water System Analysis Silverdale Water District ID A Pressure Zone 5.1 8" and 12" 8" and 10" 6" 6" 8" with one 6" 6" 8" 8" 8" and 12" 12" 8" 12" 4" and 8" 6" and 8" Pipe Diameter (in) 8" 3750 gpm fire flow goal on 8" and 12" waterline 3500/3750 gpm fire flow goal is limited by dead end branches with 8" or 10" connection 3750 gpm fire flow goal is limited by 6" waterlines 1500 gpm fire flow goal is limited by 6" and 8" waterlines. 3750 gpm fire flow goal is limited by one dead end 6" and 8" waterlines. 2000 gpm fire flow goal is limited by dead end 6" waterline 500 gpm fire flow goal that is limited by 8" dead end waterline. 2000 gpm fire flow goal is limited by 8” dead end waterline. 1,500 gpm fire flow goal is limited by 8" and dead end 12" waterlines. 1,500 gpm fire flow goal next to Mt View PRV. 1500 gpm fire flow goal on 8” dead end waterline 2500 gpm fire flow goal limited by high elevation services in Zone 5. 500 gpm fire flow goal limited by 4" and dead end 8" waterlines Available fire flow is limited by high elevation service area and 12" dead end waterline. Notes Available fire flow is limited by 8” dead end waterline and high elevation services along Olympic View Road NW 3750 3500-3750 3750 1500 3750 2000 500 2000 1500 1500 1500 2500 500 1500 Fire Flow Goal (gpm) 1500 Table 7-17. Fire Flow Analysis Summary >3750 2957-3636 1986-2770 1074-1475 3332-3330 1789-1851 >500 1546-1690 1212-1339 >1500 >1500 >2500 >500 >1500 2032 Available Fire Flow (gpm) 1300 Improvements WMR-10 None. Multiple hydrants are available to achieve fire flow goal. None. Multiple hydrants are available to achieve fire flow goal. None. Multiple hydrants are available to achieve fire flow goal. None. Multiple hydrants are available to achieve fire flow goal. None. Multiple hydrants are available to achieve fire flow goal. WMN-5 None WMN-2 WMN-6; WF-1 WMN-8. WMN-6; WF-1 WMN-11; WF-10/11/12 WMN-11/13/18; WF-10/11/12 None. 7-26 2013 Comprehensive Water System Plan 3446-3634 3100-3708 2156-2859 900-1257 3255-3556 1795-1856 316 1525-1663 1363-1459 1366 1384 1365-1366 133-141 1221 2012 Available Fire Flow (gpm) 1307 August 2014 VIKIN O RD NW 8 6 OLYM PIC VIEW RD N W CENTRAL VALLEY RD NW NW LUOTO RD 3 K J KJ H STATE WY 30 CLEAR CREEK RD NW VIKING WAY NW E LI BERTY BAY N NW 1 HOO D CANA L FJ AY G W SUBASE BAN GO R DR 2 NE STA TE HW Y 3 08 EW AY NW ! Ø J K ! ØÚ [ NW TRIGGER AVE BROWNSVILLE HWY NE SIL VE RD AL ! Ø 7 ØJ J K! K 4 N DE RS ON ! Ø [! Ú Ø J K NW A W NW BUCKLIN HILL RD AA GA W AY NE WAAGA WAY J K D ! Ø NW FAIRGROUN DS RD TRACYTON BLVD NW CENTRAL KITSAP UGA NE FAIRGRO UNDS RD Y NW NE MCWILLIAMS RD B SEA CH IC O WA [ Ú J K [ ! Ú Ø ECK W YN HANSB ERRY ST NW CHI CO BAY HW RD NE RIDDELL RD PINE RD NE LY Y ! Ø 13 NW H OL WA RD 12 J K ! Ø AA GA 11 C NW NEWBERRY HILL RD L HIL ! Ø J K [ Ú B 9 RIDGETOP BLVD NW AN 10 Ø J K [ ! Ú W W 8 [ J K ! ØÚ CENTRAL VALLEY RD NE ! Ø! Ø 9 NW ! Ø J K [ Ú A R ID J K ! Ø ANDERSON HILL R D KITSAP MALL BLVD NW NW GE TO PB LV D NW 5 Legend [ Ú Pump ! Ø J K Well Pressure (psi) 30 50 Reservoir 80 Retail Service Area Boundary 120 Figure 7-2 2012 Peak Hour Pressure Map 100 Silverdale Water District Water System Plan Water Main Water Body Aug 2013 I 0 2,000 4,000 8,000 Feet Date Saved: 6/24/2013 7:58:03 AM VIKIN O RD NW 8 6 OLYM PIC VIEW RD N W CENTRAL VALLEY RD NW NW LUOTO RD 3 K J KJ H STATE WY 30 CLEAR CREEK RD NW VIKING WAY NW E LI BERTY BAY N NW 1 HOO D CANA L FJ AY G W SUBASE BAN GO R DR 2 NE STA TE HW Y 3 08 EW AY NW ! Ø J K ! ØÚ [ NW TRIGGER AVE BROWNSVILLE HWY NE SIL VE RD AL ! Ø 7 ØJ J K! K 4 N DE RS ON NW A W NW BUCKLIN HILL RD AA GA W AY NE WAAGA WAY J K D ! Ø NW FAIRGROUN DS RD CENTRAL KITSAP UGA NE FAIRGRO UNDS RD Y NW NE MCWILLIAMS RD B SEA CH IC O WA [ Ú J K [ ! Ú Ø ECK W YN HANSB ERRY ST NW CHI CO BAY HW RD NE RIDDELL RD PINE RD NE LY ! Ø [! Ú Ø J K ! Ø 13 NW H OL Y TRACYTON BLVD NW 12 WA RD J K ! Ø AA GA 11 C NW NEWBERRY HILL RD L HIL ! Ø J K [ Ú B 9 RIDGETOP BLVD NW AN 10 Ø J K [ ! Ú W W 8 [ J K ! ØÚ CENTRAL VALLEY RD NE ! Ø! Ø 9 NW ! Ø J K [ Ú A R ID J K ! Ø ANDERSON HILL R D KITSAP MALL BLVD NW NW GE TO PB LV D NW 5 Legend Pressure (psi) [ Ú Pump 30 ! Ø J K Well 50 Reservoir 80 Retail Service Area Boundary 120 Figure 7-3 2032 Peak Hour Pressure Map 100 Silverdale Water District Water System Plan Water Main Water Body Aug 2013 I 0 2,000 4,000 8,000 Feet Date Saved: 6/24/2013 7:58:31 AM VIK ING FJ O WA RD Y DR NE NW VIKING WAY NW ! 1525 2000 NW LUOTO RD I $ 316 500 ! 1459 1500 1391 1500 ! 1459 1500 $ 1363 ! 1500 1412 1500 NE S T AT E HW Y 3 08 1366 !! $ 1500 K J KJ $ G !! ! 1343 1500 E VIEW RD N W 1366 1500 1663 2000 !! F OL YMPIC HOO D CANA L H CLEAR CREEK RD NW A SUBASE BAN GO R 1307 1500 LI BERTY BAY ! 1366 2500 NW TRIGGER AVE ØJ J K! K ! $ $ TO P BL V D NW SILVERDALE UGA L R D C 3634 3750 ! 3446 3750 $ 3634 3750 ! 3708 3750 3136 3750 2156 3750 M2859 3750 $ ! ! ! 2597 3750 A ! ! $ W A O ! Ø J K [ Ú K N 3100 3500 RIDGETOP BLVD NW Y $ 3556 3750 899 1500 ! 952 1500 1050 1500 NW BUCKLIN HILL RD L NW WAAGA WAY NE WAAGA WAY $ 1856 2000 1795 $! 2000 ! J TRACYTON BLVD NW ! Ø NW FAIRGROUN DS RD NE FAIRGRO UNDS RD CENTRAL KITSAP UGA W NE MCWILLIAMS RD SEA B EC CHICO WA Y N [ Ú J K ! [ Ø Ú WY KH HANSB ERRY ST NW CHI CO BAY NW RD NE RIDDELL RD PINE RD NE NW H OLLY ! ! Ø J K $ ! !! ! Ø !!! [! Ú Ø J K ! ! Ø J K [ Ú $ NW NEWBERRY HILL RD 3556 3750 $!! ! !! 3558 3750 Ø J K [ ! Ú J K ! Ø $ [ J K ! ØÚ AG ! Ø! Ø ! 133 500 NH IL WA ! ER SO J K ! Ø NW 141 500 AND KITSAP MALL BLVD NW $ W LE H W $ 1384 1500 CENTRAL VALLEY RD NE E N BRO WN SVIL NW EW AY AL B ! Ø J K ! ØÚ [ ! Ø RID GE ! 1365 2500 1365 ! 2500 ! 1366 1366 ! ! 2500 2500 VE RD ! 1221 ! 1500 1221 1500 D SIL 1221 1500 ! YN ! Legend Diameter (in) Fireflow Goal (%) Pump <= 4 ! 0 - 25 $ PRV 5 ! 26 - 50 ! Ø Well 6 ! 51 - 75 J K Reservoir [ Ú Retail Service Area Boundary Urban Growth Area Water Body 8 ! 10 12 >= 14 A 76 - 98 Available Fireflow (gpm) Figure 7-4 2012 Fireflow Map Fire Flow Area ID Silverdale Water District Water System Plan Fireflow Goal (gpm) Note Each location highlighted on the map represents an area where the available fire flow does not meet the established goal Aug 2013 I 0 2,000 4,000 8,000 Feet VIK ING FJ O WA RD Y DR NE NW VIKING WAY NW ! NW ST AT EH W Y 8 30 1690 2000 !! 1546 2000 NW LUOTO RD $ I F OL YMPIC 1319 1500 $ 1292 1500 G !! ! 1339 1500 NE S T AT E HW Y 3 08 VIEW RD N W $ K J KJ $ 1211 1500 E HOO D CANA L H CLEAR CREEK RD NW A SUBASE BAN GO R 1300 1500 LI BERTY BAY LE H W BRO WN SVIL EW AY AL ! Ø SIL VE RD B ! Ø J K ! ØÚ [ NW D YN ! NW TRIGGER AVE $ ØJ J K! K E $ $ W AND ER SO NH IL ! M2771 3750 ! Ø J K [ Ú Ø J K [ ! Ú 1447 1500 ! NW NEWBERRY HILL RD 3750 W 2957 2967 3750 3500 ! A Y 3332 $! 3750 !! ! 1851 2000 1789 $! 2000 ! ! Ø [! Ú Ø J K ! ! NW BUCKLIN HILL RD ! 3330 3750 1073 ! 1500 1135 1500 !! 1247 1500 L NE WAAGA WAY $ ! Ø J ! Ø TRACYTON BLVD NW SEA B EC NW FAIRGROUN DS RD NE FAIRGRO UNDS RD CENTRAL KITSAP UGA NE MCWILLIAMS RD W WY KH HANSB ERRY ST NW CHI CO BAY NW RD NE RIDDELL RD PINE RD NE NW H OLLY ! CHICO WA Y N [ Ú J K ! [ Ø Ú $ ! ! !! 477 500 J K $ ! ! ! $ [ J K ! ØÚ ! $ J K ! Ø ! ! 2343 1599 1750 3636 3750 3571 3750 RIDGETOP BLVD NW 1986 3750 $ $ 3803 4000 3849 3974 4000 4000 !! ! !! ! ! K N A $ ! AG 3898 4000 ! WA C ! Ø! Ø O ! Ø J K [ Ú 3463 3070 4000 4000 NW L R D J K ! Ø CENTRAL VALLEY RD NE N KITSAP MALL BLVD NW $ RID GE TO P BL V D NW SILVERDALE UGA Legend [ Ú $ ! Ø J K Diameter (in) Fireflow Goal (%) Pump <= 4 ! 0 - 25 PRV 5 ! 26 - 50 6 ! 51 - 75 Well Reservoir Retail Service Area Boundary Urban Growth Area Water Body 8 ! 10 12 >= 14 A 76 - 100 Available Fireflow (gpm) Figure 7-5 2032 Fireflow Map Fire Flow Area ID Silverdale Water District Water System Plan Fireflow Goal (gpm) Note Each location highlighted on the map represents an area where the available fire flow does not meet the established goal Aug 2013 I 0 2,000 4,000 8,000 Feet August 2014 7.6.4 Deficiencies This section presents a summary of the distribution and transmission system deficiencies that were identified from the results of the hydraulic analyses of the existing water system and also includes deficiencies not related to the capacity of the mains. These deficiencies will be eliminated upon completion of the proposed improvements that are presented in Section 9. Pressure Deficiencies The following areas have pressures that are either lower or higher than the acceptable pressure levels. Low Pressure Area A: There are actually two areas indicated as A. One is near the Ridgetop Reservoir, and the other along a dead end main on the edge of Zones 2 and 4.1. The service elevation limits the available pressure at these locations. The area near the Ridgetop Reservoir does not have any services connected to it. Services close by are connected to the boosted zone. In the second area, there are services present, but the pressure is just less than 30 psi. This is within the margin of error in the hydraulic model, and any improvements to make pressure above 30 psi would have substantial cost, so there are no improvements identified. Low Pressure Areas B and C: The low pressures are a result of proximity to the Provost and Dickey Reservoirs, and there are no services present. As such, no improvements are needed. Low Pressure Area D: The service elevation limits the available pressure to just under 30 psi at this location. CIP WMN-14 would extend a main along Norbert Place to connect the service to the higher pressure zone in the vicinity. High Pressure Areas 1-13: These areas are subject to pressures above 100 psi based on the topography of the system. No reasonable, cost effective improvement has been identified. PRVs may be installed at each property to control excessive pressures. Fire Flow Deficiencies The following areas have low fire flows that do not meet the District’s target fire flow goals. Most of these deficiencies result for smaller diameter piping or dead end mains. In areas where multiple hydrants are available to provide the fire flow goal, no improvement is specified. Projects relating to improving fire flow are described in Section 9. Fire Flow Area A and B: Fire flow is limited in the dead end portion of Zone 5 by a high elevation service on NW Lause Way. Fire Flow Area C: Fire flow is limited due to small diameter piping. The Apex Area projects, WMN-11/13/18 and WF-10/11/12 will improve fire flow in this area. Fire Flow Area D and F: Fire flow is limited due to high service elevation in Zone 5 along NW Lause Way. The CIP WMN-6 and WF-1 improves fire flow by adding another connection to Zone 5. The pump station provides another source of water and improves pressures in Zone 5 during fire flow conditions. Section 7 – Water System Analysis Silverdale Water District 7-31 2013 Comprehensive Water System Plan August 2014 Fire Flow Area E: Fire flow is limited on the 8” dead end waterline. CIP WMN-8 improves fire flow by creating a loop. Fire Flow Area G, H, and I: Fire flow is limited due to 8” dead end waterlines in this portion of the system. CIP WMN-2 and WMN-5 improve fire flow by creating looping. Some of the fire flow deficiencies are not addressed by these projects, but the available fire flow is greater than 75% of the goal. No additional improvement is specified. Fire Flow Area J: Fire flow is limited by 6” waterlines. The available fire flow is greater than 75% of the goal. No improvement is specified. Fire Flow Area K, L, N, and P: This portion of the water system has multiple hydrants available to provide the fire flow goal. Fire Flow Area O: The fire flow goal is 3750 gpm and the 10” waterline along Anderson Hill Road limits fire flow. CIP WMR-10 increases the waterline to 12” which increases fire flow in the area above the goal. 7.7 Limiting Factors and Carrying Capacity A key element of this WSP is the evaluation of the capacities of various water system elements and their abilities to support current and projected future water supply needs. Resulting from these evaluations are “carrying capacities,” or the maximum number of equivalent residential units (ERUs) that existing facilities can support. Such analyses aid in identifying capacity deficiencies and provide the foundation for some capital improvement projects. Table 7-18 summarizes the carrying capacities associated with the District’s primary water system components. This summary is formatted consistent with “Worksheet 6-1” of the DOH Water System Design Manual (December 2009). Details regarding source and storage capacity analyses are provided earlier in this section of the WSP. As noted in the table, annual water rights is the limiting water system component, with a current ERU capacity of 14,658. By comparing this carrying capacity with the demand forecast presented in Section 4, it can be seen that existing facilities are able to support current demands and needs projected through the 20year planning horizon. Carrying capacity analyses have not been conducted for the District’s treatment, transmission, and distribution facilities, for the following reasons. The treatment systems have been sized commensurate with the pumping capacities at the applicable sources. Therefore, there are no additional limitations imposed by the treatment systems. The District’s well sources tie directly into the distribution system and the system piping facilities serve a dual purpose for both transmission and distribution. Regarding distribution facilities, it is difficult to characterize ERU carrying capacities in terms of piping, etc. Water mains are typically designed to convey fire flows. In the case of the District, this means that they are also more than adequate to support the average and maximum day demands imposed by customers. Some deficiencies have been identified throughout the system regarding the capability of certain sections of distribution piping to convey required fire flows at minimum pressures. Such deficiencies, however, are not a function of the amount of current or proposed ERUs, and therefore do not factor into a carrying capacity analysis. The District has scheduled improvements to address noted distribution system deficiencies, as described in Section 9. Section 7 – Water System Analysis Silverdale Water District 7-32 2013 Comprehensive Water System Plan August 2014 Table 7-18. Water System Physical Capacity Documentation Based on MDD Note: Capacity determinations are only for existing facilities that are operational for the water system. Specific Single-Family Residential Connection Criteria: Average Day Demand (ADD): 197 (1) gpd/ERU Maximum Day Demand (MDD): 414 (2) gpd/ERU Water System Service Connections correlated to ERUs Service Total # Connections Total MDD for the ERUs (5) (3) in the classification (4) classification, gpd Classification 2,170,000 5,288 5,265 Single-Family 460,000 202 1,125 Multi-Family 350,000 407 847 Non Residential 210,000 108 513 Irrigation 10,000 5 33 Construction 740,000 24 1,802 Largest Users 40,000 8 86 Wholesale 230,000 N/A 560 Non- Revenue 0 Other (identify) Total existing ERUs (Residential + Nonresidential + Non-revenue + Other) = 10,232 Physical Capacity as ERUs Water System Component Calculated Capacity in ERUs for each component (Facility) Source(s) 19,510 (6) Treatment N/A (7) Equalizing Storage 27,195 (8) Standby Storage 14,721 (at 20 psi) (8) Distribution N/A (7) Transmission N/A (7) 23,181 (Qi basis) Other (water rights) 14,658 (Qa basis) (9) Water System Physical Capacity (ERUs) = 14,658 (based on the limiting water system component shown above) Notes: (1) See Section 4.4. ERU value is 197 gpd/ERU. (This is a rounded value. Actual value used in the calculations is 196.64.) (2) See Section 4.1. ADD:MDD is 2.1 (3) Based on Table 4-10, for Year 2012. (4) Based on District data. (5) See Table 4-10. (6) See Table 7-4. Based on the current pumping capacity 8,071,200 gpd. (7) Not calculated for reasons specified in the text. (8) See Table 7-9. Assumes all sources are operating. (9) See Table 6-3. Assuming water rights associated with applications are not counted, Qi is 6,663 gpm and Qa is 3,236.5 AF/yr. Section 7 – Water System Analysis Silverdale Water District 7-33 2013 Comprehensive Water System Plan August 2014 8. Operations and Maintenance 8.1 Introduction The District’s operations and maintenance program consists of the following elements: Normal Operations Emergency Operations Preventive Maintenance Cross-Connection Control Each of these is described in detail in this section. 8.2 Normal Operations 8.2.1 District Personnel The District functions under the direction of a board of three commissioners. The current operations and maintenance staff consists of maintenance and service personnel that function under the District General Manager, as shown in Figure 8-1. The water system tasks that are performed by the operations and maintenance staff include inspection, testing, installation and repair of system facilities, routine operation and preventive maintenance, record keeping, administrative tasks, general clerical work, and corrective or breakdown maintenance required in response to emergencies. These tasks and duties are summarized in Figure 8-2. Washington State Law (WAC 246-292) requires the District’s system to be operated by one or more certified operators. In addition, specialty certification is required for backflow device testing. Table 8-1 shows the current certifications of the District's operations and maintenance staff. It is District policy to maintain a well-qualified, technically-trained staff. The District annually allocates funds for personnel training, certification and membership in professional organizations, such as the American Water Works Association (AWWA). The District believes the benefits greatly outweigh the time and costs of training, certification and professional organizations, which result in improved safety, skills and confidence. Section 8 – Operations and Maintenance Silverdale Water District 8-1 2013 Comprehensive Water System Plan Figure 8-1 Silverdale Water District Organizational Chart - Employees Silverdale Water District Customers Commissioners Marcus Hoffman John Poppe Michael Sechrest Engineer General Manager Attorney Consultant Morgan Johnson Rick Gross Asst. General Manager Human Resources Skip Beahm 2025 Construction Manager Maintenance Manager Operations Manager Fiscal Manager 2025 Tim Knapp Skip Beahm Jeannie Screws Construction Service Technical Preventative Grounds/Facilities Engineer Tech 4 Service Tech 4 Service Tech 4 Service Tech 4 2020 2018 2016 Mo Beck (ST4) Nolan Corpuz (ET2) Thomas Hunter (ST2) Bryant Bach (ST4) James Cone (ST3) Christy Hickerson (GK) Ken Adams (ST3) Chuey Gutierrez (ST1) Laborer - PT - Seasonal Service Tech - 2016 Will Llewellyn (ST1) Laborer - PT - Seasonal Randy Romo (ET1) Laborer - 2012 Laborer - 2015 Organizational Chart - 2012/Employees Janitorial Treatment Environmental Operations Customer Service Administrative Finance Service Tech 4 Custodian - PT Service Tech 4 2020 Tony Hidalgo (C - PT) 2018 Environmental Tech 4 Service Tech 4 Service Tech 4 Administative Asst. 4 Administative Asst. 4 2014 Eric Pickard (ST4) 2014 2016 2016 Tim Caces (C - PT) Sid Williams (ST2) Edwin Tuason (C - PT) Service Tech - 2014 Laurelin Ward (ET3) Service Tech - 2016 Mitch Brown (ST3) Amanda Cheatham (AA2) Sammie Simmons (AA2) Lindsay Weaber (AA1) Figure 8-2 Silverdale Water District Organizational Chart - Assignments Silverdale Water District Customers Commissioners Decision-Making Establish Policy Public Leadership Supervise Appointed Official Engineer General Manager Attorney Engineering Services Administration Legal Surveying Agreements Budget Hydrogeologist Capital Improvement Plan Consultants Contracts Grants/Loans Insurance Property Acquisition Public Relations Resolutions Schedule of Charges WASWD Water Availability Water System Plan Asst. General Manager Human Resources Administration Evaluations Administrative Center Labor and Industries Information Technology Personnel Files Inventory Control Personnel Manual On-Call Scheduling Training Small Works Roster Safety Street Lights System Security WaterPAK Construction Manager Construction Operations Manager Maintenance Manager Service Technical Preventative Grounds/Facilities Janitorial Fiscal Manager Treatment Environmental Operations Customer Service Administrative Finance Accounts Payable Capital Projects Customer Service Air/Vac Valve Maintenance Blow-Off Maintenance Grounds Maint. - Admin. Ctr. Janitorial Maint. - Admin. Ctr. Chlorination Conservation Cross Connection Customer Service Accounts Receivables Conditions and Standards Meter Maintenance Construction Projects Construction Projects Grounds Maint. - CKFR Janitorial Maint. - CKFR Treatment Plant Grant Writer Inventory Locating Commissioner Meetings Budget Construction Agreements Meter Reading Control Valve Maintenance Flushing Maintenance Grounds Maint. - KCSD Janitorial Maint. - KPUD Water Quality Public Outreach Reclaimed Water System Security Customer Service Employee Benefits Construction Projects Service Installation Grounds Maint. - SWD Reclaimed Water Safety Investigations Events Financial Reporting Safety Committee Resource Management SCADA System Underground Utilities CC Meter Reading Investments Long Term Debt Equipment Maintenance Hydrant Maintenance Hydraulic Modeling Meter Maintenance Main Maintenance Inspections Pump Maintenance Meter Reading SCADA System System Security Uniforms Mapping SCADA System Maintenance Reservoir Maintenance Water Quality Transportation Utility Billing Service installations Transportation Maintenance Service Installation Water Treatment Maintenance Structure Maintenance AWWA - Subsection Well Maintenance Transportation Maintenance Partnership for Water Valve Maintenance WaterPAK Safety Committee Safety Committee Organizational Chart - 2012/Assignments Water Quality Payroll Revenue Bonds Safety Committee Safety Committee WaterPAK Emergency Management - KC August 2014 Name Morgan Johnson Skip Beahm Tim Knapp Nolan Corpuz Randy Romo Laurelin Ward Table 8-1.Personnel Certification Position Certification General Manager WDM-3, CCS, WTPO-1 Assistant General WDM-2, CCS, BAT Manager Maintenance Manager WDM-3, CCS Engineer Technician II DWM-3, CCS, WTPO-2 Engineering Technician II WDM-1 Environmental Technician WDM-3, CCS, WTPOIII IT Service Technician III WDM-2, CCS Service Technician II WDM-1, CCS Service Technician IV WDM-3, CCS, BAT Service Technician IV WDM-2, CCS Service Technician IV WDM-3, CCS, WTPO-1 Service Technician III WDM-2, CCS Service Technician III WDM-2, CCS Service Technician II WDM-2, CCS Service Technician I WDM-1, CCS Service Technician I WDM-1 Service Technician I WDM-1 Mitch Brown Sidney Williams Eric Pickard Bryant Bach Mo Beck Kenny Adams James Cone Thomas Hunter Will Llewellyn Chuy Gutierrez Ralph Balajadia Certification Definitions BAT – Backflow Assembly Tester CCS – Cross Connection Control Specialist WDM – Water Distribution Manager WDM-IT Water Distribution Manager Trainee WTPO – Water Treatment Plant Operator 8.2.2 Certification Number(s) 2609 3976, B1791 4191 6748 12961 12199 7722 10800 5433, B1881 7095 5375 9424 10722 11873 12912 12909 13163 Personnel Responsibilities The key responsibilities of the water operations and maintenance staff are summarized as follows. General Manager: Plans, directs and controls the administration, operation, installation, maintenance and repair activities involving the District. Assistant General Manager: Coordinates the responsibilities of the General Manager in his/her absence. Operations Manager: Oversees the operation and monitoring of water production and distribution, water quality, customer service, billing, conservation, inventory and purchasing. Plans, organizes and supervises the work of employees assigned to the operations staff. Maintenance Manager: Oversees the maintenance and repair of water production and distribution systems, vehicles and equipment. Directs the installation of District installed water services and distribution systems. Plans, organizes and supervises the work of employees assigned to the maintenance staff. Finance Manager: Oversees all financial reporting, payroll, personnel, treasury and administrative functions. Performs complex professional accounting work. Coordinates the financial functions of Section 8 – Operations and Maintenance Silverdale Water District 8-4 2013 Comprehensive Water System Plan August 2014 the Water District in the areas of Accounts Payable, Accounts Receivable, Timekeeping, Payroll, and General Ledger. Increased knowledge and skills are required for assisting in preparation, analysis and monitoring of budgets and financial policy planning. Administrative Assistant IV: Organizes and supervises the work of assigned staff in the area of operations assuring the effective operations of the Water District. Administrative Assistant III: Lead person performing detailed and technical operational tasks assuring the effective operations of the Water District. Administrative Assistant II: Performs detailed and technical operational tasks assuring the effective operations of the Water District. Administrative Assistant I: Performs general operational tasks assuring the effective operations of the Water District. Non-Permanent Administrative Assistant: Performs general operational tasks assuring the effective operations of the Water District. Engineer Technician IV: Performs complex and advanced professional level engineering, inspection related duties and responsibilities, and utilizes computer-aided design and drafting system, supervises and manages engineering activities assuring the effective operations of the Water District. Engineer Technician III: Performs complex and advanced professional level engineering, inspection related duties and responsibilities, and utilizes computer-aided design and drafting system assuring the effective operations of the Water District. Engineer Technician II: Performs routine professional level engineering, inspection related duties and responsibilities, and utilizes computer-aided design and drafting system assuring the effective operations of the District. Engineer Technician I: Performs general engineering and inspection related duties and responsibilities assuring the effective operations of the Water District. Environmental Technician IV: Conducts complex and advanced environmental monitoring for drinking water, streams, and lakes assuring the effective operations of the Water District. Monitors, investigates, analyzes, and reports data for regulatory, legal and special study purposes. Develops and implements public education programs and coordinates the water conservation and water quality programs. Supervises and manages operational activities assuring the effective operations of the Water District. Environmental Technician III: Conducts complex and advanced environmental monitoring for drinking water, streams, and lakes assuring the effective operations of the Water District. Monitors, investigates, analyzes, and reports data for regulatory, legal and special study purposes. Develops and implements public education programs and coordinates the water conservation and water quality programs. Section 8 – Operations and Maintenance Silverdale Water District 8-5 2013 Comprehensive Water System Plan August 2014 Environmental Technician II: Conducts routine environmental monitoring for drinking water, streams, and lakes assuring the effective operations of the Water District. Monitors, investigates, analyzes, and reports data for regulatory, legal and special study purposes. Develops and implements public education programs and coordinates the water conservation and water quality programs. Environmental Technician I: Conducts routine environmental monitoring for drinking water, streams, and lakes assuring the effective operations of the Water District. Monitors, investigates, analyzes, and reports data for regulatory, legal and special study purposes. Develops and implements public education programs and coordinates the water conservation and water quality programs. Service Technician IV: Organizes and supervises the work of assigned staff in the areas of operations, maintenance, repair, or construction, assuring the effective operations of the Water District. Service Technician III: Lead person performing detailed and technical operational, maintenance, repair, or construction tasks assuring the effective operations of the District; may operate heavy and specialized equipment; and performs varied manual labor. Service Technician II: Performs detailed and technical operational, maintenance, repair, or construction tasks assuring the effective operations of the District; may operate heavy and specialized equipment; and performs varied manual labor. Service Technician I: Performs general operational, maintenance, repair, or construction tasks assuring the effective operations of the District; may operate heavy and specialized equipment; and performs varied manual labor. Groundskeeper: Performs general grounds maintenance tasks assuring the effective operations of the District; may operate heavy and specialized equipment; and performs varied manual labor. Custodian: Performs general custodial tasks assuring the effective operations of the Water District; may operate heavy and specialized equipment; and performs varied manual labor. Laborer: Performs general grounds maintenance tasks assuring the effective operations of the Water District; may operate heavy and specialized equipment; and performs varied manual labor. Non-Permanent Laborer: Performs general grounds maintenance tasks assuring the effective operations of the Water District; may operate heavy and specialized equipment; and performs varied manual labor. 8.2.3 Available Equipment The District has several types of equipment available for daily routine operation and maintenance of the water system. The equipment is stored at the District's administrative center, which the District shares with the Central Kitsap Fire and Rescue. If additional equipment is required for specific projects, the District will rent or contract with a local contractor for the Section 8 – Operations and Maintenance Silverdale Water District 8-6 2013 Comprehensive Water System Plan August 2014 services needed. An inventory of supplies in sufficient quantities for normal system operation and maintenance and short-term emergencies is stored at the administrative center. A list of equipment and supplies used in the normal operation of the water system is shown in Table 8-2. Table 8-2. Equipment and Supplies Water Department Owned Equipment Chemical Inventory 1 – Air Compressor Calcium Hypochlorite 1 – Air Tester Sodium Hyphocholrate 1 – Arc Welder Communications Equipment 1 – Blower Cellular Tablet available for SCADA control. 21 – Compactor Two-Way Cell Phones with Email and Text capabilities 1 – Plate Compactor 21 – Diaphragm Pump 1 – Flatbed Trailer 1 – Utility Trailer (Landscape) 1 – Generator 41 – Portable Generator 1 – Hole Hog 1 – Jackhammer 21 – Lawn Mower 3 – Line Locator 43 – Metal Locator 1 - Mig Welder 1 – Pressure Pump 12 – Pressure Washer 1 – Snap Ring Cutter 1 – Snokle Lift 1 – Tap Machine 1 – Threading Machine 13 - Trucks 1 – 5 Yard Dump Truck 1 – 4 x 4 Extendahoe Miscellaneous equipment Miscellaneous small tools Laptops All Water District personnel carry cell phones that have two way radio communications. The following representatives typically provide the supplies and chemicals to the District. Supplies: Ferguson NW, HD Fowler, Hughes Supply, National Waterworks Sodium Hypochlorite: ABS Supply Calcium Hypochlorite: HD Fowler, Hughes Supply, National Waterworks The following vendors typically provide materials, equipment and service for the District's major water system components: Pumps: PACO Pumps, PumpTech, Inc. Pipe: HD Fowler, Hughes Supply, National Waterworks Section 8 – Operations and Maintenance Silverdale Water District 8-7 2013 Comprehensive Water System Plan August 2014 Hydrants: Ferguson NW, HD Fowler, Hughes Supply, National Waterworks Isolation Valves: Ferguson NW, HD Fowler, Hughes Supply, National Waterworks Control Valves: GC Systems Generators: Olympian, Wacker, Detroit Diesel 8.2.4 Routine Operations Routine operations involve the analysis, formulation, and implementation of procedures to ensure that the facilities are functioning efficiently and meeting pressure requirements and other demands of the system. The District's maintenance procedures are exceptional, with repairs being made promptly, assuring customers receive high-quality water service and limited interruptions. 8.2.5 Continuity of Service As a municipality, the District has the structure, stability, authority, and responsibility to assure that water service will be continuous. For example, changes in the Commissioners or Staff would not have a pronounced effect on the District's customers or quality of service. 8.2.6 Routine Water Quality Sampling The Washington State Department of Health (DOH) has adopted federal regulations that specify minimum monitoring requirements for water systems. The sampling requirements depend on the population served, source type and treatment provided. The specific requirements are contained in WAC 246-290-300. District staff currently performs all routine coliform sampling throughout the distribution system. A further discussion of the water quality monitoring program is contained in Section 6 and in the District's Water Quality Monitoring Plans, located in Appendix 6-1. 8.2.7 Cross-Connection Control The District has adopted a cross-connection control program to comply with WAC 246-290-490 pertaining to contamination of potable water due to cross-connections. Backflow prevention devices are required at service connections where a potential for contamination exists. The Cross-Connection Control Plan is included in Appendix 8-1. As shown in Table 8-1, all current District operation and maintenance personnel are certified Cross-Connection Control Specialists. 8.2.8 Recordkeeping and Reporting DOH has enacted regulations for recordkeeping and reporting that may be found in WAC 246290-480. The regulations identify recordkeeping and reporting procedures for operations and water quality testing. Section 8 – Operations and Maintenance Silverdale Water District 8-8 2013 Comprehensive Water System Plan August 2014 Recordkeeping Records shall be kept as specified by DOH. Details regarding DOH requirements are found in DOH publication number 331-431 (provided in Appendix 8-2). Key requirements are summarized as follows. 1. Bacteriological analysis results: 5 years. 2. Chemical analysis results: for as long as the system is in operation. 3. Other records of operation and analyses as may be required by DOH: 3 years. 4. Documentation of actions to correct violations of primary drinking water standards: 3 years after last corrective action. 5. Records of sanitary surveys: 10 years. 6. Project reports, construction documents and drawings, inspection reports and approvals: life of the facility. The District’s recordkeeping procedures are as follows: 1. Field technicians enter all maintenance tasks into Microsoft Excel Tracking sheets built by District staff; all maintenance performed on each asset is documented. 2. All hard copy originals and certifications are filed. 3. The information is kept as a data file in the administrative center. Reporting The District shall deliver safe and reliable drinking water to their customers 24 hours a day, 365 days a year. If the drinking water supply becomes contaminated, many people can become seriously ill or die. Any time the water system has a situation that poses a risk to public health, the District shall notify their customers, in accordance with state and federal law. Notifying water system customers as quickly as possible when their water may not be safe to drink, gives them time to take actions to protect their health. The District’s public notification plan is based upon the requirements, guidelines, and materials developed by DOH. These are provided in Appendix 8-2. A summary of key elements of the District’s public notification plan is provided below. Public Notification Formal public notification requirements are required whenever Silverdale Water District is in violation of: Drinking water quality or monitoring requirements; Operating under a variance or exemption; or Other situations that pose a public health risk, such as a disruption in service. Section 8 – Operations and Maintenance Silverdale Water District 8-9 2013 Comprehensive Water System Plan August 2014 Notifying District customers in a timely manner about actual or potential threats associated with drinking their tap water can help people make informed decisions affecting their health. District customers will be notified within 24 hours if there is a serious problem. Key Issues of Public Interest These three tiers will be used to determine the specific requirements for public notification Tier 1: Acute health concerns require notification within 24 hours. Tier 2: Chronic health concerns require notification within 30 days. Tier 3: Reporting and monitoring violations require notification within 365 days. Technical Assistance The District's public notification plan is meant to supplement the Public Notification Handbook ( l a s t u p d a t e d i n 2 0 1 0 ) and Department of Health publications. If there are any questions, technical assistance is available at the Office of Drinking Water Regional Office. The after-hours emergency telephone number is 1-877-481-4901. The Southwest Regional Office telephone number is 360-236-3030. Notification Requirements Tier 1 Deadline for Notification: Delivery Methods to Use: Department of Health Notification: Tier 2 Deadline for Notification: Delivery Methods to Use: Tier 3 Deadline for Notification: Delivery Methods to Use: Within 24 Hours Hand delivery, posting, or broadcast media (radio or television) Within 24 hours Within 30 days Mail, hand delivery, another method as needed to reach others Within 1 year Mail, hand delivery, or annual notice Public Notification Requirements Public notification is required for all acute MCL violations. Local: Kitsap County Health District: Melina Knoop: (360) 377-5220 Section 8 – Operations and Maintenance Silverdale Water District 8-10 2013 Comprehensive Water System Plan August 2014 WSDOH: Office of Drinking Water: (after hours emergency) 1-877-481-4901 SW Regional Office: (360) 236-3030 Sandy Brentlinger: (360) 236-3044 Virpi Salo-Zieman, Regional Engr.: (360) 236-3037 Must notify by end of the business day receive notice of violation, or if the notice was received after close of business, by end of the next business day. Other Reports Several other reports are required for state agencies, including the Department of Revenue, Department of Labor and Industries, Department of Social and Health Services, Department of Ecology, and the Employment Security Department. All of these reports are completed according to their instructions. 8.2.9 Operations and Maintenance Records Facilities Operations and Maintenance Manuals Operations and maintenance manuals are available for staff members' reference. The equipment and operational maintenance manuals required for all well supplies and equipment therein, PRV stations and equipment therein, booster pump stations and equipment, and reservoirs are maintained and housed in the equipment maintenance file at the administrative center. The District intends to maintain its policies of requiring complete operation and maintenance manuals for all new equipment and facilities. Mapping and As-Built Drawing Records Maintenance of drawings is essential to maintenance crews, county planners, developers and anyone else needing to know how the water system is laid out throughout the District. The drawing records are stored in an organized file at the administrative center and are well maintained. Operation and Maintenance Records Operation and maintenance records are stored at the administrative center or in the District’s computer database and include: Bacteriological tests Backflow and cross-connections Chlorination levels Section 8 – Operations and Maintenance Silverdale Water District 8-11 2013 Comprehensive Water System Plan August 2014 Hydrant repairs Hydrant meter forms Hydrant databases Confined spaces Vandalism forms Precipitation Water samples from new developments Water usage Water system maintenance Water used for construction Water consumable inventory Water main notes Water worksheets Water main flushing Customer complaints Lead and copper levels DOH regulated water sampling Coliform sampling Well sounding and static water levels Pump motor tests 8.2.10 Safety Procedures and Equipment Safety is the concern and responsibility of all water operations and maintenance staff. To maintain the highest level of safety, the District has taken steps toward educating its staff and providing resources to ensure a safe working environment. The District will strive to improve its safety program on an on-going basis. The American Water Works Association publishes a manual entitled, Safety Practices for Water Utilities (M3), which describes safety programs and provides guidelines for safe work practices and techniques for a variety of water utility work situations. This manual is available to all district personnel and identifies procedures for the following operations and maintenance tasks; Use of Chlorine or Chlorine Products Working in Confined Spaces Working in Trenches Section 8 – Operations and Maintenance Silverdale Water District 8-12 2013 Comprehensive Water System Plan August 2014 Working Around Heavy Equipment Working in Traffic Areas Working on or Around Water Reservoirs Working in or Around Pump Stations Working on Asbestos Cement (AC) Water Main Working on Pressurized Water Main The District also has a Safety Manual that is available to all district personnel and identifies procedures for the following operations and maintenance tasks; Safety and Health Orientation Safety Audit Annual Review of Safety Programs Fire Safety Procedures Ladder Safety Lifting and Rigging Safety Chlorine Safety Hearing Conservation Program Poisoning Fall Protection Work Plan Back Injury Prevention Slips, Trips, and Falls Asbestos Awareness Program Policy Trenching and Shoring Traffic Control Program Procedure Respiratory Protection Program Confined Spaces Entry Program Automobile Hazards and Maintenance Safety Responsibilities First Aid Kits Safety training classes in First Aid, CPR, and traffic safety and flagging are required of all Water District staff. Air testing, confined space entry, and equipment calibration is required for all necessary personal. Safety talks are conducted weekly for all staff. Section 8 – Operations and Maintenance Silverdale Water District 8-13 2013 Comprehensive Water System Plan August 2014 The following includes a list of safety and first aid equipment available to staff to carry out safety procedures for operations and maintenance tasks. First aid kits in each vehicle, workshop and lab Steel toe boots Safety eye glasses and goggles Ear plugs Reflective vests and pants Fall harnesses Fire extinguishers Chemical aprons Gloves Hard hats Respirators Eye wash stations in each facility Air-fed breathing apparatus equipment for non-hazardous work environments Trench shoring equipment Air tester for confined spaces Traffic safety equipment Confined space blower Construction radios and cell phones AED at District Administrative Offices The District follows all appropriate OSHA and WISHA regulations in its day-to-day operations and complies with the following state requirements. WAC 296-62-145 to 14529 Part M - Entry into confined spaces. WAC 296-155-650 to 66411 Part N - Shoring of open ditches. WAC 296-155-429 - Lockout-tagout for work on energized or de-energized equipment or circuits. WAC 296-155 Part C1 - Fall restraint for access to the top of the District’s water reservoirs. MUTCD - Traffic control for work in the public right-of-way. Section 8 – Operations and Maintenance Silverdale Water District 8-14 2013 Comprehensive Water System Plan August 2014 8.2.11 Environmental Awareness Practices Protecting the environment is a high priority of the District. The operations and maintenance staff have been made aware of the District’s commitment to protecting the environment through education and field training. The District recognizes that it can play a major role in protecting the environment, due to its close proximity to several water bodies within its service area and the topography of existing and future land development. Chinook salmon and bull trout were listed as a threatened species under the federal Endangered Species Act (ESA) in 1999. The District has established practices to operate, maintain, repair and expand the water system in a manner that does not adversely affect the environment. For example, the District works to not allow chlorinated water to enter surface water bodies or storm drainage systems that discharge to surface water bodies. 8.3 Emergency Operations 8.3.1 Capabilities The District is well equipped to accommodate short-term system failures and abnormalities. Its capabilities are as follow: Multiple Water Sources The District owns 11 active groundwater wells that supply the main water system and two additional groundwater wells that supply the satellite systems. Should the District lose the operation of one water source, water could be routed throughout the District from other water sources through a series of pressure reducing stations and booster pump stations. Such a failure would not adversely affect the District’s ability to meet the water demands of its customers. The District has emergency portable generator connections at well sources that can be used in an emergency. Multiple Reservoirs Water storage is provided by 12 active reservoirs that are located at different sites throughout the District’s water system. The duplication of reservoirs in separate pressure zones, coupled with the water system’s ability to transfer water between zones through a series of pressure reducing stations and booster pump stations, provides sufficient redundancy to prevent service disruption when one of the reservoirs is out of service for cleaning, painting, or repairs. Distribution System The District has attempted to loop water mains, wherever possible, to improve water circulation (i.e. water quality) and minimize impacts to the system in the event that a portion of the distribution system must be taken out of service for maintenance or repairs. Section 8 – Operations and Maintenance Silverdale Water District 8-15 2013 Comprehensive Water System Plan August 2014 Emergency Equipment The District is equipped with the necessary tools to deal with common and serious emergencies associated with water main failures. If a more serious emergency should develop, the District will hire a local contractor to make repairs to alleviate the emergency condition. Emergency Telephone Key or "on-call" personnel can be reached by the District’s internal phone system, the Kitsap County Sheriff’s Department, Central Kitsap Fire and Rescue and 911. On-Call Personnel The District designates a supervisor and service technician to be on-call at all times. The on-call service technician can respond to emergency calls within 30 minutes. A list of emergency telephone numbers is provided to each on-call employee. New employees are not placed on-call until they are familiar with the water system and maintenance procedures. Material Readiness Some critical repair parts, tools and equipment are on-hand and kept in fully operational condition. As repair parts are used, they are re-ordered. Inventory is kept current and is adequate for most common emergencies, which can reasonably be anticipated. The District has access to an inventory of repair parts, including parts required for repair of each type and size of pipe within the service area. 8.3.2 Emergency Response Program An Emergency Response Plan has been prepared as part of the District’s Vulnerability Assessment Plan. The Emergency Response Plan, which was completed in 2004, contains a contingency operation plan for responding to emergency events, a list of water personnel responsible for making decisions in emergency situations, and other elements. 8.4 Preventive Maintenance Maintenance schedules that meet or exceed manufacturer's recommendations have been established for all critical components in the water system. The following schedule is used as a minimum for preventive maintenance: 8.4.1 Reservoirs Daily Monitor water levels. Security checks. Annually Staff inspects the following for proper operation: Aesthetics, Check Valves, Doors/Hatches, Drains, Ladders, Paint, Riser Pipe, Roof/Cover, Screens, Turnover, Vents Section 8 – Operations and Maintenance Silverdale Water District 8-16 2013 Comprehensive Water System Plan August 2014 8.4.2 Distribution System Water Mains Bi-Monthly Leak survey. Annually Flush zone 1. Bi-Annually Year 1: Flush zones 2, 4, 6. Year 2: Flush zones 3, 5, 7, 9. Wells Daily Log and record volume delivered and current supply rate. Security checks. Annually Check all valves and screens; check control valve settings. Calibrate meter. As Needed Maintain electrical and mechanical equipment; paint structures and piping. Booster Pump Stations Daily Log and record volume delivered and current supply rate. Security checks. Annually Staff inspects the following for proper operation: Efficiency, Leaks, Lubrication, Noise, Odor, Operation, Pressure, Priming System. Engine Generator Sets Weekly Operate to achieve normal operating temperatures; observe output. As Needed Replace fluids and filters in accordance with manufacturer's recommendations (or more frequently depending on amount of use). As Needed Perform tune-up; replace parts as necessary. Pressure Reducing Stations Monthly Check vault for adequate drainage, clean drain if necessary. Check grout at pipe penetrations for leaks; check ladders, lid and hatch for proper operation and condition; check piping and valves for leaks, record meter and pressure readings. Annually Staff inspects the following for proper operation: Noise, Leaks, Open/Close Speed, Operation. Isolation Valves Annually Staff inspects the following for proper operation: Valve Box, Valve Box Lid, Packing, Nut, Stem, Operation. Hydrants Annually Staff inspects the following for proper operation: Cables, Caps, Drain, Gaskets, Guard Posts, Nozzle, Operating Nut, Operation, Paint, Static PSI, Reflectors, Tag, Valve Box, Valve Box Lid, Water Quality, Tracing Wire. Section 8 – Operations and Maintenance Silverdale Water District 8-17 2013 Comprehensive Water System Plan August 2014 Meters 2-20 Year Intervals Time and measure volume of meter-delivered flow; dismantle, clean, and inspect all parts, replace worn or defective parts; retest meter for accuracy. Frequency varies based on meter size. Air and Vacuum Release Valve Assemblies Annually Staff inspects the following for proper operation: Valve, Air Vac Box, Plumbing, Valve Box, Valve Box Lid, Standpipe, Tracing Wire. Blowoff Assemblies Annually Staff inspects the following for proper operation: Valve, Valve Box, Valve Box Lid, Blowoff Box, Blowoff Box Lid, Standpipe, Plug, Tracing Wire. Structures Annually Staff inspects the following for proper operation: Aesthetics, Bulkhead, Doors/Hatches, Paint, Roof, Gutters, Vents, Plumbing. Backflow Prevention Devices Annually Inspect and record status. Telemetry and Control System Monthly Visually inspect cabinets and panels for damage, dust and debris. All facilities are operated on a monthly basis via the SCADA system. Annually Staff inspects the following for proper operation: Wiring, Register Accuracy, Box, Panel, Battery, Radio, Labels, Locks. Staff tests all alarm and data collection systems, ensures accuracy. 8.4.3 Tools and Equipment Rolling Stock Weekly Check all fluid levels and brakes. Scheduled Replace fluids and filters in accordance with manufacturer's recommendations. Tools As Needed Clean after each use; lubricate and maintain as necessary. Section 8 – Operations and Maintenance Silverdale Water District 8-18 2013 Comprehensive Water System Plan August 2014 9. Water System Improvements 9.1 Introduction This section presents proposed improvements to Silverdale Water District No. 16’s (District) water system that are necessary to resolve existing system deficiencies and accommodate the projected growth of water customers. The water system improvements were identified from an evaluation of the results of the water system analyses presented in Section 7. The water system improvements were sized to meet both the existing and future demand conditions of the system. A Capital Improvement Program number, hereafter referred to as a CIP number, has been assigned to each improvement. Numbers were assigned to the improvements starting at the north end of the system and, in general, incrementally increase to the south, as shown in Figure 9-1, a plan view summary of the improvements. The improvements are organized and presented in this section according to the following categories: Water System Improvements Since Last Water System Plan Water Main Extension Water Main Replacement Facilities Improvements Water System Acquisitions Reclaimed Water Improvements Water Maintenance and Operations This section presents a brief description of each group of improvements and the basis for the cost estimates and the implementation schedule. 9.2 Description of Improvements This section provides a general description of each improvement and an overview of the deficiencies that they will resolve. Most of the improvements are necessary to resolve existing system deficiencies. However, improvements have also been identified to illustrate the major facilities that will be required to construct interties to wheel water through the District’s service area for the Kitsap Public Utility District No. 1 (PUD) and to provide water service to customers in undeveloped areas of the water system. The costs associated with these improvements shall be partially funded by the PUD or by developers, rather than wholly by the existing water system customers. The locations of all improvements are shown in Figure 9-1. Section 9 – Water System Improvements Silverdale Water District 9-1 2013 Comprehensive Water System Plan VIKING WAY NW NE HOSTMARK ST DD FJO R R N E W MN -1 $ Central Valley PRV WMN-6 Mt View PRV K J KJ $ WF-1 [ Ú 3 U V WMR-2 J K! Ø WF-14 STA TE H WY 308 2 % Spirit Ridge Well 3 and 4 PS, and Reservoir [ Ú WMN-7 WMR-1 WMN-18 ! Ø Dawn Park Well ! Ø NE CENTRAL VALLEY RD NW Olympic View PRV $ WMN-3 $ 4 M Silverdale Way 5 PRV N- WSA-7 Shadow Glen Reservoirs WMN-3 308 W WMN-16 -2 U V NW LUOTO RD 2 WF-17 % MN N- CLEAR CREEK RD NW W WSA-8 WM Hood Canal W RD N W MPIC VIE OLY WMN-16 WMN-16 WMN-3 WMN-3 VIKING WAY NW Liberty Bay Westridge PRV NW TRIGGER AVE WMN-9 SIL VE RD ALE Schold PRV WA YN W $ $ WSA-1 Old Frontier PRV WMN-10 WF-6 WSA-6 J KÚ [ WF-7 NW WM R WR-5 WMR-5 9 R- R- 10 WMR-6 W WF-4 NW BUCKLIN HILL RD W M R- WR-2 [ Ú J K WR-4 WR-3 N W WAAGA WAY NE WAAGA WAY 6 WMR-7 MR -11 Huckle Ridge PRV $ ! ØSelbo Well 3 $ Loretta Heights J K Reservoirs Newberry Hill Zone 5 PRV $ $ Newberry Hill Zone 3 PRV WF-16 2 % ! Ø Hess Well TRACYTON BLVD NW NW NEWBERRY HILL RD WMN-20 U V Walgren PRV J K Ø ! Ø! 2 % WMR-13 ! Ø Wixson Well and Reservoir WF-8 WR-6 WMR-9 M WMR-12 WF-18 WR-10 [ Ú WR-7 5 R! Ø W Chena Wells 1 and 2 (inactive) [WF-3 PS (inactive), and Reservoir Ú RIDGETOP BLVD NW WR-5 ! Ø [ J KJ KÚ WMR-11 WMR-9 WMR-10 W Dickey Well J KÚ WMR-14 [ ! Ø U V W WM R -1 WR-8 $ Shelly PRV Dickey PS and Reservoir WR-10 2 [$ Ú ! Ø Ø J K! [WMR-12 Ú WF-15 W M R- 8 WMR-17 Anderson Hill PRV Provost Well, PS, and Reservoir WF-9 303 -9 $ -4 Vintage PRV WR WM N - " @ Y 0 Ø J K! [ Ú Ridgeview PRV ! ØÚ [ J K! Ø Hillsboro PRV $ $Ridgetop PRV -1 12 Westwind Well, PS, and Reservoir $ $ Ridgetop Well, WF-2 PS, and Reservoir A WMN-11 ! Ø ! Ø N - 17 Bucklin Ridge Well and Reservoir WF-19 WMN-10 MN Silversound Well 1 and 2 K[ WF-11 !J Ø Ú WF-12 $ J K ! Ø ! Ø W WMR-15 HILL RD WMN-14 W GA AA W NW AN N RSO E D WM PRV " @ $ WSA-4 WF-10 $ Quail Hollow CENTRAL VALLEWM Y RD N-15 NE WSA-3 Reservoirs and Well WMN-15 WSA-5 WMN-9 WSA-3 $ ØJ K Island Lake J K! WR-4 WMN-8 $ WMN-19 WM R -1 6 Dyes Inlet NW FAIRGROUNDS RD NE FAIRGROUNDS RD Windsong PS BEC KH WY NW 2 % $ $ K J ! Ø ! Ø " @ [ Ú K J Pump Station - 6 Yr Pump Station - 20 Yr Intertie PRV - 6 Yr PRV - 20 Yr [ Ú $ ! Ø K J Pump PRV Well Reservoir Water Main Reservoir - 6 Yr Retail Service Area Boundary Well - 6 Yr Road Well - 20 Yr Zone Valve, 20 Pump Station - Reclaimed Water Figure 9-1 CIP Map Water Body NE RIDDELL RD Reservoir - Reclaimed Water Water Main Extension - 6 Yr Water Main Extension - 20 Yr Water Main Replacement - 6 Yr Water Main Replacement - 20 Yr Water Main - Reclaimed Water Water System Acquisitions Silverdale Water District Water System Plan PINE RD NE W N SEA 2 % [ Ú [ Ú Existing Water System H AC T I Apr 2014 0 750 1,500 PINE RD HO LL YR D WF-13 Capital Improvement Projects Source: (1) Kitsap County GIS (2) Silverdale Water District GIS RD NW WSA-2 Legend ON B E PS, and Reservoir NE MCWILLIAMS RD T R ACY J K ! [ Ø Eldorado Well, Ú CHICO W AY NW [ Ú SYLVAN WAY 3,000 Feet Document Path: D:\GISDATA\Projects\wash\Silverdale Water District\Map_Docs\Draft\Fig 9-1 CIP Map.mxd August 2014 9.2.1 Water System Improvements since Last Water System Plan The water system has undergone changes since 2005, when the District last updated its Comprehensive Water System Plan. The District has implemented many of the recommended projects from the 2005 CIP. Some notable improvements include the Island Lake reservoir expansions, seismic upgrades to all reservoirs, and the installation and replacement of tens of thousands of feet of water main. The following lists the CIP projects that have been completed, along with additional non-CIP projects that have also been completed since the District’s last comprehensive water system plan. 8-inch and 12-inch Water Main in Olympic View Road from Turtle Road to Sealion Road 8-inch and 12-inch Water Main in Westgate Road and Gustafson Road 16-inch water main in Willamette Meridian Road through undeveloped land from Newberry Hill and Airport Court to Olympic View. Zone 5/3.2 PRV on Clear Creek Road, at Mountain View Road Zone 5/3 PRV on Olympic View Road Zone 5/3 PRV on Frontier Road, South of Hosman Road Abandon Frontier Woods Well No. 1 Raise Island Lake 0.3 MG Reservoir Abandon Frontier Woods Well No. 2 Abandon Westgate Well System-Wide Chlorination Facilities System-Wide Seismic Improvements Weather Station and Stream flow monitoring Improvements 9.2.2 Water Main Extensions The following water main improvements were identified by the District and from the results of the distribution and transmission system analyses discussed in Section 7. The projects are divided into two categories. “Extensions” are water main improvements in which new water mains are being added to the system to either expand or improve the existing system. The projects are denoted by “WMN” in front of the project number. “Replacements” are water main improvements that would replace existing distribution water pipelines. These projects are denoted by “WMR” in front of the project number. Section 9 – Water System Improvements Silverdale Water District 9-3 2013 Comprehensive Water System Plan August 2014 Extensions WMN-1: Viking Way – Viking Way Extension Install approximately 4,200 feet of 8” ductile iron pipe along Viking Way to a proposed intertie with the PUD. This project creates a new connection with the PUD’s water system at this location. WMN-2: SR 308 – Silverdale Way to Central Valley Road Install approximately 1,400 feet of 8” ductile iron pipe along SR 308 from Silverdale Way to Central Valley Road. This project creates a loop between two existing dead end water mains and improves fire flow and reliability. WMN-3: Zone 4.5 Expansion Install approximately 18,200 feet of 8” ductile iron pipe along Scandia Road from Viking Way to SR 308, Virginia Loop Road from Scandia Road to SR 308, Pearson Point Road, and Virginia Point Road. This project will expand the District’s service area and will be development driven. WMN-4: Keyport Extension Install approximately 4,900 linear feet of 8” ductile iron pipe along SR 308 from Central Valley Road to the District’s service boundary with the PUD’s Keyport system. This project will create a connection with the PUD’s service area for emergency supply and will be development driven. An intertie between the two systems is described in WF-14. WMN-5: Levin Road Extension Install approximately 3,000 linear feet of 8” ductile iron pipe along Levin Road to create a loop between an existing water mains on Levin Road and Silverdale Way. This project improves fire flow, reliability, and will serve additional properties. WMN-6: Mt. View Crossing Install approximately 800 linear feet of 12” ductile iron pipe along Mountain View Road under SR 3. This project will create a new connection between Zones 4 and 5. It will provide the ability to wheel water to the PUD and to move water from the east side of the District to the west. A small booster pump station will be installed at this location and is described in WF-1. WMN-7: Half Mile Road Extension Install approximately 4,200 linear feet of 12” ductile iron pipe along Half Mile Road from Old Frontier Road to Clear Creek Road and along Clear Creek Road to Melody Lane. This project improves fire flow and reliability by creating a new connection between Zones 3.2 and 5 and by increasing looping. A pressure reducing valve (PRV) will be installed along the Half Mile Road alignment. The large pressure reducing valve should be an 8-inch valve and the small valve should be a 3-inch valve. The station should also include a pressure relief valve, sized during the Section 9 – Water System Improvements Silverdale Water District 9-4 2013 Comprehensive Water System Plan August 2014 design, to relieve pressures in Zone 3 (H.E. 361 feet) in the event of a failure of one of the pressure reducing valves. WMN-8: Trigger Avenue Extension Install approximately 3,700 linear feet of 8” ductile iron pipe along Trigger Avenue from Old Frontier Road to Clear Creek Road and Clear Creek Road to Blissful Lane. This project creates a new connection between Zone 3 and Zone 5 and improves fire flow and reliability. A PRV will be installed at Old Frontier Road and Trigger Avenue as part of this project. WMN-9: Schold Road Extension Install approximately 3,000 linear feet of 8” ductile iron pipe along Schold Road extending North and South from an existing water main along the road. This project will expand the District’s service area and will be driven by development. WMN-10: Ridgetop Growth Area Install approximately 9,800 linear feet of 12” ductile iron pipe in the area East of Silverdale Way, North of Waaga Way, West of Ridgetop Boulevard, and South of Ridgepoint Drive. This project will be development driven. The area will mostly be served from Zone 2. Small areas may need to be served from Zone 4. A PRV from Zone 1 will be installed for fire flow. WMN-11: Apex Area – Lois Drive Extension Install approximately 3,600 linear feet of 8” ductile iron pipe along Lois Drive from Willamette Meridian Road to Silversound Lane and Silversound Lane to Garons View Lane. This project will replace an existing small diameter water line and extend a water main to the Silversound Water System. This project will provide a connection to the small group B water system the District owns operates from Zone 7. The Silversound wells 1 and 2 would then be decommissioned. WMN-12: Apex Area – Apex Road Extension Install approximately 3,200 linear feet of 12” ductile iron pipe along Apex Road between the proposed Apex reservoir and an existing water main in Zone 5. This project will create a new connection between Zone 7 and Zone 5. An altitude valve and 1,000 gpm booster pump station will be installed during this project to transfer water between Zone 7 and Zone 5. WMN-13: Norbert Main Extension A portion of Zone 5 (H.E. 503 feet) in the higher elevations on Norbert Place near Newberry Hill Road has low pressures that do not meet the minimum pressure requirements. This project will convert the water main in Norbert Place to Zone 7 (H.E. 628 feet) by constructing approximately 700 lineal feet of new 8” ductile iron water main along Francis Drive and intercept the main along Nobert Place. A small section of Francis drive will have both Zone 5 and 7 available for service. Section 9 – Water System Improvements Silverdale Water District 9-5 2013 Comprehensive Water System Plan August 2014 WMN-14: Greaves Way Site Install approximately 2,500 linear feet of 16” ductile iron pipe to connect the proposed Greaves Way reservoir to Zone 1. This project will be development driven. Kitsap County recently rezoned the areas north and south of Greaves way as multi-use. It is expected that light commercial and retail type development will occur in this area. WMN-15: Central Valley Road Extension Install approximately 5,350 linear feet of 8” ductile iron pipe along Central Valley Road from Paulson Road to Walker Road and south of Paulson Road extending an existing main along Central Valley Road to the South. When water service is extended to customers located in the easterly portion of the District’s future service area along Central Valley Road, a pressure reducing valve will be necessary in the area to reduce pressures to acceptable levels and to provide adequate fire flow to water system customers in the area. This project will also install a pressure reducing station on Central Valley Road, approximately 500 feet south of Olivia Road. The large pressure reducing valve should be an 8-inch valve and the small valve should be a 2inch or 3-inch valve. The station should also include a pressure relief valve, sized during the design, to relieve pressures in Zone 2 (H.E. 344 feet) in the event of a failure of one of the pressure reducing valves. This project will be partially funded by developers. WMN-16: Zone 5.1 Extensions Install approximately 9,100 linear feet of 8” ductile iron pipe along Olympic View Loop Road, Olympic View Court, and Jupiter Trail. This project will extend water service to additional properties in the area. This project will be development driven. WMN-17: Anderson Hill Road Extension Install approximately 3,000 linear feet of 12” ductile iron pipe along Anderson Hill Road from the proposed Apex reservoir to Olympic View Road. This will create a new loop between Willamette Meridian Road and Olympic View Road increasing fire flow and system reliability. WMN-18: Olympic View Road Extension Install approximately 1,100 linear feet of 8” ductile iron pipe extending south of Olympic View Road. This project will expand the District’s water service to additional properties within the District’s service area. WMN-19: Eldorado Boulevard Extension Install approximately 1,700 linear feet of 12” ductile iron pipe along Eldorado Boulevard from Rydan Court to the Eldorado water system (22750C). The District plans to acquire the water system and this project would connect the system into the District water system. The water system acquisition is described in project WSA-2. Section 9 – Water System Improvements Silverdale Water District 9-6 2013 Comprehensive Water System Plan August 2014 WMN-20: Paulson Road Extension Install approximately 1,300 linear feet of 12” ductile iron pipe along Paulson Road to the east of Central Valley Road. Replacements WMR-1: Silver Hills Place and Avante Drive Replacement Install approximately 3,000 feet of 12” ductile iron pipe to replace existing 12” asbestos cement water main from Spirit Ridge Well 3 along Silver Hills Place and Avante Drive. This project increases reliability of the main pipeline from the Sprit Ridge wells 3 and 4 to the Island Lake Zone 4 Reservoir. WMR-2: Thomas Drive Replacement Install approximately 3,200 feet of 8” ductile iron pipe to replace existing 8” asbestos cement water main from Shadow Glen Reservoir to Clear Creek Road, along Thomas Drive. This project increases reliability of the main pipeline from the zone 3.2 reservoir. WMR-3: Island Lake Replacement Install approximately 350 feet of 14” ductile iron pipe to replace existing 14” asbestos cement water main from Island Lake Zone 4 Reservoir to Plateau Circle, along Easement. This project increases reliability of the main pipeline from the zone 4 reservoir. WMR-4: Ridgetop Boulevard, Sid Uhnick Drive, and Chena Road Replacement Install approximately 2,800 feet of 8” ductile iron pipe to replace existing 8”. The route will follow from Ridgetop Well Site along Ridgetop Boulevard and Sid Uhnick Drive and Chena Road to the Chena Reservoir Site. This project increases reliability of the main pipeline from Ridgetop Well and the proposed 2.0MG Chena (Zone 1) Reservoir. WMR-5: Chena Road and Fredrickson Road Replacement Install approximately 2,000 feet of 12” ductile iron pipe replace existing 12” asbestos cement water main. The route will follow from Chena Reservoir Site to Bucklin Hill along Chena Road and Fredrickson Road. This project increases reliability of the main pipeline from the proposed 2.0MG Chena Reservoir to the commercial core of Silverdale. WMR-6: Olson Road, Kristine Place, and Kimberly Court Replacement Install approximately 3,400 feet of 8” ductile iron pipe to replace existing 8” asbestos cement water main from Bucklin Hill Road to Palmer Place, along Olson Road and replace all pipe along Kristine Place and Kimberly Court. The District is working to replace all asbestos cement mains. This section is one of the oldest in the District. Section 9 – Water System Improvements Silverdale Water District 9-7 2013 Comprehensive Water System Plan August 2014 WMR-7: Tracyton Boulevard Replacement Install approximately 1,000 feet of 8” ductile iron pipe to replace existing 8” asbestos cement water main from Selbo Road heading North on Tracyton Boulevard. The District is working to replace all asbestos cement mains. This section will complete the replacement of all AC mains along Tracyton Boulevard. WMR-8: Silverdale Way – Bucklin Hill Road to Post Office Replacement Install approximately 5,300 feet of 12” ductile iron pipe to replace existing 6” asbestos cement water main from Bucklin Hill Road to the Post Office, past Randall Way, along Silverdale Way. This project increases fire flow in the main commercial area of Silverdale. This also improves reliability by taking the aging asbestos cement main out of service. WMR-9: Bucklin Hill Road and Anderson Hill Road Replacement Install approximately 4,080 feet of 12” ductile iron pipe to replace existing 6”, 8”, and 10” asbestos cement water main from Silverdale Way to Anderson Hill Road along Bucklin Hill Road and from Silverdale way along Anderson Hill Road to round about on Anderson Hill Road, past the Central Kitsap Jr. High School. This project increases fire flow in main commercial area of Silverdale. This also improves reliability by taking the aging asbestos cement main out of service. WMR-10: Silverdale Way – Bucklin Hill Road to Anderson Hill Road Replacement Install approximately 1,600 feet of 12” ductile iron pipe to replace existing 6” asbestos cement water main from Bucklin Hill Road to Anderson Hill Road along Silverdale Way. This project increases fire flow in main commercial area of Silverdale. This also improves reliability by taking the aging asbestos cement main out of service. WMR-11: Bayshore Drive, Washington Avenue, and Byron Street Replacement Install approximately 3,550 feet of 6” and 8” ductile iron pipe to replace existing 6” and 8” asbestos cement water main from Bucklin Hill Road along Bayshore Drive, Washington Avenue, and Byron Street to Silverdale Way. Kitsap County will be replacing sewer lines in this area; therefore the District will take advantage of construction to improve reliability by taking the aging asbestos cement main out of service. WMR-12: Silverdale Loop Road Replacement Install approximately 2,300 feet of 12” ductile iron pipe to replace existing 8” and 12” asbestos cement water main from Provost Site to Silverdale Loop Road and along Silverdale Loop Road heading north to 90 degree bend. This project increases fire flow in main commercial area of Silverdale. This also improves reliability by taking the aging asbestos cement main out of service. Section 9 – Water System Improvements Silverdale Water District 9-8 2013 Comprehensive Water System Plan August 2014 WMR-13: Provost Road – Shelly Drive to 82nd Street Replacement Install approximately 3,400 feet of 8” ductile iron pipe to replace existing 6” asbestos cement water main from Shelley Drive to 82nd Street along Provost Road. This project increases fire flow in zone 3. The District is working to replace all asbestos cement mains. This section is one of the oldest in the District. WMR-14: Dickey Road Replacement Install approximately 1,300 feet of 12” ductile iron pipe to replace existing 10” asbestos cement water main from Dickey Reservoir Site heading east along Dickey Road to 90 degree Bend. This project will increase the reliability of the main connecting the Dickey reservoir to zone 5. WMR-15: Willamette Meridian – Segerman to Contact Court Replacement Install approximately 1,200 feet of 8” ductile iron pipe to replace existing 8” PVC water main along Willamette Meridian from 320 feet north of Segerman to Contact Ct. The District is replacing all underperforming PVC water mains. This improvement will increase reliability of the water main. WMR-16: Provost Road – 6855 to 6796 Replacement Install approximately 560 feet of 8” ductile iron pipe to replace existing 8” asbestos cement water main Along Provost Road starting from the north corner of 6855 Provost to the south corner of 6796 Provost Road. This is the last section of asbestos cement main along the south portion of Provost Road. WMR-17: Apex Area – Runway Main Extension Install approximately 2,500 linear feet of 16” ductile iron pipe along the Runway to connect the new reservoir described in project WF-10 to the water system. There is an existing small diameter pipe serving properties along the alignment that would be replaced. Future Water Main Extensions and Replacements All new water main extensions and replacements shall be installed in accordance with the District’s Water System Construction Standards, which are included in Appendix H. All new water mains shall be ductile iron pipe and sized by a hydraulic analysis to ensure that all pressure, flow, and velocity requirements, as stated in Section 5, are met. In general, new water mains that will carry fire flow in residential areas shall be a minimum of 8-inches in diameter and looped for single family residential developments and 8-inches in diameter and looped for multi-family residential developments. New water mains in commercial, business park, industrial, and school areas shall be a minimum of 12-inches in diameter. Section 9 – Water System Improvements Silverdale Water District 9-9 2013 Comprehensive Water System Plan August 2014 9.2.3 Facility Improvements The following water system facility improvements were identified from the results of the water system analyses that are discussed in Section 7. WF-1: Intertie and Zone 3.2/4/5 Pump Station on NW Mountain View Road Improvement: Construct a pump station at the intersection of NW Mountain View Road and Clear Creek Road. The pump station will be capable of transferring water between the District’s Zone 4 (H.E. 485 feet) and Zone 5 (H.E. 503 feet). The ability of the pump station to transfer water between the District’s two pressure zones will increase the overall reliability of the District’s water system. The capacity of the pump station is estimated to be approximately 1,600 gpm. The actual capacity and configuration of the pump station will be determined during the preliminary design phase of the project, following the finalization of the intertie negotiations with the PUD. A PRV will be installed to transfer water from Zone 5 to Zone 3.2 to maintain reliability. The project will also install an engine generator set for providing standby power supply in the event of a power outage. This project will benefit both the PUD and the District’s customers; therefore this project will be partially funded by both utilities. Construction of these improvements should coincide with project WMN-6. Justification: To enable the District to wheel water from to the PUD, water will need to be pumped from the District’s system to transfer water to the higher hydraulic grade of the PUDs system located to the north. WF-2: Ridgetop Manganese Treatment Plant Improvement: All water produced from the Ridgetop well be chlorinated using 0.8% sodium hypochlorate, which will be generated onsite, and treated through manganese dioxide ore to consistently and reliably remove a large percentage of the Manganese naturally present in the well water. Some Iron, although not the target of the treatment plant, will be removed as well. Hydrogen sulfide will be kept in solution by maintaining a chlorine residual. Justification: The water produced from the Ridgetop Well contains 0.04 mg/L of Manganese. Although this is not over the secondary MCL, over the years, customer complaints have escalated regarding staining and dirty water. With the recent addition of Cl2, it is expected that the aesthetic problems caused by the Manganese will increase in severity. WF-3: Chena Reservoir Improvement: A 2.02 MG reservoir is currently under design. The reservoir will have an overflow elevation of 223 feet to match the existing Chena Reservoir. Justification: The storage analysis in Section 7 indicates that there is a deficiency in total existing system storage by 2032. This new reservoir resolves that deficiency. Section 9 – Water System Improvements Silverdale Water District 9-10 2013 Comprehensive Water System Plan August 2014 WF-4: Chena Pump Station Improvement: By adding the Chena booster station the District is building in security and redundancy to the system, incase of well or power failure on the east side of the District. The District will install a standby generator making this a viable sight for meeting. The pump station capacity will be approximately 1,500 gallons per minute. Justification: Currently the District can not supply water from the Zone 1 to the entire East side of the service area; including pressure zones 2, 4, and 6. WF-5: Greaves Way Property Acquisition Improvement: Purchase the site for the future Zone 1 reservoir and pump station. Justification: Property needed for the Greaves Way Reservoir and Pump Station. WF-6: Greaves Way – Zone 1 Reservoir Improvement: Construct a reservoir on property to be purchased by the District approximately 900 feet west of Clear Creek Court and 100 feet south of Bison Lane. The reservoir will have an overflow elevation of 223 feet and a minimum useful storage capacity of 0.75 MG to meet the projected needs of the system through the 20-year planning period. A preliminary evaluation by the District indicates that the site can accommodate a reservoir with a total capacity of up to 1.0 MG. The actual capacity of the reservoir will be determined during the preliminary design phase of the project. For budgeting purposes, the cost of this improvement is based on the largest capacity reservoir that can be constructed on the site. Construction of this improvement should coincide with the construction of the new Zone 1 Reservoir transmission main, completed under project WMN-14 Justification: The site has been identified for a future reservoir location. The site would be acquired by the District for a future reservoir that would be installed dependent on future development. Current the Greaves Way area is undeveloped and the proposed reservoir is not scheduled for installation in the near term. WF-7: Greaves Way – Zone 1 Pump Station Improvement: Construct a pump station on the Greaves Way site with a capacity of approximately 1,500 gallons per minute. Justification: Pump station is needed to move water from Zone 1 to Zone 3 once the Zone 1 reservoir is installed WF-8: Wixson Well Improvement: Redrill the existing well to increase the pumping capacity to 1,000 gallons per minute to fully utilize the water right. Section 9 – Water System Improvements Silverdale Water District 9-11 2013 Comprehensive Water System Plan August 2014 Justification: The Wixson Well does not fully utilize the water right for the well. This will meet future demands in Zone 5 and 7 as well. WF-9: Newberry Well Improvement: Co-develop a 1,000 gpm well with the PUD. The existing reservoir has an overflow elevation of 634 feet and a minimum useful storage capacity of 0.20 MG. The capacity of the reservoir is 0.75 MG. Justification: This will provide water for the wheeling to the north side of the County from the Seabeck Aquifer, and maintain a shared storage facility with the Kitsap PUD that will meet the future growth needs of Silverdale Water District and the Kitsap PUD. WF-10: Apex Reservoir Improvement: Construct a reservoir on Airpark Court near the intersection of Anderson Hill Road and Airpark Court. The reservoir will have an overflow elevation of 503 feet and a minimum useful storage capacity of 0.50 MG to meet the projected needs of the system through the 20-year planning period. A preliminary evaluation by the District indicates that the site can accommodate a reservoir with a total capacity of 0.75 MG. The actual capacity of the reservoir will be determined during the preliminary design phase of the project. For budgeting purposes, the cost of this improvement is based on the largest capacity reservoir that can be constructed on the site. Justification: The storage analysis in Section 7 indicates that the future Zone 5 and 7 storage supply area has insufficient capacity to meet the projected future storage requirements of the system. WF-11: Apex Pump Station Improvement: Construct a new pump station are the Apex Reservoir site. The pump station capacity will be approximately 1,000 gallons per minute and will pump from Zone 5 to Zone 7. Justification: Lack of pumping redundancy between Zone 5 and Zone 7. WF-12: Well Decommissioning The following projects involve decommissioning existing wells within the District’s service area. Silversound Wells No1 and 2 Improvement: Following the completion of project WMN-12, which will connect the Silversound system to the District’s Zone 5 (H.E. 503 feet), demolish the existing Silversound Well No. 1 and 2. Cap and lock the wellhead and decommission the well. Justification: The Silversound Wells will not be needed after the Silversound satellite water system is connected to the District’s main water system. The wells were not constructed to the District’s current construction standards. Section 9 – Water System Improvements Silverdale Water District 9-12 2013 Comprehensive Water System Plan August 2014 Chagnon Well Improvement: Transfer the water rights from the Chagnon Well based on the results of the water rights and water supply evaluation completed under CIP M-3. Demolish the existing Chagnon Well and cap and lock the wellhead. Justification: The Chagnon Well is currently inactive. Dawn Park Well Improvement: An overall rehabilitation of the well. The District will evaluate installing a Manganese removal system of the 0.1 ppm Mn levels found in the current well water. Justification: The Dawn Park Well is an aging facility and in need of overall rehabilitation. Graystone Well Improvement: Transfer the water rights from the Graystone Well based on the results of the water rights and water supply evaluation completed under CIP M-3. Demolish the existing Graystone Well and cap and lock the wellhead and decommission the well. Justification: The Graystone Well is currently inactive. 3 Wells at Apex Improvement: Transfer the water rights from the Apex Wells based on the results of the water rights evaluation. Demolish the existing Apex Wells and cap and lock the wellhead. Justification: The Apex Wells are not needed now that the Apex Water System is connected to the District’s main water system. The wells were not constructed to the District’s current construction standards. WF-13: Erland Point Intertie Improvement: Install an intertie with the Erland Point water system (23850K). Justification: Emergency supply WF-14: Keyport Intertie Improvement: Install an intertie with the PUD’s Keyport system (38850J). Justification: Emergency supply WF-15: Newberry Hill Intertie Improvement: Install an intertie with the PUD’s Newberry Hill system (06136C). Justification: Wheeling water Section 9 – Water System Improvements Silverdale Water District 9-13 2013 Comprehensive Water System Plan August 2014 WF-16: Bremerton Intertie Improvement: Install an intertie with the City of Bremerton’s Water System. The intertie between the systems will require the installation of a pump station and pressure reducing valve. It is assumed that the capacity of the pump station would be 1,000 gallons per minute and the cost would be split 50% between the District and the City of Bremerton. Justification: Emergency supply WF-17: Clear Creek Intertie Improvement: Install an intertie with the PUD’s Vinland system. Justification: Wheeling water WF-18: Provost Well Improvements Improvement: Evaluate the condition of the existing piping and equipment to determine the extent of the necessary mechanical improvements. Provide a ventilation system for the existing building. Justification: The Provost Well is an aging well and is in need of general mechanical improvements. The well building lacks proper ventilation. WF-19: Bucklin Ridge Well Improvements Improvement: Evaluate the condition of the existing piping and equipment to determine the extent of the necessary mechanical improvements. Provide a ventilation system for the existing building. Justification: The Bucklin Ridge Well is an aging well and is in need of general mechanical improvements. The well building lacks proper ventilation. WF-20: Reservoir Mixing Valves Improvement: The District plans to install mixing valves on the Dickey, Eldorado, Loretta Heights, Provost, Shadow Glen (0.3), Westwind and Wixson reservoirs. The Island Lake Reservoirs already have mixing valves, the Ridgetop Reservoir fills from the top, and the Chena Reservoir (0.25 MG) is slated for replacement. Justification: The District maintains 11 active reservoirs. Most of the reservoirs function with a single inlet/outlet pipe. As such contact time for chlorine disinfection is severely limited and temperature stratification has been identified as a water quality problem. 9.2.4 Water System Acquisitions As discussed in more detail in Section 5, as part of its Duty to Serve, the District acknowledges that it ultimately has a responsibility to serve all properties located within its Retail Service Section 9 – Water System Improvements Silverdale Water District 9-14 2013 Comprehensive Water System Plan August 2014 Area. As such, the District is prepared (and has plans) to acquire some of the small systems that are located within its service area, when conditions are appropriate. Some of the small group A and group B water systems the District is either pursuing or considering acquiring that are contained within the District’s service area are listed below. WSA-1: Brianwood (06651Y) Status: In discussion with the Kitsap PUD, this system can be operated by simply connecting the piping. WSA-2: Eldorado (22750C) Status: In discussion with the Kitsap PUD, the system is at capacity, as new properties develop, it will make sense for the District to take over and consolidate the system into Silverdale Water District’s main system. The piping in the water system also needs to be rehabilitated. Due to steep winding roads, rehabilitation will be expensive. Funding will be a major driver in this acquisition. WSA-3: Puddingstone (19246) Status: This system is owned by the property owners in the system, the Kitsap PUD operates the system. The District has not approached the property owners regarding this acquisition. WSA-4: Crystal Creek (47421) Status: In discussion with John Poppe, the system’s owner. This system can be operated by simply connecting the piping. WSA-5: Avellana (268010) Status: In discussion with the Kitsap PUD, this system can be operated by simply connecting the piping. WSA-6: Sunset Farms (86115) Status: This system is owned by the property owners in the system, Northwest Water System’s operates the system. The District has not approached the property owners regarding this acquisition. WSA-7: Mobile Home Park on Mt. View Road (13522D) Status: The owner of the system has approached the District regarding service. The acquisition is currently under consideration. WSA-8: Mobile Home Park at Scandia Loop and SR 308. Status: The owner of the system has approached the District regarding service. The acquisition is currently under consideration. Section 9 – Water System Improvements Silverdale Water District 9-15 2013 Comprehensive Water System Plan August 2014 9.2.5 Reclaimed Water Improvements The County is finishing their treatment plant upgrades to provide Class A reclaimed water. With an available source of reclaimed water, the District is planning improvements to extend a reclaimed water distribution system to serve customers within the service area boundary. The following projects are improvements the District is planning to expand reclaimed water service. Additional details regarding the District’s reclaimed water program are provided in Appendix 43. WR-1: Convert Chena Reservoir to Reclaimed Water Storage Improvement: Convert the existing Chena Reservoir for reclaimed water storage. This project will proceed after the installation of the new Chena reservoir described in project WF-3. Justification: Expansion of the District’s reclaimed water distribution system WR-2: Pump Station at Treatment Plant Improvement: Install a 1,000 gallon per minute pump station. Justification: Provides pumping to convey reclaimed water to the District’s service area. WR-3: Reservoir at Treatment Plant Improvement: Install a reservoir at the treatment plant. To identify a planning level cost estimate, it is assumed that the reservoir volume will be 1.0 MG. Justification: Reservoir at the treatment plant would provide equalizing storage for production and demand. WR-4: Main Extension to Ridgetop Jr. High Improvement: Install approximately 6,400 linear feet of 18” reclaimed water main to extend an existing water main from the treatment plant to the Ridgetop Jr. High School. Justification: Expansion of the District’s reclaimed water distribution system to connect the first reclaimed water customer. WR-5: Main Extension to Chena Reservoir Improvement: Install approximately 4,200 linear feet of 12” reclaimed water main from the Ridgetop Jr. High School to the Chena reservoir site. Justification: Expansion of the District’s reclaimed water distribution system WR-6: Main Extension to Silverdale Way Improvement: Install approximately 5,150 linear feet of 12” reclaimed water main from the Chena reservoir site to Bucklin Hill Road. Section 9 – Water System Improvements Silverdale Water District 9-16 2013 Comprehensive Water System Plan August 2014 Justification: Expansion of the District’s reclaimed water distribution system WR-7: Ridgetop Jr. High Pump Station Improvement: Install a 300 gallon per minute pump station. Justification: A pump station may be necessary to provide sufficient pressure to the Ridgetop Jr. High School WR-8: Anderson Hill Road Pump Station Improvement: Install a 500 gallon per minute pump station. Justification: A pump station will be necessary to provide service along Greaves Way. WR-9: Main Extension along Silverdale Way Improvement: Install approximately 7,000 linear feet of 8” and 12” reclaimed water main along Silverdale Way from Anderson Hill Road to Waaga Way. Justification: Expansion of the District’s reclaimed water distribution system WR-10: Main Extension to Greaves Way Improvement: Install approximately 7,400 linear feet of 8” reclaimed water main along Bucklin Hill Road from Silverdale Way to Anderson Hill Road, Anderson Hill Road, and Old Frontier Road to Greaves Way. Justification: Expansion of the District’s reclaimed water distribution system 9.2.6 Miscellaneous Improvements The following miscellaneous improvements are planning efforts and program elements that are required to comply with various water regulations or are improvements that do not fit into one of the previous categories. M-1: Annual Water Main Replacement Program Improvement: Replace existing water main with new ductile iron water main in accordance with the District’s construction standards. The individual water main improvements grouped under this project are numbered 1, 2, 3, etc., as shown in Figure 9-1. The selection of specific projects will be accomplished annually during the District’s budget development process and will be guided by the prioritization presented later in this section. This provides the District with the flexibility to coordinate these projects with other projects that may occur within the same area. An allowance of $100,000 per year has been established for the annual replacement of water mains. Section 9 – Water System Improvements Silverdale Water District 9-17 2013 Comprehensive Water System Plan August 2014 Justification: Most of the water main improvements shown in Figure 9-1 are required to resolve fire flow deficiencies caused primarily by undersized water mains. Many areas also contain water mains that have occurrences of leaks or breaks, or are constructed of non-standard (e.g., asbestos cement) water main materials. M-2: Recoating Improvement: Thoroughly inspect and sample the interior and exterior coatings of all reservoirs to determine the properties of the existing coating and the extent of the required recoating. Recoat the interior and exterior of each reservoir to prevent premature corrosion of the facilities. Justification: The interior and exterior of the District’s water storage facilities needs to be recoated every 15 to 20 years, based on the typical life of coatings on steel tanks. M-3: Water Right and Well Study Improvement: Conduct a system-wide analysis of the District’s existing wells and associated water rights to determine the condition of the well, current production rate and water quality, and the well’s ability to fully utilize its water right. Provide recommendations for water right transfers from other wells or abandonment of the facility. Review other opportunities to purchase additional water rights. Justification: The District holds water rights for various wells that have experienced water quality or production issues in the past. Some of these wells are currently inactive. The District desires to transfer the water rights for use at other facilities prior to abandoning the wells. A water right and well study will be necessary for the District to complete outstanding water right projects. M-4: Water Use Efficiency Program and Leak Detection Improvement: The District will continue its water main replacement program to reduce the amount of older and potentially leaking water main and will also implement a comprehensive leak detection/water main repair program to further reduce the amount of unaccounted-for water. The District will perform ongoing conservation measures, including public education programs and exploring potential recycling/reuse opportunities, as outlined in the Water Use Efficiency Plan included in Appendix F. Justification: The District does not currently perform leak detection on a regular basis. Several water conservation measures must also be carried out on an ongoing basis to comply with the State conservation program requirements. M-5: Cross-Connection Control Program Improvement: Update the District’s cross-connection control resolution to address the new regulations in WAC 246-290 and the current Cross-Connection Control Program included in Appendix G. The District will develop and implement an evaluation program that assesses the Section 9 – Water System Improvements Silverdale Water District 9-18 2013 Comprehensive Water System Plan August 2014 risk of existing water service connections. Potential high-risk cross-connection premises will be evaluated first. The District will then evaluate other premises, based on potential risk to the water system and budget availability. The District will carry out other cross-connection control program requirements as outlined in the Cross-Connection Control Program. The District is in the process of establishing this program and currently evaluating all commercial properties. One half-time employee is dedicated to the program. It is anticipated that the program will be in full operation by 2015. Justification: The District does not have a cross-connection control program that meets current Washington State requirements. M-6: Wellhead Protection Program Improvement: Update the Wellhead Protection Plan every six years when the District’s Comprehensive Water System Plan is updated. The District will carry out the wellhead protection program requirements as outlined in the Wellhead Protection Program included in Appendix K. Justification: The District has a Wellhead Protection Plan in place, and will continue to periodically review and update its Wellhead Protection Plan. M-7: Comprehensive Water System Plan Update Improvement: Update the Comprehensive Water System Plan every six years to meet the requirements that are in effect at the time of the update. Justification: WAC 246-290-100 requires the District to update its Comprehensive Water System Plan every six years and submit to the Department of Health for review and approval. 9.3 Estimating Costs Of Improvements Project costs for the proposed improvements were estimated by the District and were based on costs of similar recently constructed water projects. The cost estimates, which are presented in 2012 dollars, include the estimated construction cost of the improvement and indirect costs for engineering preliminary design, final design, and construction management services, permitting, legal, and administrative services. Sales tax and a 40% contingency are added to the construction cost. Construction cost estimates for water main projects were determined from the water main unit costs (i.e., cost per foot length) shown in Table 9-1 and the proposed diameter and approximate length of each improvement. Section 9 – Water System Improvements Silverdale Water District 9-19 2013 Comprehensive Water System Plan August 2014 Table 9-1. Water Main Unit Costs Water Main Diameter (in) 6 8 10 12 14 16 Construction Cost per Foot Length (2012 $/LF) $52 $59 $77 $82 $102 $107 The unit costs for each water main size are based on estimates of all construction related improvements, which includes materials and labor for the water main installation, water services, fire hydrants, fittings, valves, connections to the existing system, trench restoration, asphalt surface restoration, and other work for a complete installation. Additional costs may be added to water main improvements to cover anticipated, increased costs related to the project location and degree of difficulty. The following is a description of the capital facilities proposed to serve an equivalent of 1,000 residential units. Research and Development: Preliminary investigations and studies into the feasibility of the facilities needed to be constructed Property Acquisitions: Purchase/acquisition of a reservoir site of two well sites Well Drilling and Development: Drilling and development of two production wells with a total capacity of at least 675 gallons per minute. Well and Booster Pump Station: Construction of two well pump stations with a production capacity of at least 675 gallons per minute and a booster pump station with a total capacity of at least 1,000 gallons per minute. Reservoir: Construction of a 1-million gallon reservoir with at least 0.6-million gallons of usable equalizing, standby, and fire storage. Transmission Main: Construction of 6,000-lineal feet of 12” ductile iron water main. Operations and Maintenance Facilities: Construction of a facility capable of serving 20,000 equivalent residential units. Table 9-2 lists the estimated cost of the capital facilities to serve an equivalent 1,000 ERUs. Section 9 – Water System Improvements Silverdale Water District 9-20 2013 Comprehensive Water System Plan August 2014 Table 9-2. Cost of Capital Facilities Facility Research and Development Property Acquisition Well Drilling and Development Well and Booster Pump Station Reservoir Transmission Main O&M Facilities Unit to serve 1,000 ERUs 1 1 1,000 gpm 1,000 gpm 1.0 MG 6,000 LF 1 Cost of Capital Facilities (2012 Estimate $) $34,250 $326,820 $553,350 $549,000 $1,689,250 $593,685 $217,450 It is assumed for this plan that the preliminary research for all proposed capital facilities has been completed. The cost estimates presented in this plan for proposed property acquisitions, well developments, pump stations, and reservoirs is based on the unit costs shown in Table 9-2. Cost estimates for intertie improvements are based on estimates developed by the District, and are unique to each proposed intertie. 9.4 Schedule of Improvements The identified improvements were prioritized into an implementation schedule that can be used by the District for preparing its 6-year CIP and yearly water utility budget. The implementation schedule for the proposed improvements is shown in Table 9-3. An allowance of $100,000 per year has been established for the annual replacement of the water mains. The District will identify and schedule the replacement of these smaller water mains during the annual budget process. This provides the District with the flexibility to coordinate these projects with road or other projects within the same area. 9.4.1 Future Project Cost Adjustments All cost estimates shown in the tables are presented in year 2012 dollars. Therefore, it is recommended that future costs be adjusted to account for the effects of inflation and changing construction market conditions at the actual time of project implementation. Future costs can be estimated using the Engineering News Record (ENR) Construction Cost Index for the Seattle area or by applying an estimated rate of inflation that reflects the current and anticipated future market conditions. Section 9 – Water System Improvements Silverdale Water District 9-21 2013 Comprehensive Water System Plan Table 9-3. Capital Improvement Program (2013-2032) Schedule and Cost of Improvements (in thousands of dollars)(1) Project No. Description Water Main Extension WMN-1 Viking Way – Viking Way Extension WMN-2 SR 308 – Silverdale Way to Central Valley Rd WMN-3 Zone 4.5 Expansion WMN-4 Keyport Extension WMN-5 Levin Road Extension WMN-6 Mt. View Crossing WMN-7 Half Mile Road Extension WMN-8 Trigger Avenue Extension WMN-9 Schold Road Extension WMN-10 Ridgetop Growth Area WMN-11 Apex Area – Lois Drive Extension WMN-12 Apex Area – Apex Road Extension WMN-13 Norbert Main Extension WMN-14 Greaves Way Site WMN-15 Central Valley Road Extension WMN-16 Zone 5.1 Extensions WMN-17 Anderson Hill Road Extension WMN-18 Olympic View Road Extension WMN-19 Eldorado Boulevard Extension WMN-20 Paulson Road Extension Water Main Replacement WMR-1 Silver Hills Place and Avante Drive WMR-2 Thomas Drive WMR-3 Island Lake WMR-4 Ridgetop Boulevard, Sid Uhnick Drive, and Chena Road WMR-5 Chena Road and Fredrickson Road WMR-6 Olson Road, Kristine Place, and Kimberly Court WMR-7 Tracyton Boulevard WMR-8 Silverdale Way – Bucklin Hill Road to Post Office WMR-9 Bucklin Hill Road and Anderson Hill Road WMR-10 Silverdale Way – Bucklin Hill Road to Anderson Hill Road WMR-11 Bayshore Drive, Washington Avenue, and Byron Street WMR-12 Silverdale Loop Road WMR-13 Provost Road – Shelly Drive to 82nd Street WMR-14 Dickey Road WMR-15 Willamette Meridian – Segerman to Contact Court WMR-16 Provost Road – 6855 to 6796 WMR-17 Apex Area – Runway Main Extension Facilities Improvements WF-1 Intertie and Zone 3.2/4/5 Pump Station on NW Mountain View Road WF-2 Ridgetop Manganese Treatment Plant WF-3 Chena Reservoir WF-4 Chena Pump Station WF-5 Greaves Way Property Acquisition WF-6 Greaves Way – Zone 1 Reservoir WF-7 Greaves Way – Zone 1 Pump Station WF-8 Wixson Well WF-9 Newberry Well WF-10 Apex Reservoir WF-11 Apex Pump Station WF-12 Well Decommissioning WF-13 Erland Point Intertie WF-14 Keyport Intertie WF-15 Newberry Hill Intertie WF-16 Bremerton Intertie WF-17 Clear Creek Intertie WF-18 Provost Well Improvements WF-19 Bucklin Hill Well Improvements WF-20 Reservoir Mixing Valves Water System Acquisitions WSA-1 Brianwood (06651Y) WSA-2 Eldorado (22750C) WSA-3 Puddingstone (19246) WSA-4 Crystal Creek (47421) WSA-5 Avellana (268010) WSA-6 Sunset Farms (86115) WSA-7 Mobile Home Park on Mt. View Road (13522D) WSA-8 Mobile Home Park at Scandia Loop and SR 308. Reclaimed Water Improvements WR-1 Convert Chena Reservoir to Reclaimed Water Storage WR-2 Pump Station at Treatment Plant WR-3 Reservoir at Treatment Plant WR-4 Main Extension to Ridgetop Jr. High WR-5 Main Extension to Chena Reservoir WR-6 Main Extension to Silverdale Way WR-7 Ridgetop Jr. High Pump Station WR-8 Anderson Hill Road Pump Station WR-9 Main Extension along Silverdale Way WR-10 Main Extension to Greaves Way Water Maintenance and Operations M-1 Annual Water Main Replacement Program M-2 Recoating M-3 Water Right and Well Study M-4 Conservation Program and Leak Detection M-5 Cross-Connection Control Program M-6 Wellhead Protection Program M-7 Comprehensive Water System Plan Update Total Costs of Water System Improvements Purpose of (2) Project Financing Source(3) Base Project Cost (2012 Dollars) Deficiency Improve Improve Improve Deficiency Improve Deficiency Deficiency Improve Improve Improve Improve Deficiency Improve Improve Improve Improve Improve Improve Improve OI OI Dev Dev OI OI OI OI Dev Dev OI OI OI OI Dev OI OI OI OI OI 390 140 1,650 450 280 180 390 340 280 1,240 340 420 80 420 490 830 390 110 220 170 Improve Improve Improve Improve Improve Improve Improve Improve Deficiency Deficiency Deficiency Deficiency Deficiency Improve Improve Improve Deficiency OI OI OI OI OI OI OI LT LT LT OI OI OI OI OI OI LT 390 290 50 260 260 320 100 2,710 2,090 820 320 290 320 170 130 70 420 Improve Deficiency Deficiency Improve Improve Improve Improve Improve Improve Improve Improve Improve Improve Improve Improve Improve Improve Improve Improve Improve OI LT LT LT OI OI OI OI OI LT LT OI OI OI OI OI OI OI OI OI 1,340 1,330 2,650 270 510 2,570 1,270 860 230 1,000 220 50 190 1,390 50 260 50 20 20 1,070 Improve Improve Improve Improve Improve Improve Improve Improve OI OI OI OI OI OI OI OI 290 3,580 140 50 40 160 170 260 Reclaimed Reclaimed Reclaimed Reclaimed Reclaimed Reclaimed Reclaimed Reclaimed Reclaimed Reclaimed OI OI OI OI OI OI OI OI OI OI 390 840 2,570 1,080 540 660 220 430 700 580 O&M O&M O&M O&M O&M O&M O&M OI OI OI OI OI OI OI 100 1,300 30 14 7 12 160 2013 2014 2015 2016 2017 2018 390 140 180 390 340 80 390 260 260 2,710 2,090 820 84 84 420 1,330 2,650 270 510 230 1,000 220 50 535 535 290 3,580 50 40 390 1,080 100 100 100 30 14 7 12 30 14 7 12 1,493 7,433 6-yr CIP TOTAL 2019-2032 (4) 20-yr CIP TOTAL 390 140 0 0 0 180 390 340 0 0 0 0 80 0 0 0 0 0 0 0 0 0 1,650 450 280 0 0 0 280 1,240 340 420 0 420 490 830 390 110 220 170 390 140 1,650 450 280 180 390 340 280 1,240 340 420 80 420 490 830 390 110 220 170 390 0 0 260 260 0 0 2,710 2,090 820 84 0 0 0 84 0 420 0 290 50 0 0 320 100 0 0 0 0 290 320 170 0 70 0 390 290 50 260 260 320 100 2,710 2,090 820 84 290 320 170 84 70 420 0 1,330 2,650 270 510 0 0 0 230 1,000 220 50 0 0 0 0 0 0 0 1,070 1,340 0 0 0 0 2,570 1,270 860 0 0 0 0 190 1,390 50 260 50 20 20 0 1,340 1,330 2,650 270 510 2,570 1,270 860 230 1,000 220 50 190 1,390 50 260 50 20 20 1,070 290 3,580 0 50 40 0 0 0 0 0 140 0 0 160 170 260 290 3,580 140 50 40 160 170 260 390 0 0 1,080 0 0 0 0 0 0 0 840 2,570 0 540 660 220 430 700 580 390 840 2,570 1,080 540 660 220 430 700 580 1,400 0 980 884 842 872 320 2,000 1,300 1,160 968 884 944 480 29,488 53,324 100 100 30 14 7 12 100 1,300 30 14 7 12 30 14 7 12 30 14 7 12 160 600 1,300 180 84 42 72 160 4,696 3,538 603 6,073 23,836 Notes: (1) Costs are presented in 2012 dollars. There is no escalation to the stated year of construction. (2) Purpose of Project: Deficiency = Addresses deficiencies identified in the Water System Plan; Improve = Does not address a deficiency, but improves overall system operation; Growth = Required to address growth/expansion of the distribution system; O&M = Necessary for proper system maintenance; Reclaimed = Development of the District's reclaimed water distribution system. (3) Source of Funding: OI = Operating Income (Rates); Dev = Developer Funded/Contributed; LT = Long Term Debt. (4) Total costs associated with projects implemented in 2019 through 2032. Specific years of project implementation are noted where applicable. (5) Cost splits for the Keyport, Erland Point, and Bremerton Intertie have not been negotiated and the total project cost is included in the table. (6) Project cost splits for the Newberry Hill and Clear Creek are negotiated and the portion of cost to be incurred by Silverdale Water District is included in the table. August 2014 10. Financial Plan 10.1 Historical Financial Review Historically, the Silverdale Water District (District) has maintained a system of rates and charges to properly fund the operation, maintenance, and capital improvements for the District's water system. Table 10-1 is a historical listing of the utility's revenues and expenses from 2011 through 2012. Balances available are assumed to be committed to capital improvements and/or reserves. Table 10-1. Historic Financial Information ($000’s) 2011 Revenues Rate Revenues Other Revenues Total Water Revenue Expenses O&M Taxes Debt Service (P & I) Total Water Expenses Balance/(Deficiency) 2012 $3,098 324 $3,422 $3,440 344 $3,784 $2,231 201 907 $3,339 $83 $2,391 287 1,002 $3,680 $104 The District historically has maintained a healthy level of reserves for cash flow, capital, unanticipated maintenance and operations needs, and rate stabilization. Additional reserves are also maintained for debt service payments, and reserve requirements. Should an unanticipated event or cash flow problem occur, the District has adequate cash reserves to handle the expense without immediate impact to current rate levels. 10.2 Water Rates The District charges its customers based on the size of the meter, class of service, fire flow demands, and a charge for the amount of water used. That is, a basic charge, a fire flow charge, and a usage charge based on an inverted-block rate structure where the block sizes vary based on the rated capacity of each meter size. All customer classes are charged the same cost per block for the usage charge. Water rates charged by the District are listed in Table 10-2. Section 10 – Financial Analysis Silverdale Water District 10-1 2013 Comprehensive Water System Plan August 2014 Table 10-2. Bi-Monthly Water Rates – 2012 and Current Meter Size 5/8-inch 3/4-inch 1-inch 1-1/2-inch 2-inch 3-inch 4-inch 6-inch Residential1 Fire Flow (GPM) 1,000 1,250 1,500 1,750 2,000 2,250 2,500 First Block2 Meter Size 5/8-inch 0 – 10 ccf 3/4-inch 0 – 15 ccf 1-inch 0 – 25 ccf 1 1/2-inch 0 – 50 ccf 0 – 80 ccf 2-inch 3-inch 0 – 160 ccf 4-inch 0 – 160 ccf 6-inch 0 – 160 ccf Usage Rate $1.60 Second Block 10 – 20 ccf 15 – 30 ccf 25 – 50 ccf 50 –100 ccf 80 – 160 ccf 160 – 320 ccf 160 – 320 ccf 160 – 320 ccf $2.35 Third Block 20 – 40 ccf 30 – 60 ccf 50 – 100 ccf 100 – 200 ccf 160 – 320 ccf 320 – 640 ccf 320 – 640 ccf 320 – 640 ccf $3.60 Rate Base Charge $18.25 27.50 45.75 91.25 146.25 292.25 456.50 912.75 Charge $4.10 5.15 6.15 7.20 8.20 9.25 10.25 Fourth Block > 40 ccf > 60 ccf > 100 ccf > 200 ccf >320 ccf > 640 ccf > 640 ccf > 640 ccf $5.10 (1) Non-residential fire flow charges are approximately 4 times higher than the residential rates listed above. These rates are listed in Section 15 of the 2012 Budget and Schedule of Charges. (2) ccf = hundred cubic foot The District also charges one-time fees for new customers connecting to the system. These are Capital Facilities Charges (CFCs), where the new customers are buying into the capacity available to serve them. Table 10-3 lists the current, adopted CFCs by meter size. In addition to these fees, the District also charges installation service fees. These charges include tapping the main, installation of the service line, and meter installation. For residential customers these are set charges, as listed in Table 10-3. These charges vary by meter size. For nonresidential customers the minimum service installation fee is the same as for residential customers. However, the actual cost is based on time and materials required for the installation, plus a 20 percent charge to cover District overhead. The current fees are listed in the District’s 2012 Budget and Schedule of Charges. Section 10 – Financial Analysis Silverdale Water District 10-2 2013 Comprehensive Water System Plan August 2014 Table 10-3. Current Capital Facility Charges (CFCs) and Other Fees by Meter Size Meter Size CFC Meter Install Fee1 Total 5/8" $3,400.00 $2,550.00 $5,950.00 3/4" 5,100.00 2,550.00 7,650.00 1" 8,500.00 2,725.00 11,225.00 1-1/2" 16,900.00 5,375.00 22,275.00 2" 27,000.00 6,050.00 33,050.00 3” 67,500.00 17,850.00 85,350.00 4” 134,900.00 21,125.00 156,025.00 6” 269,700.00 24,975.00 294,675.00 (1) Set fee for residential and minimum fee for non-residential. Actual fee for non-residential is based on time and materials plus 20 percent for overhead. A Fire Flow capital facilities charge is also levied on new customers based on the fire code requirements (demands) placed on the system. These vary by class of service (residential and non-residential) and by gallons per minute required. The District also levies a Front Footage fee that provides reimbursement of a pro rata portion of the original cost of water system extensions and distribution and transmission facilities. The front footage fee varies by class of service (residential, commercial, irrigation) and has a minimum charge based on 1,000 feet of property abutting an existing water main or where one is proposed to be installed. Wholesale customers are charge by the class of customers served. These fees are listed in Table 10-4. Table 10-4. Current Front Footage Charge By Class of Service Class of Service Residential Commercial Irrigation Charge Per Foot Minimum Charge $34.94 40.44 29.44 $3,494.00 4,044.00 2,944.00 The District has appropriate fees and charges in place for equity between existing and new customers as well as customers requesting special services and those with regular water supply services. 10.3 Development of Financial Plan A financial projection was developed to determine the utility’s ability to meet its capital improvement and operating needs over the six-year time period of 2013 to 2018. This time period is consistent with the six-year planning period contained within the other planning sections. Development of the financial plan involved reviewing the projected revenues and expenses of the water system. Fund balance and reserve levels were also analyzed in developing the financial projection. The District’s 2012 budget was used as a base. Future years were escalated by applying factors for inflation and growth, which are described below. Section 10 – Financial Analysis Silverdale Water District 10-3 2013 Comprehensive Water System Plan August 2014 10.3.1 Projected Revenues The first component in developing the financial analysis is a review of the sources of revenue of the water system. The different revenues received from operations are: Rate revenues – water sales to customer accounts; Other revenues – street light income, penalties, interest income, and other miscellaneous sources. Rate revenues are calculated based on the 2012 revenue budget and inflated at 0.6% per year. This level of growth is conservative for the range of 0.4% to 1.0% as described in Section 4.2.5 of this Plan. Annual revenues are the product of the revenue of the previous year plus compounded growth. Rate revenues are projected to be approximately $3.56 million in 2013. The rate revenue is projected to remain fairly constant through 2018. By 2018 the rate revenue is projected to be $3.67 million, based on customer growth assumptions. Other revenues for 2013 are projected to total approximately $800,000; a majority of the revenue stems from the Kitsap Public Utility District (Kitsap PUD). Beginning in 2013 the Kitsap PUD will pay the District $500,000 per year for 7 years to cover their share of several capital projects and a small amount ($12,000) for O&M of these facilities. Past the 7 year time frame the PUD will continue to provide the $12,000 to the District. By 2018 the other revenue sources are projected to be $848,000. The total revenue available to offset the operating and capital requirements of the water system totals $4.37 million in 2013, and is projected to increase to $4.52 million by 2018. Table 10-5 projects the revenues for the District’s water utility for the years 2013 through 2018. Table 10-5. Projected Six-year Revenue ($000’s) Projected Revenues 2013 2014 2015 2018 Rate Revenues $3,566 $3,587 $3,609 $3,630 Other Revenues 803 810 811 814 Total Water Revenue $4,369 $4,397 $4,419 $4,445 2017 $3,652 831 $4,483 2018 $3,674 848 $4,522 10.3.2 Future Expenses The second part of the financial analyses is a review of expenses. The projection of future operating expenses is based on the 2012 budget. Four main cost components were reviewed in developing the financial plan: Operations and Maintenance (O&M) Taxes Debt Service Capital Funded From Rates Section 10 – Financial Analysis Silverdale Water District 10-4 2013 Comprehensive Water System Plan August 2014 These expenses are projected for future years by applying escalation factors pertinent to the type of expense being reviewed. The escalation factors range from 2% to 8%. Operation and Maintenance Expenses Using the 2012 budget as a starting point, expenses were escalated by factors representing assumed inflationary rates to obtain projected costs. Escalation factors include: Labor – escalated 2.5% per year Medical Benefits - escalated 8% through 2016 and 6% each year thereafter Materials and supplies, Other Benefits, Equipment, and miscellaneous – 3% Power and Utilities – 4% per year O&M expenses are projected to range from $2.67 million in 2013 to $3.06 million in 2018, based on the 2012 budget projected at the above-discussed escalation factors. Debt Service There are currently five outstanding loans and bonds for the District: two Public Works Trust Fund loans (PWTF – 1995 and 2012), two revenue bonds (2006 and 2008 issues), and a Drinking Water State Revolving (DWSRF) loan. The combined debt service on the existing debt ranges from $1.00 million in 2013 to $1.57 million in 2018. To fund future capital, as identified in this Plan, this financial plan assumes new low-interest loans of $12.26 million and new revenue bond issues totaling $8.75 million through 2018. Debt service payments for these new debt obligations range from $758,000 in 2013 to $1.38 million. In order to repay these bonds, it is necessary that water rates be maintained at a level such that redemption of the bonds (principal), plus interest payments, can be made. In addition to these amounts, an additional amount necessary to provide debt service coverage is required of revenue bonds. Meeting debt service coverage (DSC) requirements is an important financial indicator for well managed utilities. Debt service coverage is a financial measurement of a utility’s ability to repay debt. A debt service coverage ratio is a comparison of net income before debt service payments to the total debt service on revenue bonds, or on all outstanding debt service. A debt service coverage ratio of 1.25 or 1.30 is generally considered the legally acceptable minimum for revenue bonds. A DSC ratio of 1.5 is considered a stronger financial target to strive for. Bond rating agencies look at a utility’s DSC ratio as one aspect in determining the utility’s rating, which affects interest rates for future bond issues. The higher the DSC ratio, the better the rating and the lower future interest rates and debt payments. During the 6-year review period, the District’s DSC ratio ranges between 1.16 and 0.32 with no rate adjustments. If rate adjustments are made to meet the revenue requirement as developed in this analysis, the DSC for all debt ranges between 1.09 and 1.29. For revenue bonds only the DSC is strong beginning at 1.42 in 2013 and remaining above 2.25 for the remainder of the review period. Capital Improvements Funded from Rates The modeling for this plan identified a number of infrastructure improvements. The capital improvement plan (CIP) contains a number of renewal and replacement, regulatory and growthSection 10 – Financial Analysis Silverdale Water District 10-5 2013 Comprehensive Water System Plan August 2014 related projects. Renewal and replacements are, as the name suggests, the replacement of existing and worn out (depreciated) facilities. Some of the renewal and replacement projects are also major maintenance projects, such water main replacements. Some projects are also due to regulatory requirements (e.g., safe drinking water act). Growth-related facilities, on the other hand, are those related to system expansion and new customers. Many of the utility capital projects have all three elements contained. That is, they address a regulatory issue, they will replace and existing facility, and they will be designed and built to provide service for growth. Funding sources are determined, in part, by what type of improvements the project provides. As noted above in the discussion on debt service, the District has been successful in funding capital projects with State offered low-interest loans that are available. Additionally, the District is familiar with other outside funding sources such as grant programs, developer contributions, interlocal agreements, etc. The District works to maximize these possibilities in order to minimize impacts to rates. Not every project, or portion thereof, will be eligible for outside financing. Therefore, to accomplish these projects, it is imperative that the District set aside financing for at least part of a project to match outside sources. As a practical matter, and prudent practice, a utility should fund a portion of its capital improvements from rates on an on-going basis. The balancing of funding projects between existing and future customers is important, as the improvements benefit both. The funding of capital from rates typically is targeted to fund a minimum of annual depreciation expense for renewal and replacement type of projects. This funding should be paid by existing customers, the beneficiaries of the system in place. Actual replacement cost is typically at least twice the level of depreciation (for a system with an average useful life of 50 years.). Therefore, depreciation expense should be targeted as a minimum rate funding level. For the District this level of funding is gradually increased toward depreciation expense. Depreciation expense in 2012 was $1.2 million. Capital funding from rates begins in 2013 and 2014 at approximately $170,000 each year. This funding level increases gradually to $800,000 by 2018. The increase in capital funding from rates is implemented gradually to balance the impacts to rates with the goal of funding a minimum of annual depreciation expense over time. It is recommended that whenever the District is able to increase this level of funding for capital, it should. This funding source also enables the District to work towards a stronger debt service coverage ratio, which is important to maintaining lower interest rates on any future revenue bonds. 10.3.3 Project Financing The financial analysis conducted for this plan has incorporated the capital projects outlined in Section 9 of this Plan. These projects have been assigned in the year they are expected to be completed along with any known or anticipated funding sources. Capital improvement projects from 2013 to 2018 total $26.5 million over the projected 6-year review period. Table 10-6 presents a summary of the capital improvement projects and funding sources. Section 10 – Financial Analysis Silverdale Water District 10-6 2013 Comprehensive Water System Plan August 2014 Table 10-6. Summary of Projected Capital Improvement Projects ($/000) 2013 2014 2015 2016 2017 2018 Capital Improvements Water Main Extensions $0 $0 $197 $90 $0 $1,505 Water Main Replacements 0 3,321 3,348 0 0 1,087 Facilities Improvements: Ridgetop Maganese Trmnt. Plant 1,370 0 0 0 0 0 Chena Reservoir and Pump Station 0 3,098 0 0 0 0 Apex Reservoir and Pump Station 0 1,294 0 0 0 0 Other Facilities 0 0 1,393 658 0 0 Water System Acquisitions 0 0 0 371 58 0 Eldorado 0 0 0 0 0 4,275 Reclaimed Water Improvements 0 0 0 0 0 0 Main Extension to Ridgetop Jr High 0 0 0 1,216 0 0 Convert Chena Resv. To Reclaimed Stor. 0 0 0 0 452 0 Water Maintenance & Operations 168 173 178 1,647 189 386 Total Capital Improvements $1,538 $7,886 $5,116 $3,982 $699 $7,252 Funding Sources Developer $1 $2 $1 $2,002 $1 $2 Capital Facility Charges 0 0 500 0 0 0 Capital Reserves 0 0 0 0 0 0 New Low-Interest Loans 1,370 7,712 3,180 0 0 0 New Revenue Bonds 0 0 1,000 1,300 0 6,450 Total Funding Sources $1,371 $7,714 $4,681 $3,302 $1 $6,452 Capital Funded Through Rates $167 $172 $435 $680 $698 $800 10.3.4 Summary of the Financial Projections A summary of the financial plan and resulting financial status of the water system is provided in Table 10-7. This is an abbreviated summary of the detailed financial plan and analysis, which is provided in Appendix 10-1. Section 10 – Financial Analysis Silverdale Water District 10-7 2013 Comprehensive Water System Plan August 2014 Table 10-7. Projected Six-year Financial Plan Projected 2013 2014 2015 2018 Revenues Rate Revenues Other Revenues Total Water Revenue Expenses O&M Taxes Debt Service (P & I) CIP from Rates Working Capital Total Water Expenses Balance Balance as % Rates 2017 $3,566 803 $4,369 $3,587 810 $4,397 $3,609 811 $4,419 $3,630 814 $4,445 $2,778 292 1,071 167 $62 $4,369 $2,855 294 2,017 172 ($295) $5,043 $2,935 297 2,238 435 ($198) $5,708 $3,017 301 2,388 680 $94 $6,480 $3,101 305 2,420 698 $320 $6,844 $3,187 309 2,940 800 ($8) $7,229 ($0) 0.0% ($646) 18.0% ($1,288) 35.7% ($2,035) 56.1% ($2,361) 64.6% ($2,707) 73.7% 15.0% 5.5% 5.5% Possible Rate Adjust. 0.0% 18.0% 15.0% Note: Columns and rows sometimes do not add due to rounding millions. $3,652 831 $4,483 2018 $3,674 847 $4,521 The results of Table 10-7 indicate that existing rates are not sufficient to fully fund operations and provide for the prudent and proper funding of capital. Based on this analysis, there is a cumulative deficiency in revenues of 73.7% over the 6-year review period. When interpreting the results of Table 10-7 it is important to understand that the “Balance as % of Rates” is cumulative. That is, any rate adjustments made in previous years would reduce the required adjustment in the following years. Typically, during the course of any given year a utility may receive additional revenue and often actual expenditures do not total 100 percent of budget appropriations. It is important to keep in mind that it is assumed expenses are completely expended within each year. Likewise, it is also important to note that the financial plan presented in this section is predicated upon an assumed level of growth on the system, and assumptions related to inflation. Should this growth increase, slow down, or not occur, the level of rate adjustments shown in Table 10-7 would be affected. In order to meet the operation and maintenance and the proposed capital improvement schedule, the District will need to increase revenues by approximately 73.7% percent over the next six years, either through increases in rates, deferred projects, reduced operational costs, or additional revenue. Of course, portions of all of these options are likely. Additionally, the District can update the capital facilities charges to incorporate new facilities that will serve growth. 10.3.5 Reserve Levels Another key indicator of a utility’s financial health and viability is its reserve levels. Because a portion of the utility’s revenue is consumption based, and therefore dependent upon weather conditions and usage patterns, maintaining adequate reserve levels is important for stable fiscal management of the utility. A discussion of the utility’s reserves is provided below. Section 10 – Financial Analysis Silverdale Water District 10-8 2013 Comprehensive Water System Plan August 2014 District policies, referred to in Section 5 of this Plan, indicate the Working Capital Reserve that is maintained to cover unanticipated cash flow changes, and a Maintenance Fund. The policies do not specify a minimum Fund level. Industry standards recommend that utilities maintain working capital reserves at a level adequate to handle unexpected occurrences, including unexpected cash flow fluctuations. A minimal balance for an O&M reserve, or operating reserve, is recommended to be a minimum of 45 days (12 percent of annual) of operations and tax expenses for utilities that bill monthly. Some utilities with bi-monthly billing cycles will use 60 or 90 days as their minimum reserve balance to maintain. Minimum balance of 90 days for the utility equates to approximately $730,000 in 2013, increasing to $830,000 by 2018, with projected inflationary increases in O&M. Additionally, capital reserves are recommended to help balance the fluctuations in capital plans. These funds are also important in managing funds that are targeted for capital improvements, such as capital facility charges. The utility also has a balance in the capital reserve fund of $2 million at the end of 2012. During the financial review period reserve funds are applied to fund capital projects, with the reserve ending with a balance of $515,000 in 2018. Sound financial policies indicate that a capital fund balance equal to an average year’s worth of capital projects is a prudent reserve amount. For the utility, this minimum capital fund target would be $450,000. Whenever possible, the fund should be replenished. The utility also maintains a Rate Stabilization Reserve. This reserve has had a balance of approximately $730,000 in 2013. These funds are in place to provide the utility with the ability to minimize rate impacts and transition rates in over a several year period. In order to minimize the rate adjustments in 2014 and 2015 approximately $300,000 of rate stabilization reserves were used to reduce the rate adjustment in these two years. This leaves a remaining balance of approximately $130,000 during the remaining three years. As fund balances become available the rate stabilization reserve should be replenished to allow for future rate transition as needed. Between these three reserves the District’s reserve levels appear adequate to handle cash flow fluctuations and emergencies. Additionally, the District maintains separate reserves for debt payments and debt reserves. These funds are typically restricted and maintain the level of reserve and payment as required by the bonds and loan documents. 10.3.5 Overview of Future Water Rates Based upon the results of the financial analysis, the District will need rate adjustments in future years to fully fund on-going operational and capital needs of the water utility, as identified within in Table 10-7. Over the projected 5-year period for rate implementation, a cumulative rate adjustment of 73.7% is necessary to fund the capital plan in the manner in which this plan was developed. That is, funding 79% of the total CIP with debt financing, using approximately $12 million in low-interest loans and $8 million in long-term revenue bonds. The balance is rate and reserve financed. There are a number of options available to set rates at the necessary level over the 6-year period. Large rate adjustments could be implemented in the first few years followed by rate adjustments closer to 5% per year through 2018. This option is shown above in the last row of Table 10-7. That is only one option for the District in implementing this Comprehensive Plan. Other options Section 10 – Financial Analysis Silverdale Water District 10-9 2013 Comprehensive Water System Plan August 2014 to meet projected needs include levelized rate adjustments, reducing operating or capital costs, or deferring or delaying capital projects. It is important to note that the financial analysis developed is based on a number of revenue, expenditure, inflationary and growth assumptions. Should conditions change from those assumptions used in developing this plan, the rate adjustments necessary will also change. 10.4 Summary The financial plan results presented in this section indicate that water rates for the six-year projected time horizon of 2013 to 2018 will not be sufficient to fully fund the projected O&M, capital, and debt service requirements. Rate adjustments or other actions will be necessary to fund the findings of this Comprehensive Plan. The District has demonstrated its commitment to responsible management of the utility by past rate adjustments and by funding adequate levels of operations, capital and rate stabilization reserves. Continued prudent fiscal management will enable the water utility to continue to operate on a financially sound basis. Section 10 – Financial Analysis Silverdale Water District 10-10 2013 Comprehensive Water System Plan
© Copyright 2025 Paperzz