CURRICULUM VITAE MECHANICAL / PIPING DESIGN ENGINEER MOHAMMED HAFEEZ PHONE : +918019167038 EMAIL : [email protected] Professional Synopsis: Having around 2 ½ years of experience in Mechanical Engineer in Pipelines and Petrochemical industry. Good exposure computer acquaintance. Work methodically and systematically with a strong task oriented approach maintaining an active sense of urgency with order and organization; able to use own initiative, to develop strong working relationships, to work under pressure and to tackle moving and challenging situations. Skills: Pipe sizing & Pressure Drop Calculation. Calculation of Wall thickness, Schedule & Flange Class. Selection of Piping Material & Components. Calculation of Branch Reinforcement. Pipe Span calculation and selection of Supports. Pipe Rack and Expansion Loop design. Preparation of Isometric Drawings from Piping Layout. Preparation of Piping Layout or Piping GA for Critical & Non-Critical Lines Preparation of BOM / MTO’S. Equipment, Piping, Structural Modeling, Draft & Isometric Draft Extraction.(PDMS) Stress Analysis & Flexibility of Piping System by CAESAR-II. Organizational Experience: EPC CONTRACTOR: Client: Project Owner: Tecnicas Reunidas Gulf Co Limited SABIC SAUDI KAYAN http://www.tecnicasreunidas.es/ Place of Work: Al-Jubail, Saudi Arabia July 2009- Till Date 1. Project Title Role Petrochemical Plant of Saudi Kayan (Phenolics Facilities) Plant Turnover Engineer Project Description The petrochemical plant of Saudi Kayan involves in the production of essential chemical like Cumene, Phenol and Bis–Phenol. I was responsible for the System/Subsystem wise Plant Turnover/Handover for the Mechanical facilities to the client. I was involved in various phases of a project like Construction, PreCommissioning. Mechanical Completion and RFISU (Ready for Initial Start Up). The Project Handover was done in Documentation as well as using a special software called “CO-CONSOLE”, a management tool regarding Administration , Reporting and Information management during Construction. Pre-Commissioning and Commissioning. Responsibilities: Coordinate with QA/QC. Dept & Pre- commissioning dept. Involve in Project progress preparation by coordinating with all project disciplines. Scheduling final system walk downs for overall project & coordinating with Construction and subcontractors, arrange turnover final walk downs, assign engineers to conduct pre familiarization walk downs & final turnover walk downs. Compiling final punch lists and lead walk down teams to P&ID/ISO specifications. Coordinate with QA/QC activities and issuance of Internal & External punch list by client. Follow up clearance of proponent and Project inspection punch lists. Inter-discipline Coordination amongst Piping, Civil/Structural, Electrical, Instrument, Mechanical, Building on Various information required for issuance of Turnover Package. Consolidate construction punch list in the data base (Construction Integrated Management System) and update punch clearing status of all punch raised during construction and pre-commissioning activities to form a part of Turnover Conducting Walkthrough with client after mechanical competition system wise. Manage, complete and compile the required quality verifying documents for each system/sub-system. Monitor mechanical completion schedule for system and Sub-system based on pre-commissioning & Commissioning schedule developed by Project Control Manager & Plant Turnover Manager. Project Exposure: Got good knowledge and exposure SABIC Standards Got a very good exposure towards Mechanical works along with Handover procedure also. The project management consultant and basic engineering design by FLOUR Saudi Arabia Ltd. Developed good managerial skills. Company: Client: Nasser s. Al-hajri Corporation SABIC Arabia http://www.alharjricorporation.com/ Project Owner: SAUDI KAYAN Place of Work: Al-Jubail, Kingdom of Saudi April 09 to July 09 2. Project Title Role Petrochemical Plant of SaudiKayan (Phenolics Facilities) Planning Engineer Responsibilities: Prepares schedules, monitors completion of the work carried out and forecasts activities during work. Referring drawing of supports to perform fabrication. Above Ground piping supports erecting schedule. Daily scheduling of fabrication of support as per site condition Daily making piping support report erection as well as fabrication. Updating database with isometric drawing with supports details (project management software). Following drawing as per project design by client issued. Reports to Project Manager on day to day work progress and request for additional resources to meet the work load and client site instructions. Company: Client: Nasser s. Al-hajri Corporation SABIC http://www.alharjricorporation.com/ Project Owner: SAUDI KAY Place of Work: Al-Jubail, Saudi Arabia November 08 to April 09 3. Project Title Role Petrochemical Plant of SaudiKayan (Phenolics Facilities) Mechanical Engineer Responsibilities: Responsible for site execution activities of involved functions at site. Under Ground Piping Erection With Manholes, Catch Basin. Unit Piping installation and Hydro testing. 4. Making permit (Phenolics project permit receiver member) Prepare package and ensure hydro-testing process of plant and off plot piping are as per sabic standards. Calculating piping length in tonnage. Spool release as per site condition according to planning. Making report for pipe supports erected in site and fabricated supports in shops. Employer Tenure Project Title Role M/s JK Plastics, Andhra Pradesh May 2008 to November 2008 JK Plastics manufacturing of plastic items Mechanical Engineer Responsibilities: Maintaining stocks details. Dispatching the stocks to retail shop Testing the Quality of the Plastic material. Getting order from agencies Distributed day to day work and monitored the service technician’s team. Software Skills: PDMS CAESAR-II Auto Cad PRO-E : Equipment, Piping, Structural Modelling, Draft & Isometric Draft Extraction. : Stress Analysis of critical lines. : 2D & Isometric Drawing : 3D Modelling Achievements/Awards: Certified co-console user, Lucy Software BV, Netherlands. Becoming the plant Turnover Coordinator for all Disciplines in short span. Personal Traits & Skills : Preparing Isometrics based on P&ID and plant layout, pipe routing using PDMS. Pipe support and Rack design. Flexibility analysis of piping system. Hydraulic design of Liquid Piping and Pipelines (Pipe sizing, Pump head & power calculations) Pipe wall thickness calculation. Very good communication skills in 5 languages(English, Hindi, Urdu, Telegu, Tamil) Dedicated and strive achieving targets at faster rate Energetic, results-oriented & extremely committed professional Strong attention to details & dutiful adherence to compliance in all regulated environment Good team player Very much skilled in ms office family Educational Qualification: Post Graduation in Piping Design & Engineering with PDMS and CAESAR-II -As per ASME B 31.3. INDUS GLOBAL ACADEMY OF TECHNICAL EDUCATION-Bangalore, Karnataka. Bachelor of Technology ( Mechanical Engineering) From JNT University, Andhra Pradesh, India April 2008. Personal Profile : Date of Birth : 14th Feb 1985 Gender : Male Nationality : Indian Passport No : G 7834844 Marital Status : Single Current Location : Chittoor(A.P) Personal Address : Available Upon your Request. References will be provided as per requirement.
© Copyright 2026 Paperzz