Step 3 Sizing Fleets ©Dr. B. C. Paul 2000 Sizing the Fleet We have a confirmed cycle time Why Don’t we calculate the production and number of Trucks Because things detract from production • • • • • Operators Don’t run all the time Trucks Break Down Loader Breaks Down We fail to utilize all available time Trucks bunch up a create random delays at loader Calculating Production How Many Shifts per Day and how long? How Many Days Per Week? How Weeks Per Year? Quarries often don’t light haul roads • Figure and average of 10 hours/day • Use 6 days a week • Nine Months of the year More Production Calc 10 hours/day * 6 days/week * 42 weeks/year * 60 minutes per hour = 151,200 minutes/year 151,200 / 11.28 minute/cycle = 13404 cycles per year Now factor in labor running vehicles 50 minutes every hour • 13,404 * .83 = 11,125 cycles Production Calculation Next Consider that the Truck will not be Operable all the time • New trucks with close maintenance get about 90 to 95% availability • Quarries with old trucks are lucky to get 65% • 85% was long considered normal for good maintenance but less than ideal conditions Production Continued 11,125 * 0.85 = 9,456 trips per year Now consider that the truck cannot load itself and will not be producing when the loader is down • In the case of multiple loaders the calculation is trickier • Use FEL 85% available More Production 9,456 * 0.85 = 8,038 cycles/year Next Consider Utilized of Available • In real life there are times when equipment and people are available but cannot be used during a pit blast for example • We will assume 95% utilized of available More on Production 8,038 * 0.95 = 7,636 cycles Calculate our draft production per truck (one factor is still missing) • 7,636 * 58 tons = 442,884 To get 1 million tons this implies 3 trucks will be purchased (We might also consider 2 adding a third as the fleet ages) Matching the Number of Trucks to the Number of Loaders If there are too few trucks the loader will sit around idle a lot of time If the first truck can get back to the loader before the other trucks are serviced you have a guaranteed que that will add a fixed delay element to your truck cycle Check for Matched Number Formula is • Truck cycle time / loader service time • The loader service time is the time the loader spends filling a truck and if applicable waiting for it to spot 11.28 / 3 = 3.76 trucks If you have fewer trucks system is called “under trucked” If you have more “over trucked” Working Toward Bunching Evaluation We have 3 trucks so we are slightly under trucked In real life trucks tend to have a distribution of actual cycle times causing them to arrive in bunches at loader The closer the number of trucks is to the maximum allowed the more times you will have idle cycle time waiting in a que Computer Aided Bunching Evaluation One way to check bunching is with full computer simulation • There are special programming languages to allow simulation Cat did extensive simulations and then prepared summary tables of results We can use the Match Factor Tables Calculating Match Factor (No not the Make-Up Company) Formula • #Trucks * loader time / (# loaders * truck cycle time Plug In • 3 * 3 /( 1 * 11.28) = 0.8 Match Factor • Under Trucked Cat Match Factor Table Apply the Match Factor and Recheck Fleet 442,884 tons/truck * 0.9 = 398,596 tons/truck per year With 1 Million tons this does not change the selection of 3 trucks If it had we would have needed to recalculate the number to trucks and loaders and check again Tricks and Considerations There are formulas for truck production that cover these factors in various forms Trick is to count essential information without double accounting • People for example sometimes try to put bunching into utilized of available
© Copyright 2026 Paperzz