Green Township Department of Public Services Joe Lambing Director of Public Services _______________________________________________________ 6303 Harrison Avenue • Cincinnati, Ohio 45247-7818 (513) 574-8832 • FAX (513) 598-3097 • E-mail: [email protected] • www.greentwp.org NOTICE TO RESIDENTS ON STREETS TO BE REPAIRED AS PART OF THE GREEN TOWNSHIP STREET REHABILITATION PROGRAM Your street is one of fourteen scheduled to be repaired as part of the 2014 Green Township Street Rehabilitation Program. This program takes place in several phases that will begin on or around August 4th, 2014 and should be completed some time in November, weather permitting.Work will begin on your street in the next week or so. As is to be expected with any major construction project, inconveniences will surely have to be dealt with. Green Township and its contractors will work to ensure that these are kept to a minimum. Cooperation between residents, their neighbors, and our contractors will help in minimizing inconveniences and expediting the construction process. CONTRUCTION SCHEDULE: There can be as many as eight phases to the construction process depending on whether your street has curb on it or not, or if your street is constructed of asphalt or concrete. Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8 Repair of concrete curb (if applicable) Removal of existing asphalt pavement surface (if applicable) Pavement repairs, including full depth base repairs and crack and sealing of concrete pavements Installation of leveling course of asphalt Utility adjustments such as the raising of manholes Installation of surface (final) course of asphalt Sealing of asphalt edges along curb & gutter Completion of all items on project punch list The time between the completion of any one phase and the start up of another can vary from three to five weeks. This is due to the fact that the contractor is working on thirteen other streets in addition to yours. RIGHT-OF-WAY: Green Township and its contractors and/or sub-contractors are not responsible for items damaged during the course of construction that are located within the public right-ofway such as invisible dog fences, lawn sprinklers, trees and other plantings. The public right-ofway generally extends 12’ from the back of curb or edge of road. This area includes the grass strip between the street and sidewalk and the sidewalk itself. ____________________________________________________________________ Trustees: Triffon Callos • David Linnenberg • Tony Rosiello • Fiscal Officer: Tom Straus Printed on recycled paper Page 2 Green Township Street Rehabilitation TRAFFIC: One lane of traffic will be maintained throughout construction. While construction operations are in progress traffic may be limited to one-way to ensure the safety of motorists and work crews. Please observe any detours posted and plan your trips accordingly. There may be instances throughout the day where the need arises to block the street for short periods of time. These instances will be limited and kept to a maximum of ten minutes. PARKING: On street parking will be severely limited during those times when crews are actively working on a street. Please comply with no parking signs as they are posted. Those who can park in driveways are asked to do so as to keep on-street parking spaces open for those who lose access to their driveways during curb repair work and construction crews and equipment. CONSTRUCTION HOURS: Construction activity can generally be expected to take place between 7:00 a.m. and 5:00 p.m. weekdays. When paving is taking place crews may work until dark. Weather could dictate that work takes place on Saturdays, but we generally refrain from scheduling weekend work crews. In closing, I wish to reiterate the point that Green Township and its contractors will make every effort to keep inconveniences to a minimum. If you should have any questions please contact the Department of Public Services at 574-8832, weekdays between the hours of 7:00 a.m. and 3:30 p.m. Sincerely, Butch Nanney Assistant Director of Public Services ____________________________________________________________________ Trustees: Triffon Callos • David Linnenberg • Tony Rosiello • Fiscal Officer: Tom Straus Printed on recycled paper
© Copyright 2026 Paperzz