Combined-cycle power plant references

COMBINED-CYCLE POWER PLANT
REFERENCES
POWER
Alstom Profile
Alstom designs, manufactures and supplies the broadest range of products, systems and services in the power generation
industry. We are world leaders in power generation, active in coal, conventional islands for nuclear energy, gas, wind and
hydro power plants. We also provide products and services for industry, from small gas and steam turbines to air quality
control systems.
Our Plant Integrator™ concept maximises performance, while our extensive range of environmental products and
solutions enable us to supply cleaner power than ever before. It all adds up to real added-value for our customers.
Integrated power solutions
Clean power specialist
The Plant Integrator™ concept is Alstom’s unique way of creating
more value for customers. We combine outstanding expertise at a
component and plant level, as we are both an equipment designer and
manufacturer. In addition, we are an Engineering, Procurement and
Construction (EPC) contractor with proven worldwide references.
Through close collaboration, we guarantee that our customers meet
their business objectives and serve their market more effectively. There
are four Plant Integrator™ factors, which help increase the Net
Present Value for the customer.
With our help, Alstom customers are meeting the challenge of limiting
CO 2 and traditional pollutants while maintaining power plant
economics, resulting in a more affordable energy price to consumers.
Plant Integrator™
Factors
Customer benefits
INVESTMENT
Optimised capital investment
LEAD-TIME
Shorter lead-times to produce electricity faster
PERFORMANCE
Higher plant ef ficiency for increased power output
at a wide range of operational modes
Reduced emissions to meet environmental concerns
Lower Operating & Maintenance (O&M) costs
AVAILABILITY & FLEXIBILITY
Better reliability, availability and flexibility
RETROFIT
Better plant economics through Integrated Retrofit
Solutions
LIFE EXTENSION
Extended plant life options
As demand for energy continues to grow, Alstom helps our customers
build a balanced portfolio of power plants utilizing a full range of
energy sources: including fossil fuels, hydro, nuclear and wind.
In its role as Plant Integrator™ specialist, Alstom is the only service
provider designing and manufacturing all of the various components
that make up a power plant – from turbines and turbogenerators, to
boilers and air quality control systems.
INNOVATIVE POLICY TO PROTECT THE SURROUNDING ENVIRONMENT OF A
PLANT
Alstom conducts innovative research to dramatically reduce the
environmental impact of its plants. Significant progress in performance
and efficiency, as well as breakthroughs in technological developments,
contribute to the minimisation of a plant's footprint, including noise
and visual impact.
PROVEN EXPERTISE IN STATE-OF-THE-ART CLEAN POWER SOLUTIONS
The world is demanding immediate environmental action and Alstom
technologies are delivering those solutions today. At Alstom we
encourage the use of all available resources to help our customers
achieve a balanced mix of energy. Our comprehensive range of
products helps minimise the emissions of CO2 and other traditional
pollutants. That includes every type of resource for new and installed
power plant fleets, including plants that were not designed by Alstom.
CUSTOMER BENEFITS
outstanding availability
● short lead-time
● quick return on investment
● environmental excellence
●
Flexible plants, proven technology
& components
CLEAN INTEGRATED GAS SOLUTIONS
In today's competitive market place, there has never been a greater need to optimise the power plant's total
life-cycle costs, whilst ensuring the preservation of the environment. Based on decades of experience in turnkey
gas fired projects, Alstom offers a comprehensive range of solutions with applications for heat and power
generation.
Alstom’s offer also covers special applications like :
●
power augmentation
●
repowering (conversion of steam plants into combined-cycle power plants)
●
cogeneration (for district heating, industrial processes or desalination applications)
●
add-ons (conversion of gas turbine plants into combined-cycle power plants).
THE WORLD’S LARGEST PORTFOLIO OF
TECHNOLOGIES & SERVICES
KEY FIGURES
●
●
●
Over 200 gas plants delivered
worldwide
●
Over 200 combined-cycle references in the
five continents in 50 countries
●
Our GT24/GT26 fleet is approaching three
million fired hours
●
Best practice project management
methodologies
●
Engineering, Procurement & Construction
(EPC) expertise.
100 GW installed
20 projects over 1 GW
Our plants meet environmental
standards, today and tomorrow
and we keep them competitive by
offering state-of-the-art clean air
technology
YOUR BENEFITS
●
Optimised plant
●
Proven and integrated
components & solutions
●
State-of-the-art technology
●
Optimised installation time
●
High performance
●
Attractive part load efficiency
●
Low emissions at any load
●
High operational flexibility
●
High fuel flexibility
●
High reliability and availability
●
High degree of automation
Custom-made & optimised
power solutions
CARTAGENA – SPAIN
SHOREHAM – ENGLAND
KA26-1 - 3 x 400 MW
Customer: Gas Natural
In commercial operation since 2005
KA26-1 - 1 x 400 MW
Customer: South Coast Power Ltd (SCPL)
In commercial operation since 2001
High efficiency over wide load range
Low emissions & maximum
operational flexibility due to sequential
combustion
● Three GT26 based single shaft units
● Associated O&M contract
●
●
●
Fast track in a small
space
Environmental and conservation
efforts maximised to mitigate the
impact of the power station (shingle
area created)
● Remarkable architecture
KWINANA – AUSTRALIA
TARANAKI – NEW ZEALAND
KA13E2-1 - 320 MW
Customer: NewGen Power Kwinana
Partnership Limited
In commercial operation since 2008
KA26-1 - 1 x 360 MW
Customer: Contact Energy Ltd.
In commercial operation since 1998
Second KA26-1 singleshaft installation in the
deregulated UK market
Western Australia's most modern and
efficient base-load power station
● Uses seawater from Cockburn Sound
Extended lifetime of
for cooling rather than valuable fresh
power, productivity
water : plant’s daily consumption of
& profit
fresh water reduced by an advanced
recycling method implemented for plant liquid effluents (boiler drains)
First Single Shaft Power Plant with
advanced GT26 gas turbine
● Turnkey project achieving optimal
project time
● GT26 Fleet Leader with over 58,000
New Zealand’s first IPP
fired hours
● 6-year initial Alstom Operation and
Maintenance contract, then followed by another 6-year extension
contract
KUALA LANGAT – MALAYSIA
KAENG KHOI 2 – THAILAND
KA13E2-3 - 1 x 670 MW
Customer: Genting Sanyen Power Sdn Bhd
In commercial operation since 1995
KA26-2 - 2 x 760 MW
Customer: Gulf Power Generation
Company Ltd.
In commercial operation since 2008
●
●
One of the most efficient power plants
in Malaysia
● Brought into commercial operation
3 months ahead of schedule
● The first and only power plant in
Malaysia to provide its own water
supply and to supply steam to another
industry
●
Proven operational capability to burn
natural gas with high inert content.
● Easy burner adjustments for future
changes in gas composition
● Full EPC supply
● Site location in a valley requiring low
emissions
●
The first combined-cycle
cogeneration facility in
Malaysia
DK6 – FRANCE
CSA – BRAZIL
2 x KA13E2-1 - 2 x 400 MW
Customer: DK6 (ARCELOR/Gaz de France)
In commercial operation since 2005
KA11N2-2 LBtu - 490 MW
Customer: Companhia Siderurgica do
Atlantico
Under construction
Alstom is a specialist in utilising steel
mill gas in combined-cycles
● Flexible & efficient power production:
- possible arbitrage between natural
A challenge and a new
gas & electricity prices
approach to electricity
- fired on natural gas and coke oven &
production
blast furnace gas from adjacent steel
mill, thus creating economic benefits
for conventional thermal plant from steelworks gas
● High operational flexibility thanks to Fresh Air System Technology
●
Key part of the
country’s power sector
strategy
Captures low Btu wastes & steam
from a blast furnace installation to
provide electricity comparable to a
A new power plant with
utility size power plant
economic and
● A new power plant co-located with a
environmental benefits
steel mill to provide 490 MW for
consumption at the facility and on the local power grid using waste
blast furnace gas and heat scavenged from the iron smelting and
coke making process
●
Alstom Power
PT-PE/BPROB/CCPPRB08/eng/PPS/
12.08/FR/6555
© - ALSTOM 2007. ALSTOM, the ALSTOM logo and
any alternative version thereof are trademarks and
service marks of ALSTOM. The other names
mentioned, registered or not, are the property of
their respective companies. The technical and other
data contained in this document is provided for
information only. Neither ALSTOM, its officers and
employees accept responsibility for or should be
taken as making any representation or warranty
(whether express or implied) as to the accuracy or
completeness of such data or the achievement of
any projected performance criteria where these are
indicated. ALSTOM reserves the right to revise or
change this data at any time without further notice.
Allready - 500 385 489 rcs Lyon
www.power.alstom.com
COMBINED-CYCLE
POWER PLANT
REFERENCES
Alstom, always the best choice
In today's competitive market
place, there has never been a
greater need to optimise the
power plant's total life-cycle
costs, whilst ensuring the preservation of the environment.
FULL RANGE OF GAS TURBINES
●
simple cycle
●
combined cycle
●
retrofit
INTEGRATED POWER SOLUTIONS
Based on decades of experience in turnkey gas fired
projects, Alstom offers a comprehensive range of solutions
with applications for heat and
power generation.
●
optimised investment and operating costs
●
higher fuel efficiency and flexibility
●
lower emissions
●
shorter lead times
●
high reliability and availability
●
high degree of automation
●
plant life extension
UNIQUE VALUE-ADDING CAPABILITIES
●
comprehensive technology and service portfolio
●
best practice project management methodologies,
●
Engineering, Procurement and Construction (EPC) expertise
TAILORED SCOPE OF SUPPLIES AND SERVICES
●
from single component to power island and complete plant
●
from design up to full turnkey with civil works and Operation & Maintenance
(O&M) contracts
POWER
Order
Date
Plant
Output [MW]
Number
of blocks
Technology
Application
Block type
Main Fuel
Spain
10/2008
420
1
G
PG
KA26-1
NG
Turnkey
Ghannouch
Tunisia
06/2008
400
1
G
PG
KA26-1
NG
Turnkey
Muara Tawar 5
Indonesia
06/2008
235
1
G
PG
KA13E2-1
NG
Turnkey
Combigolfe
France
12/2007
420
1
G
PG
KA26-1
NG
Turnkey
Fujairah Phase 2
United Arab Emirates
12/2007
2000
3
CHP
DESAL
KA26-2/1
NG
Turnkey
Flevocentrale
The Netherlands
10/2007
870
2
G
PG
KA26-1
NG
Turnkey
Staythorpe
United Kingdom
08/2007
1650
4
G
PG
KA26-1
NG
Turnkey
Aghada
Ireland
06/2007
430
1
G
PG
KA26-1
NG
Turnkey
Grain
United Kingdom
05/2007
1275
3
CHP
PG
KA26-1
NG
Turnkey
Utran
India
05/2007
370
1
G
PG
KA26-1
NG
Turnkey
Moscow TPP26
Russia
01/2007
424.6
1
CHP
DH
KA26-1
NG
Turnkey
Nhon Trach 1 CCPP
Vietnam
12/2006
467.9
1
G
PG
KA13E2-2
NG
Power Island
KW Emsland
Germany
12/2006
840
1
G
PG
KA26-2 ICS
NG
Turnkey
CSA - Power Plant
Brazil
11/2006
477.3
1
G
I&S
KA11N2-2
BFG
Turnkey
CyCoFos
France
08/2006
420
1
G
PG
KA26-1
NG
Turnkey
Soto de la Ribera 4
Spain
07/2006
420
1
G
PG
KA26-1
NG
Turnkey
Malaga
Spain
07/2006
420
1
G
PG
KA26-1
NG
Turnkey
Tallawarra
Australia
06/2006
420
1
G
PG
KA26-1
NG
Turnkey
Langage
United Kingdom
06/2006
885
1
G
PG
KA26-2 ICS
NG
Turnkey
Modugno
Italy
05/2006
810
1
G
PG
KA26-2
NG
Turnkey
Scandale
Italy
03/2006
820
2
CHP
PG
KA26-1
NG
Power Island
Gissi
Italy
01/2006
820
2
G
PG
KA26-1
NG
Turnkey
United Arab Emirates
01/2006
430
1
G
AL
KA13E2-2
NG
Turnkey
Castejón 2
Spain
12/2005
400
1
G
PG
KA26-1
NG
Turnkey
Sohar APP
Oman
12/2005
1000
2
G
AL
KA13E2-2
NG
Turnkey
Kwinana
Australia
12/2005
320
1
G
PG
KA13E2-1
DO
Turnkey
Aluar Extension II
Argentina
09/2005
465
1
G
AL
KA13E2-2
NG
Turnkey
Keppel Merlimau
Singapore
03/2005
500
1
CHP
Che
KA13E2-2
NG
Turnkey
Kaeng Khoi 2
Thailand
11/2004
1520
2
G
PG
KA26-2
NG
Turnkey
Plant Name
Country
Soto de la Ribera 5
Dubal
PP Ext. CCPP 22
Technology:
CHP: Combined Heat & Power Generation
G: Generator / electricity generation
IGCC: Integrated Gasification Combined Cycle
Application:
AL: Aluminium Smelter
CHE: Chemical Industry
DESAL: Desalination
DH: District Heating
I&S: Iron and Steel
O&G: Oil and Gas
PC: Petro-Chemical
PG: Power Generation
PP: Pulp & Paper, Paper Mill
Block type:
OCCPT: Other Combined Cycle Plant Type
ICS: Integrated Cycle Solution
Main Fuel:
BFG: Blast Furnace Gas
CO: Crude Oil
DO: Distillate oil / Diesel / Light oil / Oil #2
HO: Heavy Oil
NG: Natural Gas
NPT: Naphta
SG: Synthetic gas / syngas
RO: Residual oil
Scope
Scope:
ST: Steam Turbine
GT: Gas Turbine
HRSG: Heat Recovery Steam Generator
EL: Electrical
I&C: Instrumentation & Control
WSC: Water Steam Cycle
Order
Date
Plant
Output [MW]
Number
of blocks
Technology
Application
Block type
Main Fuel
Spain
12/2003
1200
3
G
PG
KA26-1
NG
Turnkey
Phu My 2.1 Ext. Add-on
Vietnam
10/2003
170
1
Add-on
PG
OCCPT
NG
Turnkey
Gautami
India
09/2003
469
1
G
PG
KA13E2-2
NG
Turnkey
Kestrel
United Arab Emirates
06/2003
125
1
Add-on
AL
OCCPT
NG
Turnkey
Jegurupadu Extension
India
06/2003
228
1
G
PG
KA13E2-1
NG
Turnkey
Okpai Phase 2
Nigeria
06/2003
163.5
1
Add-on
PG
KA13E2-2
NG
Turnkey
Alba 4
Bahrain
06/2003
650
2
G
AL
KA13E2-2
NG
Turnkey
Eskol
Israel
12/2002
141
1
Add-on
PG
OCCPT
NG
Turnkey
Alon Tabor
Israel
12/2002
133
1
Add-on
PG
OCCPT
NG
Turnkey
Phu My 4
Vietnam
06/2002
450
1
G
PG
KA13E2-2
NG
Turnkey
Dunkerque DK6
France
04/2002
800
2
G
I&S
KA13E2-1
NG
Turnkey
Nehuenco II
Chile
02/2002
135
1
Add-on
PG
OCCPT
NG
Turnkey
Al Hidd II
Bahrain
09/2001
630
1
CHP
DESAL
KA13E2-3
NG
Turnkey
Termorio
Brazil
08/2001
1000
3
CHP
PC
KA11N2-2
NG
Turnkey
Cockburn
Australia
08/2001
240
1
G
PG
KA13E2-1
NG
Turnkey
Phu My 2.1 Add-on
Vietnam
03/2001
456
1
Add-on
PG
KA13E2-2
NG
Turnkey
Senoko Phase 2
Singapore
03/2001
740
2
Repowering
PG
KA26-1
NG
Turnkey
Hagit 7
Israel
02/2001
110
1
Add-on
PG
OCCPT
DO
Turnkey
Hagit 8
Isral
02/2001
110
1
Add-on
PG
OCCPT
DO
Turnkey
Bang Bo
Thailand
11/2000
350
1
G
PG
KA26-1
NG
Turnkey
Perlis
Malaysia
11/2000
650
1
G
PG
KA13E2-3
NG
Turnkey
Ringsend
Ireland
10/2000
380
1
G
PG
KA26-1
NG
Turnkey
Son Reus
Spain
10/2000
226
1
G
PG
KA8C-3
DO
Turnkey
Lumut 3
Malaysia
10/2000
650
1
G
PG
KA13E2-3
NG
Turnkey
Valle de Mexico
Mexico
08/2000
420
1
Repowering
PG
KA11N2-3
NG
Turnkey
Termobahia
Brazil
07/2000
185
1
CHP
PC
KA24-1
NG
Turnkey
Swanbank
Australia
06/2000
400
1
G
PG
KA26-1
NG
Turnkey
Hazira
India
06/2000
160
1
G
PG
KA8C2-2
NG
Turnkey
Kelanitissa
Sri Lanka
05/2000
165
1
G
PG
OCCPT
NPT
ST+generator+WSC+EL+I&C
Plant Name
Country
Cartagena
Technology:
CHP: Combined Heat & Power Generation
G: Generator / electricity generation
IGCC: Integrated Gasification Combined Cycle
Application:
AL: Aluminium Smelter
CHE: Chemical Industry
DESAL: Desalination
DH: District Heating
I&S: Iron and Steel
O&G: Oil and Gas
PC: Petro-Chemical
PG: Power Generation
PP: Pulp & Paper, Paper Mill
Block type:
OCCPT: Other Combined Cycle Plant Type
ICS: Integrated Cycle Solution
Main Fuel:
BFG: Blast Furnace Gas
CO: Crude Oil
DO: Distillate oil / Diesel / Light oil / Oil #2
HO: Heavy Oil
NG: Natural Gas
NPT: Naphta
SG: Synthetic gas / syngas
RO: Residual oil
Scope
Scope:
ST: Steam Turbine
GT: Gas Turbine
HRSG: Heat Recovery Steam Generator
EL: Electrical
I&C: Instrumentation & Control
WSC: Water Steam Cycle
Plant Name
Country
Order
Date
Plant
Output [MW]
Number
of blocks
Technology
Application
Block type
Main Fuel
Monterrey III
Mexico
03/2000
1000
4
G
PG
KA24-1 ICS™
NG
Turnkey
La Paloma
USA
03/2000
1000
4
G
PG
KA24-1 ICS™
NG
Turnkey
Bowin II
Thailand
02/2000
750
2
G
PG
KA26-1
NG
Turnkey
Castejon
Spain
01/2000
400
1
G
PG
KA26-1
NG
Turnkey
Agawam
USA
01/2000
279
1
G
PG
KA24-1 ICS™
NG
Power Island
Shoreham
United Kingdom
01/2000
400
1
G
PG
KA26-1
NG
Turnkey
Sakra Cogeneration
Singapore
12/1999
810
1
CHP
OCCPT
NG
Turnkey
Bellingham
USA
12/1999
530
2
G
PG
KA24-1 ICS™
NG
Turnkey
Midlothian Extension
USA
12/1999
480
2
G
PG
KA24-1 ICS™
NG
Turnkey
Hays County
USA
12/1999
1100
4
G
PG
KA24-1 ICS™
NG
Turnkey
Bèsos
Spain
12/1999
800
2
G
PG
KA26-1
NG
Turnkey
San Roque
Spain
11/1999
800
2
G
PG
KA26-1
NG
Turnkey
Hermosillo
Mexico
08/1999
253
1
G
PG
KA24-1 ICS™
NG
Turnkey
Bayside
Canada
06/1999
265
1
Repowering
PG
KA24-1
NG
Turnkey
Lake Road
USA
06/1999
792
3
G
PG
KA24-1 ICS™
NG
Turnkey
Blackstone
USA
06/1999
550
2
G
PG
KA24-1 ICS™
NG
Turnkey
Rosarito III
Mexico
06/1999
540
2
G
PG
KA24-1 ICS™
NG
Turnkey
Pelican Point
Australia
04/1999
480
1
G
PG
KA13E2-2
NG
Turnkey
Rades
Tunisia
04/1999
473
1
G
PG
OCCPT
NG
Turnkey
Milford
USA
03/1999
530
2
G
PG
KA24-1 ICS™
NG
Turnkey
Senoko Phase 1
Singapore
03/1999
360
1
Repowering
PG
KA26-1
NG
Turnkey
Chiba
Japan
01/1999
400
1
G
PG
KA26-1
NG
Power Island
Coryton
United Kingdom
01/1999
775
1
G
PG
KA26-2
NG
Power Island
Jebel Ali “E”
United Arab Emirates
12/1998
125
1
Add-on
PG
OCCPT
NG
Turnkey
Midlothian
USA
12/1998
1000
4
G
PG
KA24-1 ICS™
NG
Turnkey
Condor
United Arab Emirates
11/1998
125
1
Add-on
PG
OCCPT
NG
Turnkey, excl Civil Works & buildings
Island Cogen
Canada
09/1998
250
1
CHP
PP
KA24-1
NG
Turnkey
Komotini
Greece
09/1998
485
1
G
PG
KA13E2-2
NG
Turnkey
Eschs / Alzette
Luxembourg
07/1998
392
1
G
PG
OCCPT
NG
Turnkey
Technology:
CHP: Combined Heat & Power Generation
G: Generator / electricity generation
IGCC: Integrated Gasification Combined Cycle
Application:
AL: Aluminium Smelter
CHE: Chemical Industry
DESAL: Desalination
DH: District Heating
I&S: Iron and Steel
O&G: Oil and Gas
PC: Petro-Chemical
PG: Power Generation
PP: Pulp & Paper, Paper Mill
Block type:
OCCPT: Other Combined Cycle Plant Type
ICS: Integrated Cycle Solution
Main Fuel:
BFG: Blast Furnace Gas
CO: Crude Oil
DO: Distillate oil / Diesel / Light oil / Oil #2
HO: Heavy Oil
NG: Natural Gas
NPT: Naphta
SG: Synthetic gas / syngas
RO: Residual oil
Scope
Scope:
ST: Steam Turbine
GT: Gas Turbine
HRSG: Heat Recovery Steam Generator
EL: Electrical
I&C: Instrumentation & Control
WSC: Water Steam Cycle
Order
Date
Plant
Output [MW]
Number
of blocks
Technology
Application
Block type
Main Fuel
Chile
05/1998
400
1
G
PG
KA26-1
NG
Turnkey
Monterrey II
Mexico
04/1998
484
2
G
PG
KA24-1 ICS™
NG
Power Island
Winnington
United Kingdom
03/1998
140
1
G
PG
OCCPT
NG
Turnkey
Bangpoo
Thailand
12/1997
125
1
G
PG
OCCPT
NG
Turnkey
Baudour
Belgium
12/1997
339
1
G
PG
OCCPT
NG
Turnkey
Marmara Ereglesi
Turkey
12/1997
480
1
G
PG
KA13E2-2
NG
Turnkey
Nong Khae
Thailand
12/1997
121
1
G
PG
OCCPT
NG
Turnkey
Partington
United Kingdom
12/1997
400
1
G
PG
OCCPT
NG
Turnkey
St Ghislain
Belgium
12/1997
360
1
G
PG
OCCPT
NG
Turnkey
Enfield
United Kingdom
09/1997
396
1
G
PG
KA26-1
NG
Turnkey
Atacama
Chile
08/1997
740
2
G
PG
OCCPT
NG
Turnkey
Hai Fu
Taiwan
07/1997
950
2
G
PG
KA24-2
NG
Turnkey
Dock Sud
Argentina
06/1997
775
1
G
PG
KA26-2
NG
Turnkey
Tung Hsiao 6
Taiwan
04/1997
330
1
G
PG
KA11N2-2
DO
Turnkey
Aluar Puerto Madrin
Argentina
12/1996
120
1
G
PG
OCCPT
NG
Turnkey
Chacheongsao
Thailand
12/1996
210
1
G
PG
OCCPT
NG
Turnkey
Hefei
China
12/1996
116
1
Add-on
PG
OCCPT
DO
Turnkey
Jegurupadu
India
12/1996
235
1
G
PG
KA8C-3
NG
Turnkey
Orsha
Belarus
12/1996
65
1
G
PG
OCCPT
NG
Turnkey
Sengkang
Indonesia
12/1996
137
1
G
PG
KA8C-2
NG
Turnkey
Smurfit Townsend Hook
United Kingdom
12/1996
52
1
G
PG
OCCPT
NG
Turnkey
South Humber Bank II
United Kingdom
12/1996
510
1
G
PG
KA13E2-2
NG
Turnkey
API Falconara IGCC
Italy
12/1996
275
1
IGCC
PC
KA13E2-1
SG
Turnkey
Taranaki
New Zealand
05/1996
360
1
G
PG
KA26-1
NG
Turnkey
Lavrion
Greece
03/1996
550
1
G
PG
OCCPT
NG
Turnkey, excl. Civil Works
Poryong
Korea
01/1996
2021
4
G
PG
KA24-2
NG
GT+ST+HRSG
IP Cogen
Thailand
12/1995
151
2
CHP
Che
KA8C-1
NG
Turnkey
Map Ta Phut 2
Thailand
12/1995
153
1
G
PG
OCCPT
NG
Turnkey
Meishi II
China
12/1995
240
1
G
PG
KA13E2-1
DO
Turnkey
Plant Name
Country
Tocopilla
Technology:
CHP: Combined Heat & Power Generation
G: Generator / electricity generation
IGCC: Integrated Gasification Combined Cycle
Application:
AL: Aluminium Smelter
CHE: Chemical Industry
DESAL: Desalination
DH: District Heating
I&S: Iron and Steel
O&G: Oil and Gas
PC: Petro-Chemical
PG: Power Generation
PP: Pulp & Paper, Paper Mill
Block type:
OCCPT: Other Combined Cycle Plant Type
ICS: Integrated Cycle Solution
Main Fuel:
BFG: Blast Furnace Gas
CO: Crude Oil
DO: Distillate oil / Diesel / Light oil / Oil #2
HO: Heavy Oil
NG: Natural Gas
NPT: Naphta
SG: Synthetic gas / syngas
RO: Residual oil
Scope
Scope:
ST: Steam Turbine
GT: Gas Turbine
HRSG: Heat Recovery Steam Generator
EL: Electrical
I&C: Instrumentation & Control
WSC: Water Steam Cycle
Plant Name
Country
Order
Date
Plant
Output [MW]
Number
of blocks
Technology
Application
Block type
Main Fuel
RDK Karlsruhe 4S
Germany
12/1995
360
1
Repowering
PG
KA26-1
NG
Turnkey
Tarragona
Spain
12/1995
70
1
G
PG
OCCPT
NG
Turnkey
Termobarranquilla
Colombia
12/1995
750
1
G
PG
KA11N2-2/3
NG
Turnkey
Bundang II
Korea
12/1994
320
1
CHP
DH
KA11N-3
NG
GT+ST+HRSG
GUD-Anlage Ludwigshafen RWE / BASF
Germany
12/1994
390
1
CHP
Che
KA13E2-2
NG
Turnkey
Kuala Langat
Malaysia
12/1994
670
1
G
PG
KA13E2-3
NG
Turnkey
Lumut A + B
Malaysia
12/1994
1300
2
G
PG
KA13E2-3
NG
Turnkey
Map Ta Phut 1
Thailand
12/1994
153
1
G
PG
OCCPT
NG
Turnkey
Muara Tawar CC
Indonesia
12/1994
950
2
G
PG
KA13E2-3
NG
Turnkey
South Humber Bank I
United Kingdom
12/1994
750
1
G
PG
KA13E2-3
NG
Turnkey
Diemen 33
Netherlands
12/1993
240
1
CHP
DH
KA13E2-1
NG
Turnkey
HKW Berlin Mitte
Germany
12/1993
380
1
CHP
DH
KA13E2-2
NG
Turnkey
Shunde
Canada
12/1993
280
1
CHP
PC
KA13D-2
HO
Turnkey
Barking Reach
United Kingdom
12/1992
600
1
G
PG
OCCPT
NG
Turnkey, excl. Civil Works & Balance of Plant
Connah’s Quay
United Kingdom
12/1992
1452
4
G
PG
OCCPT
NG
Turnkey
Deep
United Arab Emirates
12/1992
135
1
G
AL
KA13D-1
NG
Turnkey
Eems
The Netherlands
12/1992
1775
5
G
PG
OCCPT
NG
Turnkey
Foshan
China
12/1992
280
1
CHP
PC
KA13D-2
HO
Turnkey
Gandhar
India
12/1992
657
1
G
PG
KA13E-3
NG
Turnkey
Kot Addu
Pakistan
12/1992
686
2
Add-on
PG
OCCPT
RO
Turnkey
Lage Weide 6
The Netherlands
12/1992
248
1
CHP
DH
KA13E2-1
NG
Turnkey
Lakewood
USA
12/1992
236
1
CHP
KA11N-2
DO
Turnkey
Limay Bataan A/B
Philippines
12/1992
680
2
G
PG
KA11N-3
NG
Turnkey
Shantou 1
China
12/1992
103
1
G
PG
OCCPT
CO
Turnkey, excl. Civil Works
Sousse
Tunisia
12/1992
357
1
G
PG
OCCPT
NG
Turnkey, excl. Civil Works
Black Point
China
12/1992
2496
8
G
PG
OCCPT
NG
Turnkey
Brigg
United Kingdom
12/1991
240
2
Add-on
PG
OCCPT
DO
Turnkey
Chania
Greece
12/1991
134
1
G
PG
KA8-2
DO
Turnkey
Deeside
United Kingdom
12/1991
498
1
G
PG
KA13E2-2
NG
Turnkey
Technology:
CHP: Combined Heat & Power Generation
G: Generator / electricity generation
IGCC: Integrated Gasification Combined Cycle
Application:
AL: Aluminium Smelter
CHE: Chemical Industry
DESAL: Desalination
DH: District Heating
I&S: Iron and Steel
O&G: Oil and Gas
PC: Petro-Chemical
PG: Power Generation
PP: Pulp & Paper, Paper Mill
Block type:
OCCPT: Other Combined Cycle Plant Type
ICS: Integrated Cycle Solution
Main Fuel:
BFG: Blast Furnace Gas
CO: Crude Oil
DO: Distillate oil / Diesel / Light oil / Oil #2
HO: Heavy Oil
NG: Natural Gas
NPT: Naphta
SG: Synthetic gas / syngas
RO: Residual oil
Scope
Scope:
ST: Steam Turbine
GT: Gas Turbine
HRSG: Heat Recovery Steam Generator
EL: Electrical
I&C: Instrumentation & Control
WSC: Water Steam Cycle
Order
Date
Plant
Output [MW]
Number
of blocks
Technology
Application
Block type
Main Fuel
United Kingdom
12/1991
680
1
G
PG
OCCPT
NG
Turnkey
Orlando
USA
12/1991
120
1
CHP
KA11N-1
NG
GT+ST+HRSG+Engineering
Rabigh
Saudi Arabia
12/1991
696
2
G
PG
KA11-4
CO
Turnkey
Rayong 4
Thailand
12/1991
315
1
G
PG
OCCPT
NG
Turnkey
Sellafield
United Kingdom
12/1991
170
1
G
PG
OCCPT
NG
Turnkey
Tanjung Priok
Indonesia
12/1991
1140
2
G
PG
KA13E-3
NG
Turnkey
Alba
Bahrain
12/1990
700
2
G
AL
KA13D-3
NG
Turnkey
Anyang
Korea
12/1990
462
1
CHP
DH
KA11N-4
NG
Turnkey
Bundang
Korea
12/1990
565
1
CHP
DH
KA11N-5
NG
Turnkey
Corby
United Kingdom
12/1990
356
1
G
PG
OCCPT
NG
Turnkey, excl. Civil Works
Kawas
Indonesia
12/1990
656
2
G
PG
OCCPT
NG
Turnkey
Killingholme A
United Kingdom
12/1990
652
1
G
PG
KA13E-3
NG
Turnkey
Massena
USA
12/1990
82
1
G
PG
KA8-1
NG
GT+ST+HRSG+Engineering
Shenzhen
China
12/1990
101
1
G
PG
OCCPT
CO
Turnkey, excl. Civil Works
Zhuhai
China
12/1990
100
1
G
PG
OCCPT
CO
Turnkey, excl. Civil Works
Damietta 1/2/3
Egypt
12/1989
138
1
Add-on
PG
OCCPT
NG
Turnkey
Rayong 1/3
Thailand
12/1989
945
3
G
PG
OCCPT
NG
Turnkey
Roosecote
United Kingdom
12/1989
224
1
G
PG
KA13E-1
NG
Turnkey
Tung Hsiao 4/5
Taiwan
12/1989
660
2
G
PG
KA11N-3
NG
Turnkey
Hopewell
USA
12/1988
356
1
CHP
Che
KA11N-3
HO
Turnkey
Kalaeloa
USA
12/1988
200
1
CHP
Refinery
KA11N-2
HO
Turnkey
Anta
India
12/1987
414
1
G
PG
KA13D-3
NG
Turnkey
Elmwood Park
USA
12/1987
68
1
CHP
PP
KA8-1
NG
Turnkey
Hazleton
USA
12/1987
135
1
CHP
Che
KA11-1
SG
Turnkey
Purmerend
The Netherlands
12/1987
70
1
CHP
DH
KA8-1
NG
Turnkey
Galileistraat
The Netherlands
12/1986
222
1
CHP
DH
KA8-3
NG
Turnkey
Hemweg 7/8
The Netherlands
12/1986
600
1
Repowering
DH
KA13E-1
NG
GT+ST+Engineering
Merwedekanaal Unit No 12 (MK 12)
The Netherlands
12/1986
226
1
CHP
DH
KA13E-1
NG
Turnkey
Placerita / AES Placerita
USA
12/1986
106
1
CHP
O&G
KA8-2
NG
Turnkey
Plant Name
Country
Little Barford C
Technology:
CHP: Combined Heat & Power Generation
G: Generator / electricity generation
IGCC: Integrated Gasification Combined Cycle
Application:
AL: Aluminium Smelter
CHE: Chemical Industry
DESAL: Desalination
DH: District Heating
I&S: Iron and Steel
O&G: Oil and Gas
PC: Petro-Chemical
PG: Power Generation
PP: Pulp & Paper, Paper Mill
Block type:
OCCPT: Other Combined Cycle Plant Type
ICS: Integrated Cycle Solution
Main Fuel:
BFG: Blast Furnace Gas
CO: Crude Oil
DO: Distillate oil / Diesel / Light oil / Oil #2
HO: Heavy Oil
NG: Natural Gas
NPT: Naphta
SG: Synthetic gas / syngas
RO: Residual oil
Scope
Scope:
ST: Steam Turbine
GT: Gas Turbine
HRSG: Heat Recovery Steam Generator
EL: Electrical
I&C: Instrumentation & Control
WSC: Water Steam Cycle
Order
Date
Plant
Output [MW]
Number
of blocks
Technology
Application
Block type
Main Fuel
China
12/1986
111
1
G
PG
OCCPT
CO
Turnkey, excl. Civil Works
Almere
The Netherlands
12/1985
69
1
CHP
DH
KA8-1
NG
Turnkey
Kabul 3/4
Afghanistan
12/1985
85
1
G
PG
KA9-2
DO
Turnkey
Trakya 1/2
Turkey
12/1985
600
2
G
PG
KA13D-2
NG
Turnkey
Trakya 3/4
Turkey
12/1985
600
2
G
PG
KA13D-2
NG
Turnkey
Leiden
The Netherlands
12/1984
92
1
Repowering
PG
OCCPT
NG
ST+Engineering
El Ameriya
Egypt
12/1983
46
1
G
PC
KA9-1
NG
Turnkey
Paka
Malaysia
12/1983
954
3
G
PG
OCCPT
NG
Turnkey
Merwedekanaal Unit No 11 (MK 11)
The Netherlands
12/1981
112
1
CHP
DH
KA9-2
NG
Turnkey
Lujan de Cuyo
Argentina
12/1980
81
1
G
PG
KA9-2
NG
Turnkey
Hagen Kabel
Germany
12/1979
230
1
CHP
Che
KA13D-2
NG
Turnkey
Tung Hsiao 3
Taiwan
12/1979
273
1
G
PG
KA11-3
NG
Turnkey
Korneuburg B
Austria
12/1977
128
1
G
PG
KA13D-1
NG
Turnkey
Merwedekanaal Unit No 10 (MK 10)
The Netherlands
12/1977
100
1
Repowering CHP
DH
KA9-2
NG
GT+ST+Engineering
Donge
The Netherlands
12/1972
118
1
G
PG
KA13D-1
NG
GT+ST+HRSG+Engineering
Lage Weide 5
The Netherlands
12/1972
270
1
Repowering
DH
KA11-1
NG
GT+Engineering
Lausward E
Germany
12/1972
445
1
Repowering
PG
KA13-2
NG
GT+ST+Engineering
Hüls KW 3
Germany
12/1970
165
1
G
PG
KA13-2
NG
Turnkey
Robert Frank
Germany
12/1970
510
1
G
PG
KA13-1
NG
Turnkey
Dudelange
Luxembourg
12/1954
19
1
G
PG
KA12-1
BFG
GT+ST+HRSG+Engineering
Plant Name
Country
Shantou 2
Technology:
CHP: Combined Heat & Power Generation
G: Generator / electricity generation
IGCC: Integrated Gasification Combined Cycle
Application:
AL: Aluminium Smelter
CHE: Chemical Industry
DESAL: Desalination
DH: District Heating
I&S: Iron and Steel
O&G: Oil and Gas
PC: Petro-Chemical
PG: Power Generation
PP: Pulp & Paper, Paper Mill
Block type:
OCCPT: Other Combined Cycle Plant Type
ICS: Integrated Cycle Solution
Main Fuel:
BFG: Blast Furnace Gas
CO: Crude Oil
DO: Distillate oil / Diesel / Light oil / Oil #2
HO: Heavy Oil
NG: Natural Gas
NPT: Naphta
SG: Synthetic gas / syngas
RO: Residual oil
Scope
Scope:
ST: Steam Turbine
GT: Gas Turbine
HRSG: Heat Recovery Steam Generator
EL: Electrical
I&C: Instrumentation & Control
WSC: Water Steam Cycle
Alstom Power
PT-PE/BGENE/CCPPRL08/eng/PPS/
12.08/FR/6557
© - ALSTOM 2007. ALSTOM, the ALSTOM
logo and any alternative version thereof are
trademarks and service marks of ALSTOM.
The other names mentioned, registered or
not, are the property of their respective
companies. The technical and other data
contained in this document is provided for
information only. Neither ALSTOM, its officers
and employees accept responsibility for or
should be taken as making any representation
or warranty (whether express or implied) as
to the accuracy or completeness of such data
or the achievement of any projected
performance criteria where these are
indicated. ALSTOM reserves the right to revise
or change this data at any time without
further notice.
Allready - 500 385 489 rcs Lyon
www.power.alstom.com