CURRICULUM VITAE MECHANICAL / PIPING DESIGN ENGINEER

CURRICULUM VITAE
MECHANICAL / PIPING DESIGN ENGINEER
MOHAMMED HAFEEZ
PHONE : +918019167038
EMAIL : [email protected]
Professional Synopsis:
Having around
2 ½ years of experience in Mechanical Engineer in Pipelines and
Petrochemical industry. Good exposure computer acquaintance. Work methodically and
systematically with a strong task oriented approach maintaining an active sense of urgency with order
and organization; able to use own initiative, to develop strong working relationships, to work under
pressure and to tackle moving and challenging situations.
Skills:











Pipe sizing & Pressure Drop Calculation.
Calculation of Wall thickness, Schedule & Flange Class.
Selection of Piping Material & Components.
Calculation of Branch Reinforcement.
Pipe Span calculation and selection of Supports.
Pipe Rack and Expansion Loop design.
Preparation of Isometric Drawings from Piping Layout.
Preparation of Piping Layout or Piping GA for Critical & Non-Critical Lines
Preparation of BOM / MTO’S.
Equipment, Piping, Structural Modeling, Draft & Isometric Draft Extraction.(PDMS)
Stress Analysis & Flexibility of Piping System by CAESAR-II.
Organizational Experience:
EPC CONTRACTOR:
Client: Project Owner:
Tecnicas Reunidas Gulf Co Limited SABIC
SAUDI KAYAN
http://www.tecnicasreunidas.es/
Place of Work:
Al-Jubail, Saudi Arabia
July 2009- Till Date
1. Project Title
Role
Petrochemical Plant of Saudi Kayan (Phenolics Facilities)
Plant Turnover Engineer
Project Description
The petrochemical plant of Saudi Kayan involves in the production of essential chemical like Cumene,
Phenol and Bis–Phenol. I was responsible for the System/Subsystem wise Plant Turnover/Handover for the
Mechanical facilities to the client. I was involved in various phases of a project like Construction, PreCommissioning. Mechanical Completion and RFISU (Ready for Initial Start Up). The Project Handover was
done in Documentation as well as using a special software called “CO-CONSOLE”, a management tool
regarding Administration , Reporting and Information management during Construction. Pre-Commissioning
and Commissioning.
Responsibilities:


Coordinate with QA/QC. Dept & Pre- commissioning dept.
Involve in Project progress preparation by coordinating with all project disciplines.







Scheduling final system walk downs for overall project & coordinating with Construction and
subcontractors, arrange turnover final walk downs, assign engineers to conduct pre familiarization walk
downs & final turnover walk downs.
Compiling final punch lists and lead walk down teams to P&ID/ISO specifications.
Coordinate with QA/QC activities and issuance of Internal & External punch list by client.
Follow up clearance of proponent and Project inspection punch lists.
Inter-discipline Coordination amongst Piping, Civil/Structural, Electrical, Instrument, Mechanical,
Building on Various information required for issuance of Turnover Package. Consolidate construction
punch list in the data base (Construction Integrated Management System) and update punch
clearing status of all punch raised during construction and pre-commissioning activities to form
a part of Turnover
Conducting Walkthrough with client after mechanical competition system wise. Manage, complete and
compile the required quality verifying documents for each system/sub-system.
Monitor mechanical completion schedule for system and Sub-system based on pre-commissioning &
Commissioning schedule developed by Project Control Manager & Plant Turnover Manager.
Project Exposure:




Got good knowledge and exposure SABIC Standards
Got a very good exposure towards Mechanical works along with Handover procedure also.
The project management consultant and basic engineering design by FLOUR Saudi Arabia Ltd.
Developed good managerial skills.
Company:
Client:
Nasser s. Al-hajri Corporation SABIC
Arabia http://www.alharjricorporation.com/
Project Owner:
SAUDI KAYAN
Place of Work:
Al-Jubail, Kingdom of Saudi
April 09 to July 09
2. Project Title
Role
Petrochemical Plant of SaudiKayan (Phenolics Facilities)
Planning Engineer
Responsibilities:








Prepares schedules, monitors completion of the work carried out and forecasts activities during work.
Referring drawing of supports to perform fabrication.
Above Ground piping supports erecting schedule.
Daily scheduling of fabrication of support as per site condition
Daily making piping support report erection as well as fabrication.
Updating database with isometric drawing with supports details (project management software).
Following drawing as per project design by client issued.
Reports to Project Manager on day to day work progress and request for additional resources to meet
the work load and client site instructions.
Company:
Client:
Nasser s. Al-hajri Corporation
SABIC
http://www.alharjricorporation.com/
Project Owner:
SAUDI KAY
Place of Work:
Al-Jubail, Saudi Arabia
November 08 to April 09
3. Project Title
Role
Petrochemical Plant of SaudiKayan (Phenolics Facilities)
Mechanical Engineer
Responsibilities:



Responsible for site execution activities of involved functions at site.
Under Ground Piping Erection With Manholes, Catch Basin.
Unit Piping installation and Hydro testing.





4.
Making permit (Phenolics project permit receiver member)
Prepare package and ensure hydro-testing process of plant and off plot piping are as per sabic
standards.
Calculating piping length in tonnage.
Spool release as per site condition according to planning.
Making report for pipe supports erected in site and fabricated supports in shops.
Employer
Tenure
Project Title
Role
M/s JK Plastics, Andhra Pradesh
May 2008 to November 2008
JK Plastics manufacturing of plastic items
Mechanical Engineer
Responsibilities:





Maintaining stocks details.
Dispatching the stocks to retail shop
Testing the Quality of the Plastic material.
Getting order from agencies
Distributed day to day work and monitored the service technician’s team.
Software Skills:
PDMS
CAESAR-II
Auto Cad
PRO-E
: Equipment, Piping, Structural Modelling, Draft & Isometric Draft Extraction.
: Stress Analysis of critical lines.
: 2D & Isometric Drawing
: 3D Modelling
Achievements/Awards:


Certified co-console user, Lucy Software BV, Netherlands.
Becoming the plant Turnover Coordinator for all Disciplines in short span.
Personal Traits & Skills :











Preparing Isometrics based on P&ID and plant layout, pipe routing using PDMS.
Pipe support and Rack design.
Flexibility analysis of piping system.
Hydraulic design of Liquid Piping and Pipelines (Pipe sizing, Pump head & power calculations)
Pipe wall thickness calculation.
Very good communication skills in 5 languages(English, Hindi, Urdu, Telegu, Tamil)
Dedicated and strive achieving targets at faster rate
Energetic, results-oriented & extremely committed professional
Strong attention to details & dutiful adherence to compliance in all regulated environment
Good team player
Very much skilled in ms office family
Educational Qualification:

Post Graduation in Piping Design & Engineering with PDMS and CAESAR-II -As per ASME B 31.3.
INDUS GLOBAL ACADEMY OF TECHNICAL EDUCATION-Bangalore, Karnataka.

Bachelor of Technology ( Mechanical Engineering) From JNT University, Andhra Pradesh, India
April 2008.
Personal Profile :
Date of Birth
: 14th Feb 1985
Gender
: Male
Nationality
: Indian
Passport No
: G 7834844
Marital Status
: Single
Current Location
: Chittoor(A.P)
Personal Address
: Available Upon your Request.
References will be provided as per requirement.