COMBINED-CYCLE POWER PLANT REFERENCES POWER Alstom Profile Alstom designs, manufactures and supplies the broadest range of products, systems and services in the power generation industry. We are world leaders in power generation, active in coal, conventional islands for nuclear energy, gas, wind and hydro power plants. We also provide products and services for industry, from small gas and steam turbines to air quality control systems. Our Plant Integrator™ concept maximises performance, while our extensive range of environmental products and solutions enable us to supply cleaner power than ever before. It all adds up to real added-value for our customers. Integrated power solutions Clean power specialist The Plant Integrator™ concept is Alstom’s unique way of creating more value for customers. We combine outstanding expertise at a component and plant level, as we are both an equipment designer and manufacturer. In addition, we are an Engineering, Procurement and Construction (EPC) contractor with proven worldwide references. Through close collaboration, we guarantee that our customers meet their business objectives and serve their market more effectively. There are four Plant Integrator™ factors, which help increase the Net Present Value for the customer. With our help, Alstom customers are meeting the challenge of limiting CO 2 and traditional pollutants while maintaining power plant economics, resulting in a more affordable energy price to consumers. Plant Integrator™ Factors Customer benefits INVESTMENT Optimised capital investment LEAD-TIME Shorter lead-times to produce electricity faster PERFORMANCE Higher plant ef ficiency for increased power output at a wide range of operational modes Reduced emissions to meet environmental concerns Lower Operating & Maintenance (O&M) costs AVAILABILITY & FLEXIBILITY Better reliability, availability and flexibility RETROFIT Better plant economics through Integrated Retrofit Solutions LIFE EXTENSION Extended plant life options As demand for energy continues to grow, Alstom helps our customers build a balanced portfolio of power plants utilizing a full range of energy sources: including fossil fuels, hydro, nuclear and wind. In its role as Plant Integrator™ specialist, Alstom is the only service provider designing and manufacturing all of the various components that make up a power plant – from turbines and turbogenerators, to boilers and air quality control systems. INNOVATIVE POLICY TO PROTECT THE SURROUNDING ENVIRONMENT OF A PLANT Alstom conducts innovative research to dramatically reduce the environmental impact of its plants. Significant progress in performance and efficiency, as well as breakthroughs in technological developments, contribute to the minimisation of a plant's footprint, including noise and visual impact. PROVEN EXPERTISE IN STATE-OF-THE-ART CLEAN POWER SOLUTIONS The world is demanding immediate environmental action and Alstom technologies are delivering those solutions today. At Alstom we encourage the use of all available resources to help our customers achieve a balanced mix of energy. Our comprehensive range of products helps minimise the emissions of CO2 and other traditional pollutants. That includes every type of resource for new and installed power plant fleets, including plants that were not designed by Alstom. CUSTOMER BENEFITS outstanding availability ● short lead-time ● quick return on investment ● environmental excellence ● Flexible plants, proven technology & components CLEAN INTEGRATED GAS SOLUTIONS In today's competitive market place, there has never been a greater need to optimise the power plant's total life-cycle costs, whilst ensuring the preservation of the environment. Based on decades of experience in turnkey gas fired projects, Alstom offers a comprehensive range of solutions with applications for heat and power generation. Alstom’s offer also covers special applications like : ● power augmentation ● repowering (conversion of steam plants into combined-cycle power plants) ● cogeneration (for district heating, industrial processes or desalination applications) ● add-ons (conversion of gas turbine plants into combined-cycle power plants). THE WORLD’S LARGEST PORTFOLIO OF TECHNOLOGIES & SERVICES KEY FIGURES ● ● ● Over 200 gas plants delivered worldwide ● Over 200 combined-cycle references in the five continents in 50 countries ● Our GT24/GT26 fleet is approaching three million fired hours ● Best practice project management methodologies ● Engineering, Procurement & Construction (EPC) expertise. 100 GW installed 20 projects over 1 GW Our plants meet environmental standards, today and tomorrow and we keep them competitive by offering state-of-the-art clean air technology YOUR BENEFITS ● Optimised plant ● Proven and integrated components & solutions ● State-of-the-art technology ● Optimised installation time ● High performance ● Attractive part load efficiency ● Low emissions at any load ● High operational flexibility ● High fuel flexibility ● High reliability and availability ● High degree of automation Custom-made & optimised power solutions CARTAGENA – SPAIN SHOREHAM – ENGLAND KA26-1 - 3 x 400 MW Customer: Gas Natural In commercial operation since 2005 KA26-1 - 1 x 400 MW Customer: South Coast Power Ltd (SCPL) In commercial operation since 2001 High efficiency over wide load range Low emissions & maximum operational flexibility due to sequential combustion ● Three GT26 based single shaft units ● Associated O&M contract ● ● ● Fast track in a small space Environmental and conservation efforts maximised to mitigate the impact of the power station (shingle area created) ● Remarkable architecture KWINANA – AUSTRALIA TARANAKI – NEW ZEALAND KA13E2-1 - 320 MW Customer: NewGen Power Kwinana Partnership Limited In commercial operation since 2008 KA26-1 - 1 x 360 MW Customer: Contact Energy Ltd. In commercial operation since 1998 Second KA26-1 singleshaft installation in the deregulated UK market Western Australia's most modern and efficient base-load power station ● Uses seawater from Cockburn Sound Extended lifetime of for cooling rather than valuable fresh power, productivity water : plant’s daily consumption of & profit fresh water reduced by an advanced recycling method implemented for plant liquid effluents (boiler drains) First Single Shaft Power Plant with advanced GT26 gas turbine ● Turnkey project achieving optimal project time ● GT26 Fleet Leader with over 58,000 New Zealand’s first IPP fired hours ● 6-year initial Alstom Operation and Maintenance contract, then followed by another 6-year extension contract KUALA LANGAT – MALAYSIA KAENG KHOI 2 – THAILAND KA13E2-3 - 1 x 670 MW Customer: Genting Sanyen Power Sdn Bhd In commercial operation since 1995 KA26-2 - 2 x 760 MW Customer: Gulf Power Generation Company Ltd. In commercial operation since 2008 ● ● One of the most efficient power plants in Malaysia ● Brought into commercial operation 3 months ahead of schedule ● The first and only power plant in Malaysia to provide its own water supply and to supply steam to another industry ● Proven operational capability to burn natural gas with high inert content. ● Easy burner adjustments for future changes in gas composition ● Full EPC supply ● Site location in a valley requiring low emissions ● The first combined-cycle cogeneration facility in Malaysia DK6 – FRANCE CSA – BRAZIL 2 x KA13E2-1 - 2 x 400 MW Customer: DK6 (ARCELOR/Gaz de France) In commercial operation since 2005 KA11N2-2 LBtu - 490 MW Customer: Companhia Siderurgica do Atlantico Under construction Alstom is a specialist in utilising steel mill gas in combined-cycles ● Flexible & efficient power production: - possible arbitrage between natural A challenge and a new gas & electricity prices approach to electricity - fired on natural gas and coke oven & production blast furnace gas from adjacent steel mill, thus creating economic benefits for conventional thermal plant from steelworks gas ● High operational flexibility thanks to Fresh Air System Technology ● Key part of the country’s power sector strategy Captures low Btu wastes & steam from a blast furnace installation to provide electricity comparable to a A new power plant with utility size power plant economic and ● A new power plant co-located with a environmental benefits steel mill to provide 490 MW for consumption at the facility and on the local power grid using waste blast furnace gas and heat scavenged from the iron smelting and coke making process ● Alstom Power PT-PE/BPROB/CCPPRB08/eng/PPS/ 12.08/FR/6555 © - ALSTOM 2007. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. The other names mentioned, registered or not, are the property of their respective companies. The technical and other data contained in this document is provided for information only. Neither ALSTOM, its officers and employees accept responsibility for or should be taken as making any representation or warranty (whether express or implied) as to the accuracy or completeness of such data or the achievement of any projected performance criteria where these are indicated. ALSTOM reserves the right to revise or change this data at any time without further notice. Allready - 500 385 489 rcs Lyon www.power.alstom.com COMBINED-CYCLE POWER PLANT REFERENCES Alstom, always the best choice In today's competitive market place, there has never been a greater need to optimise the power plant's total life-cycle costs, whilst ensuring the preservation of the environment. FULL RANGE OF GAS TURBINES ● simple cycle ● combined cycle ● retrofit INTEGRATED POWER SOLUTIONS Based on decades of experience in turnkey gas fired projects, Alstom offers a comprehensive range of solutions with applications for heat and power generation. ● optimised investment and operating costs ● higher fuel efficiency and flexibility ● lower emissions ● shorter lead times ● high reliability and availability ● high degree of automation ● plant life extension UNIQUE VALUE-ADDING CAPABILITIES ● comprehensive technology and service portfolio ● best practice project management methodologies, ● Engineering, Procurement and Construction (EPC) expertise TAILORED SCOPE OF SUPPLIES AND SERVICES ● from single component to power island and complete plant ● from design up to full turnkey with civil works and Operation & Maintenance (O&M) contracts POWER Order Date Plant Output [MW] Number of blocks Technology Application Block type Main Fuel Spain 10/2008 420 1 G PG KA26-1 NG Turnkey Ghannouch Tunisia 06/2008 400 1 G PG KA26-1 NG Turnkey Muara Tawar 5 Indonesia 06/2008 235 1 G PG KA13E2-1 NG Turnkey Combigolfe France 12/2007 420 1 G PG KA26-1 NG Turnkey Fujairah Phase 2 United Arab Emirates 12/2007 2000 3 CHP DESAL KA26-2/1 NG Turnkey Flevocentrale The Netherlands 10/2007 870 2 G PG KA26-1 NG Turnkey Staythorpe United Kingdom 08/2007 1650 4 G PG KA26-1 NG Turnkey Aghada Ireland 06/2007 430 1 G PG KA26-1 NG Turnkey Grain United Kingdom 05/2007 1275 3 CHP PG KA26-1 NG Turnkey Utran India 05/2007 370 1 G PG KA26-1 NG Turnkey Moscow TPP26 Russia 01/2007 424.6 1 CHP DH KA26-1 NG Turnkey Nhon Trach 1 CCPP Vietnam 12/2006 467.9 1 G PG KA13E2-2 NG Power Island KW Emsland Germany 12/2006 840 1 G PG KA26-2 ICS NG Turnkey CSA - Power Plant Brazil 11/2006 477.3 1 G I&S KA11N2-2 BFG Turnkey CyCoFos France 08/2006 420 1 G PG KA26-1 NG Turnkey Soto de la Ribera 4 Spain 07/2006 420 1 G PG KA26-1 NG Turnkey Malaga Spain 07/2006 420 1 G PG KA26-1 NG Turnkey Tallawarra Australia 06/2006 420 1 G PG KA26-1 NG Turnkey Langage United Kingdom 06/2006 885 1 G PG KA26-2 ICS NG Turnkey Modugno Italy 05/2006 810 1 G PG KA26-2 NG Turnkey Scandale Italy 03/2006 820 2 CHP PG KA26-1 NG Power Island Gissi Italy 01/2006 820 2 G PG KA26-1 NG Turnkey United Arab Emirates 01/2006 430 1 G AL KA13E2-2 NG Turnkey Castejón 2 Spain 12/2005 400 1 G PG KA26-1 NG Turnkey Sohar APP Oman 12/2005 1000 2 G AL KA13E2-2 NG Turnkey Kwinana Australia 12/2005 320 1 G PG KA13E2-1 DO Turnkey Aluar Extension II Argentina 09/2005 465 1 G AL KA13E2-2 NG Turnkey Keppel Merlimau Singapore 03/2005 500 1 CHP Che KA13E2-2 NG Turnkey Kaeng Khoi 2 Thailand 11/2004 1520 2 G PG KA26-2 NG Turnkey Plant Name Country Soto de la Ribera 5 Dubal PP Ext. CCPP 22 Technology: CHP: Combined Heat & Power Generation G: Generator / electricity generation IGCC: Integrated Gasification Combined Cycle Application: AL: Aluminium Smelter CHE: Chemical Industry DESAL: Desalination DH: District Heating I&S: Iron and Steel O&G: Oil and Gas PC: Petro-Chemical PG: Power Generation PP: Pulp & Paper, Paper Mill Block type: OCCPT: Other Combined Cycle Plant Type ICS: Integrated Cycle Solution Main Fuel: BFG: Blast Furnace Gas CO: Crude Oil DO: Distillate oil / Diesel / Light oil / Oil #2 HO: Heavy Oil NG: Natural Gas NPT: Naphta SG: Synthetic gas / syngas RO: Residual oil Scope Scope: ST: Steam Turbine GT: Gas Turbine HRSG: Heat Recovery Steam Generator EL: Electrical I&C: Instrumentation & Control WSC: Water Steam Cycle Order Date Plant Output [MW] Number of blocks Technology Application Block type Main Fuel Spain 12/2003 1200 3 G PG KA26-1 NG Turnkey Phu My 2.1 Ext. Add-on Vietnam 10/2003 170 1 Add-on PG OCCPT NG Turnkey Gautami India 09/2003 469 1 G PG KA13E2-2 NG Turnkey Kestrel United Arab Emirates 06/2003 125 1 Add-on AL OCCPT NG Turnkey Jegurupadu Extension India 06/2003 228 1 G PG KA13E2-1 NG Turnkey Okpai Phase 2 Nigeria 06/2003 163.5 1 Add-on PG KA13E2-2 NG Turnkey Alba 4 Bahrain 06/2003 650 2 G AL KA13E2-2 NG Turnkey Eskol Israel 12/2002 141 1 Add-on PG OCCPT NG Turnkey Alon Tabor Israel 12/2002 133 1 Add-on PG OCCPT NG Turnkey Phu My 4 Vietnam 06/2002 450 1 G PG KA13E2-2 NG Turnkey Dunkerque DK6 France 04/2002 800 2 G I&S KA13E2-1 NG Turnkey Nehuenco II Chile 02/2002 135 1 Add-on PG OCCPT NG Turnkey Al Hidd II Bahrain 09/2001 630 1 CHP DESAL KA13E2-3 NG Turnkey Termorio Brazil 08/2001 1000 3 CHP PC KA11N2-2 NG Turnkey Cockburn Australia 08/2001 240 1 G PG KA13E2-1 NG Turnkey Phu My 2.1 Add-on Vietnam 03/2001 456 1 Add-on PG KA13E2-2 NG Turnkey Senoko Phase 2 Singapore 03/2001 740 2 Repowering PG KA26-1 NG Turnkey Hagit 7 Israel 02/2001 110 1 Add-on PG OCCPT DO Turnkey Hagit 8 Isral 02/2001 110 1 Add-on PG OCCPT DO Turnkey Bang Bo Thailand 11/2000 350 1 G PG KA26-1 NG Turnkey Perlis Malaysia 11/2000 650 1 G PG KA13E2-3 NG Turnkey Ringsend Ireland 10/2000 380 1 G PG KA26-1 NG Turnkey Son Reus Spain 10/2000 226 1 G PG KA8C-3 DO Turnkey Lumut 3 Malaysia 10/2000 650 1 G PG KA13E2-3 NG Turnkey Valle de Mexico Mexico 08/2000 420 1 Repowering PG KA11N2-3 NG Turnkey Termobahia Brazil 07/2000 185 1 CHP PC KA24-1 NG Turnkey Swanbank Australia 06/2000 400 1 G PG KA26-1 NG Turnkey Hazira India 06/2000 160 1 G PG KA8C2-2 NG Turnkey Kelanitissa Sri Lanka 05/2000 165 1 G PG OCCPT NPT ST+generator+WSC+EL+I&C Plant Name Country Cartagena Technology: CHP: Combined Heat & Power Generation G: Generator / electricity generation IGCC: Integrated Gasification Combined Cycle Application: AL: Aluminium Smelter CHE: Chemical Industry DESAL: Desalination DH: District Heating I&S: Iron and Steel O&G: Oil and Gas PC: Petro-Chemical PG: Power Generation PP: Pulp & Paper, Paper Mill Block type: OCCPT: Other Combined Cycle Plant Type ICS: Integrated Cycle Solution Main Fuel: BFG: Blast Furnace Gas CO: Crude Oil DO: Distillate oil / Diesel / Light oil / Oil #2 HO: Heavy Oil NG: Natural Gas NPT: Naphta SG: Synthetic gas / syngas RO: Residual oil Scope Scope: ST: Steam Turbine GT: Gas Turbine HRSG: Heat Recovery Steam Generator EL: Electrical I&C: Instrumentation & Control WSC: Water Steam Cycle Plant Name Country Order Date Plant Output [MW] Number of blocks Technology Application Block type Main Fuel Monterrey III Mexico 03/2000 1000 4 G PG KA24-1 ICS™ NG Turnkey La Paloma USA 03/2000 1000 4 G PG KA24-1 ICS™ NG Turnkey Bowin II Thailand 02/2000 750 2 G PG KA26-1 NG Turnkey Castejon Spain 01/2000 400 1 G PG KA26-1 NG Turnkey Agawam USA 01/2000 279 1 G PG KA24-1 ICS™ NG Power Island Shoreham United Kingdom 01/2000 400 1 G PG KA26-1 NG Turnkey Sakra Cogeneration Singapore 12/1999 810 1 CHP OCCPT NG Turnkey Bellingham USA 12/1999 530 2 G PG KA24-1 ICS™ NG Turnkey Midlothian Extension USA 12/1999 480 2 G PG KA24-1 ICS™ NG Turnkey Hays County USA 12/1999 1100 4 G PG KA24-1 ICS™ NG Turnkey Bèsos Spain 12/1999 800 2 G PG KA26-1 NG Turnkey San Roque Spain 11/1999 800 2 G PG KA26-1 NG Turnkey Hermosillo Mexico 08/1999 253 1 G PG KA24-1 ICS™ NG Turnkey Bayside Canada 06/1999 265 1 Repowering PG KA24-1 NG Turnkey Lake Road USA 06/1999 792 3 G PG KA24-1 ICS™ NG Turnkey Blackstone USA 06/1999 550 2 G PG KA24-1 ICS™ NG Turnkey Rosarito III Mexico 06/1999 540 2 G PG KA24-1 ICS™ NG Turnkey Pelican Point Australia 04/1999 480 1 G PG KA13E2-2 NG Turnkey Rades Tunisia 04/1999 473 1 G PG OCCPT NG Turnkey Milford USA 03/1999 530 2 G PG KA24-1 ICS™ NG Turnkey Senoko Phase 1 Singapore 03/1999 360 1 Repowering PG KA26-1 NG Turnkey Chiba Japan 01/1999 400 1 G PG KA26-1 NG Power Island Coryton United Kingdom 01/1999 775 1 G PG KA26-2 NG Power Island Jebel Ali “E” United Arab Emirates 12/1998 125 1 Add-on PG OCCPT NG Turnkey Midlothian USA 12/1998 1000 4 G PG KA24-1 ICS™ NG Turnkey Condor United Arab Emirates 11/1998 125 1 Add-on PG OCCPT NG Turnkey, excl Civil Works & buildings Island Cogen Canada 09/1998 250 1 CHP PP KA24-1 NG Turnkey Komotini Greece 09/1998 485 1 G PG KA13E2-2 NG Turnkey Eschs / Alzette Luxembourg 07/1998 392 1 G PG OCCPT NG Turnkey Technology: CHP: Combined Heat & Power Generation G: Generator / electricity generation IGCC: Integrated Gasification Combined Cycle Application: AL: Aluminium Smelter CHE: Chemical Industry DESAL: Desalination DH: District Heating I&S: Iron and Steel O&G: Oil and Gas PC: Petro-Chemical PG: Power Generation PP: Pulp & Paper, Paper Mill Block type: OCCPT: Other Combined Cycle Plant Type ICS: Integrated Cycle Solution Main Fuel: BFG: Blast Furnace Gas CO: Crude Oil DO: Distillate oil / Diesel / Light oil / Oil #2 HO: Heavy Oil NG: Natural Gas NPT: Naphta SG: Synthetic gas / syngas RO: Residual oil Scope Scope: ST: Steam Turbine GT: Gas Turbine HRSG: Heat Recovery Steam Generator EL: Electrical I&C: Instrumentation & Control WSC: Water Steam Cycle Order Date Plant Output [MW] Number of blocks Technology Application Block type Main Fuel Chile 05/1998 400 1 G PG KA26-1 NG Turnkey Monterrey II Mexico 04/1998 484 2 G PG KA24-1 ICS™ NG Power Island Winnington United Kingdom 03/1998 140 1 G PG OCCPT NG Turnkey Bangpoo Thailand 12/1997 125 1 G PG OCCPT NG Turnkey Baudour Belgium 12/1997 339 1 G PG OCCPT NG Turnkey Marmara Ereglesi Turkey 12/1997 480 1 G PG KA13E2-2 NG Turnkey Nong Khae Thailand 12/1997 121 1 G PG OCCPT NG Turnkey Partington United Kingdom 12/1997 400 1 G PG OCCPT NG Turnkey St Ghislain Belgium 12/1997 360 1 G PG OCCPT NG Turnkey Enfield United Kingdom 09/1997 396 1 G PG KA26-1 NG Turnkey Atacama Chile 08/1997 740 2 G PG OCCPT NG Turnkey Hai Fu Taiwan 07/1997 950 2 G PG KA24-2 NG Turnkey Dock Sud Argentina 06/1997 775 1 G PG KA26-2 NG Turnkey Tung Hsiao 6 Taiwan 04/1997 330 1 G PG KA11N2-2 DO Turnkey Aluar Puerto Madrin Argentina 12/1996 120 1 G PG OCCPT NG Turnkey Chacheongsao Thailand 12/1996 210 1 G PG OCCPT NG Turnkey Hefei China 12/1996 116 1 Add-on PG OCCPT DO Turnkey Jegurupadu India 12/1996 235 1 G PG KA8C-3 NG Turnkey Orsha Belarus 12/1996 65 1 G PG OCCPT NG Turnkey Sengkang Indonesia 12/1996 137 1 G PG KA8C-2 NG Turnkey Smurfit Townsend Hook United Kingdom 12/1996 52 1 G PG OCCPT NG Turnkey South Humber Bank II United Kingdom 12/1996 510 1 G PG KA13E2-2 NG Turnkey API Falconara IGCC Italy 12/1996 275 1 IGCC PC KA13E2-1 SG Turnkey Taranaki New Zealand 05/1996 360 1 G PG KA26-1 NG Turnkey Lavrion Greece 03/1996 550 1 G PG OCCPT NG Turnkey, excl. Civil Works Poryong Korea 01/1996 2021 4 G PG KA24-2 NG GT+ST+HRSG IP Cogen Thailand 12/1995 151 2 CHP Che KA8C-1 NG Turnkey Map Ta Phut 2 Thailand 12/1995 153 1 G PG OCCPT NG Turnkey Meishi II China 12/1995 240 1 G PG KA13E2-1 DO Turnkey Plant Name Country Tocopilla Technology: CHP: Combined Heat & Power Generation G: Generator / electricity generation IGCC: Integrated Gasification Combined Cycle Application: AL: Aluminium Smelter CHE: Chemical Industry DESAL: Desalination DH: District Heating I&S: Iron and Steel O&G: Oil and Gas PC: Petro-Chemical PG: Power Generation PP: Pulp & Paper, Paper Mill Block type: OCCPT: Other Combined Cycle Plant Type ICS: Integrated Cycle Solution Main Fuel: BFG: Blast Furnace Gas CO: Crude Oil DO: Distillate oil / Diesel / Light oil / Oil #2 HO: Heavy Oil NG: Natural Gas NPT: Naphta SG: Synthetic gas / syngas RO: Residual oil Scope Scope: ST: Steam Turbine GT: Gas Turbine HRSG: Heat Recovery Steam Generator EL: Electrical I&C: Instrumentation & Control WSC: Water Steam Cycle Plant Name Country Order Date Plant Output [MW] Number of blocks Technology Application Block type Main Fuel RDK Karlsruhe 4S Germany 12/1995 360 1 Repowering PG KA26-1 NG Turnkey Tarragona Spain 12/1995 70 1 G PG OCCPT NG Turnkey Termobarranquilla Colombia 12/1995 750 1 G PG KA11N2-2/3 NG Turnkey Bundang II Korea 12/1994 320 1 CHP DH KA11N-3 NG GT+ST+HRSG GUD-Anlage Ludwigshafen RWE / BASF Germany 12/1994 390 1 CHP Che KA13E2-2 NG Turnkey Kuala Langat Malaysia 12/1994 670 1 G PG KA13E2-3 NG Turnkey Lumut A + B Malaysia 12/1994 1300 2 G PG KA13E2-3 NG Turnkey Map Ta Phut 1 Thailand 12/1994 153 1 G PG OCCPT NG Turnkey Muara Tawar CC Indonesia 12/1994 950 2 G PG KA13E2-3 NG Turnkey South Humber Bank I United Kingdom 12/1994 750 1 G PG KA13E2-3 NG Turnkey Diemen 33 Netherlands 12/1993 240 1 CHP DH KA13E2-1 NG Turnkey HKW Berlin Mitte Germany 12/1993 380 1 CHP DH KA13E2-2 NG Turnkey Shunde Canada 12/1993 280 1 CHP PC KA13D-2 HO Turnkey Barking Reach United Kingdom 12/1992 600 1 G PG OCCPT NG Turnkey, excl. Civil Works & Balance of Plant Connah’s Quay United Kingdom 12/1992 1452 4 G PG OCCPT NG Turnkey Deep United Arab Emirates 12/1992 135 1 G AL KA13D-1 NG Turnkey Eems The Netherlands 12/1992 1775 5 G PG OCCPT NG Turnkey Foshan China 12/1992 280 1 CHP PC KA13D-2 HO Turnkey Gandhar India 12/1992 657 1 G PG KA13E-3 NG Turnkey Kot Addu Pakistan 12/1992 686 2 Add-on PG OCCPT RO Turnkey Lage Weide 6 The Netherlands 12/1992 248 1 CHP DH KA13E2-1 NG Turnkey Lakewood USA 12/1992 236 1 CHP KA11N-2 DO Turnkey Limay Bataan A/B Philippines 12/1992 680 2 G PG KA11N-3 NG Turnkey Shantou 1 China 12/1992 103 1 G PG OCCPT CO Turnkey, excl. Civil Works Sousse Tunisia 12/1992 357 1 G PG OCCPT NG Turnkey, excl. Civil Works Black Point China 12/1992 2496 8 G PG OCCPT NG Turnkey Brigg United Kingdom 12/1991 240 2 Add-on PG OCCPT DO Turnkey Chania Greece 12/1991 134 1 G PG KA8-2 DO Turnkey Deeside United Kingdom 12/1991 498 1 G PG KA13E2-2 NG Turnkey Technology: CHP: Combined Heat & Power Generation G: Generator / electricity generation IGCC: Integrated Gasification Combined Cycle Application: AL: Aluminium Smelter CHE: Chemical Industry DESAL: Desalination DH: District Heating I&S: Iron and Steel O&G: Oil and Gas PC: Petro-Chemical PG: Power Generation PP: Pulp & Paper, Paper Mill Block type: OCCPT: Other Combined Cycle Plant Type ICS: Integrated Cycle Solution Main Fuel: BFG: Blast Furnace Gas CO: Crude Oil DO: Distillate oil / Diesel / Light oil / Oil #2 HO: Heavy Oil NG: Natural Gas NPT: Naphta SG: Synthetic gas / syngas RO: Residual oil Scope Scope: ST: Steam Turbine GT: Gas Turbine HRSG: Heat Recovery Steam Generator EL: Electrical I&C: Instrumentation & Control WSC: Water Steam Cycle Order Date Plant Output [MW] Number of blocks Technology Application Block type Main Fuel United Kingdom 12/1991 680 1 G PG OCCPT NG Turnkey Orlando USA 12/1991 120 1 CHP KA11N-1 NG GT+ST+HRSG+Engineering Rabigh Saudi Arabia 12/1991 696 2 G PG KA11-4 CO Turnkey Rayong 4 Thailand 12/1991 315 1 G PG OCCPT NG Turnkey Sellafield United Kingdom 12/1991 170 1 G PG OCCPT NG Turnkey Tanjung Priok Indonesia 12/1991 1140 2 G PG KA13E-3 NG Turnkey Alba Bahrain 12/1990 700 2 G AL KA13D-3 NG Turnkey Anyang Korea 12/1990 462 1 CHP DH KA11N-4 NG Turnkey Bundang Korea 12/1990 565 1 CHP DH KA11N-5 NG Turnkey Corby United Kingdom 12/1990 356 1 G PG OCCPT NG Turnkey, excl. Civil Works Kawas Indonesia 12/1990 656 2 G PG OCCPT NG Turnkey Killingholme A United Kingdom 12/1990 652 1 G PG KA13E-3 NG Turnkey Massena USA 12/1990 82 1 G PG KA8-1 NG GT+ST+HRSG+Engineering Shenzhen China 12/1990 101 1 G PG OCCPT CO Turnkey, excl. Civil Works Zhuhai China 12/1990 100 1 G PG OCCPT CO Turnkey, excl. Civil Works Damietta 1/2/3 Egypt 12/1989 138 1 Add-on PG OCCPT NG Turnkey Rayong 1/3 Thailand 12/1989 945 3 G PG OCCPT NG Turnkey Roosecote United Kingdom 12/1989 224 1 G PG KA13E-1 NG Turnkey Tung Hsiao 4/5 Taiwan 12/1989 660 2 G PG KA11N-3 NG Turnkey Hopewell USA 12/1988 356 1 CHP Che KA11N-3 HO Turnkey Kalaeloa USA 12/1988 200 1 CHP Refinery KA11N-2 HO Turnkey Anta India 12/1987 414 1 G PG KA13D-3 NG Turnkey Elmwood Park USA 12/1987 68 1 CHP PP KA8-1 NG Turnkey Hazleton USA 12/1987 135 1 CHP Che KA11-1 SG Turnkey Purmerend The Netherlands 12/1987 70 1 CHP DH KA8-1 NG Turnkey Galileistraat The Netherlands 12/1986 222 1 CHP DH KA8-3 NG Turnkey Hemweg 7/8 The Netherlands 12/1986 600 1 Repowering DH KA13E-1 NG GT+ST+Engineering Merwedekanaal Unit No 12 (MK 12) The Netherlands 12/1986 226 1 CHP DH KA13E-1 NG Turnkey Placerita / AES Placerita USA 12/1986 106 1 CHP O&G KA8-2 NG Turnkey Plant Name Country Little Barford C Technology: CHP: Combined Heat & Power Generation G: Generator / electricity generation IGCC: Integrated Gasification Combined Cycle Application: AL: Aluminium Smelter CHE: Chemical Industry DESAL: Desalination DH: District Heating I&S: Iron and Steel O&G: Oil and Gas PC: Petro-Chemical PG: Power Generation PP: Pulp & Paper, Paper Mill Block type: OCCPT: Other Combined Cycle Plant Type ICS: Integrated Cycle Solution Main Fuel: BFG: Blast Furnace Gas CO: Crude Oil DO: Distillate oil / Diesel / Light oil / Oil #2 HO: Heavy Oil NG: Natural Gas NPT: Naphta SG: Synthetic gas / syngas RO: Residual oil Scope Scope: ST: Steam Turbine GT: Gas Turbine HRSG: Heat Recovery Steam Generator EL: Electrical I&C: Instrumentation & Control WSC: Water Steam Cycle Order Date Plant Output [MW] Number of blocks Technology Application Block type Main Fuel China 12/1986 111 1 G PG OCCPT CO Turnkey, excl. Civil Works Almere The Netherlands 12/1985 69 1 CHP DH KA8-1 NG Turnkey Kabul 3/4 Afghanistan 12/1985 85 1 G PG KA9-2 DO Turnkey Trakya 1/2 Turkey 12/1985 600 2 G PG KA13D-2 NG Turnkey Trakya 3/4 Turkey 12/1985 600 2 G PG KA13D-2 NG Turnkey Leiden The Netherlands 12/1984 92 1 Repowering PG OCCPT NG ST+Engineering El Ameriya Egypt 12/1983 46 1 G PC KA9-1 NG Turnkey Paka Malaysia 12/1983 954 3 G PG OCCPT NG Turnkey Merwedekanaal Unit No 11 (MK 11) The Netherlands 12/1981 112 1 CHP DH KA9-2 NG Turnkey Lujan de Cuyo Argentina 12/1980 81 1 G PG KA9-2 NG Turnkey Hagen Kabel Germany 12/1979 230 1 CHP Che KA13D-2 NG Turnkey Tung Hsiao 3 Taiwan 12/1979 273 1 G PG KA11-3 NG Turnkey Korneuburg B Austria 12/1977 128 1 G PG KA13D-1 NG Turnkey Merwedekanaal Unit No 10 (MK 10) The Netherlands 12/1977 100 1 Repowering CHP DH KA9-2 NG GT+ST+Engineering Donge The Netherlands 12/1972 118 1 G PG KA13D-1 NG GT+ST+HRSG+Engineering Lage Weide 5 The Netherlands 12/1972 270 1 Repowering DH KA11-1 NG GT+Engineering Lausward E Germany 12/1972 445 1 Repowering PG KA13-2 NG GT+ST+Engineering Hüls KW 3 Germany 12/1970 165 1 G PG KA13-2 NG Turnkey Robert Frank Germany 12/1970 510 1 G PG KA13-1 NG Turnkey Dudelange Luxembourg 12/1954 19 1 G PG KA12-1 BFG GT+ST+HRSG+Engineering Plant Name Country Shantou 2 Technology: CHP: Combined Heat & Power Generation G: Generator / electricity generation IGCC: Integrated Gasification Combined Cycle Application: AL: Aluminium Smelter CHE: Chemical Industry DESAL: Desalination DH: District Heating I&S: Iron and Steel O&G: Oil and Gas PC: Petro-Chemical PG: Power Generation PP: Pulp & Paper, Paper Mill Block type: OCCPT: Other Combined Cycle Plant Type ICS: Integrated Cycle Solution Main Fuel: BFG: Blast Furnace Gas CO: Crude Oil DO: Distillate oil / Diesel / Light oil / Oil #2 HO: Heavy Oil NG: Natural Gas NPT: Naphta SG: Synthetic gas / syngas RO: Residual oil Scope Scope: ST: Steam Turbine GT: Gas Turbine HRSG: Heat Recovery Steam Generator EL: Electrical I&C: Instrumentation & Control WSC: Water Steam Cycle Alstom Power PT-PE/BGENE/CCPPRL08/eng/PPS/ 12.08/FR/6557 © - ALSTOM 2007. ALSTOM, the ALSTOM logo and any alternative version thereof are trademarks and service marks of ALSTOM. The other names mentioned, registered or not, are the property of their respective companies. The technical and other data contained in this document is provided for information only. Neither ALSTOM, its officers and employees accept responsibility for or should be taken as making any representation or warranty (whether express or implied) as to the accuracy or completeness of such data or the achievement of any projected performance criteria where these are indicated. ALSTOM reserves the right to revise or change this data at any time without further notice. Allready - 500 385 489 rcs Lyon www.power.alstom.com
© Copyright 2026 Paperzz